ztl-1705850-FINAL Signed.pdf
PDF 7 MB Posted
- Attached to
- AHU 25 REPLACEMENT & AHU 32 INSTALL at the Atlanta Air Route Traffic Control Center (ARTCC), Hampton, GA
- Solicitation number
- 697DCK-22-R-00357
About this file
This announcement is for an invitation for bids for an HVAC replacement and installation project at an FAA air traffic control center. The project involves replacing an existing air handling unit and installing a new unit. The solicitation number is provided, along with contact information for scheduling a mandatory site visit. Bids are due by a certain date. Payment and performance bonds are required. The price range for the project is listed. Successful bidders must be registered in the System for Award Management. Electronic submissions in PDF format are required by the specified due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 697DCK22R00357amendment4.pdf | ||
| 697DCK-22-R-00357amendment3.pdf | ||
| LiebertDeluxeSystem.pdf | ||
| amendment2.pdf | ||
| 697DCK-22-R-00357 amendment00001.pdf | ||
| ZTL-1705850and1801418-FINAL-SPECIFICATIONS.pdf | ||
| ahu25bid sheet.pdf | ||
| WageRate2022.pdf | ||
| RFO697DCK-22-R-00357.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
CNO
DPS1
RETUI4
RA1
OA
VO3
RET
GRN
TS2
UI13
WHT
N C
FRZ1
O
M
RaDprCmd
OaDprCmd
OaTmp
FilSts
AHU25_M3
AHU25_M4
AHU25_M5
PWR
COM
A
SIG VO1
ABNO
HWR
HWS
GRN WHT
TS1
RETUI2
VO4
R1
SA2
L3 L2 L1
480 VAC
SaFan
V
X2.1 AHU25_M4
HwVlvCmd
SaTmp
SD2 VFD
SaFanCmd
AHU25_M4
SaFanSts
NO
NC
S D a
F a n
O C
UI3
CWR
CWS
SIG VO2
X2.1 AHU25_M4
ChwVlvCmd
AB ANO
N.C.
CD-1
FILTER
RH RH
HS1
RETUI1
SaRh
X3
X4
PS
NO1
SaDpr1Cmd
AH25_M5
NO2
NO3
SaDpr2Cmd
AIR HANDLING UNIT #25
DDCP-1067-A
LOCATION: MECHANICAL ROOM 1067
SA1
SD2
2 SD13 FRZ1
CD-2
CD-3
N.O.
CD-4
TS3
UI14
MaTmp
TS4
UI15
RmTmp
UI16
LlmtAlmSts
AH25_M3
RA2
NO4
RaDpr2Cmd
CD-5
1350 CFM
HIGH SPEED:1350 CFM
AHU32
SmkDet
DI
HPS1
RETUI9
HiDctSts
NO MSTP
VFD
HIGH SPEED: 1700 CFM
LOW SPEED: 0 CFM
4 SaFan
4 HPS1
LOW SPEED:1350 CFM
HIGH SPEED:1700 CFM
LOW SPEED:0 CFM
HIGH SPEED:2700 CFM
LOW SPEED:2700 CFM
HIGH SPEED:1350 CFM
LOW SPEED:1350 CFM
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
E
B
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/2
:0
:3
P lo tt e d b y
R
-C
-E
APPROVED
z tl -1
-m
.d w g
8 234567
IS
U
10/31/2021
Jerimiah Easley
PROGRAM MANAGER
HAMPTON
ZTL-1705850-M601
ARTCC
REPLACE AHU 25 AND INSTALL AHU 32
AIRFLOW DIAGRAM
ENROUTE/FSS
ENGINEERING SERVICES
T
IO
EASTERN SERVICE AREAATO - TECHNICAL OPERATIONS
GAATLANTA CENTER
THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM
Tyler Rasch
PROJECT ENGINEER
1705850
10/31/2021 CONSTRUCTION, WR #19463 1705850 10/01/2021
M102
PLACED IN 1066 AS SHOWN ON
TEMPERATURE SENSOR TO BE
UNIT GRAPHIC PAGE.
SHOWN ON INDIVIDUAL
OVER BACNET IP AND BE
MUST BE MONITORED
THE FOLLOWING POINTS
- FAN SPEED
- DAILY ZONE LOW TEMP
- DAILY ZONE HIGH TEMP
- RUN TIME HOURS
STATUS
- ZONE LOW HUMIDITY ALARM
- ZONE HIGH HUMIDITY ALARM
- ZONE LOW TEMP ALARM
- ZONE HIGH TEMP ALARM
ALARM
ztl-1705850-m601
2021-11-29T08:58:19-0500
JERIMIAH J EASLEY
2021-11-29T09:12:01-0500
Tyler nathaniel Rasch
:4 lo tt e
ZTL-1705850-M602
MECHANICAL SCHEDULES
SEQUENCE OF OPERATIONS AHU-25:
1.HAND-OFF-AUTO (HOA) OPERATION: THE VFD (VARIABLE FREQUENCY DRIVE) INCLUDES
A HAND-OFF-AUTOMATIC CONTROL SETTING. WHEN THE DRIVE SETTING
IS “HAND”, THE FAN SHALL START AND THE CONTROLS SHALL OPERATE AS
DESCRIBED BELOW. IN THE “OFF” POSITION, THE FAN SHALL BE OFF. IN
THE “AUTO” POSITION, THE DDCP SHALL START AND STOP THE UNIT.
2.START/STOP CONTROL: THE UNIT WILL RUN 24/7. WHEN THE FAN STATUS IS OFF,
THE HOT WATER AND CHILLED WATER CONTROL VALVES SHALL CLOSE.
3.FAN SPEED CONTROL: FAN SHALL OPERATE IN 2 MODES; LOW SPEED AND HIGH
SPEED. LOW SPEED SHALL BE THE UNITS NORMAL OPERATING CONDITION. WHEN THE
THERMOSTAT LOCATED IN ROOM 1066 (TS-3) SENSES A TEMPERATURE ABOVE THE
HIGH SET POINT THE FAN SHALL ENTER HIGH SPEED MODE. THE UNIT SHALL REMAIN
BELOW THE SET POINT THEN SHALL RETURN TO LOW SPEED MODE.
3.DAMPER CONTROL: WHEN THE FAN IS STARTED IN EITHER THE HAND OR AUTO MODE,
THE RETURN AIR DAMPER (CD-2), AND SUPPLY AIR DAMPER 1 (CD-4) SHALL OPEN.
WHEN THE FAN IS STOPPED, THE DAMPERS (CD-2), AND (CD-4) SHALL CLOSE. The
OUTDOOR AIR DAMPER (CD-1), SUPPLY AIR DAMPER 2 (CD-3) AND RETURN AIR
DAMPER 2 (CD-5) SHALL BE CONTROLLED BASED ON FAN SPEED. IN LOW FAN
SPEED MODE (CD-1) SHALL BE OPENED TO DMPR(MINFANSPEED) AND BOTH (CD-3)
AND (CD-5) SHALL REMAIN CLOSED. DURING HIGH SPEED MODE (CD-1) SHALL BE
OPENED TO DMPR(MAXFANSPEED) AND BOTH (CD-3) AND (CD-5) SHALL BE OPENED.
4.THE HOT WATER CONTROL VALVE (CV-1) SHALL BE MODULATED AS REQUIRED TO
MAINTAIN THE SUPPLY AIR TEMPERATURE SET POINT. WHEN THE CURRENT SWITCH CS
SENSES THAT THE FAN IS OFF, THE HOT WATER CONTROL VALVE (CV-1) SHALL
CLOSE EXCEPT AS NOTED BELOW UNDER “FREEZESTAT".
5.CHILLED WATER VALVE CONTROL: WHEN THE FAN IS OPERATING AS SENSED BY (CS)
THE CHILLED WATER CONTROL VALVE (CV-2) SHALL BE MODULATED AS REQUIRED TO
MAINTAIN THE SUPPLY AIR TEMPERATURE SET POINT. WHEN THE CURRENT SWITCH CS
SENSES THAT THE FAN IS OFF, THE CHILLED WATER CONTROL VALVE (CV-2) SHALL
CLOSE.
6.SUPPLY AIR TEMPERATURE SETPOINT: WHEN THE OUTSIDE AIR TEMPERATURE IS
SENSED BY TS2 TO BE AT OR BELOW 30°F, THE SUPPLY AIR TEMPERATURE SETPOINT
SHALL BE 70°F. WHEN THE OUTSIDE AIR TEMPERATURE IS SENSED BY TS2 TO BE AT
OR ABOVE 85°F, THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE 60°F. WHEN THE
OUTSIDE AIR TEMPERATURE AS SENSED BY TS2 IS BETWEEN 30°F AND 85°F, THE
SUPPLY AIR TEMPERATURE SETPOINT SHALL BE BETWEEN 60°F AND 70°F AND
DETERMINED USING A LINEAR RELATIONSHIP.
7.FREEZESTAT: PROVIDE A MECHANICAL DEVICE THAT IS HARDWIRED TO SHUT DOWN THE
FAN WHEN IT SENSES A MIXED AIR TEMP OF 38°F (ADJ). THE OUTDOOR AIR DAMPER
(CD-1) SHALL CLOSE, THE CHILLED WATER CONTROL VALVE (CV-2) SHALL OPEN,
AND THE HOT WATER CONTROL VALVE (CV-1) SHALL OPEN.
8.DIRTY FILTER ALARM: DIFFERENTIAL PRESSURE SWITCH (DPS-1) SHALL MONITOR THE
PRESSURE DROP AT THE TWO STAGE FILTER. WHEN THE PRESSURE EXCEEDS AN
ADJUSTABLE LIMIT, AND ALARM SIGNAL SHALL BE SENT TO THE OWS.
9.FIRE/SMOKE DAMPERS: IF ANY DUCT SMOKE DETECTOR IS TRIGGERED, THE FAN
SHALL STOP, THE DAMPERS SHALL ALL CLOSE AND AN ALARM SHALL BE GENERATED
AND SENT TO THE DDCS.
10.FAN STATUS: A CURRENT SWITCH SHALL MONITOR THE STATUS OF THE UNIT SUPPLY
FAN. IF THE STATUS INDICATED DOES NOT MATCH THE COMMANDED OUTPUT FOR THE
FAN, AFTER A 60 SECOND TIME DELAY (ADJUSTABLE), AN ALARM SHALL BE
GENERATED AND SENT TO THE DDCS.
11.FAILURE MODE: UPON LOSS OF COMMUNICATION TO CONTROLLERS THE DEVICES WILL
CONTROL ACCORDING TO THE LAST COMMANDED STATE. UPON A LOSS IN POWER THE
FIELD DEVICES WILL FAIL AS INDICATED BELOW: A.FAN START/STOP: OFF B.OUTSIDE
AIR DAMPERS: CLOSED C.HOT WATER VALVE: OPEN D.CHILLED WATER VALVE: OPEN
E.RETURN AIR DAMPERS: OPEN E.SUPPLY AIR DAMPERS: OPEN
12.HIGH STATIC PRESSURE SWITCH: A STATIC PRESSURE SWITCH SHALL BE HARDWIRED
TO THE VFD TO SHUT OF THE UNIT IF PRESSURE RISES ABOVE A SETPOINT INITIALLY
SET AT 4" AND MUST BE MANUALLY RESET AT THE SWITCH.
13.DEHUMIDIFICATION: WHEN THE SUPPLY AIR HUMIDITY AS SENSED BY HS1 EXCEEDS A
SETPOINT INITIALLY SET AT 60°F (ADJ) THE HOT AND COLD WATER CONTROL VALVE
CONTROLS SHALL BE OVERRIDDEN. INSTEAD THE CHILLED WATER CONTROL VALVE
SHALL BE MODULATED FULLY OPEN AND THE HOT WATER CONTROL VALVE SHALL
MODULATE TO MAINTAIN THE TEMPERATURE SETPOINT.
ztl-1705850-m602
2021-11-29T08:58:30-0500
JERIMIAH J EASLEY
2021-11-29T09:12:12-0500
Tyler nathaniel Rasch
RA
DO1
GRN WHT
TS1
RETUA2
DO1
R11
SA
L3 L2 L1
480 VAC
SaTmp
SD1 STARTER
SaFanCmd
SaFanSts
O C
DI3
CWR
CWS
SIGUA11
24HAHU32
CwVlvCtrl
AB A
NO
FILTER
UB3
SaDprCtrl
AIR HANDLING UNIT #32
(LCN ROOM 1055)
COMPUTER ROOM AIR CONDITIONING UNITS
CD-1
SD1
NO C
LD1
RETDI3
LeakDetSts
HT1
RETUB2
RmTmp
RH RH
RETUB1
RmRh
P1- PS
P1+ 1
RETDI4
SmkDet
:5 lo tt e
TO FACP
ZTL-1705850-M603
AHU 32 AIRFLOW DIAGRAM
1 SD1
INTERLOCKED WITH THE SYSTEM COMPONENT IDENTIFIED
SYMBOL INDICATES THAT THE DEVICE IS ELECTRICALLY
ATTACHED TO WALL
BID ALTERNATE #2
ztl-1705850-m603
2021-11-29T08:58:42-0500
JERIMIAH J EASLEY
2021-11-29T09:12:20-0500
Tyler nathaniel Rasch lo tt e
SEQUENCE OF OPERATIONS AHU-32:
1. TEMPERATURE SENSOR. TEMPERATURE SENSOR MUST BE FURNISHED FOR UNIT AND
MUST BE COMPATIBLE WITH DDCP AND AHU REQUIREMENTS. PROVIDE DDCP WITH
MANUAL SWITCH WHICH MUST DIRECTLY CONNECT THE TEMPERATURE SENSOR WITH
THE AIR HANDLING UNIT IN THE EVENT OF A POWER FAILURE OF THE DDCP.
SWITCHES MUST BE LOCATED IN THE PANEL AND CLEARLY IDENTIFIED AS TO
FUNCTION.
2. UNIT BLOWERS. UNIT BLOWERS MUST BE ENERGIZED AND DE-ENERGIZED THROUGH
THE DDCP. UNITS MUST RUN CONTINUOUSLY. IN THE EVENT OF A POWER FAILURE,
BLOWERS MUST BE RESTARTED, ON RESUMPTION OF POWER, IN SEQUENCE, WITH AN
ADJUSTABLE TIME DELAY BETWEEN STARTS.
3. DDCP CONTROL. DDCP MUST CONTROL THE AHU ONLY IN RESPONSE TO THE
SIGNALS FROM THE SENSORS IDENTIFIED AS TS-MASTER AND HS-MASTER. SINGULAR
SIGNAL FROM TS-MASTER MUST OPERATE TO MODULATE THE CHILLED WATER VALVES
AHU (IN UNISON WITH AHU-26 AND AHU-28) TO MAINTAIN A SPACE TEMPERATURE
3.1. REMAINING TEMPERATURE SENSOR MUST OVERRIDE THE DDCP CONTROL OF THE
CHILLED WATER VALVE ONLY WHEN THE SPACE TEMPERATURE IN THE AREA OF
SENSOR MUST RELINQUISH CONTROL BACK TO THE DDCP AND TS-MASTER.
4. SMOKE DETECTOR. THE SMOKE DETECTOR WILL STOP THE BLOWER IF SMOKE IS
DETECTED.
5. FAILURE MODE. UPON LOSS OF CONTROL SIGNAL OR ELECTRICAL POWER THE
CONTROL DEVICES MUST FAIL IN THE MANOR INDICATED BELOW.
5.1. SUPPLY FAN START/STOP: OFF
5.2. COOLING CONTROL VALVE: OPEN
ZTL-1705850-M604
AHU 32 MECHANICAL SCHEDULES
BID ALTERNATE #2
ztl-1705850-m604
2021-11-29T08:58:53-0500
JERIMIAH J EASLEY
2021-11-29T09:12:33-0500
Tyler nathaniel Rasch
13A
11121314
C-C
A-6
:2 lo tt e
-a
NOTES:NOTES:
DEMOLISH APPROX. 30 UNUSABLE FLOOR TILES THAT ARE PILED IN ROOM 1066.
HAZARDS WHILE FLOOR TILES ARE REMOVED.
PROVIDE ACCEPTABLE SIGNAGE INDICATING THAT THE WORK AREA CONTAINS FALL
CONDUIT CUTS.
ESTIMATED 150 PANELS REQUIRE STRAIGHT CUTS AND 15 TILES REQUIRE
DEMOLISHED IN A DAY MUST BE REPLACED THAT DAY. CUT PANELS AS REQUIRED,
USED AS ATTIC STOCK. FLOOR TILES ARE CCN1250 WITH 1/8" HPL. ALL TILES
SYSTEM TO REMAIN AS IS. PROVIDE AN ADDITIONAL 60 TILES TO THE COR TO BE
REPLACE ALL FLOOR TILES IN ROOM 1066 (ESTIMATED 300). RAISED FLOOR
CRITICAL POWER CENTER
LCN
STAIR "E"
MOTHER ROOM
MECHANICAL ROOM
BID ALTERNATE #1
AREAWAY
ZTL-1705850-A101
CPC FLOOR TILE REPLACEMENT
-a
KEY PLAN
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
SO-D-101710-005, REV J, DATED 11/06/2018
THIS PROJECT COPY IS BASED ON DRAWING
SCALE:
A101
1/4" = 1'-0" ztl-1705850-a101
2021-11-29T08:55:09-0500
JERIMIAH J EASLEY
2021-11-29T09:09:09-0500
Tyler nathaniel Rasch
OUTSIDE SOW
PROTECTION SYSTEM
VIKING FIRE
2" CWR
2" CWS
2" HWS
2" HWR
C-2 lo tt e
-d
D101
EXISTING AHU-25 ABOVE EF-205
NTS
NOTES:
DEMOLISH FIRE/SMOKE DAMPER.
CONDUIT BACK TO PANEL.
DEMOLISH DISCONNECTS FOR EF-205 AND AHU-25 AND ALL CONDUCTORS AND
FUMES AND DUST DURING CONSTRUCTION TO SATISFACTION OF COR.
INSTALL TEMPORARY COVERING FOR DUCT TO ISOLATE EXISTING DUCTWORK FROM
DURING THE PROJECT.
STARTING WORK. VIKING SYSTEM MUST REMAIN OPERATIONAL AT ALL TIMES
PROTECT VIKING FIRE PROTECTION SYSTEM TO SATISFACTION OF COR PRIOR TO
DEMOLISH VERTICAL SECTIONS OF DUCTWORK DOWN TO THE FLOOR.
COVERING TO COR FOR APPROVAL PRIOR TO STARTING WORK.
UNTIL PERMANENT WALL COVERING IS INSTALLED. SUBMIT ON TEMPORARY WALL
DEMOLISH L-2. PROVIDE TEMPORARY INSULATED WEATHERPROOF WALL COVERING
BUILDING. SEE M502 FOR TEMPORARY WALL COVERING DETAILS.
FROM BUILDING DURING CONSTRUCTION AND TO BRING NEW MATERIAL INTO THE
DEMOLISH L-1. THIS OPENING TO BE USED TO REMOVE DEMOLISHED MATERIAL
ISOLATION VALVES TO REMAIN. DEMOLISH CONDENSATE DRAIN.
DEMOLISH HEATING AND CHILLED SUPPLY/RETURN HYDRONIC PIPING, EXISTING
DEMOLISH DUCTWORK AND SUPPORTS WHERE INDICATED.
SOURCE.
DEMOLISH EF-205. DEMOLISH ALL WIRING ASSOCIATED WITH EF-205 BACK TO
ACTUATOR.
HUMIDITY SENSOR, HOT WATER VALVE AND ACTUATOR, CHILLED WATER VALVE AND
ISOLATION DAMPER AND ACTUATOR, SUPPLY TEMPERATURE SENSOR, SUPPLY
PLATFORMS. REMOVE ALL CONTROL DEVICES AND WIRING ON AHU. THIS INCLUDES
DEMOLISH AHU-25, SUPPORTS AND THE TWO (2) ASSOCIATED SERVICE 1
L
AHU
EF
FD/SD
TOILET
STAIR "H"
IP
FDS AREA
ZTL-1705850-D101
MECHANICAL ROOM HVAC DEMOLITION
4' 0 4' 12'
SCALE: 3/16" = 1'-0"
8'
AHU 25 DUCTWORK/PIPING DEMOLITION PLAN
3/16"=1'-0" ztl-1705850-d101
2021-11-29T08:55:25-0500
JERIMIAH J EASLEY
2021-11-29T09:09:21-0500
Tyler nathaniel Rasch
2 1/2" CWR
2 1/2" CWS
DN TO BASEMENT
TO AHU-30
EXISTING CD
CITY WATER
lo tt e
DEMOLISH FIRE EXTINGUISHER CABINET IN ROOM 1055 SOUTH WALL.
WATER LINE BACK TO EXISTING VALVE UNDERNEATH HUMIDIFIER.
PIPING, ELECTRICAL DISCONNECT, AND WIRING BACK TO SOURCE. DEMOLISH CITY
DEMOLISH EH-25 HUMIDIFIER ASSOCIATED WITH AHU-25, CONDENSATE DRAIN
ROUTE AND INSTALLATION REQUIREMENTS.
MATERIAL. SEE DRAWING M101 FOR DETAILS REGARDING NEW CONDENSATE DRAIN
SEAL EXISTING ROOM 1067 WALL PENETRATION WITH 1-HR RATED FIRESTOPPING
DEMOLISH EXISTING CONDENSATE DRAIN UP TO LIMIT OF DEMOLITION AS SHOWN.
SEE DRAWING M504 FOR PIPING RISER DIAGRAM AND DETAILED DRAIN PLAN.
ASSEMBLED. WORK MUST BE COMPLETED AT NIGHT WITH MINIMAL UNIT DOWNTIME.
HR PROVING PERIOD OF AHU-T IS COMPLETE AND DUST CONTAINMENT IS
ON SUPPLY AND RETURN LINES. WORK MUST NOT BEGIN ON PIPING UNTIL 24
ISOLATE AND DRAIN PIPE BEFORE CUT. ADD BALL VALVE AT LOCATION OF CUT
AS POSSIBLE. VERIFY LOCATION OF CUT WITH COR BEFORE WORK CAN BEGIN.
PIPING APPROXIMATELY 3" AWAY FROM T-JUNCTIONS ENTERING TO THE BASEMENT
SHORTEN CHILLED WATER PIPES AND CONDENSATE DRAIN BY CUTTING EXISTING
PIPE. CUT DRAIN FROM CEILING BELOW SLAB AND CAP LINE.
SEAL WITH CAULK TO PREVENT ANY DEBRIS OR CONCRETE FROM ENTERING DRAIN
DEMOLISH FLOOR DRAIN. BLOCK PENETRATION BY INSERTING A PLYWOOD DISC.
PRIOR TO START OF DEMOLITION WORK.
TRAFFIC CONTROL. SUBMIT SILICA EXPOSURE MITIGATION PLAN TO COR 1 WEEK
NOISY EQUIPMENT SHALL BE COORDINATED WITH COR TO AVOID DISTURBING AIR
BEFORE CLOSE OF BUSINESS EACH DAY. USE OF JACKHAMMERS AND OTHER
DEMOLISH EXISTING CONCRETE PAD. ALL DEBRIS SHALL BE REMOVED FROM AREA 1
ZTL-1705850-D102
PAD/FLOOR DRAIN DEMOLITION PLAN
EH
D102
PAD/PIPING DEMOLITION PLAN
ztl-1705850-d102
2021-11-29T08:55:37-0500
JERIMIAH J EASLEY
2021-11-29T09:09:31-0500
Tyler nathaniel Rasch lo tt e
-e
BUILDING STEEL WITH A #6 GREEN TRACE INSULATED COPPER GROUND.
INSTALL VFD WITH DISCONNECT SWITCH. ENCLOSURE MUST BE CONNECTED TO
WIRE ALL CONTROL DEVICES FOR AHU-25 TO EXISTING DDCP PANEL
BREAKER TO REMAIN FOLLOWING REMOVAL OF AHU-T LABELED AS "SPARE".
INSTALL 70A BREAKER TO FEED AHU-T ON PANEL E-111-A-D SLOT 7-9-11.
SYSTEM.
EXISTING CONDUIT OR WIRE. PERFORM MEGGER TEST BEFORE ENERGIZING
INSULATION. SEE DRAWING E601 FOR DETAIL. CONTRACTOR MAY NOT REUSE
CONDUCTORS MUST BE 6 AWG STRANDED COPPER WITH THHN/THWN-2
AHU 32 MUST BE POWERED BY PANEL E-111-AD ON BREAKER SLOT 8-10-12.
OR WIRE. PERFORM MEGGER TEST BEFORE ENERGIZING SYSTEM.
SEE DRAWING E601 FOR DETAIL. CONTRACTOR MAY NOT REUSE EXISTING CONDUIT
CONDUCTORS MUST BE 12 AWG SOLID COPPER WITH THHN/THWN-2 INSULATION.
AHU 25 MUST BE POWERED BY PANEL E-111-AA ON BREAKER SLOT 1-3-5. 1
PANEL E-111-AA PANEL E-111-AD
PANEL E-111-AD
DDCP-1067-A
CLEARANCE
VFD NEC
PANEL E-111-AA
ZTL-1705850-E101
ELECTRICAL INSTALLATION PLAN
E101
ELECTRICAL INSTALLATION PLAN
ztl-1705850-e101
2021-11-29T08:55:55-0500
JERIMIAH J EASLEY
2021-11-29T09:12:42-0500
Tyler nathaniel Rasch
:1 lo tt e
ZTL-1705850-E501
VFD BLOCK DIAGRAM
NOT TO SCALE
E501 ztl-1705850-e501
2021-11-29T08:56:07-0500
JERIMIAH J EASLEY
2021-11-29T09:12:55-0500
Tyler nathaniel Rasch
EH-25
, 480/277V, 3Ø, 3W, 225A BUSE-111-A-A
30AT
100AF
EF-205
K
TO MCC A-RIE
INCOMING
AHU-25
TE111A-B
15KVA
PNL E111A-B
20AT
AHU-31
5HP
3P
7.6FLA
208/120V
, 480/277V, 3Ø, 4W, 100A BUSE-111-A-D
AHU-27
, 480/277V, 3Ø, 3W, 225A BUSE-111-A-A
TO MCC A-RIE
15AT
TE111A-B
15KVA
PNL E111A-B
AHU-31
208/120V
, 480/277V, 3Ø, 4W, 100A BUSE-111-A-D
TO MCC B-FC3
AHU-27
10HP
13.5A
2HP
2.5FLA
AHU-25
8.2FLA
TO MCC B-FC3
60AT
AHU-32
10HP
14.0FLA
70AT
AHU-T
7.5HP
lo tt e
ZTL-1705850-E502
ELECTRICAL ONE LINE DIAGRAM
E-111-A-D TEMPORARY AHU INSTALL
E502
E-111-A-A DEMOLITION
E-111-A-D AHU-32 INSTALL
E-111-A-A NEW WORK
ELECTRICAL PANEL E111A-B SHOWN ON E601 FOR REFERENCE.1
GENERAL NOTES
1. EXTREME CAUTION MUST BE PRACTICED WHEN WORKING ON ANY OF THE ELECTRICAL POWER SYSTEMS (BUILDING, ESSENTIAL, AND CRITICAL SERVICE). THIS FACILITY IS AN OPERATIONAL AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) AND UNAUTHORIZED ELECTRICAL OUTAGES MAY CAUSE ACCIDENTS AND/OR LOSS OF LIFE.
2. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITION OF ALL FEEDERS, BRANCH CIRCUIT CONNECTIONS. ELECTRICAL DEVICES AND PANELBOARD SCHEDULES, PRIOR TO DEMOLITION WORK.
3. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS AND OR DIMMING PANELS. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL ELECTRICAL OUTAGES SHALL BE COORDINATED IN ADVANCE WITH THE COR.
4. MAINTAIN CONTINUITY FOR ALL CIRCUITS SERVING AREAS NOT AFFECTED BY DEMOLITION WORK.
5. CROSS HATCH AREA REPRESENTS DEMOLITION OF CONDUIT, WIRING, AND ASSOCIATED ELECTRICAL EQUIPMENT.
ELECTRICAL ONE-LINE DIAGRAMS
ztl-1705850-e502
2021-11-29T08:56:20-0500
JERIMIAH J EASLEY
2021-11-29T09:13:11-0500
Tyler nathaniel Rasch lo tt e
E-111-A-A PANEL SCHEDULE
E-111-A-D PANEL SCHEDULE
E-111-A-B PANEL SCHEDULE
ZTL-1705850-E601
ELECTRICAL PANEL SCHEDULE
BREAKER TO REMAIN FOLLOWING REMOVAL OF AHU-T LABELED AS "SPARE".
INSTALL 70A BREAKER TO FEED AHU-T ON PANEL E-111-A-D SLOT 7-9-11.
205.
REMOVE EXISITING BRANCH CIRCUIT CONDUIT AND WIRING ASSOCIATED WITH EF-
EXISTING PANELBOARD MANUFACTURER TYPE AND AIC RATINGS.
SCHEDULE, TO FEED NEW AHU UNITS 25 AND 32. BREAKER SHALL MATCH
PROVIDE NEW CIRCUIT BREAKER, AMP RATING AS INDICATED ON PANELBOARD
UNIT 25. LABEL EXISTING BREAKER AS "SPARE".
DEMOLISH EXISTING BRANCH CIRCUIT CONDUIT AND WIRING ASSOCIATED WITH AHU
ztl-1705850-e601
2021-11-29T08:56:34-0500
JERIMIAH J EASLEY
2021-11-29T09:13:22-0500
Tyler nathaniel Rasch lo tt e
-g
T OF TRANSPO
T A
IC
OF
STATES
IT
P A
TM
EN
AVIA
LA
TRAT
SI
NI
HAMPTON, GA
ATLANTA ARTCC (ZTL)
ZTL-1705850-G001
COVER SHEET
ztl-1705850-g001
2021-11-29T08:54:07-0500
JERIMIAH J EASLEY
2021-11-29T09:08:24-0500
Tyler nathaniel Rasch lo tt e
LOCATION MAP
1.
2.
NFPA 101, EXISTING BUSINESS
IBC, GROUP B
3. CONSTRUCTION TYPE:
AND REGULATIONS:
APPLICABLE CODES
CLASSIFICATION:
OCCUPANCY
CONTROL AND AUTOMATION WING - TYPE IIA
ADMINISTRATION WING - TYPE IIB
BUILDING CODE REFERENCES
FACILITIES AND ELECTRONIC EQUIPMENT
SHIELDING REQUIREMENTS FOR
GROUNDING, BONDING, AND
LIGHTNING AND SURGE PROTECTION,FAA-STD-019F
INTERIOR ELECTRICAL WORKFAA-C-1217H
OSHA STANDARDS 29 CFR 1910 AND 1926
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
NATIONAL ELECTRICAL CODE (NEC)NFPA 70-2020
INTERNATIONAL MECHANICAL CODEIMC-2021
INTERNATIONAL BUILDING CODEIBC-2021
GENERAL
DRAWING INDEX
W
X
Y
YARD HYDRANTYH
TRAMSFORMERXFMR
TRANSFERXFER
WELDED WIRE FABRICWWF
WITHOUTW/O
WATER COLUMNWC
WET BULD TEMPERATUREWB
WITHW/
WATTSW
VENT THROUGH ROOFVTR
VERIFY IN FIELDVIF
VERTICALVERT
VOLUME DAMPERVD
VINYL COMPOSIT TILEVCT
TERMINAL
VARIABLE AIR VOLUMEVAV
VOLTSV
UNLESS NOTED OTHERWISEUNO
UNIT HEATERUH
TYPICALTYP
TEMPERATURE SENSORTS
TRANSVERSETRANS
TOP OF STEELTOS
TOP OF PIPETOP
TOP OF GRATINGTOG
TOP OF DUCTTOD
TOP OF CONCRETETOC
TEMPERATURE INDICATORTI
TEMPERATURETEMP
TOP AND BOTTOMT/B
THERMOSTATT
STRUCTURESTR
STANDARDSTD
SPECIFICATIONSSPEC
SIMILARSIM
SUPPLY FANSF
SCHEDULESCH
SOUND ABSORBING PANELSAP
SANITARYSAN
SUPPLY AIRSA
REFRIGERANT VENTRV
REVOLUTIONS PER MINUTERPM
REHEAT COILRHC
RIGID GALVENIZED STEELRGS
REVISION OR REVERSEREV
REQUIREDREQ'D
REINFORCINGREINF
REFERENCEREF
RECEPTICLEREC
REFLECTED CEILING PLANRCP
RETURN AIRRA
RADIUSR
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
PRESSURE SENSORPS
PRESSURE REDUCING VALVEPRV
POINT OF CONNECTIONPOC
PRESSURE INDICATORPI
PREHEAT COILPHC
PHASEPH
ENTERING WATER TEMPERATUREEWT
ELECTRICAL METAL TUBINGEMT
ELECTRIC WATER COOLEREWC
ELECTRIC/ELECTRICALELEC
ELEVATIONELEV
EXHAUST FANEF
ENTERING AIR TEMPERATUREEAT
DP SENSORDPS
DIFFERENTIAL PRESSUREDP
DIGITAL OUTPUTDO
DOWNDN
DISCONNECTDISC
DIAMETERDIA
DIGITAL INPUTDI
DIRECT DIGITAL CONTROL PANELDDCP
DIRECT DIGITAL CONTROLDDC
DIRECT CURRENTDC
DRY BULB TEMPERATUREDB
DRAIND
CHILLED WATER SUPPLYCWS
CHILLED WATER RETURNCWR
DOMESTIC COLD WATERCW
CONDENSING UNITCU
COOLING TOWER WATER SUPPLYCTS
WATER RETURN
CENTER OR COOLING TOWERCTR
REPRESENTATIVE
CONTRACTING OFFICERSCOR
CONTINUOUSCONT
CONNECTIONCONN
CONDENSATECOND
CONCRETECONC
COLUMNCOL
CLEAN OUTCO
CONCRETE MASONRY UNITCMU
CENTER LINECL
CIRCUITCKT
CIRCULATINGCIRC
CAST IN PLACECIP
CAST IRONCI
CUBIC FEET PER MINUTECFM
CONDENSATE DRAINCD
COOLING COILCC
BACK WATER VLAVEBWV
BALL VALVEBV
BETWEENBTW
BTU PER HOURBTUH
BRITISH THERMAL UNITBTU
BASEMENTBSMT
BOTTOMBOTT
BOTTOM OF STEELBOS
BOTTOM OF PIPEBOP
BOTTOM OF DUCTBOD
BUILDINGBLDG
BREAKERBKR
BUTTERFLY VALVEBFV
BACK FLOW PREVENTERBFP
BLIND FLANGEBF
AMERICAN WIRE GUAGEAWG
AUXILIARYAUX
ASSEMBLYASSY
ACHITECT/ARCHITECTURALARCH
APPROXIMATELYAPROX
ANALOG OUTPUTAO
AIR HANDLING UNITAHU
AIR FLOW METER/SENSORAFM
ABOVE FINISHED FLOORAFF
ACCESS DOORAD
ALTERNATING CURRENTAC
AMPA
I
J
OUTSIDE DIAMETEROD
ON CENTEROC
OUTSIDE AIROA
NOT TO SCALENTS
NATIONAL PIPE THREADNPT
NOMINALNOM
NOT IN CONTRACTNIC
MINIMUMMIN
MANUFACTURERMFG
MOTOR CONTROL CENTERMCC
1000 BTU PER HOURMBH
MAXIMUMMAX
LEAVING WATER TEMPERATURELWT
POUNDSLBS
LEAVING AIR TEMPERATURELAT
KILOWATTSKW
KILOVOLT AMPEREKVA
JUNCTION BOXJB
INDUSTRIAL WATERIW
INVERTINV
INCHIN
INSIDE DIAMETERID
HERTZHZ
HEATING WATER SUPPLYHWS
HEATING WATER RETURNHWR
HW CIRCULATION LOOPHWC
DOMESTIC HOT WATERHW
HUMIDIFIERHU
HEATERHTR
HEAT TRACE ELEMENTHTE
HUMIDITY SENSORHS
HOURHR
HORSE POWERHP
HORIZONTALHORIZ
HOT DIP GALVALINZEDHDG
HEATING COILHC
HOSE BIBBHB
GATE VALVEGV
GALLONS PER MINUTEGPM
GALLONS PER HOURGPH
GROUNDGND
GROUND FAULT INTERRUPTERGFI
GALVENIZEDGALV
GALLONSGALS
GUAGEGA
NATURAL GASG
FEETFT
FEET PER MINUTEFPM
FLOW METER/SENSORFM
FLANGEFLG
FINISHED FLOOR ELEVATIONFFE
FIRE/SMOKE DAMPERFD/SD
FIRE DAMPER OR FLOOR DRAINFD
FLOW CONTROL VALVEFCV
FLOOR CLEAN OUTFCO
FAN COIL UNITFCU
ABBREVIATIONS
Y
LOCATION
PROJECT
GEO
I
1 MILE0
HAPTON, GA 30228
299 WOOLSEY RD
DEMOLITION
ARCHITECTURAL
ELECTRICAL
E602
E601
E501
E101
M604
M603
M602
M601
M505
M504
M503
M502
M501
M103
M101
A101
D102
G004
G003
G002
G001
ELECTRICAL ONE-LINE DIAGRAM
ELECTRICAL PANEL SCHEDULE
ELECTRICAL INSTALL PLAN
AHU-32 MECHANICAL SCHEDULES
AHU-32 AIRFLOW DIAGRAM
MECHANICAL SCHEDULES
AHU-25 AIRFLOW DIAGRAM
AHU-25 DUCTWORK ELEVATION
PIPING RISER DIAGRAM AND DRAIN PLAN
GOVERNMENT FURNISHED FLOORSTAND DETAILS
TEMPORARY AHU DETAILS
MECHANICAL DETAILS
TEMPORARY COOLING PLAN
MECHANICAL DUCTWORK INSTALLATION PLAN
MECHANICAL PIPING INSTALLATION PLAN
MECHANICAL ROOM PAD/PIPING DEMOLITION PLAN
AHU-25 DUCTWORK/PIPING DEMOLITION PLAN
CONSTRUCTION STAGING PLAN
LEGENDS
MAP / ABBREVIATIONS / DRAWING LIST
COVER SHEET
ZTL-1705850-G002
LOCATION MAP & ABBREVIATIONS
MECHANICAL
ztl-1705850-g002
2021-11-29T08:54:21-0500
JERIMIAH J EASLEY
2021-11-29T09:08:34-0500
Tyler nathaniel Rasch lo tt e
BREAK LINES
ELEVATION SYMBOL
A012
DETAIL TITLE REFERENCE
SECTION TITLE REFERENCE
DETAIL NUMBER
A010
SECTION IS DRAWN
SHEET ON WHICH
SECTION CUT
NORTH ARROW
DETAIL REFERENCE
A010
MATCH LINE SYMBOL
COLUMN LINE GRID DESIGNATION
FIN FLR
EL. 89'-6"
ABOVE OR BEYOND
OUTLINE OF OBJECT
CONTRACTOR, UON
DEMOLITION BY
SECTION DESIGNATION
IS DRAWN OR SCHEDULED
SHEET ON WHICH DETAIL
DETAIL DESIGNATION
DETAIL IS DRAWN
SECTION IS CUT
ROOM NAME & NUMBER
EXISTING WORK, UON
NEW WORK, UON
ELEVATION SYMBOL (PLANS)
GRAPHIC SCALE
EQUIPMENT ROOM
FLOOR EL. 10.50'
DESCRIPTIONSYMBOL
20X10
VD
FD SD
SIZE
CFM
AIR INTAKE/OUTLET
DAMPER
SMOKE
FIRE DAMPER,
DAMPER
SMOKE/FIRE
COMBINATION
HIDDEN DUCTWORK
SHOWN)
FIGURE IS SIDE
DUCT (FIRST
RECTANGULAR
CONTROL DAMPER
VOLUME DAMPER,
ROUND SUPPLY DUCT
SQUARE SUPPLY DUCT
ROUND RETURN DUCT
SQUARE RETURN DUCT
04' 4' 8'
GENERAL LEGEND MECHANICAL LEGEND GENERAL NOTES
AHU____
200____
SYMBOL
NUMBER
EQUIPMENT DESIGNATION
THERMOSTAT
ELEVATION REFERENCE
PARTIAL SECTION CUT
ELEVATION SHOWN
DARKENED ARROW INDICATES
ELEVATION IS DRAWN
SECTION IS CUT
ELEVATION DESIGNATION
DESIGNATION
INTERIOR ELEVATION
ELEVATION NUMBER
BALL VALVE
M ELECTRIC MOTOR ACTUATOR
SEQUENCE OF WORK
16. DEMOLISH TEMPORARY COVERING AND INSTALL FINAL REMOVABLE WALL PANEL
15. AHU-25 STARTUP AND BALANCING
14. INSTALL AHU-25
13. INSTALL NEW PAD FOR AHU-25
12. AHU-25, EF-205 AND PAD DEMOLITION
11. AHU-32 STARTUP
10. INSTALL AHU-32
9. INSTALL NEW DUST CONTAINMENT FOR AHU-32
8. DEMOLISH AHU-T, TEMPORARY DUCTWORK AND DUST CONTAINMENT
7. DEMOLISH PIPING FOR AHU-32 AND INSTALL BALL VALVE
6. ISOLATE AND DRAIN PIPING FOR AHU-32
5. PERFORM 24 HOUR PROVING PERIOD FOR AHU-T
4. INSTALL AHU-T, TEMPORARY DUCTWORK, AND DUST CONTAINMENT FOR PIPE DEMO
3. DEMOLISH AHU-25 DUCTWORK
2. ISOLATE AND DRAIN CW AND HW PIPING FOR AHU 25
1. DEMOLISH L1 AND INSTALL TEMPORARY COVERING
AND ACCEPTABLE PRODUCT FOR THE GOVERNMENT.
MATERIALS SUPPLIERS WITH ALL PROJECT REQUIREMENTS TO PRODUCE
INFORMATION PROVIDED HERE WITH SITE CONDITIONS, EQUIPMENT AND
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND CONFIRM ALL
ENCOUNTERED DURING THE CONSTRUCTION PROCESS. IT IS THE
NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE
14. THESE CONTRACT DOCUMENTS ARE SCHEMATIC IN NATURE AND ARE
EXTREME CAUTION IS REQUIRED.
WORK TO BE PERFORMED NEAR CRITICAL POWER FOR FACILITY. 13.
PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
TIME. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF ANY
(DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY
EACH CASE OF BREAKER OPERATION. CONTRACTOR SHALL NOT OPEN
SHALL REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR 12.
DAYS IN ADVANCE OF PERFORMANCE OF WORK.
SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 15 WORKING
REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES SHALL BE
UNSCHEDULED INTERRUPTIONS SHALL BE NOT TOLERATED. WORK 11.
FOR ENTIRE AREA, UNLESS OTHERWISE NOTED.
WORK SPECIFIED IN ROOMS/AREAS WITH BREAK LINES INCLUDES WORK 10.
SURFACE, UNLESS OTHERWISE NOTED.
COLUMN CENTER LINES AND FACE OF MASONRY, CONCRETE OR FINISH
DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM 9.
PANELS ARE REMOVED.
MANUFACTURER IN LOCATIONS WHERE TWO (2) OR MORE FLOOR
PROVIDE AIR BARRIERS AS RECOMMENDED BY ACCESS FLOOR 8.
REMOVED IMMEDIATELY.
CONSTRUCTION DEBRIS & EQUIPMENT IN OCCUPIED AREAS SHALL BE
CLEAN CONSTRUCTION AREAS DAILY TO SATISFACTION OF COR. 7.
APPROVED SYSTEM.
OF MECHANICAL, ELECTRICAL OR FIRE PROTECTION EQUIPMENT WITH AN
BARRIERS THAT ARE EXISTING OR CAUSED BY REMOVAL OR PROVISION
FIRESTOP OPENINGS IN FIRE RATED WALLS OR CEILINGS AND SMOKE 6.
AND BARRIERS AS REQUIRED TO PROTECT ACTIVE EQUIPMENT.
EQUIPMENT IN THE WORK AREA. PROVIDE DUST PROOF PARTITIONS
DEMOLITION WORK THAT MAY CAUSE VIBRATION OR DISRUPTION TO
REMAIN OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR
EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT SHALL 5.
CONFLICTS ARE RESOLVED TO SATISFACTION OF COR.
OF CONFLICTS. NO DEMOLITION WORK SHALL PROCEED UNTIL
BEGINS. COORDINATE DEMOLITION WITH NEW WORK AND NOTIFY COR
VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION 4.
EXISTING FINISHES.
FINISHES AFFECTED BY THE WORK SHALL BE REPAIRED TO MATCH 3.
BE REMOVED.
REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR EQUIPMENT TO 2.
AND ELECTRICAL SYSTEMS.
VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL 1.
LIMIT OF DEMOLITION
LIMIT OF CONSTRUCTION
ZTL-1705850-G003
LEGENDS
MANUAL VOLUME DAMPER
GENERIC VALVE
BALANCING VALVE
REDUCER
AALTERNATE SECTION
ztl-1705850-g003
2021-11-29T08:54:36-0500
JERIMIAH J EASLEY
2021-11-29T09:08:44-0500
Tyler nathaniel Rasch
IN
ID
STATE ROUTE 20 - WOOLSEY RD
SS
XX
XX XX XX XX XX XX XX XX XX
IG
NX
BUILDING
POWER SERVICE
PARKING
VISITOR/TRUCK
AREA OF WORK
STAGING AREA
CONSTRUCTION
HOUSE
GUARD
(ARTCC)
CONTROL CENTER
TRAFFIC
AIR ROUTE
PARKING AREA
lo tt e
A.1
B.1
C.2
C.3
C.4
A.3
A.2
A.4
A.5
C.5
VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE THROUGH MAIN ENTRANCE SECURITY GATE.
OFF-LIMITS FOR PARKING.
PARKING SHALL BE LIMITED TO CONSTRUCTION STAGING AREA. EXISTING PARKING SPACES AT ARTCC ARE
CONSTRUCTION ACCESSA.
A.6
DETERMINED AT THE PRECONSTRUCTION CONFERENCE.
WITH SITE PERSONNEL AND COR, IN CONJUNCTION WITH OTHER ON GOING PROJECTS. AT THE SITE AND SHALL BE
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA SHALL BE COORDINATED
PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS.
THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY REPRESENT MANY OF
CONSTRUCTION STAGING PLAN NOTES:
FAA PERSONNEL ACCESS TO OPERATIONAL EQUIPMENT MUST NOT BE IMPEDED BY ANY ACTIVITY.
THE CONTRACTOR IS ALSO RESPONSIBLE FOR SNOW REMOVAL FROM STAGING AREA.
THE CONTRACTOR SHALL PROVIDE ADEQUATE ILLUMINATION FOR THE STAGING AREA PER OSHA REGULATIONS.
DELIVERIES SHALL BE SCHEDULED AND APPROVED IN ADVANCE WITH COR. COORDINATE DELIVERIES WITH THE COR.
KEEP LOADING DOCK AND CAFETERIA ACCESSIBLE AT ALL TIMES FOR FAA DELIVERIES.
NEAR CONSTRUCTION AREAS.
PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS
PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE
VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE SHALL BE THROUGH MAIN ENTRANCE SECURITY GATE.
CONTRACTOR PARKINGB.
OPERATIONS SHALL BE REPORTED TO THE COR IMMEDIATELY.
OF UTMOST IMPORTANCE. INCIDENTAL OR ACCIDENTAL NEGLIGENCE RESULTING IN A LOSS OR DISRUPTION OF
OF THIS CONTRACT. PROTECTION OF ANY AND ALL EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE IS
EXISTING FAA AIR TRAFFIC CONTROL EQUIPMENT SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION
DISRUPTION OF THIS FACILITY SHALL NOT BE PERMITTED.
USE GREAT CARE AND CAUTION WHILE WORKING IN THIS FACILITY. WORK SHALL BE COORDINATED WITH COR.
ESCORTS OUTSIDE BUILDING MAY BE REQUIRED.
PERSONNEL WORKING WITHIN THE BUILDING. COORDINATE WORK WITHIN THE BUILDING IN ADVANCE WITH COR.
FAA ESCORTS OR PICTURE BADGED CONTRACTOR DESIGNATED ESCORTS SHALL BE REQUIRED FOR CONSTRUCTION
SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL SHALL REMAIN IN CONSTRUCTION AREAS.
VEHICLES SHALL BE MARKED.
SUPERVISORY PERSONNEL SHALL BE RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL WHILE IN THE BUILDING.
NOT TO ACCEPT WORKERS. TEMPORARY SECURITY BADGES SHALL BE ISSUED TO CONSTRUCTION PERSONNEL.
AN ADVANCE LIST AND WEEKLY LOG OF PERSONNEL SHALL BE PROVIDED TO COR. FAA RESERVES THE RIGHTC.1
FAA SECURITY REQUIREMENTSC.
CONSTRUCTION MATERIAL STORAGED.
D.1
UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE.
AT THE DISCRETION OF COR. NO DIGGING WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES (UNDERGROUND
SURROUNDED BY A FENCE. MATERIALS SHALL BE NEATLY STORED AND PROTECTED. LIGHTING SHALL BE PROVIDED
ON SITE SHALL BE LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA SHALL BE
LIGHTING SHALL BE PROVIDED AT THE DISCRETION OF COR. STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS
DISTURBANCE OF UNDERGROUND UTILITIES IN THE AREA. MATERIALS SHALL BE NEATLY STORED AND PROTECTED.
STAGING AREA. THE CONSTRUCTION STAGING AREA SHALL BE SURROUNDED BY A SURFACE FENCE. AVOID
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE SHALL BE LIMITED TO THE CONSTRUCTION
CONSTRUCTION DEBRISE.
E.1
CONSTRUCTION. DEBRIS SHALL BE REMOVED DAILY.
AREA. AREAS AROUND DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST DURING
DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE PROVIDED WITHIN THE CONSTRUCTION STAGING
NOT USEDF.
CONSTRUCTION OFFICEG.
G.1
PRECONSTRUCTION CONFERENCE. HOOK-UPS SHALL BE THE RESPONSIBILITY OF CONTRACTOR.
WING. PROVIDE TELEPHONE AND BOTTLED WATER. POINT OF CONNECTION SHALL BE DETERMINED AT
TRAILERS FOR OFFICE, MATERIALS AND EQUIPMENT STORAGE SHALL BE LOCATED WEST OF THE AUTOMATION
CONSTRUCTION TOILET FACILITIESH.
H.1 SEE DIVISION 1 SPECIFICATIONS
DEMOLITION AND CONSTRUCTION HOURSI.
I.1
WRITING, A MINIMUM OF 15 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK.
AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY COR IN
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING SHALL BE ALLOWED ONLY
ADVANCE OF PERFORMANCE OF THE WORK.
COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 15 WORKING DAYS NOTICE IN
NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES SHALL BE SCHEDULED, SHALL BE ACCOMPLISHED DURING OFF-HOURS OF 11:00 PM TO 6:00 AM OR AS APPROVED BY COR.
PROCEDURES TO PROTECT THIS AND OTHER FAA/GOVERNMENT EQUIPMENT. WORK ON CRITICAL EQUIPMENT
COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED BY THE WORK AND
FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS FACILITY.
CONSTRUCTION NOISE SHALL BE MINIMIZED BETWEEN 6:00 AM TO 11:00 PM.
AIR TRAFFIC CONTROL FUNCTION OF THIS FACILITY SHALL NOT BE INTERFERED WITH. DEMOLITION AND
I.2
I.3
I.4
NOT USEDJ.
NOT USEDK.
PARKING LOT AND DRIVEWAY REPAIRL.
OF COR.
DISTURBED LAWNS AND LANDSCAPING SHALL BE RESTORED TO ORIGINAL CONDITION TO THE SATISFACTION
UPON COMPLETION OF WORK, REPAIR SURFACES AFFECTED BY THE WORK TO ORIGINAL CONDITION.L.1
L.1
EQUIPMENT PROTECTIONM.
M.1
ONSITE WELDING ACTIVITIES.
SUBMITTED TO FAA COR PRIOR TO ON SITE WELDING ACTIVITIES. A HOT WORK PERMIT IS REQUIRED FOR ANY
PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR. VENTILATION PLAN MUST BE
NO WELDING EQUIPMENT SHALL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING SHALL NOT BE
CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ARTCC.
ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY TO COORDINATE
CIRCUIT BREAKER AT ANY TIME.
WRITING FOR EACH CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN
IN WRITING BY COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK.
SHALL BE COMPLETED PRIOR TO SHUTDOWN AND SWITCHOVER. SCHEDULE, COORDINATE AND HAVE APPROVAL
FAA MAY OPERATE MECHANICAL VALVES, COORDINATE SHUTTING OFF VALVES WITH COR. PREPARATORY WORK
OFF-HOURS AS INDICATED IN NOTE I.2 THIS SHEET UNDER DEMOLITION AND CONSTRUCTION HOURS. ONLY
SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE ACCOMPLISHED DURING
DRILLING.
BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, DEBRIS AND DUST, INCLUDING CORE
PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING
M.2
M.3
M.4
ZTL-1705850-G004
ztl-1705850-g004
2021-11-29T08:54:50-0500
JERIMIAH J EASLEY
2021-11-29T09:08:54-0500
Tyler nathaniel Rasch
2" HWR
2" HWS
2 1/2" CWR
2 1/2" CWS
DN TO BASEMENT
TO AHU-30
NEW CD
NEW CD
SPLICED ALONG SIDES OF PAD
BARS BENT AT CORNERS AND
#4 CONTINUOUS ALL SIDES.
6x6x1.2 WWF
EQUIP
BASE
EXISTING SLAB 4" MIN/6" MAX
SIDES. DOWELS EPOXIED INTO
OF PAD AND 24" OC ALONG
#4 DOWELS AT CORNERS
VERT CORNERS
ALL HORIZ AND
3/4" CHAMFER AT
lo tt e
EQUIPMENT PAD DETAIL
SLOPED AT 1/8" PER 1'.
AND AHU-28 BACK INTO SERVICE. CONDENSATE DRAIN MUST BE UNIFORMLY
DRAIN INSTALLATION MUST RECEIVE COR APPROVAL PRIOR TO BRINGING AHU-26
PLACE DURING THE AHU-26 AND AGU-28 SHUTDOWN PERIOD. CONDENSATE
1066 TO FLOOR DRAIN IN ROOM 1067 AS SHOWN. INSTALLATION MUST TAKE
INSTALL NEW COPPER CONDENSATE DRAIN FROM POINT OF CONNECTION IN ROOM
WALL PANEL ON DRAWING M502.
WALL PANEL MUST BE EASILY REMOVABLE FOR FUTURE PROJECTS. DETAILS FOR
OPENING. MATCH MATERIAL, COLOR, FIT AND FINISH OF EXTERIOR WALL. NEW
PROVIDE AND INSTALL NEW INSULATED WALL PANEL IN PLACE OF LOUVER
INSTALLATION. SEE DETAIL ON M503 FOR PROPOSED ENCLOSURE.
SUBMIT PLAN AND SHOP DRAWINGS FOR APPROVAL TO COR PRIOR TO
PROVIDE TEMPORARY VENTILATED ENCLOSURE AROUND AHU DURING INSTALLATION.
ON DRAWING M502.
DOOR AND OUT VIA LOUVER WALL OPENING. DETAILS FOR LOUVER WALL OPENING
AS INDICATED. RUN FLEXIBLE DUCT FROM NEGATIVE PRESSURE MACHINE THROUGH
PARTITION SURROUNDING AIR HANDLER 32 AND UNDER-FLOOR PIPING LOCATED
CONTROL VALVE AND ACTUATOR.
CONNECT UNIT TO NEW CHILLED WATER SUPPLY AND RETURN PIPING. INSTALL
M503 FOR DETAILS. CONTROLS FOR UNIT INCLUDED AS BID ALTERNATE #2.
COWL LOCATED IN GOVERNMENT FURNISHED FLOORSTAND. REFER TO DRAWING
INTERLOCKED ISOLATION DAMPER. INSTALL SUPPLY AIR TEMPERATURE SENSOR IN
INSTALL GOVERNMENT FURNISHED AIR HANDLING UNIT WITH STAND AND
DRAWING.
PROVIDE AND INSTALL NEW EQUIPMENT PAD ACCORDING TO DETAIL ON THIS
ACCORDING TO DETAIL 3 ON M501.
NEW HYDRONIC PIPING. NEW HYDRONIC PIPING SHALL BE HUNG AND INSULATED
EXISTING BALL VALVES TO REMAIN AND SERVE AS POINT OF CONNECTION FOR
RECOMMENDATION AND DETAIL ON M501. PIPING MUST BE COPPER.
EXISTING 8" SQUARE DRAIN. INSTALL P-TRAP PER MANUFACTURER
CONDENSATE DRAIN LINES FROM COOLING COIL TO BE RUN ALONG WALL TO
PROPOSED NEW AHU-25 DISCONNECT PANEL LOCATION.
MOVEMENT AND REASSEMBLED WITHIN MECHANICAL ROOM.
FIT THROUGH DOORWAY AS SHIPPED. UNIT MUST BE DISASSEMBLED PRIOR TO
OPENING MEASURES 36" WIDE. UNIT SELECTED AS BASIS OF DESIGN WILL NOT
OPENING. SEE M502 FOR TEMPORARY COVERING DETAIL. ROOM 1067 DOOR
INSTALL NEW AHU-25. NEW AHU TO BE BROUGHT IN THROUGH LOUVER WALL 1
TYP FOR 4
M501TYP FOR 4
TRAPEZE
PIPE HANGER
ZTL-1705850-M101
MECHANICAL ROOM AHU 25 PIPING INSTALLATION
MECHANICAL PIPING INSTALLATION PLAN
1/4"=1'-0" ztl-1705850-m101
2021-11-29T08:56:47-0500
JERIMIAH J EASLEY
2021-11-29T09:10:47-0500
Tyler nathaniel Rasch
AND RA INTAKES
ABOVE OA
ROUTED AT CEILING
ABOVE SA INTAKE
ROUTED AT CEILING
OUTSIDE SOW
PROTECTION SYSTEM
VIKING FIRE
24X18
18X32
24x18
24x12
24x18
18X22
FD FD
FD
18X22 DOWN UNDER RAISED FLOOR
CD2
CD
CD4
CD3
CD1
1700 CFM
900 CFM DN
CD5
FM
16x12
10x10 8X8
12x10
SD/FD
SD/FD
REG-7
525 CFM
lo tt e
PROVIDE NEOPRENE SEAL WHERE DUCTWORK ENTERS RAISED FLOOR SYSTEM.
WALLS. MAINTAIN FIRE RATING OF DUCT PENETRATIONS.
INSTALL CURTAIN-STYLE FIRE DAMPERS IN NEW DUCTWORK THROUGH FIRE-RATED
MANUFACTURER.
MAINTAIN FIRE RATING OF WALL PENETRATION. MATCH EXISTING FIRESTOP
MECHANICAL ROOM AS INDICATED.
CONNECT NEW DUCTWORK TO EXISTING PENETRATION THROUGH FLOOR IN
PROVIDE NEW DUCTWORK IN MECHANICAL ROOM AND CPC VAULT AS INDICATED.
EXTERIOR.
PENETRATION. PANELS MUST MATCH MATERIAL, FORM, AND FINISH OF BUILDING
PROVIDE NEW LOUVER AND INSULATED PANELS FOR OUTSIDE AIR INTAKE 1
TESTING AND BALANCING NOTES:
3 54
ZTL-1705850-M102
MECHANICAL ROOM AHU 25 DUCTWORK INSTALLATION
1. THE UNIT MUST BE TESTED AT EACH OF THE ROOM OUTLETS AND INLETS FOR
BOTH HIGH SPEED AND LOW SPEED CONFIGURATIONS. THE CFM VALUES REQUIRED
FOR EACH ROOM ARE AS FOLLOWS:
1.1. HIGH SPEED MODE:
1.1.1. SUPPLY AIR: ROOM 1055: 1025 CFM, ROOM 1057: 775 CFM,
ROOM 1066: 1700 CFM, B140: 450 CFM, ROOM B149: 450 CFM
1.1.2. RETURN AIR: ROOM 1055: 1350 CFM, ROOM 1066: 1700 CFM
1.1.3. OUTSIDE AIR: 1350 CFM
1.1.3.1 COORDINATE WITH CONTROLS INSTALLER, RECORD OA
DAMPER POSITION REQUIRED TO PROVIDE 1350 CFM IN HIGH
SPEED MODE AS DMPR(maxfanspeed)
1.2. LOW SPEED MODE:
1.2.1. SUPPLY AIR: ROOM 1055: 1025 CFM, ROOM 1057: 775 CFM
B140: 450 CFM, ROOM B149: 450 CFM
1.2.2. RETURN AIR: ROOM 1055: 1350 CFM
1.2.3. OUTSIDE AIR: 1350 CFM
1.2.3.1 COORDINATE WITH CONTROLS INSTALLER, RECORD OA
DAMPER POSITION REQUIRED TO PROVIDE 1350 CFM IN LOW
SPEED MODE AS DMPR(minfanspeed)
AHU 25 DUCTWORK INSTALLATION PLAN
ztl-1705850-m102
2021-11-29T08:56:59-0500
JERIMIAH J EASLEY
2021-11-29T09:10:58-0500
Tyler nathaniel Rasch
3100 CFM
3100 CFM
lo tt e
INSTALL TEMPORARY THERMOSTAT TO BE USED FOR CONTROLS OF AHU-T.
SEE M601 FOR TEMPORARY AHU REQUIREMENTS.
FURNISH TEMPORARY COOLING AIR HANDLING UNIT AHU-T OUTDOORS ON SKID.
FROM AHU-T INTO ROOM 1055.
UTILIZE OPENING CREATED IN DUCTWORK DEMOLITION TO ROUTE RETURN DUCTS
RETURN DUCT MUST RETURN 4650 CFM.
ROUTED AND TERMINATED OVERHEAD, SECURED TO BUILDING STEEL. EACH
RECOMMENDED LOCATION FOR RETURN DUCT OPENING. RETURN DUCT MUST BE
COLLAR. EACH SUPPLY DUCT MUST SUPPLY 3100 CFM.
WITH A 16" HOLE IN THE MIDDLE. CONNECT THE DUCT TO THE PLYWOOD WITH A
CONNECTION TO RAISED FLOOR MUST BE MADE WITH A 2'x2' PLYWOOD SHEET
RECOMMENDED LOCATION FOR CONNECTIONS OF SUPPLY DUCT TO RAISED FLOOR.
IN ROOM 1055 MUST BE RUN OVERHEAD, SECURED TO BUILDING STEEL.
DUCTS FROM PLENUM TO UNDERNEATH THE RAISED FLOOR IN ROOM 1055 DUCTS
CONNECT THE 2 20" SUPPLY DUCTS FROM AHU-T IN ROOM 1066. ROUTE 3 16"
DUCTS IN ROOM 1066 AND OPENINGS FOR 3 16" DUCTS IN ROOM 1055.
INSTALL 36"x30" PLENUM AT TOP OF DOORWAY WITH OPENING FOR 2 20" 1
EF
PANEL E-111-AA PANEL E-111-AD
ZTL-1705850-M103
AHU 32 INSTALL PLAN
M103
TEMPORARY COOLING PLAN
ztl-1705850-m103
2021-11-29T08:57:11-0500
JERIMIAH J EASLEY
2021-11-29T09:11:07-0500
Tyler nathaniel Rasch lo tt e
CLEANOUT AS SHOWN.5.
SLOPED CONDENSATE DRAIN LINE TOWARD DRAIN. DISCHARGED AT 1/4" PER FOOT.4.
DRAIN LINE NO SMALLER THAN NIPPLE FITTING AT DRAIN PAN.3.
SLOPED CONDENSATE PAN TOWARD DRAIN LINE.2.
MUST HAVE COR APPROVAL BEFORE INSTALLATION OF NEW UNIT.
SUBMIT SHOP DRAWINGS OF PROPOSED TRAP PRIOR TO INSTALLATION OF NEW UNIT. 1.
CONDENSATE DRAIN DETAIL
HYDRONIC PIPING INSULATION DETAIL
PIPE
FIELD-APPLIED JACKETING
LONGITUDINAL OVERLAP ON
BUTT JOINT OVERLAP SEALED
PVC JACKET
SECURE INSULATION
WIRE, TAPE OR BANDS TO
RIGID INSULATION
REQUIRED ON CHILLED WATER PIPE
VAPOR STOP CONSTRUCTION IS
NOTE 2
NOTE 1
NOTE 3
NOTE 5
NOTE 4
2" MIN
INSULATIONPIPE
1/2" DIA.
PIPE CLEVIS
MINIMUM ROD
18 GAUGE
SADDLE
SHEET PIPE
GALVANIZED
INSULATED
PIPE SADDLE
INSULATION
MIN. 1/2" DIA.
THREADED ROD
SUPPORT STEEL
SADDLE
STRAP
U-BOLT OR
STEEL ANGLE
PIPE HANGER DETAIL
HYDRONIC PIPING DETAIL
AIR FLOW
OI
HEATI
NG/
COOLI
NG
C/
HW
HEADER
C/
HW
HEADER
(T
YP
FOR
2)
AUTOM
ATI
AI
VENT
5)
BALL
ALVE
DRAI
CAP
3/ 4"
OSE
ND
ALVE
/4 " B
LOW
OW
CALI
BRATE
BALANCI
VALVE
PRES
SURE
GAUGE
TE
P-
/T
HERM
OW
EL
- S
EE
ET
AI
5-
1)
3/
HOSE
IB
ONNECTI
ON
DOW
ST
RAI
NER
/B
LOW
FL
EX
CONN
YP)FL
ANGE
CONTROL
CHARACTE
RI
ZE
TW
AY
FLEX CONNECTOR REPLACEMENT, AND FLOW VALVE REPLACEMENT.
THAT ALLOWS FOR SERVICE ACCESSIBILITY, COIL PULL,
CONFIGURE AND INSTALL HYDRONIC PIPING IN SUCH A MANNER 3.
ALL DIMENSIONS MUST BE LISTED ON SHOP DRAWINGS.
BEGIN WORK ON HYDRONIC PIPING PRIOR TO SHOP DRAWING APPROVAL BY COR.
PIPING BEFORE DEMOLITION. CONTRACTOR MUST NOT
CONTRACTOR MUST SUBMIT SHOP DRAWINGS FOR THE HYDRONIC2.
PIPE FITTINGS 2" AND SMALLER ARE THREADED FITTINGS.1.
3/4" LONG SELF-TAPPING SCREWS.
SHALL BE NO LESS THAN 18GA THICK AND SCREWED TO ANGLE WITH 5/16" DIAM. X
U-BOLTS SHALL BE A MINIMUM OF 1/4" DIAMETER, GALVANIZED STEEL STRAPS 7.
SUPPORTING POINTS WHEN LOAD IS APPLIED.
DEFLECTION ON THE STEEL ANGLE SHALL BE LIMITED TO A MAXIMUM OF 1/8" FROM
STEEL ANGLE SHALL BE SIZED IN ACCORDANCE TO THE TRAPEZE LENGTH/ 6.
BUILDING STRUCTURE SHALL NOT BE PERMITTED.
SUPPORT ON THE BUILDING STRUCTURE. SINGLE ATTACHMENT OF TRAPEZE TO
FOR MULTIPLE PIPES USE TRAPEZE HANGER. DISTRIBUTE LOAD OF HANGER 5.
CONNECT SECURELY TO BUILDING STRUCTURE AS SPECIFIED.4.
SADDLES).
HANGERS ARE ALSO TYPICAL FOR UNINSULATED PIPING (WITHOUT INSULATION AND 3.
HANGER RODS SHALL NOT BE LESS THAN 1/2" DIAMETER.2.
COMPRESSIVE STRENGTH NOT LESS THAN 3,300 PSI.
INSULATION ABOVE SADDLES SHALL BE 2 INCHES THICK FOAM GLASS WITH A 1.
INSTALLED AT 90° TURNINSTALLED IN HORIZONTAL RUN
9"
THREADED TEST WELL
FS BUSHING
LINE SIZE
WHEN LINE SIZE
IS LESS THAN 4"
1" NPT 3000 LB
FS BONNEY ELBOWLET
4" DIA PIPE MIN
90 2 1/2" TEE
2 1/2" LINE SIZE REDUCER
2 1/2" & UNDER
THERMOWELL INSTALLATION DETAIL
ST
OI
NT
PET
E'
PLUG
PIPING. VERIFY JACKET COLOR WITH COR BEFORE INSTALLATION.
2. PVC JACKET MUST BE RED FOR HOT WATER PIPING AND BLUE FOR CHILLED WATER
ALL NEW HYDRONIC PIPING MUST BE INSULATED AS SHOWN IN THIS DETAIL1.
ZTL-1705850-M501
MECHANICAL DETAILS
ztl-1705850-m501
2021-11-29T08:57:22-0500
JERIMIAH J EASLEY
2021-11-29T09:11:16-0500
Tyler nathaniel Rasch
ROOF DRAIN
NOT IN SOW
EXISTING PIPING
GARDEN HOSE SPIGOT
TEMPORARY DUCTWORK
OPENING FOR
AND PLYWOOD
BETWEEN OPENING
WEATHER STRIPPING
PROVIDE TEMPORARY
LOUVER WALL FRAMEINTO OPENING
TEMPORARILY INSTALLED
PLYWOOD SHEET
4A
DUCTWORK
CONTAINMENT
OPENING FOR DUST
IN
lo tt e
HEAD
4A
METAL SHALL MATCH EXISTING BUILDING EXTERIOR IN FIT AND FINISH.
OPENING. PANEL SHALL BE COATED TO MATCH BUILDING EXTERIOR AND SHEET
PROVIDE AND INSTALL REMOVABLE PANEL COVERING EXISTING LOUVER WALL
DEMOLISHED MATERIAL. TEMPORARY PANEL MUST BE LOCKABLE.
CLOSED AND WEATHERPROOF WHEN NOT IN USE FOR MOVEMENT OF NEW OR
AND BRING IN ALL NEW MATERIAL VIA WALL OPENING. WALL OPENING MUST BE
TRANSITING NEW EQUIPMENT INTO CPC VAULT. REMOVE ALL DEMOLISHED MATERIAL
PROVIDE PANEL THAT IS EASILY REMOVABLE OR FEATURES DOORS CAPABLE OF
INSTALLED AND PROVED.
FILTER FRAME TO BE REINSTALLED AFTER ALL NEW AIR HANDLERS HAVE BEEN
TO COR FOR APPROVAL PRIOR TO STARTING WORK. LOUVER WALL, FILTERS, AND
LOUVER IS REMOVED. SUBMIT ON COVERING AND TEMPORARY HVAC CONNECTION
REMOVED. PROVIDE TEMPORARY WEATHERPROOF COVERING WHILE EXTERIOR
COMPONENTS MUST BE PROTECTED AND STORED OUT OF WEATHER WHILE
REMOVE 8'X8' LOUVER WALL, FILTERS, AND FILTER FRAME. EXISTING WALL
PARTITION AND VENTILATION DETAILS.
WELDING AND WORK UNDER RAISED FLOOR. SEE DETAIL ON DRAWING M503 FOR
TEMPORARY DUCTWORK REQUIRED FOR EXHAUSTING DUST AND FUMES FROM 1
EXISTING GRADE
BRICK
METAL SIDING
PREFORMED
TEMPORARY AHU INSTALLATION
3/8" = 1"SCALE:
EXISTING LOUVER WALL
3/8" = 1"
REMOVABLE PANEL INSTALLATION
4C
4B
SILL
4C
JAMB
4B
REMOVABLE PANEL DETAILS
(REMOVABLE)
CLOSURE
(REMOVABLE)
TAPE SEALANT
COVER WITH
SHEET METAL
18 GA GALV
METAL DRIP
GALV SHEET
18 GA
METAL DRIP
GALV SHEET
18 GA
GROUND FLOOR
PLASTIC PLUG
(TYP)
CHANNEL
STRUCTURAL
@ 2'-0" OC
W/ 1/2 "´ BOLTS
L3x3x 1/4 CONT
@ 2'-0" OC
W/ 1/2 "´ BOLTS
L3x3x 1/4 CONT
3'-0" OC (EMBED 3")
EXP ANCHORS @
L4x4x 3/8 x10'-0" W/ 5/8 "´
ZTL-1705850-M502
TEMPORARY AHU DETAILS
BLANKET INSULATION
3" THICK
ztl-1705850-m502
2021-11-29T08:57:34-0500
JERIMIAH J EASLEY
2021-11-29T09:11:25-0500
Tyler nathaniel Rasch
AHU FRONT
ABOVE FIN EL
" 4
SET TOP OF STAND
RAISED FL PANEL
STRINGER
RAISED FLOOR PEDESTAL
SEISMIC SUPPORT
ADJUSTABLE THREADED
AHU FLOOR STAND W/
lo tt e
FLOOR.
" FOAM NEOPRENE SEAL AROUND UNIT ALONG RAISED 4
PROVIDE AND INSTALL
LISTED IN SCHEDULE ON DRAWING M602.
PROVIDE AND INSTALL SUPPLY AIR TEMPERATURE SENSOR AS INDICATED. SENSOR
AND DAMPER FOR AHU 32.
USE GOVERNMENT FURNISHED FLOORSTAND, DUCT SCOOP, VIBRATION ISOLATORS,
ACTUATOR LISTED IN SCHEDULE ON M602.
ACTUATOR. SUBMITTAL MUST BE APPROVED BY COR BEFORE INSTALLATION.
DISPOSE OF EXISTING ACTUATOR AND SUPPLY NEW MOTOR-OPERATED ELECTRICAL
REQUIREMENTS FOR SEISMIC ZONE-2B (TYP).
ANCHOR TO FLOOR USING ANCHOR BOLTS CONFORMING TO AHU MANUFACTURER 1
AHU 32 FLOORSTAND TOP VIEW
1" = 1'-0"
AHU 32 FLOORSTAND FRONT VIEW
AHU 32 FLOORSTAND SIDE VIEW
DUST CONTAINMENT
AHU 32 HYDRONIC PIPING SCHEMATIC
DRI
PAN
UNI
HUM
ID
IF
IE
BAL
ANCIN
VAL
VE
CAL
IBRAT
ED
OR
PRES
SURE
CW
S CW
FL
EX
CONN
4)
CHECK
(TYP)
STRAINER
HUMIDIFIER DRAIN
COIL CONDENSATE AND
DN
DRAWI
M50
EE
DETA
IL
WI
TH
HERMOWELL
MP
CONDENSATE
PUM
CI
TY
ATE
CONNECTI
CAP
PED
AT
UNI
6 MIL POLY (TYP OF 5 SIDES)
GAGE POLY
OF ZIPPER OR HEAVIER
PASSAGE OF AIR BY USE
WILL PREVENT THE
PROVIDE ENTRY THAT
SUPPORTS (TYP)
PROVIDE ENCLOSURE
BUILDING ENVELOPE.
EXHAUST FUMES OUTSIDE
PROVIDE FLEXIBLE DUCT TO
DUST/FUMES TO OUTSIDE.
MACHINE THAT VENT
PROVIDE NEGATIVE AIR
FOR THE CONSTRUCTION AREA
SURFACE TO CREATE A AIR DAM
RAISED FLOOR TO CONCRETE
EXTEND DUST BARRIER BELOW
AIR HANDLING UNIT (AHU)
AIR HANDLING UNIT (AHU)
ZTL-1705850-M503
GOVERNMENT FURNISHED
FLOORSTAND DETAILS
TWO-
WAY
CHARACTE
RIZ
ED
CONTR
OL
ztl-1705850-m503
2021-11-29T08:57:44-0500
JERIMIAH J EASLEY
2021-11-29T09:11:34-0500
Tyler nathaniel Rasch
BALANCING VALVE
10661055
B147B149B140
2"3"
2" 2½"
3"
3"
1"
2"
"4 lo tt e
BACK INTO SERVICE.
BRANCH VALVE, OPEN UNIT ISOLATION VALVES, AND BRING AHUS 26, 28, AND 30
FOLLOWING SUCCESSFUL INSTALLTION OF NEW VALVE, CLOSE HOSE BIBS, OPEN
PIPING WITH A DIELECTRIC UNION FOR INSTALLATION WITH THE NEW UNIT.
VALVES SHALL CONNECT TO EXISTING STEEL PIPE AND TRANSITION TO COPPER
AND CHWS LINES IN FIRST FLOOR AS SHOWN IN DRAWING M102. NEW BALL
DEMOLISH EXISTING PIPING AND INSTALL NEW ISOLATION BALL VALVES ON CHWR
ON DRAIN LINE BY OPENING VALVE ON CHWS PIPE AS NEEDED.
HOSE. OPEN CHWR HOSE BIB TO BEGIN PIPE DRAIN. RELIEVE VACUUM PRESSURE
ON SOUTH SIDE OF ARTCC TO DRAIN. USE INLINE TRANSFER PUMP ON CHWR
ROOM B147. RUN BOTH HOSES OUT OF BUILDING VIA DOOR TO AREAWAY 13A
PROVIDE AND INSTALL HOSES ON HOSE BIBS (CHWR AND CHWS) LOCATED IN
BEGINNING DRAINAGE SEQUENCE. BALL VALVE LOCATED IN ROOM B152.
CLOSE BALL VALVE SUPPLYING BRANCH (AHUS 25, 26, 28, AND 30) PRIOR TO
VALVES PRIOR TO BEGINNING DRAINAGE SEQUENCE (TYP 3).
SHUT DOWN AHUS 25, 26, 28, AND 30 AND ISOLATE AT LOCAL ISOLATION
EVENT. NOTIFY COR OF ANY VALVES THAT FAIL TESTING.
MAY OPERATE VALVES. TEST ALL VALVES AT LEAST 3 DAYS PRIOR TO DRAINAGE
DRAINAGE POINTS WITH COR PRIOR TO START OF WORK. ONLY FAA PERSONNEL
DRAIN SHALL BE COMPLETED AS NIGHT WORK. VERIFY LOCATIONS OF VALVES AND
TO BEGINNING INSTALLATION OF ISOLATION VALVES FOR USE WITH AHU-32. PIPE
DRAIN CHILLED WATER PIPING ASSOCIATED WITH AHU-25, 26, 28, AND 30 PRIOR 1
FIRST FLOOR
BASEMENT
450 CFM
450 CFM
775 CFM
1025 CFM
GENERAL NOTES:
TO ENSURE THAT WORK IS COMPLETED WITHIN THE SPAN OF A SINGLE SHIFT.
BETWEEN 2300 AND 0600 LOCAL TIME. COORDINATE WITH COR AND LOCAL ESU
SENSITIVE AREAS OF THE BUILDING AND MUST BE COMPLETED OVERNIGHT
VALVE MUST BE COMPLETED SIMULTANEOUSLY. THIS WORK WILL TAKE PLACE IN
DEMOLITION WORK FOR AHU-32 PIPING AND INSTALLATION OF ISOLATION 1.
ZTL-1705850-M504
PIPING RISER DIAGRAM AND DRAIN PLAN
SA
RA
OA
CHILLED WATER PIPING RISER DIAGRAM
AIRFLOW SCHEMATIC
ztl-1705850-m504
2021-11-29T08:57:56-0500
JERIMIAH J EASLEY
2021-11-29T09:11:43-0500
Tyler nathaniel Rasch
EXISTING 3'X7' LOUVER OPENING
ACCESS DOOR (TYP 3)
FLOOR TO BASEMENT
SUPPLY DUCT THROUGH
PAD
CONC.
EXISTING STAIRS
1"
3/4" NPTI (TYP 2)
2" NPTE (TYP 2)
EXISTING PENETRATION
BUILDING EXTERIOR
lo tt e
ZTL-1705850-M505
AHU-25 DUCTWORK ELEVATION
StateATLANTA CENTER
MECHANICAL ROOM ELEVATION (NEW WORK)
3/4" = 1'
12X24
18X24
18X32
18X22
HWR
HWS
CHWR
CHWS
1350 CFM MIN1800 CFM
3050 CFM MAX
1700 CFM MAX
TESTING AND BALANCING NOTES:
1. THE UNIT MUST BE TESTED AT EACH OF THE ROOM OUTLETS AND INLETS FOR
BOTH HIGH SPEED AND LOW SPEED CONFIGURATIONS. THE CFM VALUES REQUIRED
FOR EACH ROOM ARE AS FOLLOWS:
1.1. HIGH SPEED MODE:
1.1.1. SUPPLY AIR: ROOM 1055: 1025 CFM, ROOM 1057: 775 CFM,
ROOM 1066: 1700 CFM, B140: 450 CFM, ROOM B149: 450 CFM
1.1.2. RETURN AIR: ROOM 1055: 1350 CFM, ROOM 1066: 1700 CFM
1.1.3. OUTSIDE AIR: 1350 CFM
1.1.3.1 COORDINATE WITH CONTROLS INSTALLER, RECORD OA
DAMPER POSITION REQUIRED TO PROVIDE 1350 CFM IN HIGH
SPEED MODE AS DMPR(maxfanspeed)
1.2. LOW SPEED MODE:
1.2.1. SUPPLY AIR: ROOM 1055: 1025 CFM, ROOM 1057: 775 CFM
B140: 450 CFM, ROOM B149: 450 CFM
1.2.2. RETURN AIR: ROOM 1055: 1350 CFM
1.2.3. OUTSIDE AIR: 1350 CFM
1.2.3.1 COORDINATE WITH CONTROLS INSTALLER, RECORD OA
DAMPER POSITION REQUIRED TO PROVIDE 1350 CFM IN LOW
SPEED MODE AS DMPR(minfanspeed)
WALLS. MAINTAIN FIRE RATING OF DUCT PENETRATIONS.
INSTALL CURTAIN-STYLE FIRE DAMPERS IN NEW DUCTWORK THROUGH FIRE-RATED
MANUFACTURER.
MAINTAIN FIRE RATING OF WALL PENETRATION. MATCH EXISTING FIRESTOP
MECHANICAL ROOM AS INDICATED.
CONNECT NEW DUCTWORK TO EXISTING PENETRATION THROUGH FLOOR IN
PROVIDE NEW DUCTWORK IN MECHANICAL ROOM AND CPC VAULT AS INDICATED.
EXTERIOR.
PENETRATION. PANELS MUST MATCH MATERIAL, FORM, AND FINISH OF BUILDING
PROVIDE NEW LOUVER AND INSULATED PANELS FOR OUTSIDE AIR INTAKE
0 CFM MIN
ztl-1705850-m505
2021-11-29T08:58:09-0500
JERIMIAH J EASLEY
2021-11-29T09:11:53-0500
Tyler nathaniel Rasch
File details come from the government source that posted it. Updated .