21 CS Bldg 350 ISP - Phase I & II
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA251724Q0065
- Agency
- Air Force Space Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Colorado Springs, Colorado 80914, United States
- Points of contact
-
- Ruben Guzman ruben.guzman.5@spaceforce.mil (719) 556-8987
- SSgt Frederick Chartrand frederick.chartrand@spaceforce.mil (719) 556-8058
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The Department of the Air Force Space Command, through the 21st Communications Squadron, is seeking a contractor to engineer, furnish, install, and test an upgrade of the existing premises wiring or ISP infrastructure to new Cat-6 cabling for Zones #3, #4, #5, and #6 in Building 350 at Peterson Space Force Base. The work also includes the installation and termination of new 12-strand single-mode fiber backbone cable between the hub/main communications room and each communications room in the target zones, as well as the removal of all existing outdated and abandoned Cat-3/Cat-5 premise wiring. Quotes will be evaluated for fairness and reasonableness, and technical capability will be evaluated on a pass/fail basis. Quotes are due by July 30, 2024, and a site visit is scheduled for July 9, 2024.
Paragraph 2:
This is a 100% small business set-aside procurement under NAICS code 238210 with a $19M size standard. The Government intends to make a single award to the lowest priced, technically acceptable offeror. The period of performance for the project is six months from the date of award. The place of performance is Cheyenne Mountain Air Force Base in Colorado.
Notice text
4 versions
Update #4 · Latest ·
The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.
Amendment 01 - Question submission date changed from 18 July to 15 July 2024.
Amendment 02 - Offers due date changed from 23 July to 30 July. Answers to questions will be posted by 25 July.
Amendment 03 - Q&As posted as a new attachment. Additionally, as part of Volume 1 within your submission, please include (if any) photos of the most recent ISP work your company has finished.
All applicable information is within the attached PWS.
Update #3 ·
The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.
Amendment 01 - Question submission date changed from 18 July to 15 July 2024.
Amendment 02 - Offers due date changed from 23 July to 30 July. Answers to questions will be posted by 25 July.
All applicable information is within the attached PWS.
Update #2 ·
The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.
Amendment 01 - Question submission date changed from 18 July to 15 July 2024.
All applicable information is within the attached PWS.
Update #1 ·
The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.
All applicable information is within the attached PWS.
Attachments
| File | Type | Posted |
|---|---|---|
| FA251724Q006500002 - Bld 350 ISP Phase 2 Solicitaiton Amendment 3.pdf | ||
| ISP BLDG 350 UPGRADE- Questions and Answers.docx | DOCX document | |
| FA251724Q006500002 - Bld 350 ISP Phase 2 Solicitaiton Amendment 2.pdf | ||
| FA251724Q0065 - Bld 350 ISP Phase 2 Solicitation Amendment 01.pdf | ||
| Attachment 1 - PWS for B350 ISP Upgrade Phases 1 and 2.pdf | ||
| FA251724Q0065 - Bld 350 ISP Phase 2 Solicitaiton.pdf | ||
| Attachment 2 - Wage Determination 2015-5417 Rev 26.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 21 CS Bldg 350 ISP - Phase I & II Notice of Award | Award Notice | |
| 21 CS Bldg 350 ISP - Phase I & II | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity