ZPH-Airfield--Bid-SetPlans-2025-04-07.pdf

PDF 8 MB Posted

Attached to
AIRFIELD PAVEMENTS REHAB
Solicitation number
2025-006
Issued by
Pasco County, Florida

About this file

This document is a comprehensive bid set of engineering plans for the Airfield Pavements Rehabilitation project at Zephyrhills Municipal Airport in Zephyrhills, Florida, prepared by Jacobs and Mohsen Design Group for the City of Zephyrhills in April 2025. The project involves a phased rehabilitation of airport taxiways and pavements, including 2-inch milling and resurfacing of multiple taxiway areas. The work is divided into four phases: a 30-day mobilization period, Phase 1 involving site preparation and resurfacing north of the terminal (14 calendar days), Phase 2 focusing on the area from the terminal to Taxiway B (7 calendar days), Phase 3A targeting Taxiway E pavement (18 calendar days), and Phase 3B addressing the end of Taxiway E (3 calendar days).

The project includes specific technical requirements for pavement rehabilitation, including applying tack coat, milling existing asphalt, densifying limerock base, and installing new asphalt overlay. The plans detail precise construction phasing, safety protocols, and marking requirements, with strict limitations on working hours (7:00 AM to 7:00 PM) and liquidated damages of $1,000 per additional day beyond the specified phase duration. The rehabilitation will involve approximately 2 inches of milling and overlay, with careful attention to existing infrastructure, drainage systems, and airport operational areas. The project aims to improve airport pavement conditions while maintaining minimal disruption to airport operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

LOCATION MAP VICINITY MAP

1"= 2500'

PROJECT AREAS

AIRFIELD PAVEMENTS REHABILITATION

DATE: APRIL 2025

DIMENSION INFORMATION SHOULD NOT BE OBTAINED BY SCALING THE PLANS.

DIMENSION INFORMATION NOT PROVIDED HEREIN CAN BE OBTAINED BY CONTACTING

MOHSEN DESIGN GROUP.

Prepared For:

ZEPHYRHILLS MUNICIPAL AIRPORT

Prepared By:

CITY OF ZEPHYRHILLS

AT

REVISIONS

MARK DESCRIPTION DATEBY

MOHSEN DESIGN GROUP INCORPORATED

2202 N WESTSHORE BLVD, SUITE 200

TAMPA, FL 33607

1" = 1500'

ISSUED FOR BID

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

C001

AutoCAD SHX Text Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C001-COV.dwg 4/4/2025 4:41 PM - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C001-COV.dwg 4/4/2025 4:41 PM - Yan 4/4/2025 4:41 PM - Yan4/4/2025 4:41 PM - Yan - YanYan

A

14 2345678910111213

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

GENERAL NOTES

1. THE OWNER SHALL HAVE THE AUTHORITY TO SUSPEND THE WORK WHOLLY, OR IN PART, FOR SUCH A PERIOD OR

PERIODS AS HE/SHE MAY DEEM NECESSARY. THIS MAY BE DUE TO UNSUITABLE WEATHER OR ANY OTHER CONDITION THAT MAY BE CONSIDERED UNFAVORABLE FOR THE EXECUTION OF THE WORK, OR FOR SUCH TIME AS IS NECESSARY DUE TO THE FAILURE ON THE PART OF THE CONTRACTOR TO CARRY OUT OR PERFORM AND/OR ALL PROVISIONS OF THE

CONTRACT.

2. THE CONTRACTOR IS RESPONSIBLE FOR STAKING THE CONSTRUCTION SITE PRIOR TO THE START OF CONSTRUCTION.

THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER OF ANY DISCREPANCY BETWEEN THE DESIGN DRAWINGS AND FIELD CONDITIONS. THE COST OF CONSTRUCTION STAKING AND MEASUREMENTS SHALL BE INCLUDED IN THE UNIT

PRICE FOR ITEM P-103 SURVEY AND STAKEOUT.

3. THE QUANTITIES SHOWN ON THE BID DOCUMENTS ARE APPROXIMATE AND ARE FOR THE SOLE PURPOSE OF COMPARING BIDS. THE CONTRACTOR SHALL BE PAID FOR ACTUAL QUANTITIES MEASURED IN THE FIELD AND APPROVED BY THE

OWNER.

4. THE CONTRACTOR SHALL PERFORM HIS/HER OWN QUANTITY TAKE OFF PRIOR TO ORDERING MATERIALS. ANY DISCREPANCY BETWEEN BID QUANTITY AND MEASURED QUANTITY SHALL BE IDENTIFIED TO THE RESIDENT PROJECT REPRESENTATIVE IMMEDIATELY. ORDERING INSUFFICIENT MATERIALS SHALL NOT BE SUFFICIENT GROUNDS FOR EXTENDING THE CONTRACT TIME TO AVOID LIQUIDATED DAMAGES. THE CONTRACTOR SHALL NOT BE REIMBURSED FOR

OVER ORDERING OF MATERIALS BASED ON BID SCHEDULE QUANTITIES.

5. THE CONTRACTOR SHALL DESIGNATE A PROJECT MANAGER OR SUPERINTENDENT TO THIS PROJECT AND SUBMIT HIS/HER RESUME AND QUALIFICATIONS TO THE OWNER FOR REVIEW AND APPROVAL TWO (2) WEEKS PRIOR TO THE PRE-CONSTRUCTION MEETING. THE PROJECT MANAGER OR SUPERINTENDENT SHALL BE ON THE JOB SITE AT ALL TIMES WHEN CONSTRUCTION WORK IS BEING CONDUCTED BY THE CONTRACTOR OR HIS/HER SUBCONTRACTORS.

6. THE OWNER AND ENGINEER WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF CONSTRUCTION OR SAFETY PRECAUTIONS.

7. THE CONTRACTOR WILL ENSURE ALL THE CONSTRUCTION PERSONNEL HAVE A VALID STATE ISSUED I.D. IN THEIR

POSSESSION, AT ALL TIMES WHILE WORKING WITH IN THE AIRPORT OPERATIONS AREA,

8. THE CONTRACTOR SHALL EXAMINE EXISTING ACCESS ROADS, TAXIWAYS, AND OTHER PAVEMENTS TO DETERMINE IF THEY ARE CAPABLE OF SUSTAINING LOADS FROM VEHICLES AND CONSTRUCTION EQUIPMENT. ANY DAMAGE TO EXISTING PAVEMENTS TO BE PROTECTED SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.

9. EXISTING PAVEMENT OR OTHER EXISTING WORK NOT SPECIFIED FOR REMOVAL WHICH IS TEMPORARILY REMOVED, DAMAGED, OR IN ANY WAY DISTURBED OR ALTERED BY WORK UNDER THIS CONTRACT SHALL BE REPAIRED, PATCHED, OR REPLACED TO THE COMPLETE SATISFACTION OF THE ENGINEER AT NO EXPENSE TO THE OWNER.

10. DAMAGE TO OTHER AIRPORT FACILITIES SUCH AS LIGHTING, SIGNAGE, NAVIGATIONAL AIDS, FAA CABLES, AND OTHER UTILITIES SHALL BE IMMEDIATELY REPORTED TO THE OWNER AND THE FAA AS WELL AS ANY COST FOR REPAIR, BY CONTRACTOR OR OTHERS, WILL BE BORNE BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.

11. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH OTHER CONTRACTORS WHO MIGHT BE WORKING CONCURRENTLY AT THE AIRPORT. ANY CONFLICTS IN PERFORMING WORK SHALL BE IMMEDIATELY BROUGHT TO THE

ATTENTION OF THE OWNER FOR RESOLUTION.

12. THE CONTRACTOR SHALL MEET ALL APPLICABLE LOCAL AND FEDERAL LAWS WHEN DISPOSING ANY OILS OR OTHER FLUIDS REMOVED FROM EQUIPMENT BEING SERVICED ON AIRPORT PROPERTY. CONTRACTOR SHALL IMMEDIATELY CLEAN ANY SPILLS AND DISPOSE OF THE MATERIAL OFF AIRPORT PROPERTY AT APPROVED DESIGNATED AREAS.

13. ALL CONSTRUCTION WASTE SHALL BE DISPOSED OF OFF AIRPORT PROPERTY OR AT APPROVED DESIGNATED AREAS.

THE CONTRACTOR SHALL ACQUIRE ANY REQUIRED PERMITS FOR DISPOSAL OF THIS MATERIAL AT NO EXPENSE TO THE

OWNER.

14. IF THE CONTRACTOR ENCOUNTERS SOIL STAINS, UNUSUAL ODORS, OR BURIED WASTE, WORK SHALL BE STOPPED AND

THE OWNER SHALL BE NOTIFIED IMMEDIATELY.

15. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER AS TO REDUCE EROSION TO THE PRACTICABLE MINIMUM AND TO PREVENT DAMAGING SILTATION OF WATER COURSES, STREAMS, LAKES OR RESERVOIRS. THE SURFACE AREA OF ERODIBLE LAND, EITHER ON OR OFF THE AIRPORT SITE, EXPOSED TO THE ELEMENTS BY CLEARING, GRUBBING OR GRADING OPERATIONS, INCLUDING GRAVEL PITS, WASTE OR DISPOSAL AREAS, AND HAUL ROADS, AT ANY ONE TIME, FOR THIS CONTRACT, SHALL BE SUBJECT TO APPROVAL OF THE OWNER AND THE DURATION OF SUCH EXPOSURE PRIOR TO FINAL TRIMMING AND FINISHING OF THE AREAS SHALL BE HELD TO THE MINIMUM PRACTICAL. THE OWNER OR ITS REPRESENTATIVE SHALL HAVE FULL AUTHORITY TO ORDER THE SUSPENSION OF GRADING AND OTHER OPERATIONS PENDING ADEQUATE AND PROPER PERFORMANCE OF FINISHING AND MAINTENANCE WORK OR TO RESTRICT THE

TRIMMING OF ERODIBLE LAND EXPOSED TO THE ELEMENTS.

16. THE DISTURBANCE OF LANDS AND WATERS THAT ARE OUTSIDE THE LIMITS OF CONSTRUCTION IS PROHIBITED, EXCEPT

AS FOUND NECESSARY AND APPROVED BY THE OWNER.

17. THE CONTRACTOR SHALL CONDUCT HIS/HER WORK IN SUCH A MANNER AS TO PREVENT THE ENTRY OF FUELS, OILS, BITUMINOUS MATERIALS, CHEMICALS, SEWAGE, OR OTHER HARMFUL MATERIALS INTO STREAMS, RIVERS, LAKES OR

RESERVOIRS.

18. MINIMUM POSSIBLE AREAS OF OPEN GRADING, BORROW OR AGGREGATE EXCAVATION SHALL BE EXPOSED AT ONE TIME, CONSISTENT WITH THE PROGRESS OF THE WORK.

19. WHEN NECESSARY, CERTAIN OPERATIONS SHALL BE DELAYED UNTIL PROPER WIND OR CLIMATIC CONDITIONS EXIST TO DISSIPATE OR INHIBIT POTENTIAL POLLUTANTS TO THE SATISFACTION OF REGULATORY AGENCIES.

20. UPON THE COMPLETION OF THE WORK AND BEFORE ACCEPTANCE AND FINAL PAYMENT WILL BE MADE, THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL MACHINERY, EQUIPMENT, SURPLUS AND DISCARDED MATERIALS, RUBBISH, TEMPORARY STRUCTURES, AND STUMPS OR PORTIONS OF TREES. CUT ALL BRUSH AND WOODS WITHIN THE LIMITS INDICATED AND SHALL LEAVE THE SITE IN A NEAT AND PRESENTABLE CONDITION. MATERIAL CLEARED FROM THE SITE AND DEPOSITED ON ADJACENT PROPERTY WILL NOT BE CONSIDERED AS HAVING BEEN DISPOSED OF SATISFACTORILY, UNLESS THE CONTRACTOR HAS OBTAINED THE WRITTEN PERMISSION OF SUCH PROPERTY OWNER.

21. ALL DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED.

22. ANY DEWATERING, DEWATERING PERMITS AND FEES SHALL BE CONSIDERED INCIDENTAL TO MOBILIZATION. NO

SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.

AG ---

BGV ---

BRL ---

C ---

CB ---

CF ---

CL, C ---

CLF ---

CO ---

CONC ---

CMP ---

CMON ---

CSH ---

CSL ---

CSSO ---

CY ---

DIA ---

DRM ---

DWG ---

E ---

EA ---

EC ---

EL, ELEV ---

ENG ---

EP ---

EVC ---

EOP ---

EQ ---

EX, EXIST, (E) ---

EXC ---

EXP JT ---

FAA ---

FAR ---

FCIR ---

FG ---

HGL ---

HP ---

HOR ---

HYD ---

ID ---

INV ---

LB ---

LF ---

LONG ---

LP ---

LS ---

LT ---

MAX ---

MH ---

MIN ---

MISC ---

MON ---

MULT ---

MSL ---

N ---

NO ---

NTS ---

OC ---

OD ---

OFA ---

OFZ ---

PACS ---

PC ---

PCC ---

PL ---

PL ---

PVC ---

PSI ---

PSM ---

R ---

RC ---

RCP ---

REF ---

REINF ---

RPZ ---

RSA ---

RT ---

RWY, R/W ---

S ---

SACS ---

SCIR ---

SD ---

SEC ---

SF ---

SS ---

STA ---

STD ---

S.W.P.P.P.---

SY ---

TOPO ---

TRAV ---

TSA ---

TWY, T/W ---

TYP ---

VERT ---

W ---

WPB ---

ABBREVIATIONS

ABOVE GROUND

BELOW GROUND VAULT

BUILDING RESTRICTION LINE

CONDUIT

CATCH BASIN

CUBIC FEET

CENTERLINE

CHAIN LINK FENCE

CLEANOUT

CONCRETE

CORRUGATED METAL PIPE

CONCRETE MONUMENT

CORE SAMPLE TEST HOLE

CONCRETE SLAB

CONSTRUCTION SAFETY & SECURITY OFFICER

CUBIC YARD

DIAMETER

DEEP ROD MONUMENT

DRAWING

EAST, EASTING

EACH

END OF CURVE

ELEVATION

ENGINEER, ENGINEERING

EDGE OF PAVEMENT

END OF VERTICAL CURVE

EDGE OF PAVEMENT

EQUAL

EXISTING

EXCAVATION

EXPANSION JOINT

FEDERAL AVIATION ADMINISTRATION

FEDERAL AVIATION REGULATION

FOUND CAPPED IRON ROD

FINISHED GRADE

HYDRAULIC GRADE LINE

HIGH POINT

HORIZONTAL

HYDRAULIC

INSIDE DIAMETER

INVERT ELEVATION

LICENSED BUSINESS

LINEAR FEET

LONGITUDINAL

LOW POINT

LUMP SUM

LEFT

MAXIMUM

MANHOLE

MINIMUM

MISCELLANEOUS

MONUMENT

MULTIPLE

MEAN SEA LEVEL

NORTH, NORTHING

NUMBER

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OBJECT FREE AREA

OBSTACLE FREE ZONE

PRIMARY AIRPORT CONTROL STATION

POINT OF CURVATURE

PORTLAND CEMENT CONCRETE

POINT OF INTERSECTION

PROPERTY LINE

POLYVINYL CHLORIDE

POUNDS PER SQUARE INCH

PROFESSIONAL SURVEYOR AND MAPPER

RADIUS

REINFORCED CONCRETE

REINFORCED CONCRETE PIPE

REFERENCE

REINFORCED, REINFORCEMENT

RUNWAY PROTECTION ZONE

RUNWAY SAFETY AREA

RIGHT

RUNWAY

SOUTH

SECONDARY AIRPORT CONTROL STATION

SET 5/8" CAPPED IRON ROD OSM TRAV. PT

STORM DRAIN

SECTION

SQUARE FEET

SANITARY SEWER

STATION

STANDARD

STORM WATER POLLUTION PREVENTION PLAN

SQUARE YARD

TOPOGRAPHY

TRAVERSE

TAXIWAY SAFETY AREA

TAXIWAY

TYPICAL

VERTICAL

WEST

WIRE PULL BOX

C002

GENERAL NOTES,

ABBREVIATIONS, AND

SHEET INDEX

Sheet List Table Sheet Number Sheet Title

C001 COVER SHEET

C002 GENERAL NOTES, ABBREVIATIONS, AND SHEET INDEX

C020 PROJECT LAYOUT PLAN

C031 CONSTRUCTION PHASING PLAN

C050 SAFETY AND SECURITY NOTES

C051 SAFETY AND SECURITY DETAILS

C052 AIR SPACE PROTECTION PLAN

C061 BORING LOCATION PLAN

C062 BORING LOG SECTIONS

C101 EXISTING CONDITIONS

C200 EROSION CONTROL DETAILS

C201 DEMOLITION AND EROSION CONTROL PLAN

C301 HORIZONTAL CONTROL PLAN

C401 GRADING AND DRAINAGE PLAN

C402 GRADING AND DRAINAGE PLAN

C700 MARKING PLAN

C701 PAVEMENT MARKING DETAILS

C901 PAVEMENT TYPICAL SECTIONS

Plotted: C:\Users\Ahmad\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C002-GNA.dwg - AhmadC:\Users\Ahmad\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C002-GNA.dwg - Ahmad - AhmadAhmad

X

X

X

X

X

X

X X

X

X

X

XXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

XXXX

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

PRIVATE HANGAR

PRIVATE

HANGAR

TERMINAL AND FLIGHT

LINE BUILDING (ADMIN)

PIVOVARY, INC

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TSA

TSA

TSA TSA

TSA

TS

A

TS

A

TS

A

TS

A

TOFA

TO

FA

TSA TSA

TSA

TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

EX

IS

T.

SH

AD

E

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

R/ W

5-23

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

T/ W

A

EX

IS

T.

T

HA

NG

AR

EX

IS

T.

T

HA

NG

AR

T/W E

T/W B

T/WCB

SO

UT

H

AV

EN

UE

T/ W

C

CONSTRUCTION

ACCESS GATE

CONSTRUCTION

HAUL ROUTE

CONSTRUCTION

STAGING AREA

T/W B

A

14 2345678910111213

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

0' 200'100'

LEGEND

OFZ OFZ

X X

RSA RSA

ROFA ROFA

TSA TSA

TOFA TOFA

AIRPORT PROPERTY LINE

PROJECT LIMITS

EXISTING BUILDING

EXISTING PAVEMENT

EXISTING TAXIWAY/TAXILANE OBJECT FREE AREA

EXISTING TAXIWAY/TAXILANE SAFETY AREA

EXISTING RUNWAY OBJECT FREE AREA

EXISTING RUNWAY SAFETY AREA

EXISTING OBSTACLE FREE ZONE

EXISTING AIRPORT FENCE

PROPOSED PAVEMENT

(MILLING AND OVERLAY AREA)

PROPOSED SOD AREA

STAGING AREA

HAUL ROUTES/CONSTRUCTION ACCESS

GENERAL STAGING AREA AND HAUL ROUTE NOTES

1. AT THE CONCLUSION OF EACH WORKDAY, PAVED PORTIONS ON

OR ADJACENT TO THE HAUL ROUTE SHALL BE SWEPT WITH A

VACUUM TRUCK AND CHECKED FOR FOREIGN OBJECT DEBRIS

(FOD) PRIOR TO OPENING UP THE TAXIWAY OR APRON TO TRAFFIC.

THE CONTRACTOR SHALL MAKE PROVISIONS TO HAVE A VACUUM

TRUCK ON SITE AT ALL TIMES.

2. THE CONTRACTOR SHALL GIVE THE RIGHT OF WAY TO THE PUBLIC

WHILE USING PUBLIC ROADS. THE CONTRACTOR SHALL NOT

BLOCK ROADWAYS AND ACCESS TO BUSINESSES. THE

CONTRACTOR SHALL PROVIDE FLAGMEN TO DIRECT TRAFFIC IF

TRUCKS OR VEHICLES ARE TEMPORARILY PARKED ON PUBLIC OR

AIRPORT OWNED ROADWAYS. MAINTENANCE OF TRAFFIC SHALL

MEET ALL LOCAL REQUIREMENTS AND GUIDELINES.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES FOR

IMPROPER OR ILLEGAL USE OF PUBLIC OR PRIVATE PROPERTY IN

THE PERFORMANCE OF THIS WORK AT HIS/HER EXPENSE.

4. THE CONTRACTOR SHALL ACQUIRE APPLICABLE PERMITS FROM

LOCAL AGENCIES FOR ANY MODIFICATIONS TO THE STAGING

AREA, SUCH AS SECURITY FENCING, GRADING AND DRAINAGE, OR

INSTALLING UTILITIES SUCH AS WATER, SEWER, AND POWER.

STAGING AREA, ACCESS ROADS, AND OTHER AREAS USED BY THE

CONTRACTOR SHALL BE RETURNED TO ITS ORIGINAL CONDITION

AFTER THE CONSTRUCTION IS COMPLETE AND ALL EQUIPMENT,

TRAILERS, ETC. ARE REMOVED OFF THE AIRPORT PROPERTY. THE

COST FOR THIS WORK SHALL BE INCLUDED IN THE BID UNIT PRICE

FOR MOBILIZATION.

5. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING HIS/HER

OWN UTILITIES, TEMPORARY FENCING, LIGHTING, AND OTHER

ITEMS NECESSARY FOR THE STAGING AREA. THE COST FOR

TEMPORARY UTILITIES AND LIGHTING SHALL BE INCLUDED IN THE

BID UNIT PRICE FOR MOBILIZATION.

6. THE CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR

STOCKPILE AND STAGING AREAS, EQUIPMENT, AND MATERIALS

LOCATED ON AIRPORT PROPERTY.

7. TEMPORARY ROADS, HAUL ROADS, TRAFFIC AND WORK AREAS

SHALL BE STABILIZED WITH DUST PALLIATIVE, PENETRATION

ASPHALT, WOOD CHIPS, OR OTHER APPROVED MEASURES TO

PREVENT DUST POLLUTION.

C020

PROJECT LAYOUT PLAN

Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C020-PLP.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C020-PLP.dwg - Yan - YanYan

X X

X X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

RS

A

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

PRIVATE

HANGAR

TERMINAL AND FLIGHT

LINE BUILDING (ADMIN)

PIVOVARY, INC

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TSA

TSA

TSA TSA

TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TOFA

TO

FA

TO

FA

TO

FA

TSA TSA

TSA

TSA

TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

EX

IS

T.

SH

AD

E

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

T/ W

AEX

IS

T.

T

HA

NG

AR

EX

IS

T.

T

HA

NG

AR

T/W E

T/W B

SO

UT

H

AV

EN

UE

T/ W

C

STAGING AREA

CONSTRUCTION

ACCESS GATE

CONSTRUCTION

HAUL ROUTE

3A

3A3A3A3A

3A

PHASE 1

PHASE 2

PHASE 3A

PRIVATE

HANGAR

PHASE 3B

3B3B

3B3B

3B 3B

2 2

2 2

1 111

A

14 2345678910111213

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

0' 160'80'

ZPH AIRFIELD PAVEMENTS REHABILITATION TABLE

PHASE DESCRIPTION DURATION AFFECTED FACILITIES

N/A

A MOBILIZATION PERIOD HAS BEEN

ESTABLISHED TO ALLOW THE

CONTRACTOR TO MOBILIZE TO THE

SITE, PROVIDE SHOP DRAWING

SUBMITTALS, AND PERFORM

MATERIAL TESTING FOR MIXED

DESIGN PURPOSES. THE

MOBILIZATION PERIOD STARTS WHEN

THE NOTICE-TO-PROCEED (NTP) IS

ISSUED.

CONSECUTIVE

CALENDAR

DAYS

NO IMPACT TO AIRPORT

OPERATIONS

PHASE 1

THIS PHASE INCLUDES SITE

PREPARATION, 2 INCH MILLING AND

RESURFACING AND TEMPORARY

MARKING OF EXISTING PAVEMENT

AREA NORTH OF TERMINAL AND

FLIGHT LINE BUILDING (ADMIN), PART

OF TAXIWAY B AND BETWEEN THE

THREE EXISTING HANGARS, AND

SODDING BETWEEN THE HANGARS

14 CALENDAR

DAYS

PARTIAL OF TAXIWAY B WILL BE

CLOSED DURING THIS PHASE.

WORKING HOURS ARE BETWEEN

7:00 AM AND 700 :PM. DAMAGES

ASSESSED AT $1000 PER

ADDITIONAL DAY FOR THIS BID

PHASE.

PHASE 2

THIS PHASE INCLUDES SITE

PREPARATION, 2 INCH MILLING AND

RESURFACING, AND TEMPORARY

MARKING OF THE EXISTING

PAVEMENT OF THE AREA FROM THE

FRONT OF THE TERMINAL AND

FLIGHT LINE BUILDING (ADMIN) TO

TAXIWAY B EDGE OF PAVEMENT AS

SHOWN ON THE PLANS.

7 CALENDAR

DAYS

PARTIAL OF TAXIWAY B AND

TAXIWAY C1 WILL BE CLOSED

DURING THIS PHASE, WORKING

HOURS ARE BETWEEN 7:00 AM

AND 7:00 PM. LIQUIDATED

DAMAGES ASSESSED AT $1000

PER ADDITIONAL DAY FOR THIS

BID PHASE.

PHASE 3A

THIS PHASE INCLUDES SITE

PREPARATION, 2 INCH MILLING AND

RESURFACING AND TEMPORARY

MARKING OF EXISTING TAXIWAY E

PAVEMENT. REPAIR AND PATCH

APPROXIMATELY 30 LF OF DAMAGED

ASPHALT. PROJECT AREA IS

BETWEEN EDGE OF TOFA FOR

TAXIWAY A AND END OF TAXIWAY E.

18 CALENDAR

DAYS

TAXIWAY E WILL BE CLOSED

DURING CONSTRUCTION.

WORKING HOURS ARE BETWEEN

7:00 AM AND 7:00 PM. LIQUIDATED

DAMAGES ASSESSED AT $1000

PER ADDITIONAL DAY FOR THIS

BID PHASE.

PHASE 3B

THIS PHASE INCLUDES SITE

PREPARATION, 2 INCH MILLING AND

RESURFACING AND TEMPORARY

MARKING AT THE END OF TAXIWAY E

FROM TAXIWAY A TOFA TO THE EDGE

OF TAXIWAY A.

3 CALENDAR

DAYS

TAXIWAY E AND TAXIWAY A WILL

BE CLOSED DURING

CONSTRUCTION. WORKING

HOURS ARE BETWEEN 7:00 AM

TO 7:00 PM. DAMAGES ASSESSED

AT $1000 PER ADDITIONAL DAY

FOR THIS BID PHASE.

PHASING NOTES:

1. AFTER THE LAST DAY OF PAVING AND PRIOR TO THE INSTALLATION OF FINAL MARKINGS. THE 30 DAY CURE PERIOD SHALL

COMMENCE ON THE LAST DAY OF COMPLETED AND ACCEPTED AREA OF PAVING. TEMPORARY MARKINGS, AT A 30% APPLICATION

RATE, SHALL BE INSTALLED IMMEDIATELY FOLLOWING THE FINISHING OF THE NEW PAVEMENT

2. MILL 2" OF EXISTING ASPHALT (P-403) ALONG TAXIWAY E AND WITHIN THE FBO APRON PAVEMENT. WITHIN THESE AREAS APPLY TACK COAT (P-603) TO THE MILLED SURFACE PRIOR TO PLACEMENT OF 2" ASPHALT OVERLAY.

3. ELSEWHERE, MILLING 2" OF THE PAVEMENTS WILL REQUIRE ADDITIONAL REMOVAL OF SOME OF THE IN-PLACE LIMEROCK BASE TO ACCOMMODATE PLACEMENT OF 2” ASPHALT OVERLAY (P-403). WITHIN THESE AREAS, DENSIFY THE EXPOSED SURFACES BY PROVIDING A MINIMUM OF FOUR (4) FULL COVERAGES USING A NON-VIBRATORY DRUM ROLLER HAVING A TOTAL OPERATING STATIC WEIGHT, INCLUDING FUEL AND WATER, OF AT LEAST TEN (10) TONS AND A DRUM DIAMETER OF 5 FEET. THE DENSIFICATION OF THE IN-PLACE LIMEROCK BASE SHALL BE OBSERVED BY THE RPR PRIOR TO PLACEMENT OF ANY PRIME COAT OR NEW ASPHALT.

APPLY PRIME COAT (P-602) TO THE DENSIFIED SURFACE PRIOR TO PLACEMENT OF 2” ASPHALT OVERLAY (P-403).

C031

CONSTRUCTION PHASING

PLAN

LEGEND

OFZ OFZ

X X

RSA RSA

ROFA ROFA

TSA TSA

TOFA TOFA

PROJECT LIMITS

EXISTING BUILDING

EXISTING PAVEMENT

TAXIWAY/TAXILANE OBJECT FREE AREA

TAXIWAY/TAXILANE SAFETY AREA

RUNWAY OBJECT FREE AREA

RUNWAY SAFETY AREA

OBSTACLE FREE ZONE

EXISTING AIRPORT FENCE

LIMITS OF MILLING AND OVERLAY

PROPOSED SOD AREA

HAUL ROUTES/CONSTRUCTION ACCESS

LOW PROFILE BARRICADE PHASE 1

LOW PROFILE BARRICADE PHASE 2

LOW PROFILE BARRICADE PHASE 3

2 2 3 3

1 1

Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C031-PHS.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C031-PHS.dwg - Yan - YanYan

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

AIR OPERATIONS AREA (AOA) - ALL AIRPORT AREAS WHERE AIRCRAFT CAN OPERATE, EITHER UNDER THEIR OWN POWER OR WHILE IN TOW. AIR OPERATIONS AREAS INCLUDE: RUNWAYS, TAXIWAYS, AND APRON

AREAS.

FEDERAL AVIATION ADMINISTRATION (FAA) - THE DIVISION OF THE DEPARTMENT OF TRANSPORTATION THAT INSPECTS AND RATES CIVILIAN AIRCRAFT AND PILOTS, ENFORCES THE RULES OF AIR SAFETY, AND

MAINTAINS AIR-NAVIGATION AND TRAFFIC-CONTROL FACILITIES.

FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) - A DECENTRALIZED AGENCY CHARGED WITH THE ESTABLISHMENT, MAINTENANCE, AND REGULATION OF PUBLIC TRANSPORTATION IN THE STATE OF FLORIDA.

MEAN SEA LEVEL (MSL) - THE SEA LEVEL HALFWAY BETWEEN THE MEAN LEVELS OF HIGH AND LOW WATER

(TIDE).

FOREIGN OBJECT DEBRIS (FOD) - A SUBSTANCE, DEBRIS OR ARTICLE ALIEN TO THE VEHICLE OR SYSTEM

WHICH WOULD POTENTIALLY CAUSE DAMAGE.

NOTICE TO AIRMEN (NOTAM) - A WRITTEN NOTIFICATION ISSUED TO PILOTS BEFORE A FLIGHT, ADVISING

THEM OF CIRCUMSTANCES RELATING TO THE STATE OF FLYING.

OBJECT FREE AREA (OFA) - AN AREA ON THE GROUND CENTERED ON THE RUNWAY, TAXIWAY, OR TAXILANE CENTERLINE PROVIDED TO ENHANCE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS EXCEPT FOR THOSE OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR

AIRCRAFT GROUND MANEUVERING PURPOSES.

OBSTACLE-FREE ZONE (OFZ) - THE AIRSPACE BELOW 150 FEET (45M) ABOVE THE ESTABLISHED AIRPORT ELEVATION AND ALONG THE RUNWAY AND EXTENDED RUNWAY CENTERLINE THAT IS REQUIRED TO BE CLEAR OF ALL OBJECTS, EXCEPT FOR FRANGIBLE VISUAL NAVAIDS THAT NEED TO BE LOCATED IN THE OFZ BECAUSE OF THEIR FUNCTION, IN ORDER TO PROVIDE CLEARANCE PROTECTION FOR AIRCRAFT LANDING

OR TAKING OFF FROM THE RUNWAY AND FOR MISSED APPROACHES.

PART 77 SURFACES - IMAGINARY SURFACES WITH THE PRIMARY SURFACES CENTERED ALONG THE RUNWAY CENTERLINE PLUS TRANSITIONAL SURFACES THAT LIMIT THE HEIGHTS OF OBSTRUCTIONS, INCLUDING

CONSTRUCTION EQUIPMENT.

RUNWAY PROTECTION ZONE (RPZ) - AN AREA OFF THE RUNWAY END TO ENHANCE THE PROTECTION OF

PEOPLE AND PROPERTY ON THE GROUND.

RUNWAY OBJECT FREE AREA (ROFA) - AN AREA ON THE GROUND CENTERED ON A RUNWAY, CENTERLINE PROVIDED TO ENHANCE THE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS, EXCEPT FOR OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR AIRCRAFT GROUND

MANEUVERING PURPOSES.

RUNWAY SAFETY AREA (RSA) - A DEFINED SURFACE SURROUNDING THE RUNWAY PREPARED OR SUITABLE FOR REDUCING THE RISK OF DAMAGE TO AIRPLANES IN THE EVENT OF AN UNDERSHOOT, OVERSHOOT OR

EXCURSION FROM THE RUNWAY.

TAXIWAY OBJECT FREE AREA (TOFA) - AN AREA ON THE GROUND CENTERED ON A TAXIWAY OR TAXILANE CENTERLINE PROVIDED TO ENHANCE THE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS, EXCEPT FOR OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR

AIRCRAFT GROUND MANEUVERING PURPOSES.

TAXIWAY SAFETY AREA (TSA) - A DEFINED SURFACE ALONGSIDE THE TAXIWAY PREPARED OR SUITABLE FOR REDUCING THE RISK OF DAMAGE TO AN AIRPLANE UNINTENTIONALLY DEPARTING THE TAXIWAY.

THRESHOLD - THE BEGINNING OF THAT PORTION OF THE RUNWAY AVAILABLE FOR LANDING. IN SOME

INSTANCES, THE LANDING THRESHOLD MAY BE DISPLACED.

DEFINITIONS:

SAFETY NOTES:

1. THE CONTRACTOR SHALL BE FAMILIAR WITH THE FOLLOWING FAA SAFETY PROVISIONS AND

IMPLEMENT THESE REQUIREMENTS DURING CONSTRUCTION. THE LATEST COPIES OF THESE

GUIDELINES CAN BE OBTAINED ON-LINE AT (HTTP://WWW.FAA.GOV/REGULATIONS_POLICIES)

2. THE CONTRACTOR SHALL COMPLY WITH THE SAFETY PLAN ASSOCIATED WITH THE

CONSTRUCTION PROJECT AND ENSURE THAT CONSTRUCTION PERSONNEL ARE FAMILIAR WITH

SAFETY PROCEDURES AND REGULATIONS OF THE AIRPORT.

3. THE CONTRACTOR SHALL PROVIDE A POINT OF CONTACT WHO WILL COORDINATE AN IMMEDIATE

RESPONSE TO CORRECT ANY CONSTRUCTION-RELATED ACTIVITY THAT MAY ADVERSELY

AFFECT THE OPERATIONAL SAFETY OF THE AIRPORT.

4. THE CONTRACTOR SHALL PROVIDE A SAFETY OFFICER/CONSTRUCTION INSPECTOR FAMILIAR

WITH AIRPORT SAFETY TO MONITOR CONSTRUCTION ACTIVITIES.

5. THE CONTRACTOR SHALL RESTRICT MOVEMENT OF CONSTRUCTION VEHICLES TO

CONSTRUCTION AREAS BY FLAGGING AND BARRICADING OR ERECTING TEMPORARY FENCING,

AS APPROPRIATE.

6. THE CONTRACTOR SHALL ENSURE THAT NO EMPLOYEES, EMPLOYEES OF

SUBCONTRACTORS/SUPPLIERS, OR OTHER PERSONS ENTER ANY PART OF THE AOA FROM THE

CONSTRUCTION SITE UNLESS AUTHORIZED OR ESCORTED BY AN AUTHORIZED INDIVIDUAL.

7. THE CONTRACTOR'S EMPLOYEES SHALL PARK AND SERVICE ALL CONSTRUCTION VEHICLES IN

AN AREA DESIGNATED BY THE OWNER OUTSIDE THE RUNWAY SAFETY AREAS (RSA) AND

OBSTACLE FREE ZONE (OFZ) AND NEVER ON A CLOSED TAXIWAY OR RUNWAY. EMPLOYEES

SHALL ALSO PARK CONSTRUCTION VEHICLES OUTSIDE THE OBJECT FREE AREA (OFA) WHEN NOT

IN USE BY CONSTRUCTION PERSONNEL (E.G., OVERNIGHT, ON WEEKENDS, OR DURING OTHER

PERIODS WHEN CONSTRUCTION IS NOT ACTIVE). PARKING AREAS MUST NOT OBSTRUCT ANY

RUNWAY VISUAL AIDS, SIGNS, OR NAVIGATIONAL AIDS.

8. CONTRACTOR PERSONNEL ENGAGED IN ACTIVITIES INVOLVING UNESCORTED OPERATION ON

AOA SHALL OBSERVE THE PROPER PROCEDURES FOR COMMUNICATIONS, INCLUDING USING

APPROPRIATE RADIO FREQUENCIES OR ESCORT.

9. NO CONSTRUCTION MAY OCCUR WITHIN THE RSA UNLESS THE RUNWAY IS CLOSED.

10. THE CONTRACTOR SHALL PROMINENTLY MARK OPEN TRENCHES AND EXCAVATIONS AT THE

CONSTRUCTION SITE WITH RED OR ORANGE FLAGS, AS APPROVED BY THE OWNER, AND LIGHT

THEM WITH RED LIGHTS DURING HOURS OF RESTRICTED VISIBILITY OR DARKNESS.

11. OPEN TRENCHES OR EXCAVATIONS ARE NOT PERMITTED WITHIN THE RSA WHILE THE RUNWAY IS

OPEN. IF THE RUNWAY MUST BE OPENED BEFORE EXCAVATIONS ARE BACKFILLED, COVER THE

EXCAVATIONS APPROPRIATELY. COVERINGS FOR OPEN TRENCHES OR EXCAVATIONS MUST BE

OF SUFFICIENT STRENGTH TO SUPPORT THE WEIGHT OF THE HEAVIEST AIRCRAFT OPERATING

ON THE RUNWAY.

12. CONSTRUCTION WITHIN THE TAXIWAY A OBJECT FREE AREA (TOFA) SHALL NOT BE PERMITTED

UNLESS CONTRACTOR ISSUE A NOTICE TO AIRMEN (NOTAM), OR THE TAXIWAY IS CLOSED

DURING CONSTRUCTION IN THIS AREA.

13. THE CONTRACTOR SHALL SEPARATE THE CONSTRUCTION SITE AND NON-MOVEMENT AREAS, IN

WHICH NO PART OF AN AIRCRAFT MAY ENTER BY USING LOW PROFILE BARRICADES. ALL

BARRICADES SHALL BE SECURED IN PLACE TO PREVENT MOVEMENT BY PROP WASH, JET BLAST, OR HIGH WINDS. BARRICADES SHALL BE SECURED TO PREVENT INGESTION BY JET ENGINES OR

DAMAGE BY PROPELLER WASH.

14. STOCKPILED MATERIALS AND EQUIPMENT STORAGE ARE NOT PERMITTED WITHIN THE RSA AND

OFZ OF AN OPERATIONAL RUNWAY. THE CONTRACTOR SHALL ENSURE STOCKPILED MATERIALS

AND EQUIPMENT ADJACENT TO THESE AREAS ARE PROMINENTLY MARKED AND LIGHTED DURING

HOURS OF RESTRICTED VISIBILITY OR DARKNESS. THIS INCLUDES DETERMINING AND VERIFYING

THAT MATERIALS ARE STORED AT AN APPROVED LOCATION TO PREVENT FOD AND ATTRACTION

OF WILDLIFE.

15. THE CONTRACTOR SHALL NOT USE OPEN-FLAME WELDING OR TORCHES UNLESS ADEQUATE

FIRE SAFETY PRECAUTIONS ARE PROVIDED AND THE OWNER HAS APPROVED THEIR USE.

16. FOD IS CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING GEARS, PROPELLERS, AND JET

ENGINES. THE CONTRACTOR SHALL NOT LEAVE OR PLACE FOD ON OR NEAR AIRCRAFT

MOVEMENT AREAS. MATERIALS TRACKED ONTO THESE AREAS MUST BE CONTINUALLY REMOVED

THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL CAREFULLY CONTROL AND

CONTINUOUSLY REMOVE FOD AND WASTE MATERIAL THAT MAY ATTRACT WILDLIFE.

17. THE CONTRACTOR SHALL NOT CONDUCT ANY CONSTRUCTION ACTIVITY WITHIN NAVIGATIONAL

AID RESTRICTED AREAS WITHOUT PRIOR APPROVAL FROM THE OWNER. NAVIGATIONAL AIDS

INCLUDE INSTRUMENT LANDING SYSTEM COMPONENTS, SUCH AS THE LOCALIZER, THE

GLIDESLOPE, APPROACH LIGHTS, PAPIS, ETC. THESE RESTRICTED AREAS ARE DEPICTED ON

THE CONSTRUCTION PLANS.

18. ALL VEHICLES AND MOBILE EQUIPMENT OPERATING IN THE AOA SHALL BE IDENTIFIED BY

THREE-FOOT (3') SQUARE ORANGE AND WHITE FLAG. ADDITIONALLY, ALL VEHICLES AND

MOBILE EQUIPMENT SHALL HAVE THE CONTRACTOR'S OR SUBCONTRACTOR'S NAME CLEARLY

AFFIXED ON EACH SIDE OF THE VEHICLE AND MOBILE EQUIPMENT. DURING THE HOURS

BETWEEN SUNSET AND SUNRISE AS WELL AS TIMES WHEN VISIBILITY IS IMPAIRED, ALL

VEHICLES AND MOBILE EQUIPMENT SHALL BE EQUIPPED WITH A REVOLVING YELLOW BEACON

LIGHT MOUNTED ON THE TOP OF THE VEHICLE OR EQUIPMENT. THE BEACON LIGHT SHALL

PROVIDE:

19. NO CRANE SHALL BE ALLOWED ON THE WORK SITE UNTIL THE EQUIPMENT AND ITS INTENDED

OPERATION ARE APPROVED BY THE OWNER AND THE FAA, WHICH TAKES AT LEAST 90 DAYS.

20. DURING PERIODS OF SEVERE WEATHER CONDITIONS OR OTHER OPERATIONAL EMERGENCIES, THE OWNER MAY DIRECT THE CONTRACTOR TO RELINQUISH AREAS UNDER CONSTRUCTION

AND TO PREPARE THE AREAS FOR AIRCRAFT OPERATIONS. IN THIS EVENT THE ENGINEER WILL

DIRECT THE CONTRACTOR TO EVACUATE THE AREA AND THE ENGINEER WILL SPECIFY THE

LIMITS OF THE AREA TO BE EVACUATED, THE TERM OF EVACUATION, AND THE CONDITIONS

GOVERNING THE RESTORATION WORK NECESSARY TO PREPARE THE AREA FOR AIRCRAFT

OPERATION. THE CONTRACTOR SHALL PROMPTLY AND FULLY COMPLY WITH THE ENGINEER'S

DIRECTIVE. THE CONTRACTOR WILL BE REIMBURSED FOR EXTRA WORK SHOULD THE

DIRECTIVE, AS DETERMINED BY THE ENGINEER, ENTAIL EXTRA WORK UNDER THE CONTRACT.

THE CONTRACTOR MAY BE GRANTED AN EXTENSION OF TIME SHOULD THE DIRECTIVE, AS

DETERMINED BY THE ENGINEER, ENTAIL A DELAY IN THE COMPLETION OF THE CONTRACT OR

ANY DEFINED SUBDIVISION OF THE CONTRACT.

21. VEHICULAR TRAFFIC SHALL NOT CROSS ACTIVE AIRCRAFT MOVEMENT AREAS (RUNWAYS,

TAXIWAYS, OR AIRCRAFT PARKING APRON) WITHOUT RADIO COMMUNICATIONS OR AIRPORT

VEHICLE ESCORT.

22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTIONS OF EMPLOYEES AND

SUBCONTRACTORS. PERSONNEL WHO DO NOT ABIDE BY AIRPORT RULES AND REGULATIONS

ARE SUBJECT TO REMOVAL FROM THE PROJECT AND POTENTIALLY PROSECUTION.

23. ALL ACCIDENTS CAUSING PERSONAL INJURY OR PROPERTY DAMAGE SHALL BE REPORTED TO

THE OWNER IMMEDIATELY. THE CONTRACTOR SHALL PROVIDE THE NECESSARY EQUIPMENT

AND MEDICAL FACILITIES TO SUPPLY FIRST AID SERVICE TO ANYONE WHO MAY BE INJURED IN

CONNECTION WITH WORK AT THE CONSTRUCTION SITE AND ADJACENT WORK AREAS. IN

ADDITION, IF DEATH, SERIOUS INJURIES, OR PROPERTY DAMAGE ARE CAUSED, IMMEDIATELY

REPORT THE ACCIDENT BY TELEPHONE TO 911.

24. ALL THE CONTRACTOR'S EMPLOYEES MUST HAVE VALID GOVERNMENTAL IDENTIFICATION ON

THEIR PERSON AT ALL TIMES. FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL RESULT

IN THE PERSON BEING ESCORTED OFF THE AOA.

25. ALL PERSONS FOUND WITHIN A SECURITY RESTRICTED AREA WITHOUT PROPER

IDENTIFICATION SHALL BE IN VIOLATION OF FEDERAL LAW AS WELL AS AIRPORT RULES AND

REGULATIONS. WHEN FOUND, SUCH PERSONS SHALL BE ESCORTED OFF THE AOA, AND MAY BE

CITED. THESE INDIVIDUALS MAY ALSO BE SUBJECT TO FEDERALLY MANDATED FINES. ANY AND

ALL FINES IMPOSED ARE AT THE CONTRACTOR'S EXPENSE.

26. ANY DELAY IN THE CONSTRUCTION OF THE PROJECT DUE TO THE VIOLATION OF THE FEDERAL

AND AIRPORT RULES AND REGULATIONS SHALL BE ABSORBED BY THE CONTRACTOR. AND

SHALL NOT CONSTITUTE GROUNDS FOR WAIVING POTENTIAL LIQUIDATED DAMAGES.

27. THE CONTRACTOR SHALL MAINTAIN A LIST OF ALL VEHICLES ACCESSING THE AOA AND SHALL

PRODUCE THIS LIST WHEN REQUESTED BY THE OWNER.

· THREE HUNDRED AND SIXTY (360) DEGREE AZIMUTH COVERAGE.

· EFFECTIVE INTENSITY IN THE HORIZONTAL PLANE NOT LESS THAN

FORTY (40) OR MORE THAN FOUR HUNDRED (400) CANDELAS.

· BEAM SPREAD MEASURED TO ONE-TENTH (1/10) PEAK INTENSITY

EXTENDING FROM TEN (10) DEGREES TO FIFTEEN (15) DEGREES ABOVE

THE HORIZONTAL.

· SIXTY (60) TO NINETY (90) FLASHES PER MINUTE.

· FAA ADVISORY CIRCULAR AC 150/5370-2G, "OPERATIONAL SAFETY ON

AIRPORTS DURING CONSTRUCTION"

· FAA ADVISORY CIRCULAR AC 150/5210-5D, "PAINTING, MARKING AND

LIGHTING OF VEHICLES USED ON AN AIRPORT"

· CODE OF FEDERAL REGULATIONS, 14 CFR PART 77, "SAFE, EFFICIENT

USE, AND PRESERVATION OF THE NAVIGABLE AIRSPACE"

· FAA ADVISORY CIRCULAR AC 150/5210-24, "AIRPORT FOREIGN OBJECT

DEBRIS (FOD) MANAGEMENT"

· FAA ADVISORY CIRCULAR AC 150/5200-18D, "AIRPORT SAFETY

SELF-INSPECTION"

SECURITY NOTES:

1. THE CONTRACTOR SHALL MAINTAIN, AT ALL TIMES, A SECURE AIR OPERATIONS AREA (AOA).

2. THE CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON THE PLANS. NO OTHER ACCESS POINTS SHALL BE ALLOWED UNLESS APPROVED BY THE OWNER. ALL CONTRACTOR TRAFFIC AUTHORIZED TO ENTER THE SITE SHALL BE EXPERIENCED IN THE ROUTE OR GUIDED BY THE CONTRACTOR PERSONNEL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE VARIOUS CONSTRUCTION

AREAS ON AIRPORT PROPERTY.

3. THE CONTRACTOR ACCESS GATE DESIGNATED FOR USE MAY BE UTILIZED BY OTHER CONTRACTORS OR BY AIRPORT STAFF DURING THIS PROJECT. THE CONTRACTOR IS REQUIRED TO COORDINATE ACCESS WITH ALL PARTIES. FOR THE MANUAL LEAF GATE, THE CONTRACTOR SHALL INTERLOCK (DAISY CHAIN) HIS/HER OWN PADLOCK AND CHAIN TO THE EXISTING AIRPORT LOCK SO THAT THE GATE CAN BE OPENED BY EITHER PARTY. ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE THE OWNER WITH TWO COPIES OF THE NEW CONTRACTOR PADLOCK KEYS. COSTS OF PROVIDING KEYS LOCK AND CHAINS SHALL BE INCLUDED IN THE CONTRACTORS BID UNIT PRICE FOR “SAFETY, SECURITY, AND MAINTENANCE OF AIRFIELD OPERATIONS”.

4. ALL ACCESS GATES SHALL BE NORMALLY CLOSED AND SECURED DURING CONSTRUCTION AS WELL AS MANNED AT ALL TIMES WHILE THE GATE IS OPEN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL WORK IS CONDUCTED IN A SAFE AND SECURE MANNER AND IS IN COMPLIANCE WITH THE CSPP.

C050

SAFETY AND SECURITY

NOTES

Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C050-SSN.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C050-SSN.dwg - Yan - YanYan

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

BARRICADE NOTES

FRONT VIEW

SIDE VIEW

BARRICADE SPACING

8'-0" (TYP.) 8'-0" (TYP.)4'-0" (MAX.)

8'-0" (TYP.)

6"

6"

1. BARRICADES SHALL BE INSTALLED AT THE LOCATIONS SHOWN ON THE PLANS, TO PROTECT THE WORK AREA, OR AS DIRECTED BY THE OWNER. EACH BARRICADE IS TO REMAIN IN PLACE FOR THE DURATION OF THE PHASE, AS INDICATED ON THE PLANS. BARRICADES SHALL BE INSTALLED AT THE BEGINNING OF EACH PHASE AND REMAIN IN PLACE THROUGHOUT THE PHASE.

IF THE CONTRACTOR REQUIRES TEMPORARY REMOVAL OF THE BARRICADES (TO ALLOW CONSTRUCTION TRAFFIC INTO OR OUT OF THE CONSTRUCTION AREA OR TO COMPLETE CONSTRUCTION AT THE PHASE BOUNDARY); THE CONTRACTOR SHALL PROVIDE A FLAGMAN TO PREVENT AIRCRAFT, VEHICLE, OR EQUIPMENT FROM INADVERTENTLY TRAVELING INTO THE

CONSTRUCTION AREA UNTIL THE BARRICADE IS REPLACED IN ITS ORIGINAL LOCATION.

2. LOW-PROFILE BARRICADES SHALL CONFORM TO FAA AC 150/5340-1M AND 150/5370-2G SPECIFICATIONS. BARRICADE SEGMENTS MAY BE LOCKED CONTINUALLY OR AT OWNERS DISCRETION OPTIONALLY SPACED WITH A 4' MAX. GAP. SHOULD INTERNAL WATER OR SAND BALLAST NOT PROVIDE ADEQUATE STABILIZATION, BARRICADES SHALL BE WEIGHTED DOWN

WITH SANDBAGS TO PREVENT MOVEMENT FROM PROP WASH OR JET BLAST.

3. ALL BARRICADES SHALL DELINEATE THE AREA TO BE PROTECTED AND THE BARRICADE LINE SHALL EXTEND TO THE EDGES OF PAVEMENT OR AS DIRECTED BY THE OWNER.

4. COST OF FURNISHING, MAINTAINING, AND REMOVING THE BARRICADES AS DIRECTED BY THE OWNER, SHALL BE INCLUDED IN SAFETY, SECURITY AND MAINTENANCE OF AIRFIELD

OPERATIONS PAY ITEM, P-102-1.

5. ALL STEADY BURN LOW PROFILE BARRICADE LIGHTS MUST REMAIN OPERABLE DURING PERIODS OF LOW VISIBILITY AND DARKNESS.

6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MAINTENANCE OF BARRICADES INCLUDING LIGHTS DURING CONSTRUCTION. ALL LIGHTS SHALL BE KEPT IN OPERABLE CONDITION. SANDBAGS SHALL BE REPLACED WHEN EXHIBITING SIGNS OF DISINTEGRATION AND ANY LOOSE SAND FROM THE BAGS SHALL BE REMOVED FROM THE PAVEMENT SURFACE.

7. DETAIL OF LOW-PROFILE BARRICADE SHOWN AS AN EXAMPLE. OTHER DETAILS OF LOW-PROFILE BARRICADES (e.g. HALVED PVC PIPE) MAY BE APPROVED BY THE OWNER.

LOW-PROFILE BARRICADE

ISOMETRIC VIEW

STANDARD SELF-POWERED

3-WAY 6 VOLT BARRICADE

LIGHT WITH RED LENS

3'

3'

AVIATION ORANGE

AVIATION WHITE

NOTE:

1. ALL VEHICLES SHALL BE EQUIPPED

WITH A FLAG WHILE IN THE AOA

2. SEE SAFETY NOTES FOR

CONSTRUCTION SAFETY FLAG

MOUNTING LOCATION REQUIREMENT

N.T.S.2 CONSTRUCTION SAFETY FLAG

N.T.S.1 LOW-PROFILE BARRICADE DETAIL

PLASTIC ORANGE MOLDED BODY WITH

HIGH REFLECTIVE WHITE STRIPES

C051

SAFETY AND SECURITY

DETAILS

Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C051-SSD.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C051-SSD.dwg - Yan - YanYan

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RS

A

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TSA

TSA

TSA TSA

TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TOFA

TO

FA

TO

FA

TO

FA

TSA TSA

TSA

TSA

TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

0'

TAXIWAY C

TAXIWAY B

TAXIWAY E

TA

XI

W

AY

C

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

RUNW

AY 5-23

TAXIW

AY A

GROUND ELEV.= 80.93'

W082° 09' 34.63" N028° 13' 47.38"

GROUND ELEV.= 81.11'

W082° 09' 35.68" N028° 13' 46.37"

GROUND ELEV.= 82.26'

W082° 09' 40.52" N028° 13' 46.79"

GROUND ELEV.= 82.73'

W082° 09' 42.08" N028° 13' 44.45"

GROUND ELEV.= 82.57'

W082° 09' 45.47" N028° 13' 45.59"

GROUND ELEV.= 82.61'

W082° 09' 48.32" N028° 13' 47.35"

GROUND ELEV.= 82.62'

W082° 09' 42.65" N028° 13' 48.87"

GROUND ELEV.= 82.82'

W082° 09' 45.99" N028° 13' 47.97"

GROUND ELEV.= 82.93'

W082° 09' 42.84" N028° 13' 52.89"

GROUND ELEV.= 83.03'

W082° 09' 42.56" N028° 13' 53.14"

GROUND ELEV.= 82.64'

W082° 09' 47.66" N028° 13' 48.16"

STAGING AREA

A

14 2345678910111213

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

0' 160'80'

SAFETY NOTES:

1. PERSONNEL AND EQUIPMENT SHALL NOT ENTER THE

AIRFIELD MOVEMENT AREA WITHOUT PRIOR

APPROVAL OF THE OWNER AIRPORT OPERATIONS.

2. THE MAXIMUM ALLOWABLE HEIGHT OF

CONSTRUCTION EQUIPMENT AND STOCKPILED

MATERIALS IS GOVERNED BY FAA ADVISORY

CIRCULAR (AC) 150/5370-2, CURRENT EDITION. WHEN

EQUIPMENT IS EXPECTED TO PENETRATE THE FAR

PART 77 SURFACE.

3. WORK WITHIN THE SAFETY AND OBJECT FREE AREAS

WILL REQUIRE CLOSURE OF THE RUNWAY/TAXIWAY

TO AIR TRAFFIC. A NOTAM MUST BE FILED BY THE

AIRPORT MANAGEMENT AT LEAST FORTY-EIGHT (48)

HOURS IN ADVANCE OF CLOSING RUNWAYS AND

TAXIWAYS TO AIR TRAFFIC. THE CONTRACTOR SHALL

NOTIFY OWNER WITH SUFFICIENT LEAD TIME FOR

FILING A NOTAM.

4. ELEVATIONS SHOWN HEREIN INDICATE THE

AVAILABLE HEIGHT ABOVE THE EXISTING GROUND

UNLESS OTHERWISE NOTED.

5. FAA PART 77 IMAGINARY AIRSPACE CONTOUR

ELEVATION (TYP.). THE CONTOURS REPRESENT THE

ALLOWABLE HEIGHT OF OBJECTS INCLUDING

CONSTRUCTION EQUIPMENT RELATIVE TO THE

RESPECTIVE RUNWAY CENTERLINE ELEVATION

WHILE THE RUNWAY REMAINS OPEN. PENETRATIONS

INTO THE SURFACES REQUIRE CLOSURE OF THE

RUNWAY AND MUST BE COORDINATED WITH THE FAA

AND THE AIRPORT WELL IN ADVANCE OF CLOSURE

AIRPORT PROPERTY LINE

PROJECT LIMITS

EXISTING BUILDING

EXISTING PAVEMENT

EXISTING TAXIWAY/TAXILANE OBJECT FREE AREA

EXISTING TAXIWAY/TAXILANE SAFETY AREA

EXISTING RUNWAY OBJECT FREE AREA

EXISTING RUNWAY SAFETY AREA

EXISTING OBSTACLE FREE ZONE

EXISTING AIRPORT FENCE

PROPOSED PAVEMENT

STAGING AREA

PROPOSED SOD

LEGEND

OFZ OFZ

X X

RSA RSA

ROFA ROFA

TSA TSA

TOFA TOFA

C052

AIR SPACE PROTECTION

PLAN

Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C052-ASP.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C052-ASP.dwg - Yan - YanYan

X

X

X X

X X

X X

X X

X X

XXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X

XXX

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

B-01 B-02

B-03

B-10

B-04

B-09

B-08

B-07

B-06

B-05

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFATOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TSA

TO

FA

TSA

TO

FA

TSA TSA TSA

TSA

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TS

A

TOFA TOFA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TSA TSA TSA

TSA

TSA

TSA

TSA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA TOFA

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

T/WCB

PRIVATE HANGAR

PRIVATE

HANGAR

TERMINAL AND FLIGHT

LINE BUILDING (ADMIN)

PIVOVARY, INC

EX

IS

T.

SH

AD

E

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

EX

IS

TIN

G

HA

NG

AR

T/ W

A

EX

IS

T.

T

HA

NG

AR

EX

IS

T.

T

HA

NG

AR

T/W E

T/W B

SO

UT

H

AV

EN

UE

T/ W

C

A

14 2345678910111213

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

0' 120'60'

LEGEND

OFZ OFZ

X X

RSA RSA

ROFA ROFA

TSA TSA

TOFA TOFA

PROJECT LIMITS

EXISTING BUILDING

EXISTING PAVEMENT STAGING AREA

EXISTING TAXIWAY/TAXILANE OBJECT FREE AREA

EXISTING TAXIWAY/TAXILANE SAFETY AREA

EXISTING RUNWAY OBJECT FREE AREA

EXISTING RUNWAY SAFETY AREA

EXISTING OBSTACLE FREE ZONE

EXISTING AIRPORT FENCE

BORINGS PERFORMED ON 00/00/0000

C061

BORING LOCATION PLAN

Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C061-BLP.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C061-BLP.dwg - Yan - YanYan

B

C

D

E

F

G

H

I

J

K

L

MOHSEN DESIGN GROUP INCORPORATED

2202 N. WESTSHORE BLVD., SUITE 200

TAMPA, FL 33607

REVISIONS

MARK DESCRIPTION DATE

AT: ZEPHYRHILLS MUNICIPAL AIRPORT

Issue Date:

MDG Project No.

Drawn By:

Checked By:

14 234567891011121315 116

5401 W. KENNEDY BLVD., #900

TAMPA, FL 33609

ISSUED FOR BID

39450 SOUTH AVE, ZEPHYRHILLS, FLORIDA

APRIL 2025

JAC25012

YY

ZM

AIRFIELD PAVEMENTS

REHABILITATION

C062

BORING LOG SECTIONS

ENGINEERING CLASSIFICATION

Very Loose Less than 4 Less than 3 Loose 4 - 10 3 - 8 Medium Dense 10 - 30 8 - 24 Dense 30 - 50 24 - 40 Very Dense Greater than 50 Greater than 40

Safety Hammer (SPT N-Value)

Automatic Hammer (SPT N-Value)

RELATIVE DENSITY of GRANULAR MATERIALS

Very Soft Less than 2 Less than 1 Soft 2 - 4 1 - 3 Firm 4 - 8 3 - 6 Stiff 8 - 15 6 - 12 Very Stiff 15 - 30 12 - 24 Hard Greater than 30 Greater than 24

CONSISTENCY of SILTS & CLAYS

LEGEND:

B.T. Boring Terminated

Existing Ground Surface

N Sta. Penetration Resistance in Blows Per foot (18- inch Spoon, ASTM D-1586)

WOR Weight of Rod

WOH Weight of Hammer

W Moisture Content (%)

OC Organic Content (%)

-200 Fines Passing No. 200 U.S. Sieve (%)

LL Liquid Limit

PI Plasticity Index

Ground Water at Time of Drilling

Wet Season Water Table

(SP) Unified Soil Classification Based on Visual Observation and Laboratory Tests

PWR Partially Weathered Rock

SPOON INSIDE DIAMETER - 1.4"

SPOON OUTSIDE DIAMETER - 2.0"

AVERAGE HAMMER DROP HEIGHT - 30"

HAMMER WEIGHT - 140 pounds

ASTM STANDARD DROP HAMMER (MANUAL & AUTOMATIC)

STANDARD PENETRATION TEST DATA

A.R. Auger Refusal

Topsoil

Sand

(SP)

Sand with silt

(SP-SM)

Sandy Silt

(ML)

Silty sand

(SM)

Clayey sand

(SC)

Sandy clay

(CL)

Clay

(CH)

Asphalt

Weathered Limestone

FILL

Concrete

Base

DE

PT

H

DE

PT

H

(N Auto) 4-5/8" Asphalt over 4" Limerock Base

B-01 Date Drilled: 03/26/2025

MEDIUM DENSE to LOOSE, dark gray to grayish brown, sand with silt (SP-SM)

B.T. @ 6'-8 5/8"

BORE HOLE GROUTED

4-3-2-2 (5)

2-3-2-2 (5)

NOTES:

1. See Field Exploration Plan for boring locations.

2. Groundwater not encountered in any of the borings.

3. A truck mounted CME 550 drill rig equipped with an automatic hammer was used.

LOOSE, grayish brown, sand (SP)

Sandy clay/Clay

(CL/CH)

9-7-7-5 (14)

(N Auto) 4-3/4" Asphalt over 4" Limerock Base

B-02 Date Drilled: 03/26/2025

B.T. @ 6'-8 3/4"

BORE HOLE GROUTED

3-2-2-2 (4)

2-2-1-2 (3)

3-6-5-4 (11)

(N Auto) 3-5/8" Asphalt over 3" Limerock Base

B-03 Date Drilled: 03/26/2025

B.T. @ 6'-6 5/8"

BORE HOLE GROUTED

4-6-5-7 (11)

2-2-2-2 (4)

7-5-8-5 (13)

(N Auto) 8-1/2" Asphalt (No Base)

B-04 Date Drilled: 03/26/2025

B.T. @ 6'-8 1/2"

BORE HOLE GROUTED

10-7-8-6 (15)

5-4-4-3 (8)

10-10-10-10 (20)

DE

PT

H

DE

PT

H

(N Auto) 3-3/8" Asphalt over 4" Limerock Base

B-05 Date Drilled: 03/26/2025

B.T. @ 6'-7 3/8"

BORE HOLE GROUTED

8-11-10-9 (21)

6-5-4-4 (9)

10-8-10-10 (18)

(N Auto) 1-7/8" Asphalt over 4" Limerock Base-

B-06 Date Drilled: 03/26/2025

B.T. @ 6'-5 7/8"

BORE HOLE GROUTED

7-7-6-3 (13)

3-2-1-1 (3)

6-5-4-3 (9)

(N Auto) 1-3/8" Asphalt over 6" Limerock Base

B-07 Date Drilled: 03/26/2025

B.T. @ 6'-7 3/8"

BORE HOLE GROUTED

4-5-6-7 (11)

3-2-1-2 (3)

4-7-5-3 (12)

(N Auto) 2-1/4" Asphalt over 3" Limerock Base

B-08 Date Drilled: 03/26/2025

B.T. @ 6'-5 1/4"

BORE HOLE GROUTED

7-6-5-8 (11)

4-3-3-2 (6)

10-7-11-18 (18)

DE

PT

H

DE

PT

H

(N Auto) 1-7/8" Asphalt over 3" Limerock Base

B-09 Date Drilled: 03/26/2025

B.T. @ 6'-4 7/8"

BORE HOLE GROUTED

4-3-2-3 (5)

3-2-2-2 (4)

4-7-5-4 (12)

(N Auto) 1" Asphalt over 3" Limerock Base

B-10 Date Drilled: 03/26/2025

B.T. @ 6'-4"

BORE HOLE GROUTED

3-2-1-2 (3)

2-2-3-4 (5)

4-5-5-4 (10)

W= 11.9% -200= 5.1%

W= 15.2% -200= 5.2%

W= 6.5% -200= 2.4%

W= 4.7% -200= 2.4%

W= 3.7% -200= 1.4%

W= 7.3% -200= 3.2%

W= 6.3% -200= 2.6%

W= 7.5% -200= 8.7%

W= 7.1% -200= 4.8%

W= 11.6% -200= 4.3%

MEDIUM DENSE, grayish brown, sand with silt (SP-SM)

LOOSE, gray to tan, sand (SP)

MEDIUM DENSE to LOOSE, gray, sand (SP) MEDIUM DENSE, grayish brown to gray, sand (SP)

MEDIUM DENSE, grayish brown to gray, sand (SP)

MEDIUM DENSE to LOOSE, grayish brown to gray, sand (SP)

MEDIUM DENSE, grayish brown, sand with silt (SP-SM)

MEDIUM DENSE, grayish brown, sand with silt (SP-SM)

LOOSE, gray to brown, sand (SP)

MEDIUM DENSE to LOOSE, gray, sand (SP)

LOOSE, tan, clayey sand (SC)

MEDIUM DENSE to LOOSE, grayish brown to grayish tan, sand (SP) MEDIUM DENSE to LOOSE, gray to tan, sand (SP)

Plotted: C:\Users\Ahmad\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C062-C063-LOG.dwg - AhmadC:\Users\Ahmad\mohsen design group dropbox\MDG\Projects\ZPH\jac25012-zph-airfield-pavements-rehab\05-drawings\JAC25012-C062-C063-LOG.dwg - Ahmad - AhmadAhmad

X

X

X X

X X

X X

X X

X X

XXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X

XXX

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

O

FZ

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

FA

RO

F…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .