ZJX ASB HVAC Replacement Project Drawing.pdf
PDF 9 MB Posted
- Solicitation number
- 697DCK-23-R-00479
About this file
This federal contract opportunity announcement is for the ASB HVAC Replacement Project at the Jacksonville ARTCC in Hilliard, Florida. The project involves providing all labor, equipment, and materials to replace the HVAC system. The NAICS code is 238220 and the size standard is $19 million, with this requirement being set aside exclusively for small businesses. The price range is $200,000 to $500,000 and payment and performance bonds are required. A site visit is scheduled for July 12, 2023 at 9:00 am where valid photo ID will be required for entry. Offerors must submit attendance lists in advance and any unattended visitors will be denied access. Amendments will be posted online only so offerors should check the website regularly. All proposals must conform to requirements in Sections L and M of the solicitation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/2
:0
:3
P
M lo tt e d b y S
R V
-C
-E
O
APPROVED
z jx -1
-g
.d w g
8 234567
IS
U
11/26/2022
MGR: ENROUTE/FSS ENGR CTR
HILLIARD
ZJX-1507025-G003
LW
SV
ARTCC
AUXILIARY SUPPORT BUILDING
HVAC REPLACEMENT PROJECT
CONSTRUCTION STAGING PLAN
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
N
T
IO
JACKSONVILLE CENTER
THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM
PROJECT ENGINEER
1507025
FL
VARIOUS ALLOWANCES LISTED BELOW.
THE SAME GENERAL REQUIREMENTS AND SITE PROBLEMS MAY PRECLUDE THE
THE CONTRACTING OFFICER REPRESENTATIVE (COR). ONGOING PROJECTS HAVE
EXTENT/SIZE OF THE CONSTRUCTION STAGING AREA MUST BE COORDINATED WITH
CONSTRUCTION ACCESS, CONTRACTOR PARKING, CONSTRUCTION OFFICES AND THE
C. CONSTRUCTION MATERIAL STORAGE
D. CONSTRUCTION FENCING
B. FAA SECURITY REQUIREMENTS
A. CONSTRUCTION ACCESS
E. CONSTRUCTION DEBRIS
H. DEMOLITION AND CONSTRUCTION HOURS
F. CONSTRUCTION OFFICE
G. CONSTRUCTION TOILET FACILITIES
70% PER SQ, FOOT.
ORIGINAL CONDITION. GRASS COVERAGE TO BE REESTABLISH TO
ALL LAWN DISTURBED DURING CONSTRUCTION MUST BE RETURN TO I.3
REMOVE AND REPLACE CAR-STOPS AS NEEDED.I.2
ACTIVITIES TO ORIGINAL CONDITION.
PAVED SURFACES AND STRIPPING DAMAGED BY CONSTRUCTION
UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REPAIR ALL I.1
GENERAL NOTES
EQUIPMENT PRIOR TO CONSTRUCTION.
COORDINATE WITH THE COR THE REMOVAL, PROTECTION, AND STORAGE OF FURNITURE AND 9.
PROCUREMENT, AND DELIVERY DATES.
ACTIVITIES, CONSTRUCTION DURATIONS, CRITICAL PATH, MILESTONE DATES, EQUIPMENT
SUBMIT A CONSTRUCTION SCHEDULE PRIOR TO CONSTRUCTION SHOWING CONSTRUCTION 8.
SIGNAGE, AND DUMPSTER LOCATIONS.
CONSTRUCTION. DRAWING SHALL INCLUDE FENCING, GATES, MATERIAL STORAGE, TRAILER,
SUBMIT DRAWING OF STAGING AREA FOR COR APPROVAL PRIOR TO THE START OF 7.
MUST BE ON SITE AND AVAILABLE DURING CONSTRUCTION AT ALL TIMES.
AN UP TO DATE SET OF CONSTRUCTION DOCUMENTS, DRAWINGS, AND SPECIFICATIONS 6.
REPLACEMENT WITH COR.
AND ENERGIZING, OF ANY PANELBOARD FOR CIRCUIT BREAKER
CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING,
SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY
IN WRITING FOR EACH CASE OF BREAKER OPERATION. CONTRACTOR
CONTRACTOR SHALL REQUEST PERMISSION OF FAA IN ADVANCE AND
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. 5.
LEAST 15 CALENDAR DAYS IN ADVANCE OF PERFORMANCE OF WORK.
SHALL BE SCHEDULED AND APPROVED IN WRITING BY COTR AT
WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES
UNSCHEDULED INTERRUPTIONS SHALL BE NOT TOLERATED. 4.
AND BARRIERS AS REQUIRED TO PROTECT ACTIVE EQUIPMENT.
TO EQUIPMENT WITH COR. PROVIDE DUST PROOF PARTITIONS
DEMOLITION WORK THAT MAY CAUSE VIBRATION OR DISRUPTION
REMAIN OPERATIONAL DURING CONSTRUCTION. COORDINATE ALL
EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT SHALL3.
AREAS SHALL BE REMOVED IMMEDIATELY.
CONSTRUCTION DEBRIS & EQUIPMENT IN OCCUPIED AND ADJACENT
CLEAN CONSTRUCTION AREAS DAILY TO SATISFACTION OF COR.2.
CONTRACTOR SHALL COORDINATE WITH COR AND SHALL NOT DISRUPT FAA OPERATIONS.
THE BUILDING WILL BE OCCUPIED BY FAA PERSONNEL DURING CONSTRUCTION. 1.
I. PARKING LOT, DRIVEWAY AND OTHER AREAS REPAIR
J. "AS BUILT" DRAWINGS
ON COMPLETION OF CONSTRUCTION TURN OVER TO THE COR.
UNDER THE CONTROL OF THE CONTRACTOR DURING CONSTRUCTION.
A SET OF "AS BUILT" DRAWINGS SHALL BE MAINTAINED BY AND J.1
UP
STAGING AREA
CONTRACTOR'S
ASB
NCO
PSB
ZJX
ASPHALT PARKING
VISITOR PARKING
GUARDHOUSE
ENTRANCE
K
IN
Y
AREAS.
SIGNAGE TO PROTECT, WARN AND DIRECT ALL PERSONS NEAR THE CONSTRUCTION
DELIVERIES TO THE SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, AND
PROVIDE SIGNAGE TO INDICATE THE ACCESS FOR CONSTRUCTION EMPLOYEES ANDA.5
DRIVEWAY SHALL REMAIN OPEN AT ALL TIMES.A.4
BUILDING MUST BE MAINTAINED.
ACCESS FOR DELIVERIES TO THE LOADING DOCK AND ENGINE GENERATORA.3
OCCUR AT 6:30 - 8:00 A.M. AND AT 2:30 - 5:00 P.M.
EMPLOYEE SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES
ALL DELIVERIES SHOULD BE SCHEDULED AT TIMES OTHER THAN THE FAA A.2
MANNED 24 HOURS A DAY.
THROUGH THE FRONT FAA SECURITY GATE. THIS GATE AND FACILITY ARE
CONTRACTOR'S ACCESS (VEHICLE AND PEDESTRIAN) TO THE SITE SHALL BE A.1
THE OPERATIONS BUILDING.
THE CONTRACTOR SHALL TAKE GREAT CARE AND CAUTION WHILE WORKING WITHIN B.4
COORDINATE ALL WORK OUTSIDE THE DESIGNATED AREAS WITH COR.
THE EXISTING BUILDING, OUTSIDE THE DESIGNATED CONSTRUCTION AREA.
FAA ESCORTS MAY BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN B.3
IN THE CONSTRUCTION AREAS AT ALL TIMES.
THE SITE IS A SECURE AREA AND ALL CONSTRUCTION PERSONNEL SHALL REMAIN B.2
CONTRACTOR PERSONNEL.
CONTRACTOR SHALL PROVIDE READILY IDENTIFIABLE CONTRACTOR BADGES TOB.2
SECURITY GATE. ALL PERSONNEL MUST BE U.S. CITIZENS.
EACH CONSTRUCTION EMPLOYEE SHALL CHECK IN AND OUT AT THE FRONT
COR. ALL DELIVERIES SHALL BE SCHEDULED IN ADVANCE WITH THE COR.
AN ADVANCE LIST OF CONSTRUCTION PERSONNEL SHALL BE PROVIDED TO THE B.1
TIMES. CONTRACTOR SHALL DO NO DIGGING WITHOUT PERMISSION FROM COR.
STAGING PLAN. MATERIALS SHALL BE NEATLY STORED AND PROTECTED AT ALL
LIMITED TO THE CONSTRUCTION STAGING AREA AS SHOWN ON THE CONSTRUCTION
STORAGE OF CONSTRUCTION MATERIAL AND TRAILERS ON THE SITE SHALL BE C.1
SHALL BE RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR.
CONSTRUCTION FENCES SHALL BE REMOVED. ALL AREAS AND SURFACES DISTURBED
ADVERSE WEATHER CONDITIONS. UPON COMPLETION OF CONSTRUCTION, ALL
FENCE SHALL BE PROPERLY CONSTRUCTED AND WELL MAINTAINED TO WITHSTAND
SIX FOOT HIGH CHAIN LINK TYPE CONSTRUCTION. PROVIDE GATE AS REQUIRED. THE
STAGING AREA AT THE CONTRACTOR'S OPTION. THE FENCE SHALL BE FOUR FOOT TO
A CONSTRUCTION FENCE SHALL BE PROVIDED AROUND THE CONSTRUCTION D.1
OR EQUIPMENT.
PROVIDE PROTECTION TO ASPHALT TO PREVENT ANY DAMAGE DONE BY DUMPSTERS E.2
DURING CONSTRUCTION. ALL DEBRIS SHALL BE REMOVED BY CONTRACTOR.
THE DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST
PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA. THE AREA AROUND
ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE E.1
CONTRACTOR SHALL PROVIDE TELEPHONE, POWER AND WATER FOR HIS USE.
STORAGE MAY BE LOCATED WITHIN THE CONSTRUCTION STAGING AREA. THE
CONTRACTOR TRAILER IF FURNISHED FOR OFFICE AND MATERIALS AND EQUIPMENT F.1
STAGING AREAS. PORTABLE TOILETS SHALL BE SERVICED TWO TIMES PER WEEK.
PROVIDE PORTABLE CHEMICAL TOILETS WITHIN THE FENCED CONSTRUCTION G.1
PREARRANGED TIMES APPROVED BY THE COR.
WILL BE ALLOWED ONLY DURING OFF-PEAK HOURS (12:00 AM TO 5:00 AM) OR AT
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING H.2
AT ALL TIMES.
OF THE FACILITY. DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED
THE CONTRACTOR SHALL NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION H.1
PARKING AREA
CONTRACTOR'S PERSONNEL
DOCK
LOADING
WORK
AREA OF
NOT TO SCALE
G003 zjx-1507025-g003
2023-01-26T11:51:31-0500
ROBERT L BELTON
2023-01-26T10:08:18-0500
STEVE VONG
1. WEATHER SEAL ALL OPENINGS.
EXTERIOR:
1. ALL PRE-CONSTRUCTION TASKS MUST BE COMPLETED BEFORE CONSTRUCTION CAN BEGIN.
GENERAL NOTES:
COMMISSION NEW HVAC SYSTEM3.4
TEST AND BALANCE NEW HVAC SYSTEM3.3
E601
ZJX-1507025-E102, ZJX-1507025-
8 HOURSINSTALL NEW BREAKERS AND CONDUCTORS3.2OUTAGE
M402
ZJX-1507025-M103, ZJX-1507025-
INSTALL NEW AHU AND ACU3.1
PHASE 3
ZJX-1507025-M105INSTALL CAT-6 CONTROL CABLE2.6
FIRE STOP ALL OPENINGS2.5
ZJX-1507025-M104INSTALL CO2 SENSOR, STATIC AND DIFF. PRESSURE SENSOR, THERMOSTATS AND HUMIDISTATS, AND AS-B CONTROL PANEL 2.4
ZJX-1507025-E102INSTALL ACU-M1 DISCONNECT2.3
ZJX-1507025-M104INSTALL CONTROL DAMPERS2.2
M403
ZJX-1507025-M103, ZJX-1507025-
INSTALL OUTDOOR AIR INTAKE, LOUVER, AND PRE-FILTER RACK2.1
PHASE 2
ZJX-1507025-E601
ZJX-1507025-E101,
8 HOURSDEMO ACU-M1 DISCONNECT, ELECTRIC DUCT HEATER, DUCT HEATER DISCONNECT, AND DISCONNECT EXISTING FEEDER1.8OUTAGE
M401
ZJX-1507025-M101, ZJX-1507025-
DEMO AHU-M1 AND ACU-M11.7OUTAGE
ZJX-1507025-A101INSTALL NEW SUSPENDED CEILING1.6NIGHT WORK
E102
ZJX-1507025-M104, ZJX-1507025-
INSTALL ELECTRIC AND CONTROLS CONDUIT AND WIRING1.5NIGHT WORK
ZJX-1507025-M103INSTALL SUPPLY AND RETURN DIFFUSERS1.4NIGHT WORK
ZJX-1507025-M103INSTALL SA DUCT AND VAVS1.3NIGHT WORK
ZJX-1507025-M101DEMO EXISTING DUCT WORK1.2NIGHT WORK
ZJX-1507025-A101DEMO SUSPENDED CEILING1.1NIGHT WORK
PHASE 1
PRE-CONSTRUCTION MEETING/SAFETY REVIEW0.5
COORDINATE PLAN FOR FURNITURE/EQUIPMENT COVERING AND PROTECTION DURING CONSTRUCTION0.4
SUBMIT PRODUCT DATA0.3
SUBMIT CONSTRUCTION SCHEDULE0.2
SUBMIT DRAWINGS OF STAGING AREA FOR COR APPROVAL0.1
PRE-CONSTRUCTION
DRAWINGSMAX DURATIONCONSTRUCTION ACTIVITY STAGEACTIVITY TYPE
SEQUENCE OF CONSTRUCTION
:4 lo tt e
ZJX-1507025-G004
zjx-1507025-g004
2023-01-26T11:51:43-0500
ROBERT L BELTON
2023-01-26T10:08:29-0500
STEVE VONG
ACU
M1
EF
AHU
1 1 1
1 1
9 10
3 1
2 2
2 222
EWH
CU
lo tt e
-m
54321
22x22
16x16 x x
14x14 x x x
10x10
8x10 x x
X x
SEE 1/M401 16X16
42x12 x
OFFICE
WORKSHOP
CORRIDOR
DM OFFICE
RECEPTION
SECRETARY
BREAK ROOM
RESTROOM
LOBBY
JANITOR
CONFERENCE
ZJX-1507025-M101
MECHANICAL DEMOLITION
SHEET NOTES
DEMO ACU-M1. RECOVER REFRIGERANT PER "02 41 19 - SELECTIVE DEMOLITION"
DEMO PVC SLEEVE.
DEMO REFRIGERANT LINES AND SUPPORTS.
DEMO OUTSIDE AIR DUCT, DAMPER, WALL SLEEVE, AND LOUVER.
DRAIN.
DEMO AHU-M1, SUPPLY DUCT, RETURN DUCT, REFRIGERANT LINES, AND CONDENSATE
DEMO ELECTRIC DUCT HEATER.
JUNCTION BOX AND AHU-M1.
DEMO SMOKE DETECTOR AND FLEXIBLE METAL CONDUIT BETWEEN CEILING
DEMO PORTION OF EXISTING DUCT AND PREPARE FOR NEW DUCT CONNECTION.
DEMO SUPPLY AIR DUCT, DAMPERS, ACCESSORIES, AND SUPPORTS.
DEMO RETURN AIR GRILL.
SUPPORTS.
DEMO SUPPLY AIR DIFFUSERS, FLEX DUCT, DAMPERS, ACCESSORIES, AND
CONSTRUCTION.
FIRE ALARM MUST BE DEACTIVATED AND DISABLED DURING DURATION OF 1.
AUTOMATION WINGPSB
CONTROL WING
ADMINISTRATION WING
M101
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
zjx-1507025-m101
2023-01-26T11:51:52-0500
ROBERT L BELTON
2023-01-26T10:08:53-0500
STEVE VONG
x x x x x x x
OFFICE 8x10 x lo tt e
BACK TO JUNCTION BOX.
DEMO FLEXIBLE METAL CONDUIT AND CONTROL WIRING FROM ACU-M1
PRESSURE PROBES FROM AHU-M1. TURN OVER TO RE/COR.
REMOVE AND PROTECT STATIC PRESSURE GAUGE, TUBING, AND STATIC
CONDUIT BACK TO RIGID METAL CONDUIT ON ADJACENT WALL.
DISCONNECT CONTROL WIRING FROM AHU-M1. DEMO FLEXIBLE METAL
DETAILS.
ROOM 111A IN THE AUTOMATION WING. SEE SHEET M105 FOR ADDITIONAL
DEMO CONTROL WIRING FROM CONTROL PANEL IN ASB TO DDCP-23 IN
DEMO CONTROL PANEL AND UPS. CONTROL CABINET TO REMAIN.
DEMO THERMOSTAT. DEMO CONTROL WIRING BACK TO SOURCE.
CONTROLS DEMOLITION
M102
ZJX-1507025-M102
zjx-1507025-m102
2023-01-26T11:52:02-0500
ROBERT L BELTON
2023-01-26T10:10:37-0500
STEVE VONG
VAV
9'-0"
CD
CU
:5 lo tt e x
10x8 x x x x x
2 1 1
6x8
1 1 1
Ø x
2 2
6 10x8
6" Ø10x10 x
6" Ø 11x10
20x8
10x1012x106
4 4
11 20x16
112RESTROOM 113RESTROOM
ZJX-1507025-M103
MECHANICAL PLAN
PROVIDE RECTANGULAR OUTSIDE AIR DUCT, TRANSITIONS, AND HANGERS.
PROVIDE VOLUME CONTROL DAMPER. PROVIDE ACCESS DOOR
ALUMINUM MESH FILTER. PROVIDE ACCESS DOOR.
PROVIDE PRE-FILTER HOUSING TO SUPPORT A 20"X16"X2" FILTER. PROVIDE 2" MERV 8
PROVIDE 24"X18.5" HURRICANE LOUVER.
PROVIDE NEW REFRIGERANT AND CONDENSATE DRAIN PIPING.
PROVIDE NEW PVC SLEEVE FOR REFRIGERANT/CONDENSATE DRAIN PIPING.
PROVIDE NEW SUPPLY AND RETURN DUCT, FITTINGS, AND DAMPERS.
M1.
PROVIDE NEW SMOKE DETECTOR, CONDUIT, AND WIRING TO AHU INTERLOCK IN AHU-
REMOVED.
PATCH AND REPAIR DUCT AND INSULATION WHERE ELECTRIC DUCT HEATER WAS
REMOVED.
PATCH AND REPAIR DUCT AND INSULATION WHERE DUCTWORK AND INSULATION WAS
DUCTWORK.
SPECIFIED DUCT INSULATION AND VAPOR BARRIER ON ALL NEW SHEET-METAL SUPPLY
PROVIDE RECTANGULAR SUPPLY DUCT, TRANSITIONS, AND HANGERS. PROVIDE NEW
PROVIDE ROUND SUPPLY DUCT, TRANSITIONS, AND HANGERS.
PROVIDE NEW RETURN AIR GRILL AND SOUND TRAP.
DIFFUSER.
PROVIDE NEW FLEX DUCT, NOT EXCEEDING FOUR FEET IN LENGTH, AND SUPPLY AIR
PRIOR TO TESTING AND BALANCING.
PROVIDE TEMPORARY AIR FILTERS DURING CONSTRUCTION. REPLACE AIR FILTERS 4.
AND ACU-M1 PRIOR TO EQUIPMENT INSTALLATION.
VERIFY EQUIPMENT DIMENSIONS AND SPACING OF BOLLARDS AROUND AHU-M1 3.
INSPECT ALL EXISTING DUCTWORK AND INSULATION, AND REPAIR AS NEEDED.2.
DUCT ROUTING TO NOT OBSTRUCT LIGHTING OR OTHER EXISTING FIXTURES.
LIGHTING FIXTURES SHOWN ARE FOR REFERENCE ONLY. FIELD COORDINATE 1.
MECHANICAL NEW WORK PLAN
M103
M501
SEE 1/M402
zjx-1507025-m103
2023-01-26T11:52:12-0500
ROBERT L BELTON
2023-01-26T10:11:48-0500
STEVE VONG
6 76 7
6 7
CO2
SP
DPI
DPS
DPI CD
VFD
lo tt e
EXACT LOCATION TO COMPLY WITH NEC WORKING CLEARANCES.
PROVIDE VFD FOR AHU-M1. SEE SPECIFICATION SECTION 26 29 23. FILED COORDINATE
FROM SENSOR TO CONTROL PANEL.
PROVIDE DIFFERENTIAL PRESSURE SENSOR. PROVIDE CONDUIT AND CONTROL WIRING
PROVIDE CONDUIT AND CONTROL WIRING FROM CONTROL DAMPER TO CONTROL PANEL.
ACU-M1. PROVIDE CONTROL WIRING FROM CONTROL PANEL TO ACU-M1.
PROVIDE LIQUID TIGHT FLEXIBLE METAL CONDUIT FROM EXISTING JUNCTION BOX TO
WIRING FROM SENSOR TO CONTROL PANEL.
PROVIDE DUCT MOUNTED STATIC PRESSURE SENSOR. PROVIDE CONDUIT AND CONTROL
PROVIDE CONDUIT AND CONTROL WIRING FROM VAV TO CONTROL PANEL.
PROVIDE CONDUIT AND CONTROL WIRING FROM THERMOSTAT AND HUMIDISTAT TO VAV.
FLOOR.
PROVIDE THERMOSTAT AND HUMIDISTAT. MOUNT SENSOR 48 INCHES ABOVE FINISHED
CONDUIT AND CONTROL WIRING FROM CO2 SENSOR TO CONTROL PANEL.
PROVIDE CO2 SENSOR. MOUNT SENSOR 1 FOOT ABOVE SUSPENDED CEILING. PROVIDE
ON WALL. PROVIDE CONTROL WIRING FROM CONTROL PANEL TO AHU-M1.
PROVIDE FLEXIBLE METAL CONDUIT FROM AHU-M1 TO EXISTING RIGID METAL CONDUIT
PROVIDE CONDUIT FROM EXISTING CONDUIT TERMINATION TO EXISTING JUNCTION BOX.
AUTOMATION WING. SEE SHEET M105 FOR ADDITIONAL INFORMATION.
PROVIDE CAT-6 CABLE FROM ASB CONTROL PANEL TO DDCP-32 IN ROOM 111A IN THE
INFORMATION.
EXISTING SCHNEIDER BUILDING AUTOMATION SYSTEM. SEE SHEET M105 FOR ADDITIONAL
MODULE AND UNINTERRUPTIBLE POWER SUPPLY. DDC CONTROLLER SHALL LINK TO
PROVIDE CONTROL PANEL WITH SCHNEIDER AS-B SERVER WITH IP-IO EXPANSION
CONTROL PANEL
TO THE MANUFACTURER'S REQUIREMENTS.
BACnet MS/TP COMMUNICATION BUS SHALL LINK THE DDC CONTROLLERS IN ACCORDANCE 5.
SYSTEM.
DDCS CONTROLLERS SHALL LINK TO THE EXISTING SCHNEIDER BUILDING AUTOMATION 4.
REFER TO SHEET M603 FOR CONTROLS DIAGRAM.3.
REFER TO SHEET M602 FOR SEQUENCE OF OPERATIONS.2.
REFER TO SHEET G002 FOR ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES.1.
MATCHLINE FOR CONTINUATION SEE 2/M105
CONTROLS PLAN
M104
ZJX-1507025-M104
zjx-1507025-m104
2023-01-26T11:52:27-0500
ROBERT L BELTON
2023-01-26T10:12:20-0500
STEVE VONG
10A
14A
TO AHU-M1
CONTROL
PANEL
TO DDCP-23 IN ROOM 111A
COMPUTER DISPLAY CHANNEL (CDC)
AREAWAY
13A
ELECTRICAL DISTRIBUTION ROOM
DN
DDCP-23
110A 110L
14A
110D
110KCLOSET
TO J-BOX IN
ROOM 13A
DYSIM
CRITICAL POWER CENTER EQUIPMENT SPACE COMM ROOM MAINT.
MECHANICAL EQUIPMENT AREA
AREA
110F120A
111A
AUTOMATION
WING
PSB
CONTROL
ADMINISTRATION
lo tt e
SCALE: 1/8" = 1'-0"
8' 16'08'
MATCHLINE FOR CONTINUATION SEE 1/M104
THE AUTOMATION WING FOR NEW DDC NETWORK CABLE.
REUSE EXISTING CONDUIT BETWEEN AUXILIARY SUPPORT BUILDING AND DDCP-23 IN
NETWORK SWITCH LOCATED IN THE AUTOMATION WING.
PROVIDE CONTROL CAT-6 CABLE BETWEEN AS-B CONTROL PANEL AND EXISTING
GENERAL NOTE
DEMO AND INSTALLATION.
TRACE AND VERIFY EXISTING CONTROL WIRING AN CONDUIT PATH PRIOR TO 1.
AUTOMATION WING BASEMENT
M105
AUTOMATION WING 1ST FLOOR
M105
ZJX-1507025-M105
DDC NETWORK CONNECTION PLAN
zjx-1507025-m105
2023-01-26T11:52:37-0500
ROBERT L BELTON
2023-01-26T10:12:46-0500
STEVE VONG
:1 lo tt e x
L
W x
22x29
ZJX-1507025-M401
HVAC EQUIPMENT DEMOLITION PLAN
DEMO ACU-M1.
PROBES FROM AHU-M1. TURN OVER TO RE/COR.
REMOVE STATIC PRESSURE GAUGE, TUBING, AND STATIC PRESSURE
CONDENSATE DRAIN.
DEMO AHU-M1, SUPPLY DUCT, RETURN DUCT, REFRIGERANT LINES, AND
DEMO SMOKE DETECTOR.
SCALE: 1/2" = 1'-0"
EQUIPMENT DEMO PLAN
EQUIPMENT DEMO ELEVATION
1' 0 3' 5'
1' 2' 4'
DEMO ACU-M1.
PROBES FROM AHU-M1. TURN OVER TO RE/COR.
REMOVE STATIC PRESSURE GAUGE, TUBING, AND STATIC PRESSURE
CONDENSATE DRAIN.
DEMO AHU-M1, SUPPLY DUCT, RETURN DUCT, REFRIGERANT LINES, AND
DEMO SMOKE DETECTOR.
zjx-1507025-m401
2023-01-26T11:52:47-0500
ROBERT L BELTON
2023-01-26T10:13:09-0500
STEVE VONG
lo tt e x x
ZJX-1507025-M402
HVAC EQUIPMENT NEW WORK
VELOCITY HURRICANE ZONE. BASIS OF DESIGN BMP INTERNATIONAL BMTD042.
ANCHOR ACU-M1 WITH TIE-DOWN CLIPS IN ACCORDANCE WITH ASCE 7 FOR HIGH
PROVIDE NEW REFRIGERANT AND CONDENSATE DRAIN PIPING.
PROVIDE NEW PVC PIPE PASS THROUGH FOR REFRIGERANT AND DRAIN PIPING.
CONNECT 18X36 TRANSITION TO EXISTING RETURN DUCT.
CONNECT 22X22 TRANSITION TO EXISTING SUPPLY DUCT.
IN AHU-M1.
PROVIDE NEW SMOKE DETECTOR, CONDUIT, AND CONDUCTORS TO AHU INTERLOCK
ALL NEW SHEET-METAL DUCT WORK.
REMOVED. PROVIDE NEW SPECIFIED DUCT INSULATION AND VAPOR BARRIER ON
PATCH AND REPAIR DUCT AND INSULATION WHERE ELECTRIC DUCT HEATER WAS
22x29 x x
EQUIPMENT NEW WORK PLAN
EQUIPMENT NEW WORK ELEVATION
zjx-1507025-m402
2023-01-26T11:52:57-0500
ROBERT L BELTON
2023-01-26T10:13:44-0500
STEVE VONG
1 2
:2 lo tt e
1 2
ZJX-1507025-M403
EQUIPMENT ROOM SECTION
16x20 8x20 8x20
SECURITY FENCE
ROOF BEAMROOF BEAM
SHELVES
PROVIDE NEW SUPPLY DUCT, TRANSITIONS, AND HANGERS.
PROVIDE VOLUME CONTROL DAMPER. PROVIDE ACCESS DOOR.
MERV 8 ALUMINUM MESH FILTER. PROVIDE ACCESS DOOR.
PROVIDE PRE-FILTER HOUSING TO SUPPORT A 20"X16"X2" FILTER. PROVIDE 2"
PROVIDE 24"X18.5" LOUVER. POSITION LOUVER BETWEEN SIDING RIBS.
zjx-1507025-m403
2023-01-26T11:53:06-0500
ROBERT L BELTON
2023-01-26T10:14:21-0500
STEVE VONG
FASTENER
SCREW
lo tt e
ZJX-1507025-M501
MECHANICAL DETAILS
VERTICAL DUCT RISE DETAIL
RA GRILLE SOUND TRAP DETAIL
DUCT HANGER DETAIL
DUCT RISE DETAIL
NOTE:
1. ALL DUCTWORK TO BE SUPPORTED PER LATEST EDITION OF "SMACNA HVAC
DUCT CONSTRUCTION STANDARDS".
NOTES:
1. RA GRILLE SOUND TRAP CONSTRUCTED FROM 1" THICK DUCT BOARD.
2. ALL JOINTS TO BE TAPPED WITH FSK TAPE.
3. ALL INTERIOR SURFACES TO BE PAINTED BLACK.
1. MAINTAIN MINIMUM 2" OF CLEARANCE BETWEEN DUCT SURFACES.
1. ALL DUCTWORK TO SUPPORTED PER LATEST EDITION OF "SMACNA HVAC
DUCT CONSTRUCTION STANDARDS".
2. MAINTAIN MINIMUM 2" OF CLEARANCE BETWEEN DUCT SURFACES.
zjx-1507025-m501
2023-01-26T11:53:16-0500
ROBERT L BELTON
2023-01-26T10:14:48-0500
STEVE VONG
24"x24"22"X22"TITUS 50F#26NO RETURN GRILLEE
24"x24"8" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKD
12"x12"7" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKC
24"x24"6" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKB
12"x12"6" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKA
FACE SIZENECK SIZEMODELFINISHOBDDESCRIPTIONAIR DEVICE TAG
AIR DISTRIBUTION SCHEDULE
ODYSSEYTRANE16"X25"X2" MERV 1352.953.965.180.673.787.36032081.50.754082,461ASBRM 120AHU-M1
MODEL / SERIESMFGR
(°F)
LWB
LDB
EWB (°F)
EDB
(MBH)
SENS.
TOTAL (MBH)HZPHVOLTSHP
AIRCAPACITYMOTOR DATA
(IN. W.G.)
ESP
(CFM)
OA
SUPPLY AIR (CFM)
NOTES
KNOWN ACCEPTABLE SOURCE
AIR FILTERS
COOLING COIL DATASUPPLY FANSUPPLY FAN DATA
AREA SERVEDLOCATIONUNIT NO.
SPLIT SYSTEM AIR CONDITIONER SCHEDULE
2. PROVIDE UNIT WITH HAIL GUARD.
1. PROVIDE UNIT WITH COIL COATINGS.
1,2ODYSSEYTRANE7.412.912.811.4R-410A32080.52SCROLL7.5ASB
RM 120
OUTSIDE
ACU-M1
MODEL / SERIESMFGRPHVOLTSHP
SYSTEM KWSYSTEM (IEER)CONDENSING UNIT (EER)MATCHED AHU (EER)
MOTOR DATA
NO. COMPRESSORSTYPE
NOTES
KNOWN ACCEPTABLE SOURCE
EFFICIENCY
REFRIGERANT
CONDENSER DATACOMPRESSOR DATA
CAPACITY (TONS)AREA SERVEDLOCATIONUNIT NO.
SPLIT SYSTEM AIR CONDITIONER SCHEDULE
VARIABLE AIR VOLUME UNIT SCHEDULE
UNIT
PRIMARY VALVE DATA ELECTRIC HEATING COIL DATA
BASIS OF DESIGN REMARKS
INLET SIZE MAX. CFM MIN. CFM MAX AIR PD (IN. W.G.) MAX NC KW VOLT PH HZ MIN. EQUAL STEPS
VAV-1 6" 449 124 0.180 25 1.5 120 1 60 1 TRANE VCEF
VAV-2 8" 728 165 0.070 25 2.0 120 1 60 1 TRANE VCEF
VAV-3 6" 282 165 0.070 25 1.5 120 1 60 1 TRANE VCEF
VAV-4 6" 464 105 0.190 25 1.5 120 1 60 1 TRANE VCEF
VAV-5 8" 598 165 0.050 25 2.0 120 1 60 1 TRANE VCEF
lo tt e
119 115116
210 CFM
320 CFM
451 CFM
250 CFM
250 CFM
300 CFM
110 CFM
80 CFM
160 CFM
CFM
2169 CFM
180 CFM
292 CFM
MIN
OFFICE CONFERENCEOFFICE
AHU-M1
113112111
RESTROOM RESTROOM RESTROOM
ZJX-1507025-M601
MECHANICAL SCHEDULES AND AIR FLOW DIAGRAM
AIR FLOW DIAGRAM
M601 zjx-1507025-m601
2023-01-26T11:53:27-0500
ROBERT L BELTON
2023-01-26T10:15:13-0500
STEVE VONG
lo tt e
ZJX-1507025-M602
SEQUENCE OF OPERATIONS
SEQUENCE OF OPERATIONS AHU-M1:
1. HAND-OFF-AUTO OPERATION:
HAND-OFF-AUTO OPERATION SWITCH SHALL BE PROVIDED AS PART OF THE VARIABLE FREQUENCY DRIVE (VFD).
A.IN THE OFF MODE, THE UNITS SHALL NOT OPERATE.
B. IN THE HAND MODE, THE FAN SHALL BE ENERGIZED, AND THE SPEED WILL BE MANUALLY ADJUSTED BY THE
OPERATOR.
C. IN THE AUTO POSITION, FAN SHALL RUN AT ALL TIMES AN SPEED WILL BE CONTROLLED BY THE DDCS.
BOTH HAND AND AUTO OPERATION SHALL OPEN THE RETURN AIR ISOLATION DAMPERS BEFORE THE SUPPLY FAN IS
STARTED. THE OA DAMPER SHALL CLOSE WHEN THE FAN IS STOPPED. THE DUCT MOUNTED SMOKE DETECTOR SHALL BE
WIRED TO THE VFD TO STOP THE FAN IN BOTH THE HAND AND AUTO MODES.
2. FIRE/SMOKE CONTROL:
IF THE DUCT MOUNTED SMOKE DETECTOR (SD-4) SENSES PARTICLES OF COMBUSTION, THE SUPPLY FAN SHALL BE
STOPPED. THE OUTDOOR AIR DAMPER SHALL CLOSE. THE RETURN AIR DAMPER SHALL OPEN.
3. OCCUPIED AND UNOCCUPIED MODES:
PROVIDE OCCUPIED-UNOCCUPIED-AUTOMATIC SEQUENCE OF OPERATION IN THE DDCS. IN THE AUTOMATIC
MODE, AHU-M1 SHALL BE SWITCHED BETWEEN “OCCUPIED” AND “UNOCCUPIED” MODE ACCORDING TO A DAILY
PROGRAM (TIME) SCHEDULE, WHICH INCLUDES A HOLIDAY FEATURE. WHEN “OCCUPIED” OR “UNOCCUPIED” MODE IS
SELECTED BY THE OPERATOR, THE UNIT SHALL OPERATE AS SPECIFIED FOR EACH TYPE OF UNIT MODE.
4. UNOCCUPIED COOLING MODE:
WHEN ANY SPACE TEMPERATURE, AS SENSED BY THE SPACE TEMPERATURE SENSORS, RISES ABOVE 83°F (ADJUSTABLE), SET VFD FOR THE FAN AT FULL SPEED. THE OUTDOOR AIR DAMPER SHALL OPEN AT MINIMUM POSITION TO MEET
OUTSIDE SET POINT (INITIAL SET AT 75 CFM ADJUSTABLE), THE RETURN AIR DAMPER SHALL BE OPEN TO MAXIMUM
POSITION. ALL ZONE VAV TERMINAL UNIT DAMPERS SHALL BE FULLY OPEN. WHEN ALL OF THE ZONE TEMPERATURES
DROP BELOW 80°F, SET VFD FOR THE FAN AT MINIMUM SPEED.
5. UNOCCUPIED HEATING MODE:
WHEN ANY SPACE TEMPERATURE, AS SENSED BY THE SPACE TEMPERATURE SENSORS, DROPS BELOW 63°F (ADJUSTABLE), SET FAN SPEED TO MAINTAIN ALL ZONE VAV TERMINAL UNIT DAMPERS AT MINIMUM POSITION. ALL ZONE VAV
TERMINAL UNIT ELECTRICAL HEATERS SHALL TURN ON. THE OUTDOOR AIR DAMPER SHALL OPEN AT MINIMUM POSITION
TO MEET OUTSIDE SET POINT (INITIAL SET AT 75 CFM ADJUSTABLE), THE RETURN AIR DAMPER SHALL BE OPEN TO
MAXIMUM POSITION. WHEN ALL THE SPACE TEMPERATURES RISE ABOVE 65°F, SET VFD FOR THE FAN AT MINIMUM
SPEED.
6. WARM-UP MODE:
AT A PREDETERMINED TIME (INITIALLY SET AT 30 MINUTES) PRIOR TO OCCUPANCY, A WARM-UP CYCLE SHALL BE
INITIATED IF ANY SPACE TEMPERATURE AS SENSED BY THE SPACE TEMPERATURE SENSORS IS BELOW 68°F. SET FAN SPEED
TO MAINTAIN ALL ZONE VAV TERMINAL UNIT DAMPERS AT MINIMUM POSITION. THE RETURN AIR DAMPER SHALL BE
OPEN TO MAXIMUM POSITION. WHEN ALL THE SPACE TEMPERATURES RISE ABOVE 70°F, THE WARM-UP CYCLE SHALL BE
TERMINATED AND AHU SHALL SWITCHED INTO OCCUPIED MODE.
7. COOL-DOWN MODE:
AT A PREDETERMINED TIME (INITIALLY SET AT 30 MINUTES) PRIOR TO OCCUPANCY, A COOL-DOWN CYCLE SHALL BE
INITIATED IF ANY SPACE TEMPERATURE AS SENSED BY THE SPACE TEMPERATURE SENSORS IS ABOVE 82°F. SET VFD FOR
THE FAN AT FULL SPEED. THE RETURN AIR DAMPER SHALL BE OPEN TO MAXIMUM POSITION. ALL ZONE VAV TERMINAL
UNIT DAMPERS SHALL BE FULLY OPEN. WHEN ALL OF THE ZONE TEMPERATURES DROP BELOW 79°F, THE COOL-DOWN
CYCLE SHALL BE TERMINATED AND THE UNIT SHALL BE SWITCHED INTO OCCUPIED MODE.
8. OCCUPIED MODE - FAN OPERATION:
THE UNIT SHALL BE ENABLED AND DISABLED BY THE DDCS. TO START THE AHU, THE DDCS SHALL SEND AN ENABLE SIGNAL
TO THE VFD. A CURRENT SENSING RELAY SHALL PROVIDE OPERATING STATUS OF THE FAN. IF THE UNIT DOES NOT START
AFTER A 60 SECOND (ADJUSTABLE) TIME DELAY, A UNIT FAILURE ALARM SHALL BE ISSUED AND THE UNIT START
COMMAND SHALL BE CANCELED. TO STOP THE UNIT, THE DDCS SHALL SEND A DISABLED SIGNAL TO THE VFD, WHICH
SHALL STOP THE FAN.
9. OCCUPIED MODE - FAN SPEED CONTROL:
INCREASE THE FAN SPEED UNTIL ALL ZONE VAV TERMINAL UNIT DAMPERS ARE LESS THAN 90% OPEN. DECREASE THE FAN
SPEED IF ANY OF ZONE VAV TERMINAL UNIT DAMPERS ARE MORE THAN 95% OPEN.
10. OCCUPIED MODE- DEHUMIDIFICATION CONTROL:
WHEN THE RETURN AIR HUMIDITY RISES ABOVE THE HUMIDITY SET POINT (INITIAL SET TO 55% RH) REDUCE SUPPLY AIR
TEMPERATURE SET POINT UNTIL REDUCED TO 50%.
11. OCCUPIED MODE - OUTDOOR AIR TEMPERATURE CONTROL:
STEP 1: VERIFY THE RETURN AIR DAMPER IS FULLY OPEN. OTHERWISE, OPEN THE RETURN AIR DAMPER TO 100%.
STEP 2: MODULATE OUTDOOR AIR DAMPER FROM 0% TO 100% TO MEET THE OCCUPIED MODE OUTSIDE AIR SET
POINT (292 CFM ADJUSTABLE).
STEP 3: CO2 CONTROL- THE DDCS WILL CONSTANTLY MONITOR THE CO2 LEVELS FROM THE SENSOR LOCATED IN THE
CONFERENCE ROOM (ROOM 115). AS THE CO2 LEVEL RISES ABOVE THE SET POINT AT 600PPM
(ADJUSTABLE), THE OUTDOOR AIR DAMPER AND RETURN AIR DAMPER WILL MODULATE TO MAINTAIN CO2
SETPOINT. OA DAMPER MUST 100% OPEN BEFORE THE RA DAMPER IS MODULATED TO MAINTAIN CO2
SETPOINT.
12. HIGH STATIC PRESSURE SAFETY:
THE MANUAL RESET STATIC PRESSURE SAFETY (HSP-1) LOCATED ON THE DISCHARGE OF THE SUPPLY FAN SHALL STOP THE
SUPPLY FAN UPON SENSING A DIFFERENTIAL PRESSURE ABOVE ITS SET POINT WHICH IS ADJUSTABLE AND INITIALLY SET
AT 2.0 INCHES W.C.
13. FILTER MONITORING:
DIFFERENTIAL PRESSURE SWITCHES SHALL MONITOR THE PRESSURE DROP AT THE PRE-FILTER AND FINAL FILTERS. WHEN
THE PRESSURE EXCEEDS AN ADJUSTABLE LIMIT, AN ALARM SIGNAL WILL BE SENT TO THE DDCS. PRESSURE DIFFERENCE
INDICATOR (PDI) LOCATED AT THE FILTERS SHALL INDICATE THE DIFFERENTIAL PRESSURE ACROSS THE FILTER.
14. NORMAL POSITIONS:
WHENEVER THE UNITS IS OFF, ALL ASSOCIATED DEVICES SHALL RETURN TO THEIR NORMAL POSITIONS UNLESS EXPRESSLY
REQUIRED BY ANOTHER PART OF THIS SEQUENCE OF OPERATION:
SUPPLY FAN: OFF
OUTDOOR AIR DAMPER: CLOSED
RETURN AIR DAMPER: OPEN
15. FAILURE MODE:
UPON LOSS OF POWER TO THE CONTROL SIGNAL OR ELECTRICAL POWER, THE CONTROL DEVICES SHALL FAIL IN THE
FOLLOWING STATE:
SUPPLY FAN: OFF
OUTDOOR AIR DAMPER: CLOSED
RETURN AIR DAMPER: OPEN
16. ADDITIONAL MONITORING:
IN ADDITION TO THE POINTS MENTIONED IN THESE SEQUENCES, PROVIDE THE ADDITIONAL MONITORING POINTS LISTED
IN THE “DDCS POINT SCHEDULE”.
VAV TERMINAL UNIT SEQUENCE OF OPERATION:
1. OCCUPIED MODE - ZONE VAV BOX CONTROLS:
THE VAV TERMINAL UNIT CONTROLLERS SHALL MODULATE THE VAV BOX DAMPER TO MAINTAIN THE SPACE
TEMPERATURE SETPOINT. AS THE SPACE TEMPERATURE INCREASES ABOVE THE SPACE TEMPERATURE SET POINT, MODULATE THE VAV DAMPER OPEN UNTIL THE SPACE TEMPERATURE SET POINT HAS BEEN ACHIEVED. AS THE SPACE
TEMPERATURE DECREASE BELOW THE SPACE TEMPERATURE SET POINT, MODULATE THE VAV DAMPER CLOSED TO THE
MINIMUM POSITION. THE VAV BOX MINIMUM CFM LIMIT AND MAXIMUM CFM LIMIT SHALL BE ADJUSTABLE AT THE
OWS. THE VAV BOX SPACE TEMPERATURE SET POINT SHALL BE ADJUSTABLE FROM THE SPACE THERMOSTAT AND THE
OWS.
2. OCCUPIED MODE- VAV BOX REHEAT CONTROL:
SPACE TEMPERATURE SENSORS UPON SENSING A DROP IN ZONE TEMPERATURE SHALL MODULATE VAV DAMPERS
TOWARD THE MINIMUM POSITION. AS SPACE TEMPERATURE CONTINUES TO DROP BELOW SET POINT, THE VAV
ELECTRICAL HEATER SHALL TURN ON. AS SPACE TEMPERATURE RISES ABOVE SET POINT, THE VAV ELECTRICAL HEATER
SHALL TURN OFF.
3. VAV BOX SET POINT CONTROL:
THE DDCS SHALL AUTOMATICALLY SWITCH THE VAV BOX TEMPERATURE SET POINT ACCORDING TO THE FOLLOWING:
A.OCCUPIED HEATING MODE SET POINT: 73°F
B.UNOCCUPIED HEATING MODE SET POINT: 65°F
C.OCCUPIED COOLING MODE SET POINT: 75°F
D.UNOCCUPIED COOLING MODE SET POINT: 80°F
4. UNOCCUPIED OVERRIDE:
IF DURING THE UNOCCUPIED MODE, ANY OF THE UNOCCUPIED MODE OVERRIDE SWITCHES (LOCATED ON EACH ZONE
SPACE THERMOSTAT TS/HS) ARE ACTIVATED, THE SYSTEM SHALL BE SWITCHED BACK INTO THE OCCUPIED MODE FOR AN
ADJUSTABLE TIME PERIOD WHICH IS ADJUSTABLE AT THE OWS AND INITIALLY SET AT 2 HOURS.
5. FAILURE MODE:
UPON LOSS OF COMMUNICATION TO CONTROLLERS OR UPON LOSS IN POWER THE VAV WILL REMAIN OPEN ACCORDING
TO THE LAST COMMANDED STATE.
zjx-1507025-m602
2023-01-26T11:53:38-0500
ROBERT L BELTON
2023-01-26T10:15:32-0500
STEVE VONG
lo tt e
ZJX-1507025-M603
CONTROL DIAGRAMS
SCHEDULE NOTES
AHU-M1
TS
SD
AI
TS CS
HSP
AIR
OUTSIDE
AIR
RETURN
IL
NC
NO
AI DI
ACD
FACP
TO
AO
AI DI
DI
R4
S/SFLT
FDKCTL
DI AI
DO
DI AI
FILTER
HS
AIAI
CO2
ZX
EH
HS
FROM AHU
SUPPLY AIR
VAV BOX
FROM PREVIOUS
COMMUNICATIONS
TO NEXT VAV BOX
COMMUNICATIONS
ELEC
HEAT
DP
SP
AUTOMATION SYSTEM.
DDCS CONTROLLERS SHALL LINK TO THE EXISTING SCHNEIDER BUILDING 3.
REFER TO SHEET M602 FOR SEQUENCE OF OPERATIONS. 2.
REFER TO SHEET G002 FOR ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES.1.
SEE MECHANICAL FLOOR PLANS FOR CO2 SENSOR LOCATION.
LOCATIONS.
SEE MECHANICAL FLOOR PLANS FOR SPACE TEMPERATURE/HUMIDITY SENSOR
ACCORDANCE TO THE MANUFACTURER'S REQUIREMENTS.
BACnet MS/TP COMMUNICATION BUS SHALL LINK THE DDC CONTROLLERS IN
TO EXISTING SCHNEIDER BUILDING AUTOMATION SYSTEM.
MODULE AND UNINTERRUPTIBLE POWER SUPPLY. DDC CONTROLLER SHALL LINK
PROVIDE CONTROL PANEL WITH SCHNEIDER AS-B SERVER WITH IP-IO EXPANSION
INPUT.
CONNECT SMOKE DETECTOR AUX CONTACTS TO VFD PROGRAMMABLE DIGITAL
AHU-M1 DIRECT DIGITAL CONTROLLER
VAV MICROPRESSOR CONTROLLER (MC)
AHU CONTROL DIAGRAM
M603
VAV BOX WITH REHEAT CONTROL DIAGRAM
M603
TO VAVs
SUPPLY AIR
BACNET MS/TP
TO VAVs
FROM
NETWORK
SWITCH
zjx-1507025-m603
2023-01-26T11:53:48-0500
ROBERT L BELTON
2023-01-26T10:15:54-0500
STEVE VONG
lEH-ZXZONE EH COIL CONTROL lDP-ZXZONE SA AIR FLOW (CFM) lFDK-ZXZONE SA DAMPER FEEDBACK llCD-ZXZONE SA CONTROL DAMPER
180%llllHS-ZXZONE SA HUMIDITY SENSOR
180°F60°FllllTS-ZXZONE SA TEMPERATURE SENSOR lllVAV TERMINAL UNITS (VAV Z1-Z5)
1800 PPMllllCO2-1CO2 SENSOR lTS-2MIXED AIR TEMPERATURE lllDPS-2AHU FILTER ALARM lFDK-3OUTSIDE AIR DAMPER FEEDBACK llCD-3OUTSIDE AIR CONTROL DAMPER lTS-3OUTSIDE AIR TEMPERATURE lllDPS-3OUTSIDE AIR FILTER ALARM lFDK-4RETURN AIR DAMPER FEEDBACK llCD-4RETURN AIR CONTROL DAMPER llSD-4RETURN AIR SMOKE DETECTION
180%llllHS-4RETURN AIR HUMIDITY
180°F60°FllllTS-4RETURN AIR TEMPERATURE
12.0"lllSP-1STATIC PRESSURE SENSOR
175°F50°FllllTS-1SUPPLY AIR TEMPERATURE
12.0"lllHSP-1SUPPLY AIR HIGH STATIC PRESSURE llFLTFAN STATUS (VFD FAULT CONTACTS) lllFDKFAN SPEED FEEDBACK lCTLFAN SPEED CONTROL llS/SFAN START/STOP lCSCURRENT SENSOR lllAIR HANDLING UNIT (AHU-M1)
IG
IM
IT
I
IC
-D
/C
/O
IR
NOTESALARMSGRAPHICSFAIL MODEHARDWAREPOINT DESCRIPTION
DDCS POINT FUNCTION SCHEDULE
lo tt e
SCHEDULE NOTE
1. LISTED ALARM LIMITS ARE INITIAL SETTINGS ONLY, ACTUAL ALARM LIMITS MAY BE
DIFFERENT DEPENDING ON ACTUAL OPERATIONS.
ZJX-1507025-M604
POINT FUNCTION SCHEDULE
zjx-1507025-m604
2023-01-26T11:53:58-0500
ROBERT L BELTON
2023-01-26T10:16:20-0500
STEVE VONG
lo tt e
-a
4 5
RESTROOM RESTROOM
ROOM
BREAK
113RESTROOM
ZJX-1507025-A101
FLOOR AND REFLECTED CEILING PLAN
-a
ADDITIONAL DETAILS.
LOUVER. COORDINATE PENETRATION HEIGHT WITH RE/COR. SEE SHEET M403 FOR
DEMO SIDING AND WALL. PROVIDE WALL SLEEVE AND PREPARE FOR NEW DUCT AND
REPAIR SIDING AND WALL. MATCH EXISTING EXTERIOR SIDING.
WEATHER SEAL AROUND PVC SLEEVE AND PIPING.
SIGN AND FRONT OF NEW ELECTRICAL DISCONNECT.
REINSTALL PARKING SIGN. MAINTAIN NEC WORKING CLEARANCE OF 42 INCHES BETWEEN
RELOCATE LIGHT ONE CEILING TILE TO THE RIGHT.
REPLACEMENT CEILING TILES AND GRID TO MATCH EXISTING.
REMOVE CEILING GRID AND TILES IN NOTED AREAS PRIOR TO WORK. PROVIDE 1
GENERAL NOTE
PRESSURE SENSORS, AND FIRE DETECTORS.
PROVIDE LABEL ON CEILING GRID TO MARK LOCATION OF VAV'S, DAMPERS, CO2 SENSORS, 1.
CEILING GRID PLAN
A101 zjx-1507025-a101
2023-01-26T11:55:43-0500
ROBERT L BELTON
2023-01-26T10:05:52-0500
STEVE VONG
lo tt e
-e
114 102
3 AHU
PANEL LA
PANEL LB
BREAK ROOM RESTROOM
112RESTROOM RESTROOM 113
ZJX-1507025-E101
ELECTRICAL DEMOLITION PLAN
FACILITY. CUT AND REMOVE ALL UNUSED WIRING ABOVE THE CEILING.
SURVEY AND DETERMINE ANY EXISTING WIRING THAT DOES NOT SUPPORT THE 3.
UNIDENTIFIED WIRE.
IDENTIFY ALL WIRING (COMMUNICATION, POWER, OR LOW VOLTAGE). LABEL ANY 2.
ENERGIZING, OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING, AND
BREAKER OPERATION. CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE
REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF
ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR SHALL 1.
TO BE RECONNECTED.
DISCONNECT AND LEAVE EXISTING GROUNDING CONDUCTORS FROM ACU-M1 AND PIPING
CONDUCTORS JUNCTION BOXES TO REMAIN. DEMO BREAKER LA-1,3,5.
DISCONNECT ACU-M1 AND MAKE SAFE. DEMO DISCONNECT AND FLEXIBLE CONDUIT.
CONDUCTORS AND DISCONNECT TO REMAIN. DEMO BREAKER LA-8,10,12.
DISCONNECT AHU-M1 AND MAKE SAFE. DEMO FLEXIBLE CONDUIT BACK TO DISCONNECT.
AND CONDUCTORS BACK TO PANEL LA . DEMO BREAKER LA-19,21,23.
DISCONNECT ELECTRIC DUCT HEATER AND MAKE SAFE. DEMO DISCONNECT, CONDUIT,
LOBBY.
RELOCATE EXISTING LIGHT FIXTURE ONE CEILING TILE TO THE RIGHT, TOWARDS THE
ELECTRICAL DEMOLITION
E101 zjx-1507025-e101
2023-01-26T11:55:32-0500
ROBERT L BELTON
2023-01-26T10:06:12-0500
STEVE VONG
lo tt e
ZJX-1507025-E102
ELECTRICAL NEW WORK PLAN
WITH COR.
AND ENERGIZING OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT
(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING
4' 8'04'
LA-8,10,12
LB-40
LB-39
LB-37
LB-42
LB-35
3P
A60
PROVIDE CONDUITS AND CONDUCTORS FROM VFD TO PANEL LA.
INSTALL NEW BREAKERS IN PANEL LA AND PANEL LB PER PANEL SCHEDULES ON E601.
COUNTERPOISE.
REATTACH ACU-M1 FRAME AND NEW REFRIGERANT PIPING TO EXISTING GROUNDING
DISCONNECT.
FROM NEW DISCONNECT SWITCH TO ACU-M1. RECONNECT EXISTING CONDUCTORS TO
PROVIDE NEW 60A NEMA 4X DISCONNECT SWITCH. PROVIDE CONDUIT AND CONDUCTORS
PROVIDE CONDUIT AND CONDUCTORS FROM EXISTING DISCONNECT SWITCH TO AHU-M1.
PANEL SCHEDULE.
PROVIDE CONDUIT AND CONDUCTORS FROM EACH VAV TO PANEL LB. SEE M601 FOR
ELECTRICAL NEW WORK
E102
WITH COR.
AND ENERGIZING OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT
(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING
zjx-1507025-e102
2023-01-26T11:55:03-0500
ROBERT L BELTON
2023-01-26T10:06:45-0500
STEVE VONG
1. SURFACE MOUNTED, BOTTOM FED, EXISTING TO REMAIN
443150PANEL LB43
42BLANK120SPARE41
40SPARE201120SPARE39
38SPARE201120SPARE37
36SPARE201120SPARE35
34SPARE201120SPARE33
32BAS CABINET201120SPARE31
30A/C120SPARE29
28A/C202120SPARE27
26REC 120201120GARAGE DOOR RECEPTACLE25
24REC 120, OUTSIDE GFE BY N DOOR201DUCT HEATER23
22SPARE201DUCT HEATER21
20LTG - EXIT/EMERG/OUTSIDE LTG2013110DUCT HEATER19
18LTG 120, EF-6201120SMOKE DETECTOR17
16LTG 120, EF-5201A/C15
14SPARE201240A/C13
12AHUM-1EUH-211
10AHUM-1EUH-29
8AHUM-1153340EUH-27
6EUH-1ACUM-15
4EUH-1ACUM-13
2EUH-1403340ACUM-11
AMPSPOLESCBAPOLESAMPS
NUM
CIRC
DESCRIPTION
BREAKERPHASEBREAKER
GE4318,000100%400A300A43208/120
MFGRMAX CIRCSAIC RATINGN BUSMAIN BUSMAIN BKRWIREPHASEVOLTAGE
AUXILIARY SUPPORT BUILDINGISB SERVICE PANELBUILDING SERVICES
LOCATIONSOURCESERVICE
1. SURFACE MOUNTED, BOTTOM FED, EXISTING TO REMAIN
443150PANEL LB43
42BLANK120SPARE41
40SPARE201120SPARE39
38SPARE201120SPARE37
36SPARE201120SPARE35
34SPARE201120SPARE33
32BAS CABINET201120SPARE31
30A/C120SPARE29
28A/C202120AHU-M1 VFD27
26REC 120201120GARAGE DOOR RECEPTACLE25
24REC 120, OUTSIDE GFE BY N DOOR201120SPARE23
22SPARE201120SPARE21
20LTG - EXIT/EMERG/OUTSIDE LTG201120SPARE19
18LTG 120, EF-6201120SMOKE DETECTOR17
16LTG 120, EF-5201A/C15
14SPARE201240A/C13
12AHUM-1EUH-211
10AHUM-1EUH-29
8AHUM-1153340EUH-27
6EUH-1ACUM-15
4EUH-1ACUM-13
2EUH-1403340ACUM-11
GE4318,000100%400A300A43208/120
AUXILIARY SUPPORT BUILDINGISB SERVICE PANELBUILDING SERVICES
1. SURFACE MOUNTED, TOP FED, EXISTING TO REMAIN
42VAV 5251120SPARE41
40VAV 4201120VAV 339
38ACP-8A201125VAV 237
36120VAV 135
34EWH - 3202120LTG - BOLLARD33
32120REC - EWC31
30EWH - 2202120SCP29
28120REC - TELCO27
26EWH - 120225
24REC - 119201240WATER HEATER23
22REC - 101, 117201120REC - 101, 102, 112, 113, EF - 2, 321
20REC - 102, 103201120REC - 110, 111, 118, EF - 1, 419
18REC - 104, 105201120REC - 102, 11417
16REC - 108201120REC - 106, 11415
14REC - 108, 109201120REC - REFRIGERATOR 11013
12REC - 115201120REC - 11611
10REC - 115201120REC - 1169
8FACP201120LTG - 1157
6LTG - 101, 111, 112, 113, 117201120LTG - 1165
4LTG - 102, 106, 114201120LTG - 109, 110, 118, 1193
2LTG-EXIT/EMER201120LTG - 103, 104, 105, 1081
GE4218,000100%225AMLO43208/120
AUXILIARY SUPPORT BUILDINGPANEL LABUILDING SERVICES
1. SURFACE MOUNTED, TOP FED, EXISTING TO REMAIN
42SPARE201120SPARE41
40SPARE251120SPARE39
38ACP-8A201125SPARE37
36120SPARE35
34EWH - 3202120LTG - BOLLARD33
32120REC - EWC31
30EWH - 2202120SCP29
28120REC - TELCO27
26EWH - 120225
24REC - 119201240WATER HEATER23
22REC - 101, 117201120REC - 101, 102, 112, 113, EF - 2, 321
20REC - 102, 103201120REC - 110, 111, 118, EF - 1, 419
18REC - 104, 105201120REC - 102, 11417
16REC - 108201120REC - 106, 11415
14REC - 108, 109201120REC - REFRIGERATOR 11013
12REC - 115201120REC - 11611
10REC - 115201120REC - 1169
8FACP201120LTG - 1157
6LTG - 101, 111, 112, 113, 117201120LTG - 1165
4LTG - 102, 106, 114201120LTG - 109, 110, 118, 1193
2LTG-EXIT/EMER201120LTG - 103, 104, 105, 1081
GE4218,000100%225AMLO43208/120
AUXILIARY SUPPORT BUILDINGPANEL LABUILDING SERVICES
lo tt e
GENERAL NOTES:
TRACE, IDENTIFY, AND VERIFY ALL PANEL CIRCUITS PRIOR TO DEMO.3.
PANEL, AND AT COMPLETION OF CONSTRUCTION.
PROVIDE UPDATED PANEL SCHEDULES AT EACH PHASE OF WORK IN EACH 2.
THE SCHEDULED OUTAGE.
COORDINATE ALL OUTAGES WITH COR AT LEAST THREE WEEKS PRIOR TO
ONLY FAA PERSONNEL MAY OPERATE BREAKERS AND DISCONNECTS. 1.
SCHEDULE NOTES:
USE EXISTING SPARE BREAKER FOR VAV BOXES.
REMOVE FEEDERS FROM BREAKER AND RENAME BREAKER "SPARE".
DISCONNECT EXISTING FEEDERS FROM DUCT HEATER BACK TO BREAKER.
PROVIDE NEW CIRCUIT BREAKERS.
PANEL LA SCHEDULE DEMO
PANEL LA SCHEDULE NEW WORK
PANEL LB SCHEDULE DEMO
PANEL LB SCHEDULE NEW WORK
ELECTRICAL PANEL SCHEDULES
zjx-1507025-e601
2023-01-26T11:54:51-0500
ROBERT L BELTON
2023-01-26T10:07:06-0500
STEVE VONG
lo tt e
ZJX-1507025-G001
COVER SHEET AND VICINITY MAP
DUVAL
RIVER
JOHNS
RIVER
ST.
NASSAU
JACKSONVILLEI
GEORGIA
I 9
FLORIDA
OCEAN
ATLANTIC
FERNANDINA
BEACH
IA
I 10
RT 90
ST
IV
JOHNS
CALLAHAN
INTERNATIONAL
AIRPORT
JACKSONVILLE
ST
BRYCEVILLE
FLORIDA
GEORGIA
RT 90
I 10
LOCATION
PROJECT
AIA
NASSAU
RT 23
R
IV
FOLKSTON
5A
T 301
VICINITY MAP
HILLIARD, FLORIDA
I 95
OF TRANSP
OF
TATES
AVIA
LA
TRAT
SI
NI
ZJX/ARTCC - HILLIARD, FLORIDA
zjx-1507025-g001
2023-01-26T11:51:05-0500
ROBERT L BELTON
2023-01-26T10:07:22-0500
STEVE VONG
lo tt e
ZJX-1507025-G002
DRAWING INDEX, LEGEND AND ABBREVIATIONS
A012
A010
A010
E1
FIN_FLR_________
EL._89'-6"______
C-C
04' 4' 8'
FLOOR_EL._10.50'__
Sb_
L1
DP-1
+90"
J
(15)
30A
3P
A60
DRAWING NO.
DRAWING LIST
STANDARD ABBREVIATIONS
ELEVATION SYMBOL (PLANS)
GRAPHIC SCALE
NEW WORK, UON
CONTRACTOR, UON
DEMOLITION BY
EXISTING WORK, UON
ROOM NUMBER
DUST PARTITION
CONNECT TO EXISTING
DESIGNATION
INTERIOR ELEVATION
LIMIT OF DEMOLITION
ABOVE OR BEYOND
OUTLINE OF OBJECT
SECTION TITLE REFERENCE
SECTION CUT
DETAIL TITLE REFERENCE
BREAK LINES
ELEVATION SYMBOL
MATCH LINE SYMBOL
COLUMN LINE GRID DESIGNATION
DETAIL REFERENCE
ELEVATION REFERENCE
NORTH ARROW
ELEVATION DESIGNATION
SECTION IS CUT
SHEET ON WHICH
SECTION DESIGNATION
ELEVATION SHOWN
DARKENED ARROW INDICATES
ELEVATION NUMBER
ELEVATION IS DRAWN
SECTION DESIGNATION
IS DRAWN OR SCHEDULED
SHEET ON WHICH DETAIL
DETAIL NUMBER
DETAIL IS DRAWN
DETAIL DESIGNATION
SECTION IS DRAWN
SYMBOL DESCRIPTION
BY COMAS INDICATE MULTIPLE POLE BREAKERS.
NUMBER INDICATE THE CIRCUIT LOCATION IN THE PANEL. NUMBERS SEPARATED
HOMERUN TO PANELBOARD. LETTERS INDICATE PANEL DESIGNATION AND
WALL SPACE
SAME AS BRANCH CIRCUIT - EXCEPT CONCEALED IN OR ABOVE CEILING OR
CONDUIT DOWN
CONDUIT UP
VARIABLE FREQUENCY DRIVE FOR AHU UNIT
SURFACE/SUSPENDED FIXTURE - CAPITAL LETTERS INDICATE FIXTURE TYPE
3P = NUMBER OF POLES
30A = SWITCH SIZE
60" A.F.F. TO DISCONNECT HANDLE, U.O.N.
600V, 3-POLE, 60A SWITCH, IN NEMA 4X ENCLOSURE
NON-FUSIBLE DISCONNECT SWITCH:
MOUNTING HEIGHTS SHOWN WITH SYMBOL TO CENTER OF DEVICE (UON)
SAME AS BRANCH CIRCUIT USING 3/4" LFMC CONDUIT, UON
JUNCTION BOX, WALL MOUNTED EXPOSED WITH BLANK COVER PLATE (UON)
JUNCTION BOX, CEILING MOUNTED EXPOSED WITH BLANK COVER PLATE (UON)
SURFACE MOUNTED 480Y/277 VOLT PANELBOARD
SURFACE MOUNTED 208Y/120 VOLT PANELBOARD
BRANCH CIRCUIT- EXPOSED, 3/4" C, WITH 2#12 WIRES PLUS 1#12 GROUND, UON
INDICATES SWITCH LEG, 48" AFF (UON)
SINGLE POLE SWITCH OUTLET. LOWERCASE SUBSCRIPT, WHEN USED,
A CONDUIT
CROSS MARKS DENOTE NUMBER OF WIRES WHEN THERE ARE MORE THAN 3 IN
EMERGENCY LIGHTING UNITS, WALL MOUINTED, WITH BATTERY PACK
(15) = FUSE SIZE
30A = SWITCH SIZE
60" A.F.F. TO DISCONNECT HANDLE, U.O.N.
600V, 3-POLE, 30A SWITCH, 30A FUSES, IN NEMA 1 ENCLOSURE
FUSIBLE DISCONNECT SWITCH:
ZJX-1507025-E102
ZJX-1507025-E101
ZJX-1507025-M604
ZJX-1507025-M603
ZJX-1507025-M602
ZJX-1507025-M601
ZJX-1507025-M501
ZJX-1507025-M403
ZJX-1507025-M402
ZJX-1507025-M401
ZJX-1507025-M105
ZJX-1507025-M104
ZJX-1507025-M103
ZJX-1507025-M102
ZJX-1507025-M101
ZJX-1507025-A101
ZJX-1507025-G004
ZJX-1507025-G003
ZJX-1507025-G002
ZJX-1507025-G001
ENTERING WATER TEMPERATUREEWT
ELECTRICAL METAL TUBINGEMT
ELECTRIC/ELECTRICALELEC
ELEVATIONELEV
EXHAUST FANEF
ENTERING AIR TEMPERATUREEAT
DP SENSORDPS
DIFFERENTIAL PRESSUREDP
DIGITAL OUTPUTDO
DOWNDN
DISCONNECTDISC
DIAMETERDIA
DIRECT DIGITAL CONTROLDDC
DIRECT CURRENTDC
DOUBLEDBL
DRY BULB TEMPERATUREDB
DRAIND
CHILLED WATER SUPPLYCWS
CHILLED WATER RETURNCWR
DOMESTIC COLD WATERCW
CHECK VALVECV
REPRESENTATIVE
CONTRACTING OFFICERSCOR
CONTINUOUSCONT
CONNECTIONCONN
CONDENSATECOND
CONCRETECONC
COLUMNCOL
CLEAN OUTCO
CONCRETE MASONRY UNITCMU
CENTER LINECL
CIRCUITCKT
CIRCULATINGCIRC
CAST IN PLACECIP
CUBIC FEET PER MINUTECFM
CONDENSATE DRAINCD
COOLING COILCC
BACK WATER VLAVEBWV
BALL VALVEBV
BETWEENBTW
BTU PER HOURBTUH
BRITISH THERMAL UNITBTU
BASEMENTBSMT
BOTTOMBOTT
BOTTOM OF PIPEBOP
BOTTOM OF DUCTBOD
BUILDINGBLDG
BREAKERBKR
BUTTERFLY VALVEBFV
BACK FLOW PREVENTERBFP
AMERICAN WIRE GUAGEAWG
AUXILIARYAUX
ASSEMBLYASSY
AUXILIARY SUPPORT BUILDINGASB
ACHITECT/ARCHITECTURALARCH
APPROXIMATELYAPROX
ANALOG OUTPUTAO
AIR HANDLING UNITAHU
AIR FLOW METER/SENSORAFM
ABOVE FINISHED FLOORAFF
ACCESS DOORAD
ALTERNATING CURRENTAC
AMPA
POUNDS PER SQUARE INCHPSI
PRESSURE SWITCHPS
PRESSURE REDUCING VALVEPRV
POINT OF CONNECTIONPOC
PRESSURE INDICATORPI
PHASEPH
OUTSIDE DIAMETEROD
ON CENTEROC
OUTSIDE AIROA
NOT TO SCALENTS
NATIONAL PIPE THREADNPT
NOMINALNOM
NORMALY OPENNO
NOT IN CONTRACTNIC
NORMALY CLOSEDNO
MINIMUMMIN
MANUFACTURERMFG
MOTOR CONTROL CENTERMCC
MAIN CIRCUIT BREAKERMCB
1000 BTU PER HOURMBH
MAXIMUMMAX
LEAVING WATER TEMPERATURELWT
POUNDSLBS
LEAVING AIR TEMPERATURELAT
KILOWATTSKW
KILOVOLT AMPEREKVA
JUNCTION BOXJB
INDUSTRIAL WATERIW
INVERTINV
INCHIN
INSIDE DIAMETERID
HERTZHZ
HW CIRCULATION LOOPHWC
DOMESTIC HOT WATERHW
HUMIDIFIERHU
HUMIDITY SENSORHS
HOURHR
HORSE POWERHP
HAND CONTROL VALVEHCV
GATE VALVEGV
GALLONS PER MINUTEGPM
GALLONS PER HOURGPH
GROUNDGND
GROUND FAULT INTERRUPTERGFI
GALVENIZEDGALV
GUAGEGA
NATURAL GASG
FEETFT
FEET PER MINUTEFPM
FLOW METER/SENSORFM
FLANGEFLG
FLOW INDICATORFI
FIRE DAMPER OR FLOOR DRAINFD
FLOW CONTROL VALVEFCV
FAN COIL UNITFCU
YARD HYDRANTYH
TRAMSFORMERXFMR
TRANSFERXFER
WATER COLUMNWC
WET BULD TEMPERATUREWB
WITHW/
WATTSW
VIBRATION SENSORVS
VERIFY IN FIELDVIF
VARIABLE FREQUENCY DRIVEVFD
VERTICALVERT
VOLUME DAMPERVD
VARIABLE AIR VOLUMEVAV
VENT OR VOLTSV
UNIT HEATERUH
TYPICALTYP
TEMPERATURE SENSORTS
TOP OF PIPETOP
TEMPERATURE INDICATORTI
RESISTANT NYLON COATED
THERMOPLASTIC HIGH HEATTHHN
TEMPERATURETEMP
TOTAL DISSOLVED SOLIDSTDS
THERMOSTATT
SOLENOID VALVESV
STRUCTURESTR
STANDARDSTD
SPECIFICATIONSSPEC
SIMILARSIM
SMOKE DAMPERSD
SCHEDULESCH
SUPPLY AIRSA
REFRIGERANT VENTRV
REVOLUTIONS PER MINUTERPM
RIGID GALVENIZED STEELRGS
REQUIREDREQ'D
REINFORCINGREINF
REFERENCEREF
RECEPTICLEREC
RAISED ACCESS FLOORINGRAF
RETURN AIRRA
RADIUSRR
REV. DATE DESCRIPTION
ELECTRICAL PANEL SCHEDULES
ELECTRICAL NEW WORK PLAN
ELECTRICAL DEMOLITION PLAN
POINT FUNCTION SCHEDULE
CONTROL DIAGRAMS
SEQUENCE OF OPERATIONS
MECHANICAL SCHEDULES & AIR FLOW DIAGRAM
MECHANICAL DETAILS
HVAC EQUIPMENT NEW WORK
HVAC EQUIPMENT DEMOLITION PLAN
DDC NETWORK CONNECTION PLAN
MECHANICAL PLAN
FLOOR AND REFLECTED CEILING PLAN
DRAWING INDEX, LEGEND, AND ABBREVIATIONS
COVER SHEET AND VICINITY MAP
GENERAL LEGEND MECHANICAL LEGEND ELECTRICAL LEGEND
20X10
VD
FD SD
FD/SD
SPD
BDD
SIZE
DOOR LOUVER
MITERED ELBOW
HIDDEN DUCTWORK
OUTSIDE AIR INTAKE
DUCT RISE
DUCT DROP
(FIRST FIGURE IS SIDE SHOWN)
RECTANGULAR DUCT
WITH TURNING VANES
MITERED ELBOW
(DIAMETER)
ROUND DUCT
RECTANGULAR TO ROUND
TRANSITION
CONTROL DAMPER
VOLUME DAMPER,
SMOKE DAMPER
FIRE DAMPER
FIRE/SMOKE DAMPER
COMBINATION
BACKDRAFT DAMPER
SUPPLY DUCT DOWN
SUPPLY DUCT UP
RETURN DUCT UP
EXHAUST DUCT UP
THERMOSTAT
RETURN DUCT DOWN
INTERIOR DUCT LINER
FLEXIBLE DUCT
FLEXIBLE CONNECTION
STATIC PRESSURE DAMPER
RETURN GRILLE
SUPPLY GRILLE
EXHAUST DUCT DOWN
SS
TO BOTTOM OF PIPE
BRANCH CONNECTION
FLOOR DRAIN
POSITION OPEN/CLOSED
BALL VALVE WITH NORMAL
OR PIPING BELOW GROUND
SANITARY VENT
TO TOP OF PIPE
BRANCH CONNECTION
OR PIPING ABOVE GROUND
SANITARY SEWER/WASTE
FD
EQUIPMENT DESIGNATION
SIZE TYPE
SYMBOL
NUMBER
PIPE TURNING DOWN
PIPE TURNING UP
CAPPED PIPE/OUTLET
CONCENTRIC REDUCER
FIRE LIFE SAFETY LEGEND
1 HOUR RATED PARTITION
K zjx-1507025-g002
2023-01-26T11:51:21-0500
ROBERT L BELTON
2023-01-26T10:07:35-0500
STEVE VONG
File details come from the government source that posted it. Updated .