ZEPH_SAMPLE_CHANGE_ORDER.pdf
PDF 119 KB Posted
- Attached to
- AIRFIELD PAVEMENTS REHAB
- Solicitation number
- 2025-006
- Issued by
- Pasco County, Florida
About this file
This document is an AIA Document G701 Change Order form for a construction project related to the Airfield Pavements Rehab in Florida. The form is a standard template used to document and authorize modifications to an existing construction contract, allowing for adjustments to the contract sum, guaranteed maximum price, or contract time. While the specific details of the change order are not filled in, the document provides a structured format for recording project modifications, including space for describing the changes, impacts on contract sum, and contract time.
The form requires signatures from the Architect, Contractor, and Owner to validate the change order, emphasizing the collaborative nature of contract modifications in construction projects. The document is dated 2017 and is copyrighted by the American Institute of Architects, indicating it is a standardized professional form used in the construction industry to formally document and approve contract changes. No specific financial amounts or detailed change descriptions are present in this sample document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .