6680--Loch Raven Boiler Fuel Reserve Tank

Closed Solicitation Posted

Solicitation number
36C24526Q0377
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Loch Raven Md Va Medical Center 3901 Loch Raven Blvd, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5, through its Maryland Health Care System, is procuring and installing a 6,000-gallon UL 142 double-wall steel aboveground storage tank to supplement the existing boiler fuel reserve system at the Loch Raven VA Medical Center in Baltimore, Maryland. The procurement includes delivery, installation of 1-inch supply and return fuel piping, integration with the existing Veeder Root TLS-450 Plus monitoring system, installation of six traffic barriers and a 6-foot construction fence, and provision of 1-inch thick steel road plates under tank supports to distribute load. Key contract requirements include SAM.gov registration, manufacturer authorization letters on company letterhead, a complete Buy American Act certificate, and compliance with all relevant safety standards and National Electrical Code requirements. The evaluation criteria include SAM.gov registration status, manufacturer authorization documentation, best value assessment, stated delivery lead times, and Buy American Act compliance certification. The solicitation, numbered 36C24526Q0377, was originally due March 30, 2026, but has been extended to Monday, April 6, 2026, at 12:00 PM Eastern Time, with the contracting officer being Theresa Thomas at theresa.thomas7@va.gov.

This is a 100% total small business set-aside with no incumbent contractor identified in the available documentation. The contract is structured on a firm-fixed-price basis with delivery required within 60 days after receipt of order, though no specific contract value has been disclosed in the solicitation materials. The place of performance is 3901 Loch Raven Boulevard, Baltimore, Maryland 21218, with the tank to be positioned on the existing asphalt drive lane adjacent to the emergency generator, approximately 40 feet from the boiler room. Electrical power for pumps, leak detection, and monitoring equipment will be provided through location G-17 with final connection details to be determined in the field. The facility currently holds an oil storage permit, and the project is designed to enhance the facility's fuel supply reliability while maintaining compatibility with existing infrastructure and monitoring systems.

Notice text

5 versions

Update #5 · Latest ·

AMENDMENT TO SOLICITATION - 36C24526Q0377

It is being added to the STATEMENT OF WORK

**The contractor must provide a 1 thick steel road plates to be placed under the tank supports. Plates to extend out approximately 2 radially from the support to distribute the load.**

B.2 STATEMENT OF WORK

LR Boiler Reserve Fuel Tank

SCOPE OF WORK:

The purpose of this project is to purchase and install a 6,000-gallon reserve fuel tank to support the boiler at the Loch Raven VA property. The fuel tank will supplement the existing reserve fuel tank and be placed on the existing asphalt drive lane adjacent to the emergency generator. The project includes delivery, installation, fuel line connection, and securing the tank area. Delivery and Installation of Fuel Tank: Provide and install a new UL 142 double-wall steel 6,000-gallon, 8 ft diameter skid-mounted aboveground storage tank (AST). The tank will include all required components and fittings such as venting, manway lid, spill bucket, overfill control valve, stick port, visual level gauge, and anti-siphon control. The tank will be white and have all required labels and signage.

Fuel Piping Installation: Install 1-inch supply and return piping with all required valves and fittings.

Support the piping properly and connect it to the existing piping outside the building at the sump.

Fuel Delivery: The owner will provide a fuel delivery to the tank.

Installation of Concrete Barriers: Install six (6) traffic barriers to protect the tank. The barriers will be placed on the asphalt adjacent to the tank and spaced out to provide access to the tank.

Secured Perimeter Installation: Install a 6 ft construction fence around the tank. One section of the fence will be designed to open for tank access.

Integration with Existing Monitoring System:

Install a refurbished probe with a diesel and water float kit.

Install all wiring and conduit in compliance with the manufacturer s recommendations and the National Electric Code.

Install an interstitial sensor in the tank secondary along with all necessary wiring and connections.

Program the existing Veeder Root console to monitor the diesel probe and sensor.

Program the overfill alarm to activate at 90% capacity, providing overfill protection for the new 6,000-gallon diesel tank.

**The contractor must provide a 1 thick steel road plates to be placed under the tank supports. Plates to extend out approximately 2 radially from the support to distribute the load.**

DELIVERABLES:

6,000-Gallon Tank Installation: UL 142 double-wall steel tank, including all required fittings and components.

Secure fencing and traffic barriers to protect the tank.

Fuel Piping: Installed supply and return piping with necessary and compatible valves and fittings.

Monitoring System Integration: Refurbished probe with diesel and water float kit.

Installed interstitial sensor and all necessary wiring.

Programmed Veeder Root console for monitoring and overfill protection.

Responsibilities:

Contractor: Responsible for the delivery and installation of the fuel tank and associated components.

Responsible for installing the piping, barriers, and fencing.

Responsible for integrating the tank with the existing Veeder Root monitoring system.

The tank will be installed directly on the existing asphalt driveway.

All work is to be performed in compliance with relevant regulations and safety standards.

EVALUATION FACTORS:

Vendor must be registered in SAM.gov; all bid quotes must provide a letter of authorization to distribute supplies on a letterhead from manufacturer; Best Value; Delivery Lead times stated; complete BAA certificate.

Update #4 ·

AMENDMENT TO SOLICITATION 36C24526Q0377

This amendment is to answer the following questions:

What is the distance from the new tank location to the Boiler Room? This distance is approximately 40 feet. Picture attached.

Is there an existing electrical source near the proposed tank location suitable for powering pumps, leak detection, or monitoring equipment? Yes, the shop recommends G-17 and running a cord to an outlet or tying into one of the panels inside. This will be determined in the field.

Does the facility currently hold an oil storage or oil burning operating permit? Yes, the facility does hold an oil storage permit.

Please confirm the model number of the existing Veeder Root monitoring system so we can verify compatibility with the new tank installation. Model: TLS-450 Plus

The solicitation will be closed on Monday, 4/6/2026 at 12PM EST.

Update #3 ·

AMENDMENT ON SOLICITATION 36C24526Q0377

This amendment is to extend the closing of this solicitation for another week.

The solicitation will now close on Monday, 4/6/26 at 12PM EST.

Update #2 ·

AMENDMENT TO SOLICITATION - 36C24526Q0377

Attachment of Loch Raven MD Property for placement location of Boiler Reserve Fuel Tank to be installed. See the BLUE X next to EMERGENCY POWER.

Solicitation will close on Monday, 3/30/26 at 12PM EST.

Update #1 ·

The purpose of this project is to purchase and install a 6,000-gallon reserve fuel tank to support the boiler at the Loch Raven VA property. The fuel tank will supplement the existing reserve fuel tank and be placed on the existing asphalt drive lane adjacent to the emergency generator. The project includes delivery, installation, fuel line connection, and securing the tank area.

Files

File Type Posted
36C24526Q0377_5.docx DOCX document
image.png PNG image
36C24526Q0377_4.docx DOCX document
36C24526Q0377_3.docx DOCX document
36C24526Q0377_2.docx DOCX document
Loch Raven Diagram for Boiler Fuel Reserve_3.24.26.pdf PDF
36C24526Q0377 Reserve Fuel Tank.pdf PDF
36C24526Q0377_1.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
J045--36C24227Q0051 - updated schedule New Jersey VA Healthcare System East Orange and Lyons Campuses East Orange, New Jersey 07018, United States · NAICS 811310 Veterans Integrated Service Network 2 Total Small Business
J091--Aboveground Fuel Tank Inspection Services - Kansas City VAMC Department of Veterans Affairs Kansas City VA Medical Center Kansas City MO 64128, United States · NAICS 562910 Veterans Integrated Service Network 15 No set-aside
J044--NOTICE OF INTENT TO SOLE SOURCE Baltimore VAMC Steam System Preventive Maintenance from Vicinity Energy Baltimore Corporation NAICS 561210 Veterans Integrated Service Network 5 No set-aside
H999--Underground Fuel Storage Tank Cleaning, Inspection, Testing and Re-Fueling NAICS 213112 Veterans Integrated Service Network 21 No set-aside
Medical Gas System Activation and Bulk Oxygen Tank Services Louisville, Kentucky 40222, United States · NAICS 325120 Veterans Integrated Service Network 9 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors