3RD floor flooring replacement, 2-1731, FT bragg NC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9124725QA023
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
314110 Carpet and Rug Mills
Place of performance
Fort Bragg, North Carolina 28310, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Mission and Installation Contracting Command - Fort Bragg is seeking contractors to replace carpet on the 3rd floor of Building 2-1731 at Fort Liberty, North Carolina. The project involves removing existing carpet and installing new 24" x 24" Tarkett carpet tiles in offices, along with new cove base and VCT flooring in specific rooms. The contract requires the contractor to furnish all labor, equipment, materials, and supervision necessary to complete the flooring replacement work within 30 calendar days after receiving notice to proceed. The solicitation uses a lowest price technically acceptable (LPTA) evaluation process, assessing technical approach, project schedule, materials, and past performance, with each factor rated as acceptable or unacceptable. Critical dates include the mandatory site visit on September 8, 2025, questions due by September 10, 2025, and quotes due by 4:00 PM EDT on September 17, 2025.

This opportunity is designated as a total small business set-aside with an estimated value between $100,000 and $250,000. The work must be performed at Fort Liberty, North Carolina, specifically on the 3rd floor of Building 2-1731, which houses approximately 75 personnel across B-Stack and C-Stack office configurations. The performance period runs from September 29, 2025, to October 28, 2025, with contractors required to begin work within 10 calendar days of award notification. Performance and payment bonds are required, with contractors having 7 calendar days to submit bonds after contract award. The project involves replacing carpet in multiple offices ranging from small 6' x 7' spaces to larger conference rooms measuring 14' x 28', with specific rooms requiring VCT installation instead of carpet.

Notice text

3 versions

Update #3 · Latest ·

The RFQ is amended as of 12 SEP 2025 as follows. 

<RFQ Amendment P00002>

Two attachments are added .

RFI Questions and Answers FZ-40113-25 and  h. Magnitude of Construction for FZ-40113--25

All other terms and conditions remain the same. NOTHING FURTHER FOLLOWS in the amendment P00002.
__________________________________________________________________________________________________

<RFQ Amendment P00001>, 09SEP25

A. revised Statement of Work dated 08 SEP 2025, with supporting details contained within the attached documentation. Changes in Section J. Attachment 01 SOW - now reads 01 FZ-40113-25 Revised SOW , Attachment g. FZ-40113-25 Office Dimensions - now reads g. FZ-40113-25 Revised Office Dimensions.

All other terms and conditions remain the same. NOTHING FURTHER FOLLOWS in the amendment P00001.

B. extension to Q and A till 4PM 10 SEP 2025.

C. Section L, Quoters must acknowledge the latest amendment and be responsive accordingly.

All other terms and conditions remain the same. NOTHING FURTHER FOLLOWS in the amendment P00001.

The Mission and Installation Contracting Command – Fort Bragg (MICC-BR) has received a requirement from the Directorate of Public Works (DPW) FZ-40113-25 Replace Carpet inf Offices, 2-1731, Fort Bragg, North Carolina. The Statement of Work contains specific deliverables and identifies the scope of work that is to be completed by the contractor. The contractor is required to furnish all labor, equipment, transportation, tools, supervision, and materials necessary to perform the required work outlined in the Statement of work and technical exhibits.

RSVP SITE VISIT 4PM, EDT, 4 SEP 2025
SITE VISIT 10AM, EDT, 8 SEP 2025
Q AND A 10AM, EDT, 10 SEP 2025
RFQ SUBMISSION  4PM, EDT 17 SEP 2025.

Submission Requirements:
a. All question shall be emailed to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.
mil no later than 12:00 PM, noon, Eastern Daylight Time (EDT) on 10 SEP 2025. Late questions may not be accepted or
considered. All questions and answers will be combined on a single document which will be made available to all qualified
offerors, on a non-attribution basis. Verbal questions will not be answered.
b. Quotes shall be submitted to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.mil
no later than 4:00 PM, EDT on 17 SEP 2025. Late quotes may not be considered for evaluation or award.


Site visit:
a. Interested parties will RSVP to Paul Ciabotti at paul.m.ciabotti.mil@army.mil, Philhwa Kim at philhwa.kim.mil@army.

Update #2 ·

The RFQ is amended as of 9 SEP 2025 as follows.

A. revised Statement of Work dated 08 SEP 2025, with supporting details contained within the attached documentation. Changes in Section J. Attachment 01 SOW - now reads 01 FZ-40113-25 Revised SOW , Attachment g. FZ-40113-25 Office Dimensions - now reads g. FZ-40113-25 Revised Office Dimensions.

All other terms and conditions remain the same. NOTHING FURTHER FOLLOWS in the amendment P00001.

B. extension to Q and A till 4PM 10 SEP 2025.

C. Section L, Quoters must acknowledge the latest amendment and be responsive accordingly.

All other terms and conditions remain the same. NOTHING FURTHER FOLLOWS in the amendment P00001.

The Mission and Installation Contracting Command – Fort Bragg (MICC-BR) has received a requirement from the Directorate of Public Works (DPW) FZ-40113-25 Replace Carpet inf Offices, 2-1731, Fort Bragg, North Carolina. The Statement of Work contains specific deliverables and identifies the scope of work that is to be completed by the contractor. The contractor is required to furnish all labor, equipment, transportation, tools, supervision, and materials necessary to perform the required work outlined in the Statement of work and technical exhibits.

RSVP SITE VISIT 4PM, EDT, 4 SEP 2025
SITE VISIT 10AM, EDT, 8 SEP 2025
Q AND A 10AM, EDT, 10 SEP 2025
RFQ SUBMISSION  4PM, EDT 17 SEP 2025.

Submission Requirements:
a. All question shall be emailed to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.
mil no later than 12:00 PM, noon, Eastern Daylight Time (EDT) on 10 SEP 2025. Late questions may not be accepted or
considered. All questions and answers will be combined on a single document which will be made available to all qualified
offerors, on a non-attribution basis. Verbal questions will not be answered.
b. Quotes shall be submitted to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.mil
no later than 4:00 PM, EDT on 17 SEP 2025. Late quotes may not be considered for evaluation or award.


Site visit:
a. Interested parties will RSVP to Paul Ciabotti at paul.m.ciabotti.mil@army.mil, Philhwa Kim at philhwa.kim.mil@army.
mil, and Souvannaly Keel souvannaly.s.keel.mil@army.mil no later than 4:00 PM, EDT on 4 SEP 2025, however, it is not mandatory. See the provision 52.236-27 Site Visit
(Construction) for further information.

Update #1 ·

The Mission and Installation Contracting Command – Fort Bragg (MICC-BR) has received a requirement from the Directorate of Public Works (DPW) FZ-40113-25 Replace Carpet inf Offices, 2-1731, Fort Bragg, North Carolina. The Statement of Work contains specific deliverables and identifies the scope of work that is to be completed by the contractor. The contractor is required to furnish all labor, equipment, transportation, tools, supervision, and materials necessary to perform the required work outlined in the Statement of work and technical exhibits.

RSVP SITE VISIT 4PM, EDT, 4 SEP 2025
SITE VISIT 10AM, EDT, 8 SEP 2025
Q AND A 10AM, EDT, 10 SEP 2025
RFQ SUBMISSION  4PM, EDT 17 SEP 2025.

Submission Requirements:
a. All question shall be emailed to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.
mil no later than 12:00 PM, noon, Eastern Daylight Time (EDT) on 10 SEP 2025. Late questions may not be accepted or
considered. All questions and answers will be combined on a single document which will be made available to all qualified
offerors, on a non-attribution basis. Verbal questions will not be answered.
b. Quotes shall be submitted to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.mil
no later than 4:00 PM, EDT on 17 SEP 2025. Late quotes may not be considered for evaluation or award.


Site visit:
a. Interested parties will RSVP to Paul Ciabotti at paul.m.ciabotti.mil@army.mil, Philhwa Kim at philhwa.kim.mil@army.
mil, and Souvannaly Keel souvannaly.s.keel.mil@army.mil no later than 4:00 PM, EDT on 4 SEP 2025, however, it is not mandatory. See the provision 52.236-27 Site Visit
(Construction) for further information.

Files

Show all 16

Notice history

Notice Type Posted
3RD floor flooring replacement, 2-1731, FT bragg NC Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Flooring IDR Pre-Solicitation Notice Grand Forks AFB, North Dakota 58205, United States · NAICS 238330 Air Mobility Command Total Small Business
United states coast guard ketchikan alaska new carpet installation Ketchikan, Alaska 99901, United States · NAICS 238330 — No set-aside
IDIQ Flooring NAICS 238330 Mission and Installation Contracting Command Competitive 8(a)
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina Fort Bragg, NC · NAICS 236220 ENDIST Savannah No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity