ZMA-1006075-Drawings-Final.pdf
PDF 8 MB Posted
- Attached to
- AHU 510, 515 and 520 Replacement at the Miami Air Route Traffic Control Center, Miami, Florida
- Solicitation number
- 697DCK-21-R-00464
About this file
This federal contract solicitation seeks offers for the AHU 510, 515 and 520 Replacement at the Miami Air Route Traffic Control Center in Miami, Florida. The project involves replacing three air handling units and associated ductwork, controls, and chilled water piping. The estimated price range for the work is $750,000 to $2,000,000, with payment and performance bonds required. The opportunity is designated as unrestricted and open to all offerors. The NAICS code is 238220 for the size standard of $16.5 million. A site visit will take place on September 22, 2021 for interested contractors to visit the facility. Offers are due by 2:00 PM Eastern on October 5, 2021. The Federal Aviation Administration's Boston Enroute Construction Office will administer the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
CURB (TYP)
CONCRETE
XFMR GLB
PANEL DPG
TR DPG
EF-507
XFER SW
MANUAL
45'-9"2'-5"
LW
CM
PROJECT ENGINEER MGR: ENROUTE/FSS ENGR CTR
05/04/2021 1006075
ZMA-1006075-E101
z m a -1
-e
.d g n
THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
C O
N S
T R
U
IO
ENGINEERING SERVICES
ENROUTE/FSS
ARTCC
ELECTRICAL DEMOLITION
HVAC REPLACEMENT
POWER SERVICE BUILDING
FLMIAMI CENTERMIAMI
F531
C'
F
D
B
A
A'
4'6' 5'7'
FS
M
V
3'4'
/0
/2
:1
:4
P lo tt e d b y
-C
E
G -E
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
POWER SERVICE BLDG
WING
CONTROL
ADMIN
AUTO
KEY PLAN
SHEET NOTES:
EXIST LOW ROOF
LOW ROOF
DDC PANELS
AHU
#4 BC (TYP)
DPE-8
1"C-3#6 & 1#10 GND
DPD-13,15,17
DPE-13,15,17
DPE-8,10,12
(1ST FLOOR PLAN)
PANEL DPE
MCC EG-6
IN
#5
TANK
DAY
PNL
GLB
PANEL DPD
MCC EG-5
PANEL DPF
PANEL GLB1
PANEL GLB
DPE-13
1#10 GND
1"C-3#8 &
DPD-13
1"C-3#6 &
DEMOLISH EXISTING VFD UNISTRUT MOUNTING SYSTEM.8
GLB WILL SHUT DOWN GLB1.
EXISTING PANEL GLB1 IS FED FROM PANEL GLB. ANY OUTAGE OF PANEL 7
E601 FOR MORE DETAIL OF PANEL SCHEDULE.
CONDUIT, AND WIRING BACK TO SOURCE PANEL GLB. REFER TO DRAWING
DEMOLISH EXHAUST FAN EF-507 AND ASSOCIATED DISCONNECT SWITCH, 6
EXISTING POWER PANELS FOR AHU UNITS TO REMAIN.5
HOUSING TO BUILDING STEEL.
DEMOLISH EXISTING GROUNDING AND BONDING CONNECTIONS FROM AHU 4
FAN MOTOR.
DEMOLISH EXISTING CONDUIT AND WIRING FROM VFD OUTPUT TO AHU 3
EXISTING CONDUIT PENETRATION THROUGH-WALL FROM EG ROOM 110.2
EXISTING CONDUIT TO POWER PANEL TO REMAIN FOR NEW WORK.
AHU-510, 515, AND 520. DEMOLISH EXISTING WIRING BACK TO SOURCE.
DEMOLISH EXISTING VARIABLE FREQUENCY DRIVE W/ BYPASS PANEL FOR 1
515515
3/16" = 1'-0"SCALE:
PARTIAL SECOND FLOOR - DEMOLITION PLAN
SCALE: 3/16" = 1'-0"
PARTIAL FIRST FLOOR - DEMOLITION PLAN2
E101
MECHANICAL ROOM
GENERATOR ROOM
IS
8' 12'4'04' zma-1006075-e101
2021-08-04T15:50:10-0400
ROBERT L BELTON
2021-08-04T08:45:17-0400
MICHAEL T L COX
-m
MECHANICAL SCHEDULES
MC
ZMA-1006075-M603
:5 lo tt e zma-1006075-m603
2021-08-04T15:44:16-0400
ROBERT L BELTON
2021-08-04T09:29:39-0400
MICHAEL T L COX
ZMA-1006075-E102
ELECTRICAL NEW WORK
17'-10 1/2 "17'-10 1/2 "10'-0"
XFMR GLB
PANEL DPG
TR DPG
NEW COVER
NEW COVER
DPP-20,22,24
& 1 #10 GND
1" RGS - 3 #6
XFER SW
MANUAL
4'6' 5'7' 1
VFD
3'4'
M M
:3 lo tt e
CIRCUITS.
PERFORM INSULATION RESISTANCE TEST ON ALL NEW BRANCH OR FEEDER 4.
ABOVE 8' AFF TRANSITION CONDUIT TO EMT.
(AFF). POWER CONDUIT TO BE IN RGS WHEN BELOW 8' ABOVE FINISHED FLOOR 3.
OF THE NATIONAL ELECTRICAL CODE (NEC) AND FAA STANDARD FAA-STD-019F.
ALL EQUIPMENT SHALL BE GROUNDED ACCORDING TO THE LATEST EDITION 2.
SUPPORTED INDEPENDENTLY FROM MECHANICAL EQUIPMENT.
VARIABLE FREQUENCY DRIVES SHALL BE INSTALLED ON UNISTRUT FRAME 1.
STEEL. GROUNDING WIRE MUST BE IN ELECTRICAL PVC CONDUIT.
PROVIDE AND INSTALL GROUNDING FROM VFD AND AHU HOUSING TO BUILDING 8
PLAN, IN ORDER TO MINIMIZE THE DOWNTIME OF PANEL DPE.
REPLACEMENT OF UNITS IN ACCORDANCE WITH THE MECHANICAL PHASING
PANEL DPE FEEDS AHU-515 AND AHU-520. CONTRACTOR SHALL COORDINATE 7
ON DRAWING E601.
MANUFACTURER, TYPE, AND AIC RATINGS, AS PER PANELBOARD SCHEDULES
PROVIDE NEW CIRCUIT BREAKERS TO MATCH EXISTING PANELBOARD 6
MOUNT SHOULD BE SECURED TO BUILDING STEEL AND NOT TO THE FLOOR.
PROVIDE SECURE STAND-ALONE MOUNT FOR VFDS WITH UNISTRUT. THE 5
FACTORY REPRESENTATIVE SPECIALIST.
VFD CONFIGURATION AND START-UP SHOULD BE ACCOMPLISHED BY A 4
ON DRAWING. CONDUCTORS AS INDICATED
EXISTING ESSENTIAL PANELBOARD TO NEW VFDS. SIZE NEW FROM
PROVIDE AND ROUTE NEW BRANCH CIRCUIT WIRING IN EXISTING CONDUIT, 3
CONNECT TO VFD ENCLOSURE USING LFMC CONDUIT (3FT MAX.).
BOXES AND EXTEND EXISTING CONDUIT AS NECESSARY TO REACH NEW VFD.
MODIFY EXISTING RIGID METAL CONDUIT TO REACH NEW VFD. PROVIDE J-2
OUTPUT AND THE AHU FAN MOTOR.
WITH W/ BYPASS CONTROL PANEL INSTALLED AND WIRED BETWEEN THE VFD
PROVIDE NEW VARIABLE FREQUENCY DRIVE, SINGLE VFD CONFIGURATION 1
GENERAL NOTES:
1 4
5 8
PANEL GLB1
PANEL GLB
PANEL DPF
PANEL DPE
MCC EG-6
PANEL DPD
MCC EG-5
#5
DAY
PNL
GLB
3/16" = 1'-0"SCALE:
PARTIAL SECOND FLOOR - INSTALLATION PLAN 1
PARTIAL FIRST FLOOR - INSTALLATION PLAN2
E102
DPE-20,22,24
1"C RGS-3#6 & 1#10 GND
DPD-20,22,24
DPE-19,21,23
DPE-20,22,24
3 2
DPE-19,21,23
1"C RGS-3#8 &
E102
(1ST FLOOR PLAN)
EXIST
DDC PANELS
GENERATOR ROOM
zma-1006075-e102
2021-08-04T15:53:42-0400
ROBERT L BELTON
2021-08-04T08:46:03-0400
MICHAEL T L COX
THEY ARE NOT INCLUDED IN CONTRACT WORK.
SEQUENCES ARE HERE FOR REFERENCE ONLY.
SEQUENCE OF OPERATIONS
ZMA-1006075-M604
lo tt e
BE USED IN EMERGENCIES.
PURGE MODE ON. PROVIDE A WARNING ON THIS BUTTON THAT IT SHOULD ONLY
BUTTON ON BACNET INTERFACE TO BE ADDED FOR USERS TO MANUALLY TURN
100%(ADJ) OPEN POSITION.
PURGE CYCLE, THE MINIMUM OUTSIDE DAMPERS SHALL BE MAINTAINED IN THE
3200 CFM (ADJ). WHEN THE OUTSIDE AIR DAMPERS ARE OPERATING IN THE
OUTSIDE AIR CFM SET POINT FOR AHU 510 AND 515 SHALL BE INITIALLY SET AT
AS SENSED BY THE OUTSIDE AIRFLOW STATIONS (AFMS-510,515). THE MINIMUM
(CD-510D,515D) SHALL BE MODULATED TO MAINTAIN MINIMUM OUTSIDE AIR CFM,
RETURNED TO THEIR NORMAL POSITIONS. THE MINIMUM OUTSIDE AIR DAMPERS
EXCEEDS THE SETPOINT (INITIALLY SET AT 70°F), THE DAMPERS SHALL BE
ENTHALPY EXCEEDS THE SETPOINT OR THE OUTDOOR AIR TEMPERATURE
WHICH IS ADJUSTABLE AND INITIALLY SET AT 48°F. WHEN THE OUTDOOR AIR
PURGE MODE IF THE MIXED AIR TEMPERATURE DROPS BELOW ITS SET POINT,
SENSOR (TS-2). THE MIXED AIR TEMPERATURE SENSOR (TS-1) SHALL DISABLE
AIR TEMPERATURE SET POINT AS SENSED BY THE SUPPLY AIR TEMPERATURE
SEQUENCE WITH THE COOLING (CV-510,515) VALVES TO MAINTAIN THE SUPPLY
(CD-510A,515) AND RETURN AIR DAMPERS (CD-520B), SHALL BE MODULATED IN
DROPS BELOW THE SETPOINT (INITIALLY SET AT 20), THE OUTSIDE AIR DAMPERS
CONTROL OF PURGE CYCLE BY THE DDCS. AS THE OUTSIDE AIR ENTHALPY
RELATIVE HUMIDITY SHALL BE SENSED TO PROVIDE INPUT DATA FOR ENTHALPY
MODULATED 100% OPEN. THE RETURN AIR AND OUTSIDE AIR TEMPERATURE AND
MODE. IN PURGE MODE THE OUTSIDE AIR DAMPERS (CD-510A,515A) SHALL BE
IN THE EVENT OF A CHILLED WATER FAILURE THE UNIT SHALL ENTER PURGE
PURGE MODE:10.
ALARM WILL BE GENERATED.
STATIC PRESSURE RISES ABOVE 0.05" W.C. OR FALLS BELOW -0.05" W.C., AN
MAINTAIN A SLIGHTLY POSITIVE BUILDING STATIC PRESSURE. IF THE BUILDING
SWITCHGEAR ROOM 109. THE BMS WILL MODULATE THE RELIEF DAMPERS TO
THE BMS WILL MONITOR THE BUILDING PRESSURE WITHIN THE CRITICAL
9. RELIEF DAMPERS:
FLOW STATION.
AIR AT ALL TIMES. OUTDOOR AIR FLOW WILL BE MEASURED BY OUTDOOR AIR
THE OUTDOOR AIR DAMPER WILL MODULATE TO MAINTAIN 3200 CFM OF OUTSIDE
8. UNIT DAMPER CONTROL:
SUPPLY AIR DAMPER: CLOSED E.
RETURN AIR DAMPER: OPEN D.
OUTDOOR AIR DAMPER: CLOSED C.
COOLING COIL CONTROL VALVE: CLOSED B.
SUPPLY FAN START/STOP: OFF A.
DEVICES SHALL FAIL IN THE MANNER, AS FOLLOWS:
UPON LOSS OF CONTROL SIGNAL OR ELECTRICAL POWER, THE CONTROL
FAILURE MODE:7.
DIFFERENTIAL PRESSURE ACROSS THE FILTERS.
DIFFERENCE INDICATOR LOCATED AT THE FILTERS SHALL INDICATE THE
ADJUSTABLE LIMIT, AN ALARM SIGNAL WILL BE SENT TO THE DDCS. PRESSURE
THE PRE-FILTER AND FINAL FILTERS. WHEN THE PRESSURE EXCEEDS AN
DIFFERENTIAL PRESSURE SWITCHES SHALL MONITOR THE PRESSURE DROP AT
DIRTY FILTER ALARM: 6.
ALARM SIGNAL SHALL BE SENT TO THE DDCS.
IF THE SUPPLY AIR TEMPERATURE RISES ABOVE 80°F, A HIGH-TEMPERATURE
SUPPLY AIR ALARM 5.
BE RETURNED TO OPERATION.
AND THE FIRE ALARM SYSTEM HAS BEEN RESET, THE AIR HANDLING UNIT SHALL
STOP THE SUPPLY FAN. WHEN THE FIRE ALARM CONDITION HAS BEEN CLEARED,
ALARM SYSTEM SHALL ACTIVATE AN ADDRESSABLE CONTROL DEVICE (ACD) TO
UPON RECEIVING AN ALARM SIGNAL FROM DUCT SMOKE DETECTOR, THE FIRE
FIRE ALARM SHUTDOWN:4.
AND AN ALARM SHALL SOUND AT THE DDCS AND OWS.
CONTINUES TO DROP TO 40°F, THE FAN AT EACH AHU SHALL BE DEACTIVATED
SHALL BE MODULATED TO THE OPEN POSITION. IF THE MIXED AIR TEMPERATURE
SHALL BE MODULATED TO THE CLOSED POSITION AND THE RETURN AIR DAMPER
WHEN MIXED AIR TEMPERATURE REACHES 45°F, THE OUTSIDE AIR DAMPER
MIXED AIR SHUTDOWN:3.
SCHEDULE WITH OUTSIDE AIR TEMPERATURE
MAINTAIN A SUPPLY AIR TEMPERATURE FROM 55F TO 65F BASED ON A RESET
ECONOMIZER DAMPERS (IF ECONOMIZER SEQUENCE IS PERFORMED) TO
THE UNIT. THE BMS WILL MODULATE THE UNIT CHILLED WATER VALVE OR
THE BMS WILL CONSTANTLY MONITOR THE SUPPLY AIR TEMPERATURE FROM
SUPPLY AIR TEMPERATURE CONTROL: 2.
(AV:6, THROUGH THE BACNET INTERFACE) FOR MONITORING PURPOSES ONLY.
VFD. THE BMS WILL ALSO MONITOR THE POWER CONSUMPTION OF THE DRIVE
AND WILL DISPLAY THIS ALARM UPON RECEIVING A FAULT CONDITION FROM THE
(AV:51, THROUGH THE BACNET INTERFACE) FOR TROUBLESHOOTING PURPOSES
THE BMS WILL ALSO MONITOR THE FAULT CODE GENERATED BY THE DRIVE
GENERATED AND THE UNIT'S SUPPLY FAN SPEED WILL NOT BE CONTROLLED.
BE GENERATED. IF THE FAN IS BYPASSING THE VFD, AN ALARM WILL BE
COMMAND DOES NOT MATCH THE FEEDBACK SIGNAL RECEIVED, AN ALARM WILL
ALARM WILL BE GENERATED AND THE UNIT WILL BE DISABLED. IF THE SPEED
AND THE UNIT WILL BE DISABLED. IF A VFD FAULT CONDITION OCCURS, AN
FAN STATUS DOES NOT MATCH THE COMMAND, AN ALARM WILL BE GENERATED
STATUS, FAN FAULT CONDITION, FAN SPEED, AND FAN BYPASS STATUS. IF THE
BETWEEN A MINIMUM OF 18HZ (ADJ) TO 60HZ (ADJ). THE BMS WILL MONITOR FAN
TEMPERATURE SETPOINT OF 72 F (ADJ). SUPPLY FAN SHALL MODULATE
ENABLED, THE BMS WILL MODULATE THE UNIT SUPPLY FAN TO MAINTAIN A SPACE
LEAD UNIT WILL BE ROTATED ON A WEEKLY BASIS TO EQUALIZE RUNTIME. WHEN
AHU-510 & AHU-515 WILL OPERATE IN A LEAD/STANDBY CONFIGURATION. THE
SUPPLY FAN VFD CONTROL: 1.
BE USED IN EMERGENCIES.
PURGE MODE ON. PROVIDE A WARNING ON THIS BUTTON THAT IT SHOULD ONLY
BUTTON ON BACNET INTERFACE TO BE ADDED FOR USERS TO MANUALLY TURN
RETURNED TO THEIR NORMAL POSITIONS.
EXCEEDS THE SETPOINT (INITIALLY SET AT 70°F), THE DAMPERS SHALL BE
ENTHALPY EXCEEDS THE SETPOINT OR THE OUTDOOR AIR TEMPERATURE
WHICH IS ADJUSTABLE AND INITIALLY SET AT 48°F. WHEN THE OUTDOOR AIR
PURGE MODE IF THE MIXED AIR TEMPERATURE DROPS BELOW ITS SET POINT,
SENSOR (TS-2). THE MIXED AIR TEMPERATURE SENSOR (TS-1) SHALL DISABLE
TEMPERATURE SET POINT AS SENSED BY THE SUPPLY AIR TEMPERATURE
SEQUENCE WITH THE COOLING (CV-520) VALVES TO MAINTAIN THE SUPPLY AIR
(CD-520A) AND RETURN AIR DAMPERS (CD-520B), SHALL BE MODULATED IN
DROPS BELOW THE SETPOINT (INITIALLY SET AT 20), THE OUTSIDE AIR DAMPERS
CONTROL OF PURGE CYCLE BY THE DDCS. AS THE OUTSIDE AIR ENTHALPY
RELATIVE HUMIDITY SHALL BE SENSED TO PROVIDE INPUT DATA FOR ENTHALPY
MODULATED 100% OPEN. THE RETURN AIR AND OUTSIDE AIR TEMPERATURE AND
MODE. IN PURGE MODE THE OUTSIDE AIR DAMPERS (CD-520A) SHALL BE
IN THE EVENT OF A CHILLED WATER FAILURE THE UNIT SHALL ENTER PURGE
PURGE MODE:
THE MODULATION OF CD-520A.
OA VALUE WILL BE 500 CFM AND BE MAINTAINED AT ALL TIMES VIA THE AFMS BY
MAINTAIN A SUPPLY AIR TEMPERATURE SETPOINT OF 52"F (ADJ). THE MINIMUM
THE UNIT. THE BMS WILL MODULATE THE UNIT CHILLED WATER VALVE TO
THE BMS WILL CONSTANTLY MONITOR THE SUPPLY AIR TEMPERATURE FROM
SUPPLY AIR TEMPERATURE CONTROL:
BACNET INTERFACE) FOR MONITORING PURPOSES ONLY.
ALSO MONITOR THE POWER CONSUMPTION OF THE DRIVE (AV:6, THROUGH THE
THIS ALARM UPON RECEIVING A FAULT CONDITION FROM THE VFD. THE BMS WILL
BACNET INTERFACE) FOR TROUBLESHOOTING PURPOSES AND WILL DISPLAY
MONITOR THE FAULT CODE GENERATED BY THE DRIVE (AV:51, THROUGH THE
UNIT'S SUPPLY FAN SPEED WILL NOT BE CONTROLLED. THE BMS WILL ALSO
IF THE FAN IS BYPASSING THE VFD, AN ALARM WILL BE GENERATED AND THE
NOT MATCH THE FEEDBACK SIGNAL RECEIVED, AN ALARM WILL BE GENERATED.
GENERATED AND THE UNIT WILL BE DISABLED. IF THE SPEED COMMAND DOES
BE DISABLED. IF A VFD FAULT CONDITION OCCURS, AN ALARM WILL BE
NOT MATCH THE COMMAND, AN ALARM WILL BE GENERATED AND THE UNIT WILL
CONDITION, FAN SPEED, AND FAN BYPASS STATUS. IF THE FAN STATUS DOES
WILL BE GENERATED. THE BMS WILL MONITOR FAN STATUS, FAN FAULT
IF THE SPACE TEMPERATURE RISES 5"F ABOVE SETPOINT, A HIGH TEMP ALARM
TO MAINTAIN THE SPACE TEMPERATURE WITHIN CRITICAL SWITCHGEAR ROOM B.
SETPOINT OF 72"F (ADJ). THIS UNIT WILL WORK IN CONJUNCTION WITH CRAC-1
THE BMS WILL MODULATE THE SUPPLY FAN TO MAINTAIN A SPACE TEMPERATURE
SUPPLY FAN VFD CONTROL:
FOR AS LONG AS THE CONTACTS ON THE HYDROGEN SENSOR ARE CLOSED.
NOTIFIED, THE BMS WILL GENERATE AN ALARM. THIS ALARM WILL REMAIN ACTIVE
HYDROGEN PANEL WILL NOTIFY THE BMS OF AN ALARM CONDITION. WHEN
ALARM PANEL. WHEN THE HYDROGEN LEVEL RISES ABOVE 50% LEL, THE
THE BMS WILL MONITOR A SET OF ALARM CONTACTS LOCATED ON A HYDROGEN
HYDROGEN MONITORING:
WORKING FAN TO 100%.
(ADJ), THE BMS WILL GENERATE AN ALARM AND WILL SET THE SPEED OF THE
FAN STATUS DOES NOT MATCH THE COMMAND AFTER A 5 MINUTE INTERVAL
ENDSWITCH WILL MAKE AND THE FANS WILL THEN RAMP UP TO SPEED. IF THE
RUN AT 50% SPEED. WHEN THE ISOLATION DAMPER OPENS, THE DAMPER
THE FAN'S ISOLATION DAMPERS. THE BMS WILL THEN ENABLE BOTH FANS TO
RUN CONTINUOUSLY. WHEN THE FANS ARE ENABLED, THE BMS WILL FIRST OPEN
EXHAUST FANS EF-1 & EF-2 WILL SERVE BATTERY ROOM 101. THESE UNIT'S WILL
EF-1, EF-2:
OF THE WORKING FAN TO 100%.
INTERVAL (ADJ), THE BMS WILL GENERATE AN ALARM AND WILL SET THE SPEED
IF THE FAN STATUS DOES NOT MATCH THE COMMAND AFTER A 5 MINUTE
DAMPER ENDSWITCH WILL MAKE AND THE FANS WILL THEN RAMP UP TO SPEED.
DURING TESTING & BALANCING). WHEN THE ISOLATION DAMPER OPENS, THE
AND SUPPLY 850 CFM PER FAN (CFM SPEED SETPOINT TO BE DETERMINED
ISOLATION DAMPER. THE BMS WILL THEN ENABLE BOTH SUPPLY FANS TO RUN
IF ONE OF THE UNIT'S IS RUNNING, THEN THE BMS WILL OPEN THE SUPPLY
(ADJ), THE BMS WILL FIRST CONFIRM EITHER AHU-510 OR AHU-515 ARE RUNNING.
FED FROM AHU-510 & AHU-515. IF THE SPACE TEMPERATURE RISES ABOVE 77"F
TEMPERATURE WITHIN THE SPACE. THE SUPPLY FANS WILL HAVE SUPPLY AIR
WILL SERVE BATTERY ROOM 101. THE BMS WILL MONITOR THE SPACE
SUPPLY FANS SF-1 & SF-2
SEQUENCE OF OPERATIONS SF-1, SF-2:
THE BMS WILL GENERATE AN ALARM AND DISABLE THE UNIT.
GENERAL ALARM CONTACTS LOCATED ON THE UNIT. IF THESE CONTACTS TRIP,
THE PUMP AND GENERATE AN ALARM. THE BMS WILL MONITOR A SET OF
CHP-5. IF THE STATUS DOES NOT MATCH THE COMMAND, THE BMS WILL DISABLE
THAT THE PUMP HAS BEEN STARTED. THE BMS WILL MONITOR THE STATUS OF
CRAC UNIT CHILLED WATER PUMP CHP-5 AND WILL GENERATE A NOTIFICATION
TEMPERATURE RISES 5"F (ADJ) ABOVE SETPOINT, THE BMS WILL ENABLE THE
SETPOINT TO BE 52"F (ADJ). IF THE UNIT IS RUNNING AND THE UNIT'S SUPPLY AIR
SUPPLY AIR TEMPERATURE SETPOINT. INITIAL SUPPLY AIR TEMPERATURE
THE BMS WILL MONITOR THE UNIT'S FAN SPEED, SUPPLY AIR TEMPERATURE, &
SPACE TEMPERATURE SETPOINT.
(ADJ). THIS UNIT WILL WORK IN CONJUNCTION WITH AHU-520 TO MAINTAIN THE
CONTROL ITSELF TO MAINTAIN A SPACE TEMPERATURE SETPOINT OF 72"F
THE UNIT WILL BE PROVIDED WITH ITS OWN SET OF CONTROLS AND WILL
THE BMS WILL COMMUNICATE WITH THE CRAC UNIT VIA A BACNET/LP INTERFACE.
CRAC-1:
SEQUENCE OF OPERATIONS AHU-510 & AHU-515: SEQUENCE OF OPERATIONS AHU-520:
CONTROL DIAGRAM TO BE UPDATED. SEE COR FOR EXAMPLE GRAPHIC.1.
NOTE:
zma-1006075-m604
2021-08-04T16:03:58-0400
ROBERT L BELTON
2021-08-04T09:31:22-0400
MICHAEL T L COX
480V15 H.PDANFOSS FC-102AHU-520VFD-520
480V30 H.PDANFOSS FC-102AHU-515VFD-515
480V30 H.PDANFOSS FC-102AHU-510VFD-510
VOLTAGESIZEMODELSERVICENAME
VARIABLE FREQUENCY DRIVE
ZMA-1006075-E601
SCHEDULES
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
1 2
A B C
K
L
AMP DESCRIPTION
AMPDESCRIPTION
MOUNTING: SURFACE
SPARE BLANK
(FOR REFERENCE ONLY)
MAIN AMPS RATING: 225A MLO
VOLTAGE: 480V, 3 PHASE, 3 WIRE
SPARE SPARE
PANEL "DPD"
COMPRESSOR EG #5 JWH
AHU-510
CHGR 4DCA
LOCATION: POWER SERVICE BUILDING
FEED: BOTTOM
SPARE SPARE
MAIN AMPS RATING: 225A MLO
VOLTAGE: 480V, 3 PHASE, 3 WIRE
PANEL "DPE"
AHU-520
LOCATION: POWER SERVICE BUILDING
FEED: BOTTOM
EG #6 JWH AHU-515
SPARE
CHGR 4DCA
AHU-520 AHU-515
AHU-510
A.I.C.: 25000 A.I.C.: 25000
FEED: TOP
A.I.C.: 18000
VOLTAGE: 208/120V, 3 PHASE, 4 WIRE
1 1
20 1 1 20
RCPT S.G. RM
RCPT. MECH ROOM
PANEL "GLB"
LOCATION: EG ROOM 110
SECURITY LIGHTS NORTH
EXIT LIGHTS
EWC RECEPTACLE
KATO E/G DAY TANK
KATO E/G RETURN OIL COOLER
KATO RM FILTER/TRANSFER ROOM
ESU BATH, EX. FAN, SINK DISPOSAL
BATHROOM POWER
20 1
20 1 20
20 1
SURGE PROTECTOR
ADAS PDU-1
ADAS PDU-2
SEC. LIGHTS E/G ROOF
CHARGER - E/G ROOM
RECEPTACLE E/G ROOM
RCPT. MECH ROOM
EF-507 MECH ROOM
KATO E/G DAY TANK (NORMAL)
RCPT. GFCI, EXTERIOR ACEPS
EF-510 E/G ROOM
FUEL SYSTEM DDCP 1-5
EF-509 BATT ROOM
PNL GLB1
EF-508B / LIGHT (JANITOR)
MAIN AMPS RATING: 100A
SOURCE: MCC-A
(ESSENTIAL SERVICE)
SOURCE: MCC-C
SOURCE 2: PANEL DPE
SOURCE 1: PANEL DPD
TRANSFER SWITCH PANEL GLB
TRANSFER SWITCH PANEL GLB
25 26
FEED: TOP
A.I.C.: 18000
VOLTAGE: 208/120V, 3 PHASE, 4 WIRE
1 1
PCMS
AHU 510/515/520 DDCP#4 MEC R
DAMPER, CONTROLS DDCP #6
BLANK
PANEL "GLB-1"
LOCATION: EG ROOM 110
TANK NORM OPERATION
APMS
FIRE ALARM PANEL
FIRE ALARM BOOSTER
SECURITY
SECURITY
VEEDER ROOT OVERFILL ALARM
CAMERA P29
CAMERA P30
20 1 1 30
20 1 1 30
20 1 1 30CAMERA P31, P32
WALL OUTLET
KATO E/G 5 & 6 OVERFLOW TANK
DDCP #5 MECH ROOM
350 TANK MONITOR W/SURGE ARRE
KATO E/G #5 RETURN OIL COOLER
PCMS
EMH-G GFCI
TVSS
EMH-G GFCI
MAIN AMPS RATING: 100A
SOURCE 2: PANEL DPE
SOURCE 1: PANEL DPD
25 26 lo tt e
102P22KT4E21H2.
FC-THE TYPE CODE IN RELATION TO THE 30 H.P MODEL NUMBERS IS: 7
BREAK CIRCUIT BREAKERS.
HI-EXISTING PANELBOARDS ARE GE A-SERIES PANELBOARDS WITH THED 6
PRIOR TO DEMOLITION WORK.
EQUIPMENT, BRANCH CIRCUIT CONNECTIONS AND PANELBOARD SCHEDULES,
ELECTRICAL CONTRACTOR MUST FIELD VERIFY EXISTING CONDITION OF ALL 5
EXISTING CONDUIT TO BE REUSED.E102.
DRAWING PROVIDE NEW BRANCH CIRCUIT WIRING TO AHU'S AS INDICATED ON 4
EF-507. LABEL EXISTING BREAKER AS "SPARE".
WITH REMOVE EXISTING BRANCH CIRCUIT CONDUIT AND WIRING ASSOCIATED 3
MATCH EXISTING PANELBOARD MANUFACTURER TYPE AND AIC RATINGS.
SCHEDULE, TO FEED NEW AHU UNITS 510, 515, AND 520. BREAKER SHALL
PANELBOARD PROVIDE NEW CIRCUIT BREAKER, AMP RATING AS INDICATED ON 2
510, 515, AND 520. LABEL EXISTING BREAKER AS "SPARE".
UNITS DEMOLISH EXISTING BRANCH CIRCUIT WIRING ASSOCIATED WITH AHU 1
2 24
POWER PANEL SCHEDULES
NOT TO SCALE
NEW VFD SCHEDULE
zma-1006075-e601
2021-08-04T15:54:22-0400
ROBERT L BELTON
2021-08-04T08:47:03-0400
MICHAEL T L COX
ZMA-1006075-F101
-f
FIRE ALARM DEMOLITON PLAN
DETECTOR
DUCT SMOKE
FIRE ALARM CONDUIT
CONDUIT
FIRE ALARM
CONDUIT LOOP
EXISTING FIRE ALARM
DUCT SMOKE DETECTOR
4'6' 5'7'
-f
:0 lo tt e
1 DEMOLISH EXISTING SUPPLY AND RETURN DUCT SMOKE DETECTORS FOR AHU-510,
515, AND 520.
2 DEMOLISH EXISTING FIRE ALARM CONDUIT THAT PERIMETERS AHU.
3 DEMOLISH EXISTING FIRE ALARM CONDUIT WHIP TO VFD.
4 REMOVE FIRE ALARM WIRE WITH INTENTION TO RE-USE. DO NOT CUT AND CREATE NEW
SPLICES.
5 EXISTING MECHANICAL ROOM FIRE ALARM LOOP TO REMAIN IN PLACE.
6 EXISTING CONDUIT PENETRATION THROUGH-WALL FROM EG ROOM 110.
NOTES:
CONTRACTOR SHALL BE EST CERTIFIED. (EDWARD SYSTEM TECHNOLOGY)5.
DOWNTIME. THE MAIN WORK SCHEDULE TO MINIMIZE THE
CONTRACTOR SHALL COORDINATE THE WORK OF THE FIRE ALARM SYSTEMS WITH4.
REPLACEMENT.
BYPASS THE ASSOCIATED DUCT SMOKE DETECTOR FOR EACH AHU, DURING EACH AHU
TIMES CONTRACTOR SHALL COORDINATE WITH FAA/COR/ESU TO DISCONNECT OR
THE EXISTING FIRE ALARM SYSTEM MUST REMAIN IN OPERATIONAL CONDITION AT ALL 3.
CONDUIT MUST BE FACTORY RED.
THE CONTRACTOR SHALL VERIFY AND LABEL EACH FIRE WIRE AND CONDUIT. ALL FIRE 2.
CONNECTIONS BETWEEN ELECTRICAL DEVICES AND EQUIPMENT.
ROUTE OF CONDUITS SHOWN ARE ILLUSTRATIVE AND INTENDED ONLY TO INDICATE 1.
4 2
LOOP
ALARM CONDUIT
EXISTING FIRE
1 SECOND FLOOR - DEMOLITION PLAN
F101 zma-1006075-f101
2021-08-04T15:55:18-0400
ROBERT L BELTON
2021-08-04T08:47:53-0400
MICHAEL T L COX
DUCT SMOKE DETECTOR
CONCRETE CURB (TYP)
"2
17'-10"2
17'-1010'-0"
FIRE ALARM CONDUIT
45'-9"
2'-5"
ZMA-1006075-F102
-f
FIRE ALARM INSTALLATION PLAN
-f
:2 lo tt e
4'6' 5'7' 1
1 PROVIDE NEW DUCT SMOKE DETECTORS FOR AHU 510, 515, AND 520.
2 PROVIDE AND ROUTE FIRE ALARM WIRING AND 3/4 " EMT CONDUIT THAT PERIMETERS
EACH AHU.
3 PROVIDE NEW FIRE ALARM CONDUIT WHIPS TO NEW VFD.
4 EXISTING FIRE ALARM LOOP, TO REMAIN.
5 NEW CONDUIT FOR FIRE ALARM SYSTEM MUST BE ROUTED TO FIT EACH NEW AHU
AND MUST NOT INTERFERE WITH ANY ACCESS DOORS OR CONTROLS.
CONTRACTOR SHALL BE EST CERTIFIED (EDWARD SYSTEM TECH).5.
THE MAIN WORK SCHEDULE TO MINIMIZE THE DOWNTIME.
CONTRACTOR SHALL COORDINATE THE WORK OF THE FIRE ALARM SYSTEMS WITH4.
REPLACEMENT.
BYPASS THE ASSOCIATED DUCT SMOKE DETECTOR FOR EACH AHU, DURING THE VFD
TIMES CONTRACTOR SHALL COORDINATE WITH FAA/COR/ESU TO DISCONNECT OR
THE EXISTING FIRE ALARM SYSTEM MUST REMAIN IN OPERATIONAL CONDITION AT ALL 3.
CONDUIT MUST BE FACTORY RED.
THE CONTRACTOR SHALL VERIFY AND LABEL EACH FIRE WIRE AND CONDUIT. ALL FIRE 2.
CONNECTIONS BETWEEN ELECTRICAL DEVICES AND EQUIPMENT.
. ROUTE OF CONDUITS SHOWN ARE ILLUSTRATIVE AND INTENDED ONLY TO INDICATE 1
1 SECOND FLOOR - INSTALLATION PLAN
F102
ROOF
EXIST LOW
zma-1006075-f102
2021-08-04T15:56:01-0400
ROBERT L BELTON
2021-08-04T08:48:37-0400
MICHAEL T L COX
COVER SHEET AND LOCATION MAP
ZMA-1006075-G001
-g lo tt e
SCALES SHOWN FOR 22X34 SHEETS ADJUST SCALES FOR OTHER SIZES
N.W. 58TH ST
X
W
Y
IL
IR
MIAMI SPRINGS
N.W. 36TH ST
RT. 27MIAMI CANAL
.W
LOCATION
PROJECT
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
AVIA
I
LAR
TRAT
SI
NI
ZMA/ARTCC - MIAMI, FLORIDA
LOCATION MAP
zma-1006075-g001
2021-08-04T15:56:41-0400
ROBERT L BELTON
2021-08-04T08:49:45-0400
MICHAEL T L COX
ZMA-1006075-G002
DRAWING INDEX AND GENERAL NOTES
GENERAL NOTES DRAWING LIST
DESCRIPTIONDATEREV.DRAWING NO.
REQUIREMENTS FOR GROUNDING, SPLICING, TERMINATION, BONDING, AND INSTALLATION OF THE ELECTRICAL SYSTEMS THAT ARE SPECIFIC FOR THE AIR TRAFFIC OPERATIONS.
COPY OF THE FAA'S STANDARDS FOR ELECTRICAL WORK AND COMPLY WITH ALL THE REQUIREMENTS SET BY THIS STANDARD. THE FAA'S ELECTRICAL STANDARDS INCLUDE SPECIFIC
INCLUDE AND ARE NOT LIMITED TO THE LATEST EDITIONS OF THE INTERNATIONAL BUILDING CODE, NFPA, ASHRAE, SMACNA, THE NATIONAL INSULATION STANDARD, AND FAA ORDERS. OBTAIN A
THIS PROJECT AS A MINIMUM, ALL WORK SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS, CODES, STANDARDS, AND REGULATIONS. APPLICABLE CODES AND STANDARDS FOR 11.
ALL CONSTRUCTION MUST BE DONE IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.10.
TEST ON ALL NEW AND EXISTING BRANCH OR FEEDER CIRCUITS. REPORT ANY FAILURES TO COR.
INSULATION RESISTANCE ALL EQUIPMENT MUST BE GROUNDED ACCORDING TO THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE (NEC) AND FAA STANDARD FAA-STD-019F. PERFORM 9.
PERMITTED.
EACH BRANCH CIRCUIT SHALL HAVE ITS OWN SEPARATE NEUTRAL AND SEPARATE GROUNDING CONDUCTOR. USE OF COMMON/SHARED NEUTRAL OR GROUNDING CONDUCTORS IS NOT
FIELD VERIFY AND LABEL ALL FEEDERS, BRANCH CIRCUITS CONNECTIONS, PANELBOARD SCHEDULES AND ELECTRICAL EQUIPMENT RELATED TO THE WORK.8.
WORK. THE COR SHALL STOP WORK ACTIVITIES IF FIELD WORK DEVIATES FROM THE APPROVED COORDINATION DRAWINGS.
ACTUAL FIELD CONDITIONS. THE CONTRACTOR MUST ENSURE THE COORDINATION DRAWINGS ARE APPROVED BY THE COR PRIOR TO INSTALLATION AND MUST USE THESE TO DICTATE THE FIELD
AND COMPONENTS WITHIN THE SPACE AND THE BUILDING ELEMENTS. INDICATE IN THE COORDINATION DRAWINGS ANY DEVIATION FROM THE DESIGN TO FIT THE NEW INSTALLATION TO THE
THE NEW EQUIPMENT SUBMIT COORDINATION DRAWINGS FOR THE APPROVAL OF THE COR. COORDINATION DRAWINGS MUST INDICATE DIMENSIONS, DISTANCES, AND ELEVATIONS THAT RELATE TO 7.
ONCE APPROVED BY THE COR AND AT NO ADDITIONAL COST TO THE FAA.
ENCOUNTERED ON SITE FIELD VERIFY THE EXACT CONDITIONS ON SITE TO ADJUST, OR MODIFY EQUIPMENT LOCATIONS AND ROUTING OF UTILITIES AND CONNECTIONS TO FIT THE CONDITIONS 6.
INTERRUPTIONS ARE NOT PERMITTED.
UNSCHEDULED WORK REQUIRING PERMANENT, TEMPORARY, OR PARTIAL ELECTRICAL/WATER OUTAGES MUST BE COORDINATED WITH THE COR AT LEAST 14 CALENDAR DAYS IN ADVANCE. 5.
ONLY FAA PERSONNEL MAY OPERATE VALVES. THE CONTRACTOR SHALL NOT OPEN OR CLOSE ANY VALVE AT ANY TIME.4.
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. THE CONTRACTOR SHALL NOT DE-ENERGIZE OR ENERGIZE ANY CIRCUIT BREAKER AT ANY TIME. 3.
CONTROL CENTER (ARTCC) AND UNAUTHORIZED OUTAGES OF UTILITY SERVICES MAY CAUSE ACCIDENTS AND/OR LOSS OF LIFE.
AIR ROUTE TRAFFIC EXTREME CAUTION MUST BE PRACTICED WHEN WORKING ON ANY OF THE BUILDING UTILITIES (ELECTRICAL, MECHANICAL, OR PLUMBING). THIS FACILITY IS AN OPERATIONAL 2.
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND CONFIRM ALL INFORMATION PROVIDED HERE WITH SITE CONDITIONS, EQUIPMENT AND MATERIAL SUPPLIERS.
PROCESS. IT IS THE THESE CONTRACT DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS TO BE ENCOUNTERED DURING THE CONSTRUCTION 1.
COVER SHEET AND LOCATION MAP
DRAWING INDEX AND GENERAL NOTES
ABBREVIATIONS AND LEGENDS
CONSTRUCTION STAGING PLAN
MECHANICAL DEMOLITION PLAN
ARCHITECTURAL ELEVATIONS
MECHANICAL INSTALLATION PLAN
SECTION VIEW
SECTION HVAC
MECHANICAL DETAILS
CHILLED WATER SYSTEM DETAILS
AIRFLOW DIAGRAM AHU 510/515
AIRFLOW DIAGRAM AHU 520
MECHANICAL SCHEDULES
SEQUENCE OF OPERATIONS
ELECTRICAL DEMOLITION
ELECTRICAL NEW WORK
SCHEDULES
FIRE ALARM DEMOLITION PLAN
FIRE ALARM INSTALLATION PLAN
05/04/2021
ZMA-1006075-G001
ZMA-1006075-G002
ZMA-1006075-G003
ZMA-1006075-G004
ZMA-1006075-D101
ZMA-1006075-A101
ZMA-1006075-M101
ZMA-1006075-M301
ZMA-1006075-M302
ZMA-1006075-M501
ZMA-1006075-M502
ZMA-1006075-M601
ZMA-1006075-M602
ZMA-1006075-M603
ZMA-1006075-M604
ZMA-1006075-E101
ZMA-1006075-E102
ZMA-1006075-E601
ZMA-1006075-F101
ZMA-1006075-F102
lo tt e zma-1006075-g002
2021-08-04T15:57:24-0400
ROBERT L BELTON
2021-08-04T14:36:58-0400
MICHAEL T L COX
ZMA-1006075-G003
ABBREVIATIONS AND LEGENDS
GENERAL LEGEND STANDARD ABBREVIATIONS
J
TRANSFORMERXFMR
TRANSFERXFER
WITHOUTW/O
WATER COLUMNWC
WET BULB TEMPERATUREWB
WITHW/
WATTSW
VERTICALVERT
VOLUME DAMPERVD
VOLTSV
UNLESS OTHERWISE NOTEDUON
TYPICALTYP
TEMPERATURE TRANSMITTERTT
TEMPERATURE SENSORTS
TOP OF PIPETOP
TOP OF DUCTTOD
TEMPERATURE INDICATORTI
TEMPERATURETEMP
THERMOSTATT
STRUCTURESTR
STANDARDSTD
SPECIFICATIONSSPEC
SUPPLY FANSF
SCHEDULESCH
SUPPLY AIRSA
REVOLUTIONS PER MINUTERPM
RIGID GALVANIZED STEELRGS
REVISION OR REVERSEREV
REQUIREDREQ'D
REINFORCINGREINF
REGISTERREG
RECEPTACLEREC
RETURN AIRRA
RADIUSR
POUNDS PER SQUARE INCHPSI
PRESSURE SENSORPS
PRESSURE REDUCING VALVE PRV
POINT OF CONNECTIONPOC
PRESSURE INDICATORPI
PHASEPH
OUTSIDE DIAMETEROD
OUTSIDE AIROA
NOT TO SCALE NTS
NATIONAL PIPE THREADNPT
NOMINALNOM
NORMALLY OPENNO
NOT IN CONTRACTNIC
NORMALLY CLOSEDNC
MANUAL MOTOR PROTECTION MMP
MINIMUMMIN
MANUFACTURERMFG
MOTOR CONTROL CENTERMCC
1000 BTU PER HOURMBH
MAXIMUMMAX
MANUAL AIR VENT MAV
LEAVING WATER TEMPERATURELWT
POUNDSLBS
LEAVING AIR TEMPERATURELAT
KILOWATTSKW
KILOVOLT AMPEREKVA
JUNCTION BOXJB
INVERTINV
INCHIN
INSIDE DIAMETERID
HERTZHZ
HUMIDITY SENSORHS
HOURHR
HORSE POWERHP
HORIZONTALHORIZ
GATE VALVEGV
GALLONS PER MINUTEGPM
GROUNDGND
GROUND FAULT INTERRUPTERGFI
GALVANIZEDGALV
GAUGEGA
FEETFT
FEET PER MINUTEFPM
FLOW METER/SENSORFM
FLANGEFLG
FINISHED FLOOR ELEVATIONFFE
FIRE/SMOKE DAMPERFD/SD
FIRE DAMPER OR FLOOR DRAINFD
FLOW CONTROL VALVEFCV
ENTERING WATER TEMPERATUREEWT
ENERGY VALVEEV
ELECTRICAL METAL TUBINGEMT
ELECTRIC/ELECTRICALELEC
ELEVATIONELEV
EXHAUST FANEF
ENTERING AIR TEMPERATUREEAT
DP SENSORDPS
DIFFERENTIAL PRESSURE TRANSMITTERDPT
DIFFERENTIAL PRESSURE INDICATORDPI
DIFFERENTIAL PRESSUREDP
DIGITAL OUTPUTDO
DOWNDN
DISCONNECTDISC
DIAMETERDIA
DIRECT DIGITAL CONTROLDDC
DIRECT CURRENTDC
DOUBLEDBL
DRY BULB TEMPERATUREDB
DRAIND
CHILLED WATER SUPPLYCWS
CHILLED WATER RETURNCWR
CHILLED WATERCW
CONDENSING UNITCU
CONTRACT STARTS HERECSH
TECHNICAL REPRESENTATIVE
CONTRACTING OFFICERSCOR
CONTINUOUSCONT
CONDENSATECOND
CONCRETECONC
COLUMNCOL
CLEAN OUTCO
CENTER LINECL
CIRCUITCKT
CIRCULATINGCIRC
CAST IN PLACECIP
CUBIC FEET PER MINUTECFM
CONDENSATE DRAINCD
COOLING COILCC
BALL VALVEBV
BTU PER HOURBTUH
BRITISH THERMAL UNITBTU
BOTTOMBOTT
BOTTOM OF PIPEBOP
BOTTOM OF DUCTBOD
BREAKERBKR
BUTTERFLY VALVEBFV
BLIND FLANGEBF
AMERICAN WIRE GAUGEAWG
APPROXIMATELYAPROX
ANALOG OUTPUTAO
AIR HANDLING UNITAHU
AIR FLOW METER/SENSORAFM
ABOVE FINISHED FLOORAFF
ACCESS DOORAD
ALTERNATING CURRENTAC
AMPA
CONSTRUCTION SEQUENCE
F-531.
507 AND REPAIR WALL OPENINGS ORIGINALLY USED WITH EF-19.
CONDUCTORS.
DEMOLISH EF-507 AND F-531 AND ASSOCIATED 18.
REINSTALL SECOND FLOOR REMOVABLE PANEL.17.
MECHANICAL ROOM.
INSTALL NEW RESINOUS FLOORING IN SECOND FLOOR 16.
CLEAN FLOORS15.
DAYS FOLLOWING REPAIRS.
UNIT WILL BE REQUIRED TO OPERATE FOR 5 CONSECUTIVE
DURATION OF THE PROVING PERIOD WILL BE RESET AND THE
PERIOD. IN THE EVENT OF EQUIPMENT FAILURE THE
PROVING AHU-520 STARTUP AND BEGINNING OF 5-DAY 14.
AND CONTROLS.
SENSORS, INSTALL NEW AHU-520 INCLUDING ALL DUCTWORK, 13.
EQUIPMENT PAD.INSTALL EPOXY RESIN COATING TO AHU-520 12.
DUCTWORK.DEMOLISH EXISTING AHU-520 AND ASSOCIATED 11.
PRIOR TO BEGINNING WORK ON AHU-520.
A-SIDE COORDINATE BUILDING POWER SUPPLY CUTOVER TO 10.
NOR AHU-510/510 PROVING PERIODS.
WILL NOT OCCUR CONCURRENTLY WITH AHU-510/515 WORK
CONSECUTIVE DAYS FOLLOWING REPAIRS. AHU-520 WORK
RESET AND THE UNIT WILL BE REQUIRED TO OPERATE FOR 5
FAILURE THE DURATION OF THE PROVING PERIOD WILL
PERIOD. IN THE EVENT OF EQUIPMENT MALFUNCTION OR
PROVING AHU-515 STARTUP AND BEGINNING OF 5-DAY 9.
SENSORS, INSTALL NEW AHU-515 INCLUDING ALL DUCTWORK, 8.
EQUIPMENT PAD.INSTALL EPOXY RESIN COATING TO AHU-515 7.
DUCTWORK.DEMOLISH EXISTING AHU-515 AND ASSOCIATED 6.
NOR AHU-510/510 PROVING PERIODS.
WILL NOT OCCUR CONCURRENTLY WITH AHU-510/515 WORK
CONSECUTIVE DAYS FOLLOWING REPAIRS. AHU-520 WORK
RESET AND THE UNIT WILL BE REQUIRED TO OPERATE FOR 5
FAILURE THE DURATION OF THE PROVING PERIOD WILL BE
PERIOD. IN THE EVENT OF EQUIPMENT MALFUNCTION OR
PROVING AHU-510 STARTUP AND BEGINNING OF 5-DAY 5.
SENSORS, INSTALL NEW AHU-510 INCLUDING ALL DUCTWORK, 4.
EQUIPMENT PAD.INSTALL EPOXY RESIN COATING TO AHU-510 3.
DUCTWORK.DEMOLISH EXISTING AHU-510 AND ASSOCIATED 2.
REMOVE SECOND FLOOR EXTERIOR REMOVABLE PANEL.1.
BREAK LINES
ELEVATION SYMBOL
A012
DETAIL TITLE REFERENCE
SECTION TITLE REFERENCE
DETAIL NUMBER
A010
SECTION CUT
ELEVATION REFERENCE
NORTH ARROW
PARTIAL SECTION CUT
MATCH LINE SYMBOL
COLUMN LINE GRID DESIGNATION
SECTION DESIGNATION
ROOM NAME & NUMBER
EXISTING WORK, UON
NEW WORK, UON
ELEVATION SYMBOL (PLANS)
GRAPHIC SCALE
ELEVATION DESIGNATION
FLOOR EL. 10.50'
GATE VALVE
GLOBE VALVE
BALL VALVE
GLV
BV
GV
CHECK VALVE
UNION
PRESSURE REDUCING VALVE
CV
PRV
EXISTING WORK TO BE REMOVED
EXISTING WORK TO REMAIN
NEW WORK
SECTION IS DRAWN
SHEET ON WHICH
ABOVE OR BEYOND
OUTLINE OF OBJECT
CONTRACTOR, UON
DEMOLITION BY
IS DRAWN OR SCHEDULED
SHEET ON WHICH DETAIL
SECTION IS CUT
ELEVATION IS DRAWN
SECTION IS CUT
MECHANICAL LEGEND
CHILLED WATER SUPPLY
CHILLED WATER RETURN
FLUID FLOW DIRECTION
CWS
CWR
MOTOR OPERATED CONTROL VALVE
STRAINER WITH BLOWDOWN VALVE
IDENTIFYING NUMBER
EQUIPMENT DESIGNATION SYMBOL
SUPPLY AIRSA
RETURN AIRRA
SCALE: 1/4" = 1'-0"
4' 8'04'
ENERGY VALVE
ELECTRIC MOTOR ACTUATOR
EV
DP-1
3 IN A CONDUIT
CROSS MARKS DENOTE NUMBER OF WIRES WHEN THERE ARE MORE THAN
PLATE (UON)
JUNCTION BOX- WALL MOUNTED AT HEIGHT INDICATED WITH BLANK COVER
CONDUIT DOWN
CONDUIT UP
PLATE (UON)
JUNCTION BOX ABOVE CEILING OR BELOW RAISED FLOOR WITH BLANK COVER
MOUNTING HEIGHTS SHOWN WITH SYMBOL TO CENTER OF DEVICE UON
SEPARATED BY COMAS INDICATE MULTIPLE POLE BREAKERS.
NUMBER INDICATE THE CIRCUIT LOCATION IN THE PANEL. NUMBERS
HOMERUN TO PANELBOARD. LETTERS INDICATE PANEL DESIGNATION AND
OR WALL SPACE
SAME AS BRANCH CIRCUIT - EXCEPT CONCEALED IN OR ABOVE CEILING
+90"
UON
BRANCH CIRCUIT- EXPOSED, 3/4" C, WITH 3#12 WIRES PLUS 1#12 GROUND,
GROUND, UON.
FLEXIBLE METALLIC CONDUIT EXPOSED WITH 2#12 WIRES PLUS 1#12
VARIABLE FREQUENCY DRIVE
ELECTRICAL PANELBOARD
MANUAL MOTOR STARTER SWITCH
ELECTRICAL LEGEND
4'
X001
POINT OF CONNECTION - NEW TO EXISTING
POINT OF TERMINATION OF DEMOLITION
TURNING VEIN
CONNECTION
FLEX DUCT
SYMBOL ABBREVIATION DESCRIPTION
lo tt e zma-1006075-g003
2021-08-04T16:03:00-0400
ROBERT L BELTON
2021-08-04T08:51:29-0400
MICHAEL T L COX
SECURITY FENCE
FENCE LINE
RAMP
TOWER
RCL
PATIO
BRIDGE
FOOT
SHELTER
DUMPSTER
STAGING AREA
PARKING AND
CONTRACTOR
PROPOSED
LOBBY
WATER
AREA OF WORK
SECURITY GATE
MAIN ENTRANCE
HOUSE
GUARD
DOCK
LOADING
PATIO
ZMA-1006075-G004
.5
6.70'
LP
X X
XX
X X X X
XX
XXX
:0 lo tt e
SHALL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR.
NO WELDING EQUIPMENT SHALL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDINGG.2
(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.
WRITING FOR EACH CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE
PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN
MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA
AND SWITCHOVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY COR WITH A
SHUTTING OFF VALVES WITH COR. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN
AND CONSTRUCTION HOURS. ONLY FAA MAY SHUT OFF MECHANICAL VALVES, COORDINATE
BE ACCOMPLISHED DURING OFF-HOURS AS INDICATED IN NOTE D.2 THIS SHEET UNDER DEMOLITION CORE DRILLING. SHUTDOWNS AND SWITCHOVERS OF MECHANICAL AND ELECTRICAL SYSTEMS SHALL INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, DEBRIS AND DUST, INCLUDING PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, G.1
EQUIPMENT PROTECTIONG.
SATISFACTION OF COR.
DISTURBED LAWNS AND LANDSCAPING MUST BE RESTORED TO ORIGINAL CONDITION TO THE F.2
ORIGINAL CONDITION, INCLUDING STRIPING OF PARKING LOT.
UPON COMPLETION OF WORK, REPAIR PAVED SURFACES AFFECTED BY THE WORK TOF.1
PARKING LOT AND DRIVEWAY REPAIRF.
CONTRACTOR TO PROVIDE PORTABLE TOILETSE.1
CONSTRUCTION TOILET FACILITIESE.
PERFORMANCE OF THE WORK.
HAVE APPROVAL BY COR IN WRITING, A MINIMUM OF 10 WORKING DAYS BEFORE THE
ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING SHALL BED.6
STAGING AREA MUST BE RESTORED TO ORIGINAL CONDITIONS AT THE CONCLUSION OF THE PROJECT.
CLEANED AT THE CONCLUSION OF THE PROJECT WHEN ALL CONSTRUCTION IS COMPLETE. THE
ALL DEBRIS MUST BE REMOVED FROM SITE BY CONTRACTOR. ENTIRE STAGING AREA MUST BE D.5
OF EXCESS DEBRIS DURING CONSTRUCTION. LOOSE DEBRIS MUST BE SECURED OR DISPOSED DAILY.
WITHIN THE STAGING AREA. THE AREAS AROUND THE DUMPSTERS MUST BE KEPT CLEAN AND FREE DUMPSTERS FOR DISPOSAL OF CONSTRUCTION WASTE MUST BE PROVIDED BY THE CONTRACTORD.4
COR.PERFORMANCE OF WORK. CONTRACTOR MUST NOT DIG WITHOUT WRITTEN PERMISSION OF THE
SCHEDULED AND APPROVED IN WRITING BY COR AT LEAST 10 WORKING DAYS IN ADVANCE OF
TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY, OR PARTIAL OUTAGES MUST BE
MECHANICAL AND ELECTRICAL ROOMS. UNSCHEDULED INTERRUPTIONS SHALL NOT BE
THE CONTRACTOR MUST USE GREAT CARE AND CAUTION WHILE WORKING WITHIN THE EXISTING D.3
6:00 AM OR AS APPROVED BY COR.
WORK ON CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING OFF-HOURS OF 11:00 PM TO
BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/GOVERNMENT EQUIPMENT.
FACILITY. COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS D.2
TO 6:00 A.M.
OF THE BUILDING MAY BE REQUIRED TO BE SCHEDULED DURING OFF-REGULAR HOURS 11:00 P.M.
IN ADVANCE OF PERFORMANCE OF WORK. WORK ACTIVITIES THAT MAY DISRUPT THE OPERATION COORDINATED AND SUBMITTED FOR APPROVAL TO THE COR WITH A MINIMUM OF 10 DAYS NOTICE PM. DEMOLITION AND CONSTRUCTION INSIDE OR OUTSIDE THE BUILDING MUST BE SCHEDULED, ARTCC. DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 6:00 AM TO 11:00
COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE
ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT WILL BE NECESSARY TOD.1
DEMOLITION AND CONSTRUCTIOND.
CONSTRUCTION AREAS AT ALL TIMES.
THIS SITE IS A SECURE AREA AND ALL CONSTRUCTION PERSONNEL MUST REMAIN IN THE C.2
SIGN IN. ALL PERSONNEL MUST BE U.S. CITIZENS.
AND OUT AT THE MAIN SECURITY GATE AND WILL NEED A GOVERNMENT ISSUED PHOTO ID TO
MUST BE SCHEDULED IN ADVANCE WITH COR. EACH CONSTRUCTION EMPLOYEE MUST CHECK IN
ADVANCE. TEMPORARY DAILY BADGES WILL BE ISSUED TO EACH INDIVIDUAL. ALL DELIVERIES A LIST OF CONSTRUCTION PERSONNEL MUST BE PROVIDED TO THE COR AT LEAST 24 HOURS IN C.1
FAA SECURITY REQUIREMENTSC.
CONSTRUCTION FENCE MUST BE INSTALLED SURROUNDING CONSTRUCTION MATERIALS.
AREA. MATERIALS MUST BE NEATLY STORED AND PROTECTED AT ALL TIMES. A TEMPORARY
STORAGE OF CONSTRUCTION MATERIAL MUST BE LIMITED TO THE CONSTRUCTION STAGING B.3
CONTRACTOR STAGING AREA. ALL UTILITIES MUST BE PROVIDED BY THE CONTRACTOR.
THE CONTRACTOR. THE LOCATION OF THE OFFICE TRAILER WILL BE LIMITED TO THE
CONTRACTOR JOB OFFICE TRAILER, IF DESIRED BY THE CONTRACTOR, WILL BE PROVIDED BY B.2
PARKING AREA. ADDITIONAL PARKING, IF NECESSARY, MUST BE COORDINATED WITH THE COR.
CONTRACTOR'S PERSONNEL PARKING MUST BE LIMITED TO THE INDICATED CONTRACTOR B.1
CONTRACTOR STAGINGB.
CONTRACTOR AND EMPLOYEES MUST BE ESCORTED AT ALL TIMES BY BADGED PERSONNEL.A.4
DIRECT ALL PERSONS NEAR THE CONSTRUCTION AREAS.
PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND A.3
AND FROM 2:00 P.M. TO 4:00 P.M.
CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR FROM 6:30 A.M. TO 8:00 A.M.
ALL DELIVERIES SHOULD BE SCHEDULED AT TIMES OTHER THAN THE FAA EMPLOYEE SHIFT A.2
GUARDHOUSE.
THE CONTRACTOR'S VEHICLES. PEDESTRIANS AND ALL DELIVERIES TO SITE SHALL BE THROUGHA.1
CONSTRUCTION ACCESSA.
MAY PRECLUDE THE VARIOUS ALLOWANCES LISTED BELOW.
ONGOING PROJECTS. EACH PROJECT HAS THE SAME GENERAL REQUIREMENTS AND SITE CONDITIONS MUST BE COORDINATED WITH SITE PERSONNEL (VIA COR): PARTICULARLY IN CONJUNCTION WITH PARKING. CONSTRUCTION OFFICES AND THE EXTENT/SIZE OF THE CONSTRUCTION STAGING AREA TO MODIFY OR REPLACE ANY DIVISION 1 REQUIREMENTS. CONSTRUCTION ACCESS, CONTRACTORS THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1-GENERAL REQUIREMENT" OF
THE FOLLOWING NOTES AND ACCOMPANYING "CONSTRUCTION STAGING PLAN" GRAPHICALLY
CONSTRUCTION STAGING PLAN NOTES
NW 58TH STREET
PLAYGROUND
CENTER
CHILD CARE
PARKING
ADA
CONTROLPARKING
WAREHOUSE
ADMINISTRATION
AUTOMATION
MAIN ARTCC BUILDING
.R
CBS STRUCTURE
TWO-STORY
ANNEX BLDG.
GARAGE
STORAGE
BUILDING
POWER SERVICE
OFFICE
COORD.
NAS
ASPHALT PAVEMENT
SCALE: 1" = 800'
800' 1600'0800'
STATION
SEWAGE LIFT
zma-1006075-g004
2021-08-04T15:51:50-0400
ROBERT L BELTON
2021-08-04T08:52:27-0400
MICHAEL T L COX
ZMA-1006075-M101
EXISTING OA OPENING
4'6' 5' 1 7' lo tt e
COATING.
PREPARE AND COAT ENTIRE FLOOR WITH TRAFFIC RATED EPOXY
IN MECHANICAL ROOM 201.
PROVIDE INSULATION AND JACKETING FOR ALL CHILLED WATER PIPING
OBSTRUCTION.
COMPLETE REMOVAL OF COOLING COILS FROM AHUS WITHOUT
COORDINATE EQUIPMENT AND PIPING LOCATIONS TO ALLOW FOR
REQUIRED ATTACHMENT MATERIALS.
RECOMMENDED INSTALLATION PROCEDURES INCLUDING ANY
EXISTING WALL PANELS. CONFORM WITH MANUFACTURER'S
MATCH THE MATERIAL GAUGE, COLOR, FINISH, AND PATTERN OF
REPAIR EF-507 AND F-531 OPENINGS WITH INSULATED PANELS TO
WITH ACCESS DOORS IN DUCTWORK.
PROVIDE NEW CURTAIN STYLE FIRE DAMPERS IN ROOM 201 AT WALL
COOLING OF MECHANICAL ROOM.
PROVIDE 12"X24" RETURN GRILL WITH MANUAL DAMPER CONTROL FOR
FOR COOLING OF MECHANICAL ROOM.
PROVIDE 12"X24" SUPPLY REGISTER WITH MANUAL DAMPER CONTROL
HEAVY DUTY BIRD SCREEN. SEE SCHEDULE ON M603.
" 4
PROVIDE MIAMI-DADE COUNTY HURRICANE RATED LOUVERS AND
MANUFACTURERS RECOMMENDATION.
LEADING AND LAGGING DUCT LENGTH IN ACCORDANCE WITH
PROVIDE AIRFLOW MONITORING STATION. INSTALL WITH APPROPRIATE
DUCT TO BE SUPPORTED FROM THE FLOOR. SEE DETAIL ON M501.
STARTING ON M901 FOR DETAILS.
LOCATION OF EXISTING CONTROL PANELS. SEE CONTROLS DRAWINGS
EXISTING ISOLATION VALVES. SEE DETAIL ON M501
REPLACE CHILLED WATER PIPING AND INSULATION AT EACH AHU FROM
DAMPERS, AIRFLOW MONITORING STATIONS, AND SMOKE DETECTORS.
PROVIDE DUCT ACCESS DOORS FOR ALL CONTROL DAMPERS, FIRE
PROVIDE ALL DUCTWORK TO INDICATED LIMITS OF INSTALLATION.
DOORS, SEE DETAIL ON M501
PROVIDE NEW CURTAIN STYLE FIRE DAMPERS IN SLAB WITH ACCESS
TO FLOOR DRAINS. SEE DETAIL ON M501.
PROVIDE NEW INSULATED COPPER CONDENSATE DRAINS FROM AHUS
PROVIDE NEW AHU UNITS, PER SCHEDULE ON M601.
PREPARE AND COAT CONCRETE PADS PRIOR TO SETTING NEW AHUS.
M302
72X30 DN
48X34 DN
3" CWS/CWR
3" CWS/CWR
VD
12X12
2" CWS/CWR
1515 55 22
4436X18
102 102
24X30
74X34
1111 1111
74X34
24X30
AHU-520 DETAIL VIEW
M501
SEE DETAIL
TRAPEZE
PIPE HANGER
201201
STAIRWELL
M301 zma-1006075-m101
2021-08-04T16:05:17-0400
ROBERT L BELTON
2021-08-04T09:16:44-0400
MICHAEL T L COX
FD
72X30
8'-5"
BOD
88X34 (O.A.)
W/ INSECT SCREEN
OA INTAKE LOUVER
4" CWS
4" CWR
SECTION VIEW
ZMA-1006075-M301
4'5'6'7'1 lo tt e
REFERENCE ONLY.
7. FIRST FLOOR DUCTWORK TO REMAIN. SHOWN AS
515, AND 520.
OUTSIDE AIR DUCT TO THE AIR HANDLING UNITS 510,
CONNECTION OF THE SUPPLY AIR, RETURN AIR, AND
6. A FLEXIBLE CONNECTOR MUST BE USED AT THE
PROCEDURES.
MANUFACTURER'S RECOMMENDED INSTALLATION
NECESSARY MATERIALS SHALL CONFORM TO PANEL
USE WITH EXTERNALLY INSULATED DUCT. ALL
MIAMI DADE LOUVER W/ INSECT SCREEN FOR
5. OUTSIDE AIR INTAKES SHALL BE FITTED WITH A
ADJACENT TO ALL DAMPERS.
4. PROVIDE INSULATED 12"X12"X1" ACCESS DOORS
SCHEDULE.
REQUIREMENTS. SEE M603 FOR DAMPER ACTUATOR
"AF" OR APPROVED EQUAL - MATCH VOLTAGE
RETURN DIRECT COUPLED AIR DAMPER ACTUATOR TYPE
3. ALL AIR DAMPER ACTUATORS TO BE BELIMO SPRING
AIR DAMPER MUST FAIL CLOSED.
DAMPER MUST FAIL OPEN AND NO SUPPLY EXISTS. OUTSIDE
DAMPER ARRANGEMENT SIMILAR, BUT RETURN AIR
AHU 510 AND AHU 515 AND ALL MUST FAIL CLOSED. AHU 520
SUPPLY AIR, RETURN AIR AND OUTSIDE AIR DUCT ON
AHU-510 AND AHU-515 EACH) MUST BE INSTALLED ON THE
2. MOTOR OPERATED DAMPERS (3 FOR AHU-520, 4 FOR
INSULATION PENETRATIONS SHALL BE SEALED TIGHTLY.
DUCT AND AT NEW OUTSIDE AIR DUCT. ALL JOINTS AND
POINT OF NEW RETURN AIR DUCT TO EXISTING RETURN AIR
DUCT TO EXISTING SUPPLY AIR DUCT, AT CONNECTION
INSULATION AT CONNECTION POINT OF NEW SUPPLY AIR
INSULATION FOR AHU-510, 515, AND 520. PROVIDE EXTERIOR
PROVIDE EXTERIOR INSULATED DUCT WITH BOARD1.
3" CWR
3" CWS
2" CWS
2" CWR
30X24
18X36 RA
34X40
88X34 x
74x34
FL EL 98'-2"
EL 100'-4"
FL
520C
CD
M502
520A
520B
515D
515A
515B
109109
SWITCHGEAR ROOM
1 SECTION DETAIL
M301 zma-1006075-m301
2021-08-04T15:49:27-0400
ROBERT L BELTON
2021-08-04T09:18:22-0400
MICHAEL T L COX
SECTION HVAC
ZMA-1006075-M302
AD (TYP)
3" CWS/R
4" CWS/R 3" CWS/R
SCREEN
W/ INSECT
LOUVER
OA INTAKE
F A' A DC' B
lo tt e
510 AND 515. SEE DETAIL 4 ON M501.
8. PROVIDE DUCT FLOOR SUPPORT ON SUPPLY DUCT FOR AHU
REFERENCE ONLY.
7. FIRST FLOOR DUCTWORK TO REMAIN. SHOWN AS
THE AIR HANDLING UNITS 510, 515, AND 520.
OF THE SUPPLY AIR, RETURN AIR, AND OUTSIDE AIR DUCT TO
6. A FLEXIBLE CONNECTOR MUST BE USED AT THE CONNECTION
RECOMMENDED INSTALLATION PROCEDURES.
MATERIALS SHALL CONFORM TO PANEL MANUFACTURER'S
EXTERNALLY INSULATED DUCT. ALL NECESSARY
DADE LOUVER W/ INSECT SCREEN FOR USE WITH
5. OUTSIDE AIR INTAKES SHALL BE FITTED WITH A MIAMI
ADJACENT TO ALL DAMPERS.
4. PROVIDE INSULATED 12"X12"X1" ACCESS DOORS
SEE M603 FOR DAMPER ACTUATOR SCHEDULE.
APPROVED EQUAL-MATCH MATCH VOLTAGE REQUIREMENTS.
DIRECT COUPLED AIR DAMPER ACTUATOR TYPE "AF" OR
3. ALL AIR DAMPER ACTUATORS TO BE BELIMO SPRING RETURN
MUST FAIL CLOSED.
FAIL OPEN AND NO SUPPLY EXISTS. OUTSIDE AIR DAMPER
ARRANGEMENT SIMILAR, BUT RETURN AIR DAMPER MUST
AND ALL MUST FAIL CLOSED. AHU 520 DAMPER
RETURN AIR AND OUTSIDE AIR DUCT ON AHU 510 AND AHU 515
AND AHU-515 EACH) MUST BE INSTALLED ON THE SUPPLY AIR,
2. MOTOR OPERATED DAMPERS (3 FOR AHU-520, 4 FOR AHU-510
PENETRATIONS SHALL BE SEALED TIGHTLY.
AND AT NEW OUTSIDE AIR DUCT. ALL JOINTS AND INSULATION
OF NEW RETURN AIR DUCT TO EXISTING RETURN AIR DUCT
DUCT TO EXISTING SUPPLY AIR DUCT, AT CONNECTION POINT
INSULATION AT CONNECTION POINT OF NEW SUPPLY AIR
INSULATION FOR AHU-510, 515, AND 520. PROVIDE EXTERIOR
PROVIDE EXTERIOR INSULATED DUCT WITH BOARD 1.
FL EL 113'-4"
FL EL 98'-2"
24X4230X60
32X12 (TYP)
30X6024X42
34X48
510B
34X88
510A
510D
BOX
MIXING
510C
38X50
34X48
38X50
BOX
MIXING
515B
34X88
515D
515A
515C
TO AHU-520
234X14 BEYOND
34X74
2" CWS/R
SWITCHGEAR ROOM
SCREEN
W/INSECT
LOUVER
OA INTAKE
34X14 BEYOND
34X74
SCALE: 1/4" = 1'-0"
4' 8'04'
M302
SECTION DETAIL
FINISHED GRADE
zma-1006075-m302
2021-08-05T07:48:53-0400
ROBERT L BELTON
2021-08-04T09:20:25-0400
MICHAEL T L COX
MECHANICAL DETAILS
ZMA-1006075-M501
BUTT JOINT OVERLAP SEALED
FIELD-APPLIED JACKETING
LONGITUDINAL OVERLAP ON
PIPE
SECURE INSULATION
WIRE, TAPE OR BANDS TO
CHILLED WATER PIPE
REQUIRED ON
CONSTRUCTION IS
VAPOR STOP
PVC JACKET
BLADE LOCK
FIRE RATED SEALANT
FILL WITH AN APPROVED
ENDS (TYP)
BARRIER SEALED AT BOTH
INSULATION WITH VAPOR
SPRING
NEGATOR CLOSURE
STAINLESS STEEL
RIGID INSULATION
NOTE 3NOTE 5
NOTE 4
EXISTING FLOOR
INSULATED
CLEVIS
MIN. 1/2" DIA.
THREADED ROD
SUPPORT STEEL
PIPE SADDLE
INSULATION
SHEET PIPE SADDLE
18 GAUGE GALVANIZED
INSULATION
STRAP
U-BOLT OR
PIPE SADDLE
STEEL ANGLE
1/4" MIN. CLEARANCE
lo tt e
SCREWS.
DIAM. X 3/4" LONG SELF-TAPPING 5/16" LESS THAN 18GA THICK AND SCREWED TO ANGLE WITH DIAMETER, GALVANIZED STEEL STRAPS SHALL BE NO 1/4" BOLTS SHALL BE A MINIMUM OFU-7.
LOAD IS APPLIED.
FROM SUPPORTING POINTS WHEN /8" 1THE STEEL ANGLE SHALL BE LIMITED TO A MAXIMUM OF
STEEL ANGLE SHALL BE SIZED IN ACCORDANCE TO THE TRAPEZE LENGTH/ DEFLECTION ON 6.
NOT BE PERMITTED.
BUILDING STRUCTURE. SINGLE ATTACHMENT OF TRAPEZE TO BUILDING STRUCTURE SHALL
MULTIPLE PIPES USE TRAPEZE HANGER. DISTRIBUTE LOAD OF HANGER SUPPORT ON THE FOR 5.
CONNECT SECURELY TO BUILDING STRUCTURE AS SPECIFIED.4.
HANGERS ARE ALSO TYPICAL FOR UNINSULATED PIPING (WITHOUT INSULATION AND SADDLES).3.
DIAMETER.1/2" HANGER RODS SHALL NOT BE LESS THAN 2.
STRENGTH NOT LESS THAN 3,300 PSI.
INSULATION ABOVE SADDLES SHALL BE 2 INCHES THICK FOAM GLASS WITH A COMPRESSIVE 1.
NOTES: NOTES:
DUCT
DUCTNOTE 2
HVAC DUCT
MINIMUM ROD
1/2" DIA.
NOT TO SCALEM501
PIPE HANGER DETAIL
4. ANCHOR STAND INTO FLOOR USING CONCRETE ANCHOR BOLTS.
INSTALLATION OF DUCT. SHOP DRAWINGS MUST BE APPROVED PRIOR TO START OF WORK.
3. FIELD VERIFY DUCT HEIGHT AND SUBMIT SHOP DRAWINGS TO COR PRIOR TO
THAN 4' UNSUPPORTED.
2. DUCT SUPPORTS TO BE INSTALLED SO THAT NO SECTION OF DUCT SPANS MORE
ANGLE IRON.
1. ALL DUCT SUPPORTS CONSTRUCTED FROM HOT DIPPED GALVANIZED 2"x2"x1/4"
DUCT FLOOR SUPPORT DETAIL
CONDENSATE DRAIN DETAIL 2
FIRE DAMPER INSTALLATION DETAIL 3
CHILLED WATER PIPING INSULATION DETAIL
NOTES: NOTES:
ON FIRE DAMPER INSTALLATION REQUIREMENTS.
REFER TO FIRE DAMPER MANUFACTURER INSTALLATION INSTRUCTIONS FOR SPECIFIC INFORMATION 3.
DAMPER RESET.
PROVIDE AN ACCESS DOOR ON 2ND-FLOOR SIDE OF THE FIRE DAMPER FOR INSPECTION AND 2.
SERVICED/REPLACED FROM ABOVE. INSTALLATION OF FIRE DAMPER FROM BELOW IS PROHIBITED.
FIRE DAMPER MUST DROP IN FROM SERVICE SIDE (ABOVE FLOOR) AND BE ABLE TO BE 1.
NOTE:
VAPOR STOP CONSTUCTION IS REQUIRED ON CHILLED WATER PIPE.1.
5. CLEANOUT AS SHOWN.
4. SLOPED CONDENSATE DRAIN LINE TOWARD DRAIN. DISCHARGED AT 1/4" PER FOOT.
3. DRAIN LINE NO SMALLER THAN NIPPLE FITTING AT DRAIN PAN.
2. SLOPED CONDENSATE PAN TOWARD DRAIN LINE.
MUST HAVE COR APPROVAL BEFORE INSTALLATION OF NEW UNIT.
1. SUBMIT SHOP DRAWINGS OF PROPOSED TRAP PRIOR TO INSTALLATION OF NEW UNIT.
zma-1006075-m501
2021-08-04T15:47:16-0400
ROBERT L BELTON
2021-08-04T09:21:24-0400
MICHAEL T L COX
10 GPM
120 GPM
CHILLED WATER SYSTEM DETAILS
ZMA-1006075-M502
3" CWR 4" CWR
3" CWR 4" CWR
lo tt e
FLEX CONNECTOR REPLACEMENT, AND FLOW VALVE REPLACEMENT.
THAT ALLOWS FOR SERVICE ACCESSIBILITY, COIL PULL,
CONFIGURE AND INSTALL HYDRONIC PIPING IN SUCH A MANNER 3.
ALL DIMENSIONS MUST BE LISTED ON SHOP DRAWINGS.
BEGIN WORK ON HYDRONIC PIPING PRIOR TO SHOP DRAWING APPROVAL BY COR.
PIPING OF EACH AHU BEFORE DEMOLITION. CONTRACTOR MUST NOT
CONTRACTOR MUST SUBMIT SHOP DRAWINGS FOR THE HYDRONIC2.
PIPE FITTINGS 2" AND SMALLER ARE THREADED FITTINGS.1.
FLEX CONNECTOR REPLACEMENT, AND FLOW VALVE REPLACEMENT.
THAT ALLOWS FOR SERVICE ACCESSIBILITY, COIL PULL,
CONFIGURE AND INSTALL HYDRONIC PIPING IN SUCH A MANNER 3.
ALL DIMENSIONS MUST BE LISTED ON SHOP DRAWINGS.
BEGIN WORK ON HYDRONIC PIPING PRIOR TO SHOP DRAWING APPROVAL BY COR.
PIPING OF EACH AHU BEFORE DEMOLITION. CONTRACTOR MUST NOT
CONTRACTOR MUST SUBMIT SHOP DRAWINGS FOR THE HYDRONIC2.
PIPE FITTINGS 2" AND SMALLER ARE THREADED FITTINGS.1.
M502 NOT TO SCALE
CHILLED WATER SINGLE-COIL PIPING DETAIL
CHILLED WATER DUAL-COIL PIPING DETAIL
CHILLED WATER FLOW DIAGRAM
(T
YP
FOR
2)
DRAI
CAP
3/ 4"
OSE
END
ALV
/4 " B
LOW
OW
EX
CONN
YP)FL
ANGE
PRES
SURE
GAUGE
CONTROL V
CHARACTE
RI
ZE
TW
AY
AUTOM
AT
IC
A
ENT
5)
BALL
CW
HEADER
CALI
BRAT
ED
BALANCI
NG
VALV
TE
P-
/T
HERM
ELL
DOW
STRAI
NER
/B
4" AIR FLOW
290 GPM
4" CWS
40 GPM
2" CWS
40 GPM
2" CWR
AHUAHU
COOLI
COI
AIR FLOW
AIR FLOW
DRAI
CAP
OSE
END
/4 " B
EX
CONN
YP)FL
ANGE
PRES
SURE
CONTROL V
CHARACTE
RI
ZE
TW
AY
AUTOM
AT
IC
A
ENT
5)
BALL
CALI
BRAT
ED
BALANCI
TE
P-
/T
HERM
ELL
DOW
STRAI
NER
/B
VALVE
BALANCING
290 GPM
4" CWR
zma-1006075-m502
2021-08-04T15:46:26-0400
ROBERT L BELTON
2021-08-04T09:22:32-0400
MICHAEL T L COX
LINE
LINE
FLOOR
SECOND
SECOND8
REMOVABLE PANEL
10'-0"x10'-0
2'-0" 8'-5"
9'-0" 8'-2"
CONC WALL
SECOND
ROOF LINE
6'-4"
ZMA-1006075-A101
-a
ARCHITECTURAL ELEVATIONS
5' 7'4' 16' 7' 5' 4' 1 6'
A' F D B A
-a lo tt e
DEMOLITION OF EXISTING LOUVER CAN BEGIN.
M603 FOR LOUVER SCHEDULE. NEW LOUVER MUST BE ON SITE BEFORE
ACCORDING TO MANUFACTURER RECOMMENDATION. SEE DRAWING
PROVIDE NEW MIAMI-DADE HURRICANE RATED LOUVER AND INSTALL
APPROVED BY COR BEFORE WORK CAN BEGIN.
OF EXISTING WALL. NEW COVERING MUST BE SUBMITTED AND
WEATHER TIGHT, MATCH EXISTING MATERIAL GAUGE AND MATCH FINISH
PROVIDE NEW WALL COVERING. PERMANENT COVERING MUST BE
INSTALLED.
TO BE REINSTALLED AFTER ALL NEW AIR HANDLERS HAVE BEEN
BE PROTECTED AND STORED OUT OF WEATHER WHILE REMOVED. PANEL
COR FOR APPROVAL PRIOR TO START OF WORK. EXISTING PANEL MUST
WITHSTANDING HURRICANE-FORCE WINDS. SUBMIT ON COVERING TO
IS REMOVED. TEMPORARY COVERING MUST BE CAPABLE OF
UNITS. PROVIDE TEMPORARY WEATHER TIGHT COVERING WHILE PANEL
EXISTING. REMOVE 10'-0" X 10'-0" PANEL TO BRING IN NEW AIR HANDLING
PANEL DETAILS AND LOCATION SHOWN FOR REFERENCE ONLY. PANEL IS 1
SCALE: 1/8" = 1'-0"
NORTH ELEVATION
A101
SOUTH ELEVATION
WEST ELEVATION
BATTERY ROOMBATTERY ROOM
8' 16'08' zma-1006075-a101
2021-08-04T15:52:55-0400
ROBERT L BELTON
2021-08-04T08:43:34-0400
MICHAEL T L COX
M603.
DAMPER AND ACTUATOR. SEE
PROVIDE AND INSTALL NEW
FILTER RACKS.
PRESSURE SWITCHES FOR
RECONNECT DDC WIRES
AFTER INSTALLATION
PROTECTION CONTRACTOR.
REPLACED BY FIRE
DUCT SMOKE DETECTOR TO BE
M603
ACTUATOR. SEE SCHEDULE ON
CHILLED WATER VALVE AND
TEMPERATURE SENSOR
RECONNECT DDC WIRES.
AFTER INSTALLATION
PROTECTION CONTRACTOR.
REPLACED BY FIRE
DUCT SMOKE DETECTOR TO BE
SERPENTINE TYPE
PROVIDE AND INSTALL NEW AIR
SENSOR AND ALL WIRING.
VFD. REPLACE CURRENT
SCHEDULE ON M603.
AND ACTUATOR. SEE
REPLACE EXISTING DAMPER
AIRFLOW DIAGRAM AHU 510/515
ZMA-1006075-M601
TI
XX-05
TI
XX-04
RA
VO3
GND
AO
NO
COM
NC
DI
RET
RETAI
GRN WHT
TS1
DPS2
NO C
PDI-1
RETDIDI RET
CNO
DPS1
BAG-FILTERPRE-FILTER
3 SaDpr
SaDpr4
480 VAC
L2L3 L1
R1
DO
PWR
SIG
A NO
CHS
CHR
AB
N.C.
CD-510C
RETDI
SD1
S3
S1
SaSmkDet
SaFan
AH510_MOD3
AI RET
WHTGRN
TS2
SaTmp
VFD2 RaSmk SaSmk
SaFanCmd
X1
ChwVlvCmd
AH510_MOD4
AH510_MOD3AH510_MOD3
PreFilDifPr BagFilDifPr
MaTmp
N.O.
CD-510B
RaDprPos
AH510_MOD4
RaSmkDet
AI RET
AFS-1
SA
AH510_MOD6
AirFlw A p r F k
AI
RaDprFbk
NO MSTP
SaDprFbk
CD-510D
2 1 3
CD-510A
OA
MIN
OA
ECO
14 X 34
74 X 34
3200 CFM MAX
20000 CFM MAX
c o r F k r r
AH520_MOD3
SaFanSts
O C
CD-510D
CD-510A
:4 lo tt e
SCHEDULE ON M603
MONITORING STATION. SEE
PROVIDE AND INSTALL NEW AIR
M603. REPLACE WIRING.
DAMPER AND ACTUATOR. SEE
MECH RM