117th ARW Alert Pad Crack Repairs
Cancelled Solicitation Posted
- Solicitation number
- W50S6M26QA013
- Agency
-
Alabama National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Birmingham, Alabama 35217, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Alabama Army National Guard seeks sealed bids for concrete crack repair and expansion joint replacement at the 117th Air Refueling Wing Alert Pad in Birmingham, Alabama, with proposals due July 30, 2026 at 10:00 AM local time. This procurement is set aside exclusively for small businesses.
Work includes repair of approximately 300 linear feet of concrete cracking in the apron pavement and removal and replacement of 5,000 linear feet of existing apron expansion joints. The slab thickness is 15 inches; full-depth cutting is not required. Contractors must remove existing sealant and fill joints with backer rod and sealant. All contractor personnel must pass security clearance before base access, and all flightline personnel require Civil Engineering or Airfield Operations escort with compliance to airfield operations driving regulations. The government will provide water access from on-base hydrants and designate locations for equipment staging and dumpster placement.
The estimated project magnitude is between $100,000 and $250,000 under a firm fixed-price arrangement. NAICS code 236220 applies with a small business size standard of $45,000,000 average revenue. PSC code is Y1BZ. Performance must begin within ten calendar days of notice to proceed and complete within 120 calendar days. Performance and payment bonds are required. Construction wage rates apply under General Decision Number AL20260157, effective May 18, 2026, reflecting Davis-Bacon prevailing wage requirements for Jefferson County, Alabama. Award will be made to the responsible bidder offering the best value considering price and past performance. A site visit is scheduled for July 9, 2026 at 1400 hours CDT.
Notice text
RFI:
- Joint type / detail: Could you provide a joint detail whether these are: • true expansion joints (e.g., ~¾" asphalt fiber board, full pavement depth, sealant in the top 1–2") requiring full-depth filler removal, or • construction/contraction joints (~¼–½" wide, ≤2" deep, backer rod + sealant)? And is the intent to remove the full-depth joint filler, or only reseal the top of the joint? What is the apron slab thickness and saw-cut depth drive the cost significantly, so a joint detail would let us bid it accurately?
ANSWER:True expansion joint. The slab thickness is 15 ½” a full depth cut is not required. Remove existing sealant and joint will be filled with backer rod and sealant. Photos of existing joint seal attached.
- Plan sheet: Is there a plan sheet or apron layout showing the crack-repair and joint locations?
ANSWER:CE/Airfield Ops will escort contractors to location.
- Site logistics: Can the contractor draw water from an on-base hydrant to fill a water truck, and where may we stage a laydown area and a dumpster? Any airfield access/escort or flight-line traffic-control procedures we should plan around?
ANSWER:CE will give location to draw water and stage dumpster. All personnel will have to pass security check before allowed on base. Everyone on the flightline will be escorted and all drivers will follow flightline driving regulations, given by Airfield Operations.
The 117th Air Refueling Wing, Birmingham, Alabama has a rerequiremet for non-personal construction services to repair of approximately 300 linear feet of concrete cracking at the "Alert Pad" apron pavement. Additionally, removal and replacement of 5,000 linear feet of existing apron expansion joint. The contractor shall provide all personnel, equipment, supplies, supervision and any other items and services necessary to perform the work as described in the attached Statement of Work.
This requirement is being solicited via the attached Standard Form (SF) 1442.
The estimated magnitude of this construction project is between $100,000 and $250,000.
The Government intends to award a Firm Fixed Price (FFP) contract to the reponsible vendor whose offer, conforming to the solicitatio, is determined to be the most advantageous to the Government, considering price and past performance.
Site Visit
A site visit is highly encouraged for all interested offerors.
- Date: July 9, 2026
- Time: 2:00 P.M. CDT
- Location: Attendees will meet at 5401 East Lake Blvd. Birmingham, AL 35217, Bldg. 700 Civil Engioneering Squadron Conference Room.
Site Visit Registration: Due to security requirements, all attendees must pre-register. Please email the following information to MSgt Joshua Waters at joshua.waters.8@us.af.mil at least three (3) busiuness days prior to the site visit.
- Firm Name and Telephone number
- Visitor's Full Name
- Social Security Number
- Driver's License Number and State of Issue
Failure to provide this information may result in denial of access to the installation.
Questions Regarding this Solicitation
All questions must be submitted in writing via email to MSgt Joshua Waters at joshua.waters.8@us.af.mil. Questions must be recieved with sufficient time to allow for a response prior to the offer submission deadline. Please reference solicitation number W50S6M26QA013 in the subject line.
Submission of Offers
Offers must be submitted electronically to MSgt Joshua Waters at joshua.waters.8@us.af.mil and william.hall.65@us.af.mil no later than the response date and time. A complete offer package must include:
- A signed and completed SF 1442, including the Offer Section (Blocks 14-20).
- A completed Section B Contract Line Item Number (CLIN) Schedule with princing.
- Completed representations and certifications as required in the solcitation and document (or confirmation of current registration in SAM.gov).
- A minimum of two(2), and a maximum of three(3), past performance references for recent and relevant projects.
- Acknowledgement of any and all amendments isued.
Offerorers are reponsible for monitoring this site for the release of any amendments. All offerors must be registered in the System for Award Management (SAM.gov) to be eligible for award.
Files
| File | Type | Posted |
|---|---|---|
| IMG_0132.jpeg | JPEG file | |
| IMG_0131.jpeg | JPEG file | |
| IMG_0130.jpeg | JPEG file | |
| Wage Determination.pdf | ||
| SOW_Crack seal and expansion joint .docx | DOCX document | |
| Solicitation - W50S6M26QA013_Final.pdf | ||
| 117th Site Visit Request.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| Airfield Blast Shield | Global Strike Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity