21 CS Bldg 350 ISP - Phase I & II

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA251724Q0065
Agency
Air Force Space Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
N061 Installation Of Equipment- Electric Wire And Power Distribution Equipment
Place of performance
Colorado Springs, Colorado 80914, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The Department of the Air Force Space Command, through the 21st Communications Squadron, is seeking a contractor to engineer, furnish, install, and test an upgrade of the existing premises wiring or ISP infrastructure to new Cat-6 cabling for Zones #3, #4, #5, and #6 in Building 350 at Peterson Space Force Base. The work also includes the installation and termination of new 12-strand single-mode fiber backbone cable between the hub/main communications room and each communications room in the target zones, as well as the removal of all existing outdated and abandoned Cat-3/Cat-5 premise wiring. Quotes will be evaluated for fairness and reasonableness, and technical capability will be evaluated on a pass/fail basis. Quotes are due by July 30, 2024, and a site visit is scheduled for July 9, 2024.

Paragraph 2:

This is a 100% small business set-aside procurement under NAICS code 238210 with a $19M size standard. The Government intends to make a single award to the lowest priced, technically acceptable offeror. The period of performance for the project is six months from the date of award. The place of performance is Cheyenne Mountain Air Force Base in Colorado.

Notice text

4 versions

Update #4 · Latest ·

The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.

Amendment 01 -  Question submission date changed from 18 July to 15 July 2024. 

Amendment 02 - Offers due date changed from 23 July to 30 July. Answers to questions will be posted by 25 July. 

Amendment 03 - Q&As posted as a new attachment. Additionally, as part of Volume 1 within your submission, please include (if any) photos of the most recent ISP work your company has finished. 

All applicable information is within the attached PWS. 

Update #3 ·

The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.

Amendment 01 -  Question submission date changed from 18 July to 15 July 2024. 

Amendment 02 - Offers due date changed from 23 July to 30 July. Answers to questions will be posted by 25 July. 

All applicable information is within the attached PWS. 

Update #2 ·

The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.

Amendment 01 -  Question submission date changed from 18 July to 15 July 2024. 

All applicable information is within the attached PWS. 

Update #1 ·

The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.

All applicable information is within the attached PWS. 

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
21 CS Bldg 350 ISP - Phase I & II Notice of Award Award Award Notice
21 CS Bldg 350 ISP - Phase I & II This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity