A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK)
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- FA8202-18-R-1001
- Agency
- AFLCMC Hill AFB Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Lifecycle Management Center is seeking to procure A-10 Thunderbolt advanced wing continuation kitting assemblies and related engineering services through an indefinite-delivery, indefinite-quantity contract. Key requirements include the production of first article units, low-rate initial production wings, and additional wing assemblies ordered annually or semi-annually. Proposals will be evaluated based on technical approach, past performance on similar wing production programs, and total evaluated price based on pricing tables. The deadline for proposals is June 5, 2018, with evaluations occurring between June 2018 and March 2019 and anticipated contract award by March 25, 2019.
There is no set-aside designation specified. The primary NAICS code is 336413 for aircraft manufacturing with a size standard of 1,250 employees. The incumbent contractor is unspecified. The estimated maximum contract value is $4,653,000 for 112 production units over seven years. Initial orders consist of one first article unit and three low-rate production wings, with an anticipated total production quantity of 109 wing sets valued between $50-100 million to support the A-10 fleet.
Notice text
3 versions
Update #3 · Latest ·
Added: Dec 22, 2017 2:45 pm Modified: Apr 19, 2018 4:39 pmTrack Changes
ATTACK PRE-SOLICITATION SYNOPSIS
FA8202-18-R-1001
Synopsis:
This is not a solicitation but rather a Pre-Solicitation Synopsis as required by FAR 5.204
The purpose of this synopsis is to inform the market that the United States Air Force intends to solicit the A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK), and will negotiate an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a 5-year ordering period, two additional 1-year optional ordering periods, and a 5-year delivery period thereafter. The proposed NAICS Code is 336413 - Transportation Equipment Manufacturing/Other Aircraft Parts and Auxiliary Equipment Manufacturing, size standard of 1250. The PSC code is 1560.
NOTES:
This is not a request for proposal (RFP) or an invitation for bid, nor is it to be construed as a commitment by the Government. The Government does not intend to make an award on the basis of this synopsis.
______________________________________________________________________
Please see attached Sources Sought Document.
Update #2 ·
Added: Feb 08, 2018 4:09 pm
Please find a DRAFT version of the following documents attached:
RFP
Form 260
ATTACK SOW
ATTACK Sections L and M
Price Evaluation Tool
Schedule Incentive
Updated A029 TMCR
Draft Schedule
(All previously uploaded CDRLS, with the exception of the above-noted, have remained unchanged)
Thank you for your interest in our program. These draft documents are being provided to inform contractors of our current way forward. We request any questions or comments to these documents be submitted to the Contracting Office by 23 February 2018, as stated in this posting. Due to potential A-10 groundings, this acquisition is being expedited to the maximum extent possible (see draft schedule). The Government has utilized information from the previous A-10 wing buy and the recently-cancelled DLA TUSK source selection to put together and plan this acquisition. We believe these documents represent a solid requirements package that will help ensure that this aggressive schedule can be realized, with your help.
As always, please contact the Contracting Office with direct questions or concerns. Due to the schedule we are happy to entertain phone calls.
Update #1 ·
Added: Dec 22, 2017 2:45 pm Please see attached Sources Sought Document.
Attachments
Show all 50
This notice has more attachments on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK) | Special Notice | |
| A-10 Thunderbolt Advanced-Wing Continuation Kit (ATTACK) | Award Notice | |
| A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK) | Pre-Solicitation | |
| A-10 Thunderbolt Advanced-Wing Continuation Kitting (ATTACK) | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity