Access Control Facility
Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- W912DR20R0011
- Agency
- ENDIST Baltimore US Army Corps of Engineers, Department of Defense
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort George G Meade MD 20755 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This project is for the construction of a new 10,000 gross square foot Access Control Facility to support visitor processing for the Department of the Army Corps of Engineers Engineering District Baltimore. Requirements include accommodations for waiting, service counter, offices, security systems, and compliance with DoD antiterrorism standards and the ADA. The facility must achieve LEED Silver certification and comply with energy legislation. This will be a firm fixed price, two-phase design-build project utilizing best value selection procedures. Phase one proposals will be due on or around July 7, 2020.
There is no set-aside designated for this project. The work is anticipated to fall under NAICS codes 237910 for site preparation and 238210 for plumbing, heating, and air-conditioning contractors. As this is for a new facility, there are no incumbent or current contractors. The project scope includes site preparation, demolition of an existing facility, and construction so the overall budget range is likely in the millions of dollars. Low impact development techniques must be incorporated as applicable given the large site changes involved.
Notice text
2 versions
Update #2 · Latest ·
This project includes the construction of a 10,000 gross square foot new Access Control Facility with the capacity to support the processing of visitors per criteria established by the Unified Facilities Criteria (UFC). These requirements include a waiting area, service counter, break room, offices, restrooms, electrical, mechanical and fire alarm/suppression.
The supporting facilities include site preparation, infrastructure improvements, utility services, perimeter security measures, infrastructure for the telecommunication and the physical security system. The site preparation will include standard clearing, grubbing, cut, fill, grading and environmental (sustainable) features. A surface parking lot and the demolition of the existing ACF will also be a part of this project. The new facility will be required to meet the minimum DoD Antiterrorism standards and to meet the requirements of the American Disabilities ACT (ADA). There may be minimal asbestos, lead paint and bio-hazards remediation in the existing ACF building.
The facility is required to be in compliance with the UFC 1-200-02 High Performance and Sustainable Building Requirements, with Change 4 as dated 01 October 2019. This policy includes the Leadership in Energy and Environmental Design (LEED) Silver which requires certification via third party and requires compliance with the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Low Impact Development will be included in the design and construction of this project as appropriate.
This will be a firm fixed priced constrution project utilizing the two phase design build construction selection procedures. The requirement is unrestricted. The soliciation for phase one will be issued on or about 24 July 2020.
Update #1 ·
This project includes the construction of a 10,000 gross square foot new Access Control Facility with the capacity to support the processing of visitors per criteria established by the Unified Facilities Criteria (UFC). These requirements include a waiting area, service counter, break room, offices, restrooms, electrical, mechanical and fire alarm/suppression.
The supporting facilities include site preparation, infrastructure improvements, utility services, perimeter security measures, infrastructure for the telecommunication and the physical security system. The site preparation will include standard clearing, grubbing, cut, fill, grading and environmental (sustainable) features. A surface parking lot and the demolition of the existing ACF will also be a part of this project. The new facility will be required to meet the minimum DoD Antiterrorism standards and to meet the requirements of the American Disabilities ACT (ADA). There may be minimal asbestos, lead paint and bio-hazards remediation in the existing ACF building.
The facility is required to be in compliance with the UFC 1-200-02 High Performance and Sustainable Building Requirements, with Change 4 as dated 01 October 2019. This policy includes the Leadership in Energy and Environmental Design (LEED) Silver which requires certification via third party and requires compliance with the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Low Impact Development will be included in the design and construction of this project as appropriate.
This will be a firm fixed priced constrution project utilizing the two phase design build construction selection procedures. The requirement is unrestricted. The soliciation for phase one will be issued on or about 7 July 2020.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Access Control Facility (ACF) Visitor Center 1 (VC1) | Solicitation | |
| Access Control Facility | Pre-Solicitation | |
| Access Control Facility | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity