ZJX ASB HVAC Replacement Project Drawing.pdf

PDF 9 MB Posted

Attached to
ASB HVAC Replacement Project at the Jacksonville ARTCC, Hilliard, Florida
Solicitation number
697DCK-23-R-00479
Issued by

About this file

This federal contract opportunity announcement is for the ASB HVAC Replacement Project at the Jacksonville ARTCC in Hilliard, Florida. The project involves providing all labor, equipment, and materials to replace the HVAC system. The NAICS code is 238220 and the size standard is $19 million, with this requirement being set aside exclusively for small businesses. The price range is $200,000 to $500,000 and payment and performance bonds are required. A site visit is scheduled for July 12, 2023 at 9:00 am where valid photo ID will be required for entry. Offerors must submit attendance lists in advance and any unattended visitors will be denied access. Amendments will be posted online only so offerors should check the website regularly. All proposals must conform to requirements in Sections L and M of the solicitation.

View the file

Other files

File Type Posted
amendment 0003697DCK-23-R-00479.pdf PDF
697DCK-23-R-00479 amendment0002.pdf PDF
zme-d-artcc-d104.pdf PDF
030130 - Maintenance of Cast-In-Place Concrete.pdf PDF
Amendment0002.pdf PDF
amendment0001.pdf PDF
RFO697DCK23R00479.pdf PDF
FAA-STD-019f Chg. 1.pdf PDF
FAA-C-1217H.pdf PDF
wageratemay.pdf PDF
ZJX ASB HVAC Replacement Project Specs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

DATE

REDLINE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DRAWING NO

DESIGNED

REVIEWED BY

/2

:0

:3

P

M lo tt e d b y S

R V

-C

-E

O

APPROVED

z jx -1

-g

.d w g

8 234567

IS

U

11/26/2022

MGR: ENROUTE/FSS ENGR CTR

HILLIARD

ZJX-1507025-G003

LW

SV

ARTCC

AUXILIARY SUPPORT BUILDING

HVAC REPLACEMENT PROJECT

CONSTRUCTION STAGING PLAN

ENROUTE/FSS

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

N

T

IO

JACKSONVILLE CENTER

THIS DRAWING PRODUCED ON ASO REGION MICROSTATION SYSTEM

PROJECT ENGINEER

1507025

FL

VARIOUS ALLOWANCES LISTED BELOW.

THE SAME GENERAL REQUIREMENTS AND SITE PROBLEMS MAY PRECLUDE THE

THE CONTRACTING OFFICER REPRESENTATIVE (COR). ONGOING PROJECTS HAVE

EXTENT/SIZE OF THE CONSTRUCTION STAGING AREA MUST BE COORDINATED WITH

CONSTRUCTION ACCESS, CONTRACTOR PARKING, CONSTRUCTION OFFICES AND THE

C. CONSTRUCTION MATERIAL STORAGE

D. CONSTRUCTION FENCING

B. FAA SECURITY REQUIREMENTS

A. CONSTRUCTION ACCESS

E. CONSTRUCTION DEBRIS

H. DEMOLITION AND CONSTRUCTION HOURS

F. CONSTRUCTION OFFICE

G. CONSTRUCTION TOILET FACILITIES

70% PER SQ, FOOT.

ORIGINAL CONDITION. GRASS COVERAGE TO BE REESTABLISH TO

ALL LAWN DISTURBED DURING CONSTRUCTION MUST BE RETURN TO I.3

REMOVE AND REPLACE CAR-STOPS AS NEEDED.I.2

ACTIVITIES TO ORIGINAL CONDITION.

PAVED SURFACES AND STRIPPING DAMAGED BY CONSTRUCTION

UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REPAIR ALL I.1

GENERAL NOTES

EQUIPMENT PRIOR TO CONSTRUCTION.

COORDINATE WITH THE COR THE REMOVAL, PROTECTION, AND STORAGE OF FURNITURE AND 9.

PROCUREMENT, AND DELIVERY DATES.

ACTIVITIES, CONSTRUCTION DURATIONS, CRITICAL PATH, MILESTONE DATES, EQUIPMENT

SUBMIT A CONSTRUCTION SCHEDULE PRIOR TO CONSTRUCTION SHOWING CONSTRUCTION 8.

SIGNAGE, AND DUMPSTER LOCATIONS.

CONSTRUCTION. DRAWING SHALL INCLUDE FENCING, GATES, MATERIAL STORAGE, TRAILER,

SUBMIT DRAWING OF STAGING AREA FOR COR APPROVAL PRIOR TO THE START OF 7.

MUST BE ON SITE AND AVAILABLE DURING CONSTRUCTION AT ALL TIMES.

AN UP TO DATE SET OF CONSTRUCTION DOCUMENTS, DRAWINGS, AND SPECIFICATIONS 6.

REPLACEMENT WITH COR.

AND ENERGIZING, OF ANY PANELBOARD FOR CIRCUIT BREAKER

CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING,

SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY

IN WRITING FOR EACH CASE OF BREAKER OPERATION. CONTRACTOR

CONTRACTOR SHALL REQUEST PERMISSION OF FAA IN ADVANCE AND

ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. 5.

LEAST 15 CALENDAR DAYS IN ADVANCE OF PERFORMANCE OF WORK.

SHALL BE SCHEDULED AND APPROVED IN WRITING BY COTR AT

WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES

UNSCHEDULED INTERRUPTIONS SHALL BE NOT TOLERATED. 4.

AND BARRIERS AS REQUIRED TO PROTECT ACTIVE EQUIPMENT.

TO EQUIPMENT WITH COR. PROVIDE DUST PROOF PARTITIONS

DEMOLITION WORK THAT MAY CAUSE VIBRATION OR DISRUPTION

REMAIN OPERATIONAL DURING CONSTRUCTION. COORDINATE ALL

EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT SHALL3.

AREAS SHALL BE REMOVED IMMEDIATELY.

CONSTRUCTION DEBRIS & EQUIPMENT IN OCCUPIED AND ADJACENT

CLEAN CONSTRUCTION AREAS DAILY TO SATISFACTION OF COR.2.

CONTRACTOR SHALL COORDINATE WITH COR AND SHALL NOT DISRUPT FAA OPERATIONS.

THE BUILDING WILL BE OCCUPIED BY FAA PERSONNEL DURING CONSTRUCTION. 1.

I. PARKING LOT, DRIVEWAY AND OTHER AREAS REPAIR

J. "AS BUILT" DRAWINGS

ON COMPLETION OF CONSTRUCTION TURN OVER TO THE COR.

UNDER THE CONTROL OF THE CONTRACTOR DURING CONSTRUCTION.

A SET OF "AS BUILT" DRAWINGS SHALL BE MAINTAINED BY AND J.1

UP

STAGING AREA

CONTRACTOR'S

ASB

NCO

PSB

ZJX

ASPHALT PARKING

VISITOR PARKING

GUARDHOUSE

ENTRANCE

K

IN

Y

AREAS.

SIGNAGE TO PROTECT, WARN AND DIRECT ALL PERSONS NEAR THE CONSTRUCTION

DELIVERIES TO THE SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, AND

PROVIDE SIGNAGE TO INDICATE THE ACCESS FOR CONSTRUCTION EMPLOYEES ANDA.5

DRIVEWAY SHALL REMAIN OPEN AT ALL TIMES.A.4

BUILDING MUST BE MAINTAINED.

ACCESS FOR DELIVERIES TO THE LOADING DOCK AND ENGINE GENERATORA.3

OCCUR AT 6:30 - 8:00 A.M. AND AT 2:30 - 5:00 P.M.

EMPLOYEE SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES

ALL DELIVERIES SHOULD BE SCHEDULED AT TIMES OTHER THAN THE FAA A.2

MANNED 24 HOURS A DAY.

THROUGH THE FRONT FAA SECURITY GATE. THIS GATE AND FACILITY ARE

CONTRACTOR'S ACCESS (VEHICLE AND PEDESTRIAN) TO THE SITE SHALL BE A.1

THE OPERATIONS BUILDING.

THE CONTRACTOR SHALL TAKE GREAT CARE AND CAUTION WHILE WORKING WITHIN B.4

COORDINATE ALL WORK OUTSIDE THE DESIGNATED AREAS WITH COR.

THE EXISTING BUILDING, OUTSIDE THE DESIGNATED CONSTRUCTION AREA.

FAA ESCORTS MAY BE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN B.3

IN THE CONSTRUCTION AREAS AT ALL TIMES.

THE SITE IS A SECURE AREA AND ALL CONSTRUCTION PERSONNEL SHALL REMAIN B.2

CONTRACTOR PERSONNEL.

CONTRACTOR SHALL PROVIDE READILY IDENTIFIABLE CONTRACTOR BADGES TOB.2

SECURITY GATE. ALL PERSONNEL MUST BE U.S. CITIZENS.

EACH CONSTRUCTION EMPLOYEE SHALL CHECK IN AND OUT AT THE FRONT

COR. ALL DELIVERIES SHALL BE SCHEDULED IN ADVANCE WITH THE COR.

AN ADVANCE LIST OF CONSTRUCTION PERSONNEL SHALL BE PROVIDED TO THE B.1

TIMES. CONTRACTOR SHALL DO NO DIGGING WITHOUT PERMISSION FROM COR.

STAGING PLAN. MATERIALS SHALL BE NEATLY STORED AND PROTECTED AT ALL

LIMITED TO THE CONSTRUCTION STAGING AREA AS SHOWN ON THE CONSTRUCTION

STORAGE OF CONSTRUCTION MATERIAL AND TRAILERS ON THE SITE SHALL BE C.1

SHALL BE RESTORED TO ORIGINAL CONDITION BY THE CONTRACTOR.

CONSTRUCTION FENCES SHALL BE REMOVED. ALL AREAS AND SURFACES DISTURBED

ADVERSE WEATHER CONDITIONS. UPON COMPLETION OF CONSTRUCTION, ALL

FENCE SHALL BE PROPERLY CONSTRUCTED AND WELL MAINTAINED TO WITHSTAND

SIX FOOT HIGH CHAIN LINK TYPE CONSTRUCTION. PROVIDE GATE AS REQUIRED. THE

STAGING AREA AT THE CONTRACTOR'S OPTION. THE FENCE SHALL BE FOUR FOOT TO

A CONSTRUCTION FENCE SHALL BE PROVIDED AROUND THE CONSTRUCTION D.1

OR EQUIPMENT.

PROVIDE PROTECTION TO ASPHALT TO PREVENT ANY DAMAGE DONE BY DUMPSTERS E.2

DURING CONSTRUCTION. ALL DEBRIS SHALL BE REMOVED BY CONTRACTOR.

THE DUMPSTERS SHALL BE KEPT CLEAN AND FREE OF EXCESS DEBRIS AND DUST

PROVIDED BY THE CONTRACTOR WITHIN THE STAGING AREA. THE AREA AROUND

ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS SHALL BE E.1

CONTRACTOR SHALL PROVIDE TELEPHONE, POWER AND WATER FOR HIS USE.

STORAGE MAY BE LOCATED WITHIN THE CONSTRUCTION STAGING AREA. THE

CONTRACTOR TRAILER IF FURNISHED FOR OFFICE AND MATERIALS AND EQUIPMENT F.1

STAGING AREAS. PORTABLE TOILETS SHALL BE SERVICED TWO TIMES PER WEEK.

PROVIDE PORTABLE CHEMICAL TOILETS WITHIN THE FENCED CONSTRUCTION G.1

PREARRANGED TIMES APPROVED BY THE COR.

WILL BE ALLOWED ONLY DURING OFF-PEAK HOURS (12:00 AM TO 5:00 AM) OR AT

CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING H.2

AT ALL TIMES.

OF THE FACILITY. DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED

THE CONTRACTOR SHALL NOT INTERFERE WITH THE AIR TRAFFIC CONTROL FUNCTION H.1

PARKING AREA

CONTRACTOR'S PERSONNEL

DOCK

LOADING

WORK

AREA OF

NOT TO SCALE

G003 zjx-1507025-g003

2023-01-26T11:51:31-0500

ROBERT L BELTON

2023-01-26T10:08:18-0500

STEVE VONG

1. WEATHER SEAL ALL OPENINGS.

EXTERIOR:

1. ALL PRE-CONSTRUCTION TASKS MUST BE COMPLETED BEFORE CONSTRUCTION CAN BEGIN.

GENERAL NOTES:

COMMISSION NEW HVAC SYSTEM3.4

TEST AND BALANCE NEW HVAC SYSTEM3.3

E601

ZJX-1507025-E102, ZJX-1507025-

8 HOURSINSTALL NEW BREAKERS AND CONDUCTORS3.2OUTAGE

M402

ZJX-1507025-M103, ZJX-1507025-

INSTALL NEW AHU AND ACU3.1

PHASE 3

ZJX-1507025-M105INSTALL CAT-6 CONTROL CABLE2.6

FIRE STOP ALL OPENINGS2.5

ZJX-1507025-M104INSTALL CO2 SENSOR, STATIC AND DIFF. PRESSURE SENSOR, THERMOSTATS AND HUMIDISTATS, AND AS-B CONTROL PANEL 2.4

ZJX-1507025-E102INSTALL ACU-M1 DISCONNECT2.3

ZJX-1507025-M104INSTALL CONTROL DAMPERS2.2

M403

ZJX-1507025-M103, ZJX-1507025-

INSTALL OUTDOOR AIR INTAKE, LOUVER, AND PRE-FILTER RACK2.1

PHASE 2

ZJX-1507025-E601

ZJX-1507025-E101,

8 HOURSDEMO ACU-M1 DISCONNECT, ELECTRIC DUCT HEATER, DUCT HEATER DISCONNECT, AND DISCONNECT EXISTING FEEDER1.8OUTAGE

M401

ZJX-1507025-M101, ZJX-1507025-

DEMO AHU-M1 AND ACU-M11.7OUTAGE

ZJX-1507025-A101INSTALL NEW SUSPENDED CEILING1.6NIGHT WORK

E102

ZJX-1507025-M104, ZJX-1507025-

INSTALL ELECTRIC AND CONTROLS CONDUIT AND WIRING1.5NIGHT WORK

ZJX-1507025-M103INSTALL SUPPLY AND RETURN DIFFUSERS1.4NIGHT WORK

ZJX-1507025-M103INSTALL SA DUCT AND VAVS1.3NIGHT WORK

ZJX-1507025-M101DEMO EXISTING DUCT WORK1.2NIGHT WORK

ZJX-1507025-A101DEMO SUSPENDED CEILING1.1NIGHT WORK

PHASE 1

PRE-CONSTRUCTION MEETING/SAFETY REVIEW0.5

COORDINATE PLAN FOR FURNITURE/EQUIPMENT COVERING AND PROTECTION DURING CONSTRUCTION0.4

SUBMIT PRODUCT DATA0.3

SUBMIT CONSTRUCTION SCHEDULE0.2

SUBMIT DRAWINGS OF STAGING AREA FOR COR APPROVAL0.1

PRE-CONSTRUCTION

DRAWINGSMAX DURATIONCONSTRUCTION ACTIVITY STAGEACTIVITY TYPE

SEQUENCE OF CONSTRUCTION

:4 lo tt e

ZJX-1507025-G004

zjx-1507025-g004

2023-01-26T11:51:43-0500

ROBERT L BELTON

2023-01-26T10:08:29-0500

STEVE VONG

ACU

M1

EF

AHU

1 1 1

1 1

9 10

3 1

2 2

2 222

EWH

CU

lo tt e

-m

54321

22x22

16x16 x x

14x14 x x x

10x10

8x10 x x

X x

SEE 1/M401 16X16

42x12 x

OFFICE

WORKSHOP

CORRIDOR

DM OFFICE

RECEPTION

SECRETARY

BREAK ROOM

RESTROOM

LOBBY

JANITOR

CONFERENCE

ZJX-1507025-M101

MECHANICAL DEMOLITION

SHEET NOTES

DEMO ACU-M1. RECOVER REFRIGERANT PER "02 41 19 - SELECTIVE DEMOLITION"

DEMO PVC SLEEVE.

DEMO REFRIGERANT LINES AND SUPPORTS.

DEMO OUTSIDE AIR DUCT, DAMPER, WALL SLEEVE, AND LOUVER.

DRAIN.

DEMO AHU-M1, SUPPLY DUCT, RETURN DUCT, REFRIGERANT LINES, AND CONDENSATE

DEMO ELECTRIC DUCT HEATER.

JUNCTION BOX AND AHU-M1.

DEMO SMOKE DETECTOR AND FLEXIBLE METAL CONDUIT BETWEEN CEILING

DEMO PORTION OF EXISTING DUCT AND PREPARE FOR NEW DUCT CONNECTION.

DEMO SUPPLY AIR DUCT, DAMPERS, ACCESSORIES, AND SUPPORTS.

DEMO RETURN AIR GRILL.

SUPPORTS.

DEMO SUPPLY AIR DIFFUSERS, FLEX DUCT, DAMPERS, ACCESSORIES, AND

CONSTRUCTION.

FIRE ALARM MUST BE DEACTIVATED AND DISABLED DURING DURATION OF 1.

AUTOMATION WINGPSB

CONTROL WING

ADMINISTRATION WING

M101

4' 0 4' 8'

SCALE: 1/4" = 1'-0"

zjx-1507025-m101

2023-01-26T11:51:52-0500

ROBERT L BELTON

2023-01-26T10:08:53-0500

STEVE VONG

x x x x x x x

OFFICE 8x10 x lo tt e

BACK TO JUNCTION BOX.

DEMO FLEXIBLE METAL CONDUIT AND CONTROL WIRING FROM ACU-M1

PRESSURE PROBES FROM AHU-M1. TURN OVER TO RE/COR.

REMOVE AND PROTECT STATIC PRESSURE GAUGE, TUBING, AND STATIC

CONDUIT BACK TO RIGID METAL CONDUIT ON ADJACENT WALL.

DISCONNECT CONTROL WIRING FROM AHU-M1. DEMO FLEXIBLE METAL

DETAILS.

ROOM 111A IN THE AUTOMATION WING. SEE SHEET M105 FOR ADDITIONAL

DEMO CONTROL WIRING FROM CONTROL PANEL IN ASB TO DDCP-23 IN

DEMO CONTROL PANEL AND UPS. CONTROL CABINET TO REMAIN.

DEMO THERMOSTAT. DEMO CONTROL WIRING BACK TO SOURCE.

CONTROLS DEMOLITION

M102

ZJX-1507025-M102

zjx-1507025-m102

2023-01-26T11:52:02-0500

ROBERT L BELTON

2023-01-26T10:10:37-0500

STEVE VONG

VAV

9'-0"

CD

CU

:5 lo tt e x

10x8 x x x x x

2 1 1

6x8

1 1 1

Ø x

2 2

6 10x8

6" Ø10x10 x

6" Ø 11x10

20x8

10x1012x106

4 4

11 20x16

112RESTROOM 113RESTROOM

ZJX-1507025-M103

MECHANICAL PLAN

PROVIDE RECTANGULAR OUTSIDE AIR DUCT, TRANSITIONS, AND HANGERS.

PROVIDE VOLUME CONTROL DAMPER. PROVIDE ACCESS DOOR

ALUMINUM MESH FILTER. PROVIDE ACCESS DOOR.

PROVIDE PRE-FILTER HOUSING TO SUPPORT A 20"X16"X2" FILTER. PROVIDE 2" MERV 8

PROVIDE 24"X18.5" HURRICANE LOUVER.

PROVIDE NEW REFRIGERANT AND CONDENSATE DRAIN PIPING.

PROVIDE NEW PVC SLEEVE FOR REFRIGERANT/CONDENSATE DRAIN PIPING.

PROVIDE NEW SUPPLY AND RETURN DUCT, FITTINGS, AND DAMPERS.

M1.

PROVIDE NEW SMOKE DETECTOR, CONDUIT, AND WIRING TO AHU INTERLOCK IN AHU-

REMOVED.

PATCH AND REPAIR DUCT AND INSULATION WHERE ELECTRIC DUCT HEATER WAS

REMOVED.

PATCH AND REPAIR DUCT AND INSULATION WHERE DUCTWORK AND INSULATION WAS

DUCTWORK.

SPECIFIED DUCT INSULATION AND VAPOR BARRIER ON ALL NEW SHEET-METAL SUPPLY

PROVIDE RECTANGULAR SUPPLY DUCT, TRANSITIONS, AND HANGERS. PROVIDE NEW

PROVIDE ROUND SUPPLY DUCT, TRANSITIONS, AND HANGERS.

PROVIDE NEW RETURN AIR GRILL AND SOUND TRAP.

DIFFUSER.

PROVIDE NEW FLEX DUCT, NOT EXCEEDING FOUR FEET IN LENGTH, AND SUPPLY AIR

PRIOR TO TESTING AND BALANCING.

PROVIDE TEMPORARY AIR FILTERS DURING CONSTRUCTION. REPLACE AIR FILTERS 4.

AND ACU-M1 PRIOR TO EQUIPMENT INSTALLATION.

VERIFY EQUIPMENT DIMENSIONS AND SPACING OF BOLLARDS AROUND AHU-M1 3.

INSPECT ALL EXISTING DUCTWORK AND INSULATION, AND REPAIR AS NEEDED.2.

DUCT ROUTING TO NOT OBSTRUCT LIGHTING OR OTHER EXISTING FIXTURES.

LIGHTING FIXTURES SHOWN ARE FOR REFERENCE ONLY. FIELD COORDINATE 1.

MECHANICAL NEW WORK PLAN

M103

M501

SEE 1/M402

zjx-1507025-m103

2023-01-26T11:52:12-0500

ROBERT L BELTON

2023-01-26T10:11:48-0500

STEVE VONG

6 76 7

6 7

CO2

SP

DPI

DPS

DPI CD

VFD

lo tt e

EXACT LOCATION TO COMPLY WITH NEC WORKING CLEARANCES.

PROVIDE VFD FOR AHU-M1. SEE SPECIFICATION SECTION 26 29 23. FILED COORDINATE

FROM SENSOR TO CONTROL PANEL.

PROVIDE DIFFERENTIAL PRESSURE SENSOR. PROVIDE CONDUIT AND CONTROL WIRING

PROVIDE CONDUIT AND CONTROL WIRING FROM CONTROL DAMPER TO CONTROL PANEL.

ACU-M1. PROVIDE CONTROL WIRING FROM CONTROL PANEL TO ACU-M1.

PROVIDE LIQUID TIGHT FLEXIBLE METAL CONDUIT FROM EXISTING JUNCTION BOX TO

WIRING FROM SENSOR TO CONTROL PANEL.

PROVIDE DUCT MOUNTED STATIC PRESSURE SENSOR. PROVIDE CONDUIT AND CONTROL

PROVIDE CONDUIT AND CONTROL WIRING FROM VAV TO CONTROL PANEL.

PROVIDE CONDUIT AND CONTROL WIRING FROM THERMOSTAT AND HUMIDISTAT TO VAV.

FLOOR.

PROVIDE THERMOSTAT AND HUMIDISTAT. MOUNT SENSOR 48 INCHES ABOVE FINISHED

CONDUIT AND CONTROL WIRING FROM CO2 SENSOR TO CONTROL PANEL.

PROVIDE CO2 SENSOR. MOUNT SENSOR 1 FOOT ABOVE SUSPENDED CEILING. PROVIDE

ON WALL. PROVIDE CONTROL WIRING FROM CONTROL PANEL TO AHU-M1.

PROVIDE FLEXIBLE METAL CONDUIT FROM AHU-M1 TO EXISTING RIGID METAL CONDUIT

PROVIDE CONDUIT FROM EXISTING CONDUIT TERMINATION TO EXISTING JUNCTION BOX.

AUTOMATION WING. SEE SHEET M105 FOR ADDITIONAL INFORMATION.

PROVIDE CAT-6 CABLE FROM ASB CONTROL PANEL TO DDCP-32 IN ROOM 111A IN THE

INFORMATION.

EXISTING SCHNEIDER BUILDING AUTOMATION SYSTEM. SEE SHEET M105 FOR ADDITIONAL

MODULE AND UNINTERRUPTIBLE POWER SUPPLY. DDC CONTROLLER SHALL LINK TO

PROVIDE CONTROL PANEL WITH SCHNEIDER AS-B SERVER WITH IP-IO EXPANSION

CONTROL PANEL

TO THE MANUFACTURER'S REQUIREMENTS.

BACnet MS/TP COMMUNICATION BUS SHALL LINK THE DDC CONTROLLERS IN ACCORDANCE 5.

SYSTEM.

DDCS CONTROLLERS SHALL LINK TO THE EXISTING SCHNEIDER BUILDING AUTOMATION 4.

REFER TO SHEET M603 FOR CONTROLS DIAGRAM.3.

REFER TO SHEET M602 FOR SEQUENCE OF OPERATIONS.2.

REFER TO SHEET G002 FOR ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES.1.

MATCHLINE FOR CONTINUATION SEE 2/M105

CONTROLS PLAN

M104

ZJX-1507025-M104

zjx-1507025-m104

2023-01-26T11:52:27-0500

ROBERT L BELTON

2023-01-26T10:12:20-0500

STEVE VONG

10A

14A

TO AHU-M1

CONTROL

PANEL

TO DDCP-23 IN ROOM 111A

COMPUTER DISPLAY CHANNEL (CDC)

AREAWAY

13A

ELECTRICAL DISTRIBUTION ROOM

DN

DDCP-23

110A 110L

14A

110D

110KCLOSET

TO J-BOX IN

ROOM 13A

DYSIM

CRITICAL POWER CENTER EQUIPMENT SPACE COMM ROOM MAINT.

MECHANICAL EQUIPMENT AREA

AREA

110F120A

111A

AUTOMATION

WING

PSB

CONTROL

ADMINISTRATION

lo tt e

SCALE: 1/8" = 1'-0"

8' 16'08'

MATCHLINE FOR CONTINUATION SEE 1/M104

THE AUTOMATION WING FOR NEW DDC NETWORK CABLE.

REUSE EXISTING CONDUIT BETWEEN AUXILIARY SUPPORT BUILDING AND DDCP-23 IN

NETWORK SWITCH LOCATED IN THE AUTOMATION WING.

PROVIDE CONTROL CAT-6 CABLE BETWEEN AS-B CONTROL PANEL AND EXISTING

GENERAL NOTE

DEMO AND INSTALLATION.

TRACE AND VERIFY EXISTING CONTROL WIRING AN CONDUIT PATH PRIOR TO 1.

AUTOMATION WING BASEMENT

M105

AUTOMATION WING 1ST FLOOR

M105

ZJX-1507025-M105

DDC NETWORK CONNECTION PLAN

zjx-1507025-m105

2023-01-26T11:52:37-0500

ROBERT L BELTON

2023-01-26T10:12:46-0500

STEVE VONG

:1 lo tt e x

L

W x

22x29

ZJX-1507025-M401

HVAC EQUIPMENT DEMOLITION PLAN

DEMO ACU-M1.

PROBES FROM AHU-M1. TURN OVER TO RE/COR.

REMOVE STATIC PRESSURE GAUGE, TUBING, AND STATIC PRESSURE

CONDENSATE DRAIN.

DEMO AHU-M1, SUPPLY DUCT, RETURN DUCT, REFRIGERANT LINES, AND

DEMO SMOKE DETECTOR.

SCALE: 1/2" = 1'-0"

EQUIPMENT DEMO PLAN

EQUIPMENT DEMO ELEVATION

1' 0 3' 5'

1' 2' 4'

DEMO ACU-M1.

PROBES FROM AHU-M1. TURN OVER TO RE/COR.

REMOVE STATIC PRESSURE GAUGE, TUBING, AND STATIC PRESSURE

CONDENSATE DRAIN.

DEMO AHU-M1, SUPPLY DUCT, RETURN DUCT, REFRIGERANT LINES, AND

DEMO SMOKE DETECTOR.

zjx-1507025-m401

2023-01-26T11:52:47-0500

ROBERT L BELTON

2023-01-26T10:13:09-0500

STEVE VONG

lo tt e x x

ZJX-1507025-M402

HVAC EQUIPMENT NEW WORK

VELOCITY HURRICANE ZONE. BASIS OF DESIGN BMP INTERNATIONAL BMTD042.

ANCHOR ACU-M1 WITH TIE-DOWN CLIPS IN ACCORDANCE WITH ASCE 7 FOR HIGH

PROVIDE NEW REFRIGERANT AND CONDENSATE DRAIN PIPING.

PROVIDE NEW PVC PIPE PASS THROUGH FOR REFRIGERANT AND DRAIN PIPING.

CONNECT 18X36 TRANSITION TO EXISTING RETURN DUCT.

CONNECT 22X22 TRANSITION TO EXISTING SUPPLY DUCT.

IN AHU-M1.

PROVIDE NEW SMOKE DETECTOR, CONDUIT, AND CONDUCTORS TO AHU INTERLOCK

ALL NEW SHEET-METAL DUCT WORK.

REMOVED. PROVIDE NEW SPECIFIED DUCT INSULATION AND VAPOR BARRIER ON

PATCH AND REPAIR DUCT AND INSULATION WHERE ELECTRIC DUCT HEATER WAS

22x29 x x

EQUIPMENT NEW WORK PLAN

EQUIPMENT NEW WORK ELEVATION

zjx-1507025-m402

2023-01-26T11:52:57-0500

ROBERT L BELTON

2023-01-26T10:13:44-0500

STEVE VONG

1 2

:2 lo tt e

1 2

ZJX-1507025-M403

EQUIPMENT ROOM SECTION

16x20 8x20 8x20

SECURITY FENCE

ROOF BEAMROOF BEAM

SHELVES

PROVIDE NEW SUPPLY DUCT, TRANSITIONS, AND HANGERS.

PROVIDE VOLUME CONTROL DAMPER. PROVIDE ACCESS DOOR.

MERV 8 ALUMINUM MESH FILTER. PROVIDE ACCESS DOOR.

PROVIDE PRE-FILTER HOUSING TO SUPPORT A 20"X16"X2" FILTER. PROVIDE 2"

PROVIDE 24"X18.5" LOUVER. POSITION LOUVER BETWEEN SIDING RIBS.

zjx-1507025-m403

2023-01-26T11:53:06-0500

ROBERT L BELTON

2023-01-26T10:14:21-0500

STEVE VONG

FASTENER

SCREW

lo tt e

ZJX-1507025-M501

MECHANICAL DETAILS

VERTICAL DUCT RISE DETAIL

RA GRILLE SOUND TRAP DETAIL

DUCT HANGER DETAIL

DUCT RISE DETAIL

NOTE:

1. ALL DUCTWORK TO BE SUPPORTED PER LATEST EDITION OF "SMACNA HVAC

DUCT CONSTRUCTION STANDARDS".

NOTES:

1. RA GRILLE SOUND TRAP CONSTRUCTED FROM 1" THICK DUCT BOARD.

2. ALL JOINTS TO BE TAPPED WITH FSK TAPE.

3. ALL INTERIOR SURFACES TO BE PAINTED BLACK.

1. MAINTAIN MINIMUM 2" OF CLEARANCE BETWEEN DUCT SURFACES.

1. ALL DUCTWORK TO SUPPORTED PER LATEST EDITION OF "SMACNA HVAC

DUCT CONSTRUCTION STANDARDS".

2. MAINTAIN MINIMUM 2" OF CLEARANCE BETWEEN DUCT SURFACES.

zjx-1507025-m501

2023-01-26T11:53:16-0500

ROBERT L BELTON

2023-01-26T10:14:48-0500

STEVE VONG

24"x24"22"X22"TITUS 50F#26NO RETURN GRILLEE

24"x24"8" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKD

12"x12"7" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKC

24"x24"6" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKB

12"x12"6" ØTITUS TMS#26YESSQUARE CEILING ROUND NECKA

FACE SIZENECK SIZEMODELFINISHOBDDESCRIPTIONAIR DEVICE TAG

AIR DISTRIBUTION SCHEDULE

ODYSSEYTRANE16"X25"X2" MERV 1352.953.965.180.673.787.36032081.50.754082,461ASBRM 120AHU-M1

MODEL / SERIESMFGR

(°F)

LWB

LDB

EWB (°F)

EDB

(MBH)

SENS.

TOTAL (MBH)HZPHVOLTSHP

AIRCAPACITYMOTOR DATA

(IN. W.G.)

ESP

(CFM)

OA

SUPPLY AIR (CFM)

NOTES

KNOWN ACCEPTABLE SOURCE

AIR FILTERS

COOLING COIL DATASUPPLY FANSUPPLY FAN DATA

AREA SERVEDLOCATIONUNIT NO.

SPLIT SYSTEM AIR CONDITIONER SCHEDULE

2. PROVIDE UNIT WITH HAIL GUARD.

1. PROVIDE UNIT WITH COIL COATINGS.

1,2ODYSSEYTRANE7.412.912.811.4R-410A32080.52SCROLL7.5ASB

RM 120

OUTSIDE

ACU-M1

MODEL / SERIESMFGRPHVOLTSHP

SYSTEM KWSYSTEM (IEER)CONDENSING UNIT (EER)MATCHED AHU (EER)

MOTOR DATA

NO. COMPRESSORSTYPE

NOTES

KNOWN ACCEPTABLE SOURCE

EFFICIENCY

REFRIGERANT

CONDENSER DATACOMPRESSOR DATA

CAPACITY (TONS)AREA SERVEDLOCATIONUNIT NO.

SPLIT SYSTEM AIR CONDITIONER SCHEDULE

VARIABLE AIR VOLUME UNIT SCHEDULE

UNIT

PRIMARY VALVE DATA ELECTRIC HEATING COIL DATA

BASIS OF DESIGN REMARKS

INLET SIZE MAX. CFM MIN. CFM MAX AIR PD (IN. W.G.) MAX NC KW VOLT PH HZ MIN. EQUAL STEPS

VAV-1 6" 449 124 0.180 25 1.5 120 1 60 1 TRANE VCEF

VAV-2 8" 728 165 0.070 25 2.0 120 1 60 1 TRANE VCEF

VAV-3 6" 282 165 0.070 25 1.5 120 1 60 1 TRANE VCEF

VAV-4 6" 464 105 0.190 25 1.5 120 1 60 1 TRANE VCEF

VAV-5 8" 598 165 0.050 25 2.0 120 1 60 1 TRANE VCEF

lo tt e

119 115116

210 CFM

320 CFM

451 CFM

250 CFM

250 CFM

300 CFM

110 CFM

80 CFM

160 CFM

CFM

2169 CFM

180 CFM

292 CFM

MIN

OFFICE CONFERENCEOFFICE

AHU-M1

113112111

RESTROOM RESTROOM RESTROOM

ZJX-1507025-M601

MECHANICAL SCHEDULES AND AIR FLOW DIAGRAM

AIR FLOW DIAGRAM

M601 zjx-1507025-m601

2023-01-26T11:53:27-0500

ROBERT L BELTON

2023-01-26T10:15:13-0500

STEVE VONG

lo tt e

ZJX-1507025-M602

SEQUENCE OF OPERATIONS

SEQUENCE OF OPERATIONS AHU-M1:

1. HAND-OFF-AUTO OPERATION:

HAND-OFF-AUTO OPERATION SWITCH SHALL BE PROVIDED AS PART OF THE VARIABLE FREQUENCY DRIVE (VFD).

A.IN THE OFF MODE, THE UNITS SHALL NOT OPERATE.

B. IN THE HAND MODE, THE FAN SHALL BE ENERGIZED, AND THE SPEED WILL BE MANUALLY ADJUSTED BY THE

OPERATOR.

C. IN THE AUTO POSITION, FAN SHALL RUN AT ALL TIMES AN SPEED WILL BE CONTROLLED BY THE DDCS.

BOTH HAND AND AUTO OPERATION SHALL OPEN THE RETURN AIR ISOLATION DAMPERS BEFORE THE SUPPLY FAN IS

STARTED. THE OA DAMPER SHALL CLOSE WHEN THE FAN IS STOPPED. THE DUCT MOUNTED SMOKE DETECTOR SHALL BE

WIRED TO THE VFD TO STOP THE FAN IN BOTH THE HAND AND AUTO MODES.

2. FIRE/SMOKE CONTROL:

IF THE DUCT MOUNTED SMOKE DETECTOR (SD-4) SENSES PARTICLES OF COMBUSTION, THE SUPPLY FAN SHALL BE

STOPPED. THE OUTDOOR AIR DAMPER SHALL CLOSE. THE RETURN AIR DAMPER SHALL OPEN.

3. OCCUPIED AND UNOCCUPIED MODES:

PROVIDE OCCUPIED-UNOCCUPIED-AUTOMATIC SEQUENCE OF OPERATION IN THE DDCS. IN THE AUTOMATIC

MODE, AHU-M1 SHALL BE SWITCHED BETWEEN “OCCUPIED” AND “UNOCCUPIED” MODE ACCORDING TO A DAILY

PROGRAM (TIME) SCHEDULE, WHICH INCLUDES A HOLIDAY FEATURE. WHEN “OCCUPIED” OR “UNOCCUPIED” MODE IS

SELECTED BY THE OPERATOR, THE UNIT SHALL OPERATE AS SPECIFIED FOR EACH TYPE OF UNIT MODE.

4. UNOCCUPIED COOLING MODE:

WHEN ANY SPACE TEMPERATURE, AS SENSED BY THE SPACE TEMPERATURE SENSORS, RISES ABOVE 83°F (ADJUSTABLE), SET VFD FOR THE FAN AT FULL SPEED. THE OUTDOOR AIR DAMPER SHALL OPEN AT MINIMUM POSITION TO MEET

OUTSIDE SET POINT (INITIAL SET AT 75 CFM ADJUSTABLE), THE RETURN AIR DAMPER SHALL BE OPEN TO MAXIMUM

POSITION. ALL ZONE VAV TERMINAL UNIT DAMPERS SHALL BE FULLY OPEN. WHEN ALL OF THE ZONE TEMPERATURES

DROP BELOW 80°F, SET VFD FOR THE FAN AT MINIMUM SPEED.

5. UNOCCUPIED HEATING MODE:

WHEN ANY SPACE TEMPERATURE, AS SENSED BY THE SPACE TEMPERATURE SENSORS, DROPS BELOW 63°F (ADJUSTABLE), SET FAN SPEED TO MAINTAIN ALL ZONE VAV TERMINAL UNIT DAMPERS AT MINIMUM POSITION. ALL ZONE VAV

TERMINAL UNIT ELECTRICAL HEATERS SHALL TURN ON. THE OUTDOOR AIR DAMPER SHALL OPEN AT MINIMUM POSITION

TO MEET OUTSIDE SET POINT (INITIAL SET AT 75 CFM ADJUSTABLE), THE RETURN AIR DAMPER SHALL BE OPEN TO

MAXIMUM POSITION. WHEN ALL THE SPACE TEMPERATURES RISE ABOVE 65°F, SET VFD FOR THE FAN AT MINIMUM

SPEED.

6. WARM-UP MODE:

AT A PREDETERMINED TIME (INITIALLY SET AT 30 MINUTES) PRIOR TO OCCUPANCY, A WARM-UP CYCLE SHALL BE

INITIATED IF ANY SPACE TEMPERATURE AS SENSED BY THE SPACE TEMPERATURE SENSORS IS BELOW 68°F. SET FAN SPEED

TO MAINTAIN ALL ZONE VAV TERMINAL UNIT DAMPERS AT MINIMUM POSITION. THE RETURN AIR DAMPER SHALL BE

OPEN TO MAXIMUM POSITION. WHEN ALL THE SPACE TEMPERATURES RISE ABOVE 70°F, THE WARM-UP CYCLE SHALL BE

TERMINATED AND AHU SHALL SWITCHED INTO OCCUPIED MODE.

7. COOL-DOWN MODE:

AT A PREDETERMINED TIME (INITIALLY SET AT 30 MINUTES) PRIOR TO OCCUPANCY, A COOL-DOWN CYCLE SHALL BE

INITIATED IF ANY SPACE TEMPERATURE AS SENSED BY THE SPACE TEMPERATURE SENSORS IS ABOVE 82°F. SET VFD FOR

THE FAN AT FULL SPEED. THE RETURN AIR DAMPER SHALL BE OPEN TO MAXIMUM POSITION. ALL ZONE VAV TERMINAL

UNIT DAMPERS SHALL BE FULLY OPEN. WHEN ALL OF THE ZONE TEMPERATURES DROP BELOW 79°F, THE COOL-DOWN

CYCLE SHALL BE TERMINATED AND THE UNIT SHALL BE SWITCHED INTO OCCUPIED MODE.

8. OCCUPIED MODE - FAN OPERATION:

THE UNIT SHALL BE ENABLED AND DISABLED BY THE DDCS. TO START THE AHU, THE DDCS SHALL SEND AN ENABLE SIGNAL

TO THE VFD. A CURRENT SENSING RELAY SHALL PROVIDE OPERATING STATUS OF THE FAN. IF THE UNIT DOES NOT START

AFTER A 60 SECOND (ADJUSTABLE) TIME DELAY, A UNIT FAILURE ALARM SHALL BE ISSUED AND THE UNIT START

COMMAND SHALL BE CANCELED. TO STOP THE UNIT, THE DDCS SHALL SEND A DISABLED SIGNAL TO THE VFD, WHICH

SHALL STOP THE FAN.

9. OCCUPIED MODE - FAN SPEED CONTROL:

INCREASE THE FAN SPEED UNTIL ALL ZONE VAV TERMINAL UNIT DAMPERS ARE LESS THAN 90% OPEN. DECREASE THE FAN

SPEED IF ANY OF ZONE VAV TERMINAL UNIT DAMPERS ARE MORE THAN 95% OPEN.

10. OCCUPIED MODE- DEHUMIDIFICATION CONTROL:

WHEN THE RETURN AIR HUMIDITY RISES ABOVE THE HUMIDITY SET POINT (INITIAL SET TO 55% RH) REDUCE SUPPLY AIR

TEMPERATURE SET POINT UNTIL REDUCED TO 50%.

11. OCCUPIED MODE - OUTDOOR AIR TEMPERATURE CONTROL:

STEP 1: VERIFY THE RETURN AIR DAMPER IS FULLY OPEN. OTHERWISE, OPEN THE RETURN AIR DAMPER TO 100%.

STEP 2: MODULATE OUTDOOR AIR DAMPER FROM 0% TO 100% TO MEET THE OCCUPIED MODE OUTSIDE AIR SET

POINT (292 CFM ADJUSTABLE).

STEP 3: CO2 CONTROL- THE DDCS WILL CONSTANTLY MONITOR THE CO2 LEVELS FROM THE SENSOR LOCATED IN THE

CONFERENCE ROOM (ROOM 115). AS THE CO2 LEVEL RISES ABOVE THE SET POINT AT 600PPM

(ADJUSTABLE), THE OUTDOOR AIR DAMPER AND RETURN AIR DAMPER WILL MODULATE TO MAINTAIN CO2

SETPOINT. OA DAMPER MUST 100% OPEN BEFORE THE RA DAMPER IS MODULATED TO MAINTAIN CO2

SETPOINT.

12. HIGH STATIC PRESSURE SAFETY:

THE MANUAL RESET STATIC PRESSURE SAFETY (HSP-1) LOCATED ON THE DISCHARGE OF THE SUPPLY FAN SHALL STOP THE

SUPPLY FAN UPON SENSING A DIFFERENTIAL PRESSURE ABOVE ITS SET POINT WHICH IS ADJUSTABLE AND INITIALLY SET

AT 2.0 INCHES W.C.

13. FILTER MONITORING:

DIFFERENTIAL PRESSURE SWITCHES SHALL MONITOR THE PRESSURE DROP AT THE PRE-FILTER AND FINAL FILTERS. WHEN

THE PRESSURE EXCEEDS AN ADJUSTABLE LIMIT, AN ALARM SIGNAL WILL BE SENT TO THE DDCS. PRESSURE DIFFERENCE

INDICATOR (PDI) LOCATED AT THE FILTERS SHALL INDICATE THE DIFFERENTIAL PRESSURE ACROSS THE FILTER.

14. NORMAL POSITIONS:

WHENEVER THE UNITS IS OFF, ALL ASSOCIATED DEVICES SHALL RETURN TO THEIR NORMAL POSITIONS UNLESS EXPRESSLY

REQUIRED BY ANOTHER PART OF THIS SEQUENCE OF OPERATION:

SUPPLY FAN: OFF

OUTDOOR AIR DAMPER: CLOSED

RETURN AIR DAMPER: OPEN

15. FAILURE MODE:

UPON LOSS OF POWER TO THE CONTROL SIGNAL OR ELECTRICAL POWER, THE CONTROL DEVICES SHALL FAIL IN THE

FOLLOWING STATE:

SUPPLY FAN: OFF

OUTDOOR AIR DAMPER: CLOSED

RETURN AIR DAMPER: OPEN

16. ADDITIONAL MONITORING:

IN ADDITION TO THE POINTS MENTIONED IN THESE SEQUENCES, PROVIDE THE ADDITIONAL MONITORING POINTS LISTED

IN THE “DDCS POINT SCHEDULE”.

VAV TERMINAL UNIT SEQUENCE OF OPERATION:

1. OCCUPIED MODE - ZONE VAV BOX CONTROLS:

THE VAV TERMINAL UNIT CONTROLLERS SHALL MODULATE THE VAV BOX DAMPER TO MAINTAIN THE SPACE

TEMPERATURE SETPOINT. AS THE SPACE TEMPERATURE INCREASES ABOVE THE SPACE TEMPERATURE SET POINT, MODULATE THE VAV DAMPER OPEN UNTIL THE SPACE TEMPERATURE SET POINT HAS BEEN ACHIEVED. AS THE SPACE

TEMPERATURE DECREASE BELOW THE SPACE TEMPERATURE SET POINT, MODULATE THE VAV DAMPER CLOSED TO THE

MINIMUM POSITION. THE VAV BOX MINIMUM CFM LIMIT AND MAXIMUM CFM LIMIT SHALL BE ADJUSTABLE AT THE

OWS. THE VAV BOX SPACE TEMPERATURE SET POINT SHALL BE ADJUSTABLE FROM THE SPACE THERMOSTAT AND THE

OWS.

2. OCCUPIED MODE- VAV BOX REHEAT CONTROL:

SPACE TEMPERATURE SENSORS UPON SENSING A DROP IN ZONE TEMPERATURE SHALL MODULATE VAV DAMPERS

TOWARD THE MINIMUM POSITION. AS SPACE TEMPERATURE CONTINUES TO DROP BELOW SET POINT, THE VAV

ELECTRICAL HEATER SHALL TURN ON. AS SPACE TEMPERATURE RISES ABOVE SET POINT, THE VAV ELECTRICAL HEATER

SHALL TURN OFF.

3. VAV BOX SET POINT CONTROL:

THE DDCS SHALL AUTOMATICALLY SWITCH THE VAV BOX TEMPERATURE SET POINT ACCORDING TO THE FOLLOWING:

A.OCCUPIED HEATING MODE SET POINT: 73°F

B.UNOCCUPIED HEATING MODE SET POINT: 65°F

C.OCCUPIED COOLING MODE SET POINT: 75°F

D.UNOCCUPIED COOLING MODE SET POINT: 80°F

4. UNOCCUPIED OVERRIDE:

IF DURING THE UNOCCUPIED MODE, ANY OF THE UNOCCUPIED MODE OVERRIDE SWITCHES (LOCATED ON EACH ZONE

SPACE THERMOSTAT TS/HS) ARE ACTIVATED, THE SYSTEM SHALL BE SWITCHED BACK INTO THE OCCUPIED MODE FOR AN

ADJUSTABLE TIME PERIOD WHICH IS ADJUSTABLE AT THE OWS AND INITIALLY SET AT 2 HOURS.

5. FAILURE MODE:

UPON LOSS OF COMMUNICATION TO CONTROLLERS OR UPON LOSS IN POWER THE VAV WILL REMAIN OPEN ACCORDING

TO THE LAST COMMANDED STATE.

zjx-1507025-m602

2023-01-26T11:53:38-0500

ROBERT L BELTON

2023-01-26T10:15:32-0500

STEVE VONG

lo tt e

ZJX-1507025-M603

CONTROL DIAGRAMS

SCHEDULE NOTES

AHU-M1

TS

SD

AI

TS CS

HSP

AIR

OUTSIDE

AIR

RETURN

IL

NC

NO

AI DI

ACD

FACP

TO

AO

AI DI

DI

R4

S/SFLT

FDKCTL

DI AI

DO

DI AI

FILTER

HS

AIAI

CO2

ZX

EH

HS

FROM AHU

SUPPLY AIR

VAV BOX

FROM PREVIOUS

COMMUNICATIONS

TO NEXT VAV BOX

COMMUNICATIONS

ELEC

HEAT

DP

SP

AUTOMATION SYSTEM.

DDCS CONTROLLERS SHALL LINK TO THE EXISTING SCHNEIDER BUILDING 3.

REFER TO SHEET M602 FOR SEQUENCE OF OPERATIONS. 2.

REFER TO SHEET G002 FOR ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES.1.

SEE MECHANICAL FLOOR PLANS FOR CO2 SENSOR LOCATION.

LOCATIONS.

SEE MECHANICAL FLOOR PLANS FOR SPACE TEMPERATURE/HUMIDITY SENSOR

ACCORDANCE TO THE MANUFACTURER'S REQUIREMENTS.

BACnet MS/TP COMMUNICATION BUS SHALL LINK THE DDC CONTROLLERS IN

TO EXISTING SCHNEIDER BUILDING AUTOMATION SYSTEM.

MODULE AND UNINTERRUPTIBLE POWER SUPPLY. DDC CONTROLLER SHALL LINK

PROVIDE CONTROL PANEL WITH SCHNEIDER AS-B SERVER WITH IP-IO EXPANSION

INPUT.

CONNECT SMOKE DETECTOR AUX CONTACTS TO VFD PROGRAMMABLE DIGITAL

AHU-M1 DIRECT DIGITAL CONTROLLER

VAV MICROPRESSOR CONTROLLER (MC)

AHU CONTROL DIAGRAM

M603

VAV BOX WITH REHEAT CONTROL DIAGRAM

M603

TO VAVs

SUPPLY AIR

BACNET MS/TP

TO VAVs

FROM

NETWORK

SWITCH

zjx-1507025-m603

2023-01-26T11:53:48-0500

ROBERT L BELTON

2023-01-26T10:15:54-0500

STEVE VONG

lEH-ZXZONE EH COIL CONTROL lDP-ZXZONE SA AIR FLOW (CFM) lFDK-ZXZONE SA DAMPER FEEDBACK llCD-ZXZONE SA CONTROL DAMPER

180%llllHS-ZXZONE SA HUMIDITY SENSOR

180°F60°FllllTS-ZXZONE SA TEMPERATURE SENSOR lllVAV TERMINAL UNITS (VAV Z1-Z5)

1800 PPMllllCO2-1CO2 SENSOR lTS-2MIXED AIR TEMPERATURE lllDPS-2AHU FILTER ALARM lFDK-3OUTSIDE AIR DAMPER FEEDBACK llCD-3OUTSIDE AIR CONTROL DAMPER lTS-3OUTSIDE AIR TEMPERATURE lllDPS-3OUTSIDE AIR FILTER ALARM lFDK-4RETURN AIR DAMPER FEEDBACK llCD-4RETURN AIR CONTROL DAMPER llSD-4RETURN AIR SMOKE DETECTION

180%llllHS-4RETURN AIR HUMIDITY

180°F60°FllllTS-4RETURN AIR TEMPERATURE

12.0"lllSP-1STATIC PRESSURE SENSOR

175°F50°FllllTS-1SUPPLY AIR TEMPERATURE

12.0"lllHSP-1SUPPLY AIR HIGH STATIC PRESSURE llFLTFAN STATUS (VFD FAULT CONTACTS) lllFDKFAN SPEED FEEDBACK lCTLFAN SPEED CONTROL llS/SFAN START/STOP lCSCURRENT SENSOR lllAIR HANDLING UNIT (AHU-M1)

IG

IM

IT

I

IC

-D

/C

/O

IR

NOTESALARMSGRAPHICSFAIL MODEHARDWAREPOINT DESCRIPTION

DDCS POINT FUNCTION SCHEDULE

lo tt e

SCHEDULE NOTE

1. LISTED ALARM LIMITS ARE INITIAL SETTINGS ONLY, ACTUAL ALARM LIMITS MAY BE

DIFFERENT DEPENDING ON ACTUAL OPERATIONS.

ZJX-1507025-M604

POINT FUNCTION SCHEDULE

zjx-1507025-m604

2023-01-26T11:53:58-0500

ROBERT L BELTON

2023-01-26T10:16:20-0500

STEVE VONG

lo tt e

-a

4 5

RESTROOM RESTROOM

ROOM

BREAK

113RESTROOM

ZJX-1507025-A101

FLOOR AND REFLECTED CEILING PLAN

-a

ADDITIONAL DETAILS.

LOUVER. COORDINATE PENETRATION HEIGHT WITH RE/COR. SEE SHEET M403 FOR

DEMO SIDING AND WALL. PROVIDE WALL SLEEVE AND PREPARE FOR NEW DUCT AND

REPAIR SIDING AND WALL. MATCH EXISTING EXTERIOR SIDING.

WEATHER SEAL AROUND PVC SLEEVE AND PIPING.

SIGN AND FRONT OF NEW ELECTRICAL DISCONNECT.

REINSTALL PARKING SIGN. MAINTAIN NEC WORKING CLEARANCE OF 42 INCHES BETWEEN

RELOCATE LIGHT ONE CEILING TILE TO THE RIGHT.

REPLACEMENT CEILING TILES AND GRID TO MATCH EXISTING.

REMOVE CEILING GRID AND TILES IN NOTED AREAS PRIOR TO WORK. PROVIDE 1

GENERAL NOTE

PRESSURE SENSORS, AND FIRE DETECTORS.

PROVIDE LABEL ON CEILING GRID TO MARK LOCATION OF VAV'S, DAMPERS, CO2 SENSORS, 1.

CEILING GRID PLAN

A101 zjx-1507025-a101

2023-01-26T11:55:43-0500

ROBERT L BELTON

2023-01-26T10:05:52-0500

STEVE VONG

lo tt e

-e

114 102

3 AHU

PANEL LA

PANEL LB

BREAK ROOM RESTROOM

112RESTROOM RESTROOM 113

ZJX-1507025-E101

ELECTRICAL DEMOLITION PLAN

FACILITY. CUT AND REMOVE ALL UNUSED WIRING ABOVE THE CEILING.

SURVEY AND DETERMINE ANY EXISTING WIRING THAT DOES NOT SUPPORT THE 3.

UNIDENTIFIED WIRE.

IDENTIFY ALL WIRING (COMMUNICATION, POWER, OR LOW VOLTAGE). LABEL ANY 2.

ENERGIZING, OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT WITH COR.

(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING, AND

BREAKER OPERATION. CONTRACTOR SHALL NOT OPEN (DE-ENERGIZE) OR CLOSE

REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF

ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. CONTRACTOR SHALL 1.

TO BE RECONNECTED.

DISCONNECT AND LEAVE EXISTING GROUNDING CONDUCTORS FROM ACU-M1 AND PIPING

CONDUCTORS JUNCTION BOXES TO REMAIN. DEMO BREAKER LA-1,3,5.

DISCONNECT ACU-M1 AND MAKE SAFE. DEMO DISCONNECT AND FLEXIBLE CONDUIT.

CONDUCTORS AND DISCONNECT TO REMAIN. DEMO BREAKER LA-8,10,12.

DISCONNECT AHU-M1 AND MAKE SAFE. DEMO FLEXIBLE CONDUIT BACK TO DISCONNECT.

AND CONDUCTORS BACK TO PANEL LA . DEMO BREAKER LA-19,21,23.

DISCONNECT ELECTRIC DUCT HEATER AND MAKE SAFE. DEMO DISCONNECT, CONDUIT,

LOBBY.

RELOCATE EXISTING LIGHT FIXTURE ONE CEILING TILE TO THE RIGHT, TOWARDS THE

ELECTRICAL DEMOLITION

E101 zjx-1507025-e101

2023-01-26T11:55:32-0500

ROBERT L BELTON

2023-01-26T10:06:12-0500

STEVE VONG

lo tt e

ZJX-1507025-E102

ELECTRICAL NEW WORK PLAN

WITH COR.

AND ENERGIZING OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT

(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING

4' 8'04'

LA-8,10,12

LB-40

LB-39

LB-37

LB-42

LB-35

3P

A60

PROVIDE CONDUITS AND CONDUCTORS FROM VFD TO PANEL LA.

INSTALL NEW BREAKERS IN PANEL LA AND PANEL LB PER PANEL SCHEDULES ON E601.

COUNTERPOISE.

REATTACH ACU-M1 FRAME AND NEW REFRIGERANT PIPING TO EXISTING GROUNDING

DISCONNECT.

FROM NEW DISCONNECT SWITCH TO ACU-M1. RECONNECT EXISTING CONDUCTORS TO

PROVIDE NEW 60A NEMA 4X DISCONNECT SWITCH. PROVIDE CONDUIT AND CONDUCTORS

PROVIDE CONDUIT AND CONDUCTORS FROM EXISTING DISCONNECT SWITCH TO AHU-M1.

PANEL SCHEDULE.

PROVIDE CONDUIT AND CONDUCTORS FROM EACH VAV TO PANEL LB. SEE M601 FOR

ELECTRICAL NEW WORK

E102

WITH COR.

AND ENERGIZING OF ANY PANELBOARD FOR CIRCUIT BREAKER REPLACEMENT

(ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME. COORDINATE DE-ENERGIZING

zjx-1507025-e102

2023-01-26T11:55:03-0500

ROBERT L BELTON

2023-01-26T10:06:45-0500

STEVE VONG

1. SURFACE MOUNTED, BOTTOM FED, EXISTING TO REMAIN

443150PANEL LB43

42BLANK120SPARE41

40SPARE201120SPARE39

38SPARE201120SPARE37

36SPARE201120SPARE35

34SPARE201120SPARE33

32BAS CABINET201120SPARE31

30A/C120SPARE29

28A/C202120SPARE27

26REC 120201120GARAGE DOOR RECEPTACLE25

24REC 120, OUTSIDE GFE BY N DOOR201DUCT HEATER23

22SPARE201DUCT HEATER21

20LTG - EXIT/EMERG/OUTSIDE LTG2013110DUCT HEATER19

18LTG 120, EF-6201120SMOKE DETECTOR17

16LTG 120, EF-5201A/C15

14SPARE201240A/C13

12AHUM-1EUH-211

10AHUM-1EUH-29

8AHUM-1153340EUH-27

6EUH-1ACUM-15

4EUH-1ACUM-13

2EUH-1403340ACUM-11

AMPSPOLESCBAPOLESAMPS

NUM

CIRC

DESCRIPTION

BREAKERPHASEBREAKER

GE4318,000100%400A300A43208/120

MFGRMAX CIRCSAIC RATINGN BUSMAIN BUSMAIN BKRWIREPHASEVOLTAGE

AUXILIARY SUPPORT BUILDINGISB SERVICE PANELBUILDING SERVICES

LOCATIONSOURCESERVICE

1. SURFACE MOUNTED, BOTTOM FED, EXISTING TO REMAIN

443150PANEL LB43

42BLANK120SPARE41

40SPARE201120SPARE39

38SPARE201120SPARE37

36SPARE201120SPARE35

34SPARE201120SPARE33

32BAS CABINET201120SPARE31

30A/C120SPARE29

28A/C202120AHU-M1 VFD27

26REC 120201120GARAGE DOOR RECEPTACLE25

24REC 120, OUTSIDE GFE BY N DOOR201120SPARE23

22SPARE201120SPARE21

20LTG - EXIT/EMERG/OUTSIDE LTG201120SPARE19

18LTG 120, EF-6201120SMOKE DETECTOR17

16LTG 120, EF-5201A/C15

14SPARE201240A/C13

12AHUM-1EUH-211

10AHUM-1EUH-29

8AHUM-1153340EUH-27

6EUH-1ACUM-15

4EUH-1ACUM-13

2EUH-1403340ACUM-11

GE4318,000100%400A300A43208/120

AUXILIARY SUPPORT BUILDINGISB SERVICE PANELBUILDING SERVICES

1. SURFACE MOUNTED, TOP FED, EXISTING TO REMAIN

42VAV 5251120SPARE41

40VAV 4201120VAV 339

38ACP-8A201125VAV 237

36120VAV 135

34EWH - 3202120LTG - BOLLARD33

32120REC - EWC31

30EWH - 2202120SCP29

28120REC - TELCO27

26EWH - 120225

24REC - 119201240WATER HEATER23

22REC - 101, 117201120REC - 101, 102, 112, 113, EF - 2, 321

20REC - 102, 103201120REC - 110, 111, 118, EF - 1, 419

18REC - 104, 105201120REC - 102, 11417

16REC - 108201120REC - 106, 11415

14REC - 108, 109201120REC - REFRIGERATOR 11013

12REC - 115201120REC - 11611

10REC - 115201120REC - 1169

8FACP201120LTG - 1157

6LTG - 101, 111, 112, 113, 117201120LTG - 1165

4LTG - 102, 106, 114201120LTG - 109, 110, 118, 1193

2LTG-EXIT/EMER201120LTG - 103, 104, 105, 1081

GE4218,000100%225AMLO43208/120

AUXILIARY SUPPORT BUILDINGPANEL LABUILDING SERVICES

1. SURFACE MOUNTED, TOP FED, EXISTING TO REMAIN

42SPARE201120SPARE41

40SPARE251120SPARE39

38ACP-8A201125SPARE37

36120SPARE35

34EWH - 3202120LTG - BOLLARD33

32120REC - EWC31

30EWH - 2202120SCP29

28120REC - TELCO27

26EWH - 120225

24REC - 119201240WATER HEATER23

22REC - 101, 117201120REC - 101, 102, 112, 113, EF - 2, 321

20REC - 102, 103201120REC - 110, 111, 118, EF - 1, 419

18REC - 104, 105201120REC - 102, 11417

16REC - 108201120REC - 106, 11415

14REC - 108, 109201120REC - REFRIGERATOR 11013

12REC - 115201120REC - 11611

10REC - 115201120REC - 1169

8FACP201120LTG - 1157

6LTG - 101, 111, 112, 113, 117201120LTG - 1165

4LTG - 102, 106, 114201120LTG - 109, 110, 118, 1193

2LTG-EXIT/EMER201120LTG - 103, 104, 105, 1081

GE4218,000100%225AMLO43208/120

AUXILIARY SUPPORT BUILDINGPANEL LABUILDING SERVICES

lo tt e

GENERAL NOTES:

TRACE, IDENTIFY, AND VERIFY ALL PANEL CIRCUITS PRIOR TO DEMO.3.

PANEL, AND AT COMPLETION OF CONSTRUCTION.

PROVIDE UPDATED PANEL SCHEDULES AT EACH PHASE OF WORK IN EACH 2.

THE SCHEDULED OUTAGE.

COORDINATE ALL OUTAGES WITH COR AT LEAST THREE WEEKS PRIOR TO

ONLY FAA PERSONNEL MAY OPERATE BREAKERS AND DISCONNECTS. 1.

SCHEDULE NOTES:

USE EXISTING SPARE BREAKER FOR VAV BOXES.

REMOVE FEEDERS FROM BREAKER AND RENAME BREAKER "SPARE".

DISCONNECT EXISTING FEEDERS FROM DUCT HEATER BACK TO BREAKER.

PROVIDE NEW CIRCUIT BREAKERS.

PANEL LA SCHEDULE DEMO

PANEL LA SCHEDULE NEW WORK

PANEL LB SCHEDULE DEMO

PANEL LB SCHEDULE NEW WORK

ELECTRICAL PANEL SCHEDULES

zjx-1507025-e601

2023-01-26T11:54:51-0500

ROBERT L BELTON

2023-01-26T10:07:06-0500

STEVE VONG

lo tt e

ZJX-1507025-G001

COVER SHEET AND VICINITY MAP

DUVAL

RIVER

JOHNS

RIVER

ST.

NASSAU

JACKSONVILLEI

GEORGIA

I 9

FLORIDA

OCEAN

ATLANTIC

FERNANDINA

BEACH

IA

I 10

RT 90

ST

IV

JOHNS

CALLAHAN

INTERNATIONAL

AIRPORT

JACKSONVILLE

ST

BRYCEVILLE

FLORIDA

GEORGIA

RT 90

I 10

LOCATION

PROJECT

AIA

NASSAU

RT 23

R

IV

FOLKSTON

5A

T 301

VICINITY MAP

HILLIARD, FLORIDA

I 95

OF TRANSP

OF

TATES

AVIA

LA

TRAT

SI

NI

ZJX/ARTCC - HILLIARD, FLORIDA

zjx-1507025-g001

2023-01-26T11:51:05-0500

ROBERT L BELTON

2023-01-26T10:07:22-0500

STEVE VONG

lo tt e

ZJX-1507025-G002

DRAWING INDEX, LEGEND AND ABBREVIATIONS

A012

A010

A010

E1

FIN_FLR_________

EL._89'-6"______

C-C

04' 4' 8'

FLOOR_EL._10.50'__

Sb_

L1

DP-1

+90"

J

(15)

30A

3P

A60

DRAWING NO.

DRAWING LIST

STANDARD ABBREVIATIONS

ELEVATION SYMBOL (PLANS)

GRAPHIC SCALE

NEW WORK, UON

CONTRACTOR, UON

DEMOLITION BY

EXISTING WORK, UON

ROOM NUMBER

DUST PARTITION

CONNECT TO EXISTING

DESIGNATION

INTERIOR ELEVATION

LIMIT OF DEMOLITION

ABOVE OR BEYOND

OUTLINE OF OBJECT

SECTION TITLE REFERENCE

SECTION CUT

DETAIL TITLE REFERENCE

BREAK LINES

ELEVATION SYMBOL

MATCH LINE SYMBOL

COLUMN LINE GRID DESIGNATION

DETAIL REFERENCE

ELEVATION REFERENCE

NORTH ARROW

ELEVATION DESIGNATION

SECTION IS CUT

SHEET ON WHICH

SECTION DESIGNATION

ELEVATION SHOWN

DARKENED ARROW INDICATES

ELEVATION NUMBER

ELEVATION IS DRAWN

SECTION DESIGNATION

IS DRAWN OR SCHEDULED

SHEET ON WHICH DETAIL

DETAIL NUMBER

DETAIL IS DRAWN

DETAIL DESIGNATION

SECTION IS DRAWN

SYMBOL DESCRIPTION

BY COMAS INDICATE MULTIPLE POLE BREAKERS.

NUMBER INDICATE THE CIRCUIT LOCATION IN THE PANEL. NUMBERS SEPARATED

HOMERUN TO PANELBOARD. LETTERS INDICATE PANEL DESIGNATION AND

WALL SPACE

SAME AS BRANCH CIRCUIT - EXCEPT CONCEALED IN OR ABOVE CEILING OR

CONDUIT DOWN

CONDUIT UP

VARIABLE FREQUENCY DRIVE FOR AHU UNIT

SURFACE/SUSPENDED FIXTURE - CAPITAL LETTERS INDICATE FIXTURE TYPE

3P = NUMBER OF POLES

30A = SWITCH SIZE

60" A.F.F. TO DISCONNECT HANDLE, U.O.N.

600V, 3-POLE, 60A SWITCH, IN NEMA 4X ENCLOSURE

NON-FUSIBLE DISCONNECT SWITCH:

MOUNTING HEIGHTS SHOWN WITH SYMBOL TO CENTER OF DEVICE (UON)

SAME AS BRANCH CIRCUIT USING 3/4" LFMC CONDUIT, UON

JUNCTION BOX, WALL MOUNTED EXPOSED WITH BLANK COVER PLATE (UON)

JUNCTION BOX, CEILING MOUNTED EXPOSED WITH BLANK COVER PLATE (UON)

SURFACE MOUNTED 480Y/277 VOLT PANELBOARD

SURFACE MOUNTED 208Y/120 VOLT PANELBOARD

BRANCH CIRCUIT- EXPOSED, 3/4" C, WITH 2#12 WIRES PLUS 1#12 GROUND, UON

INDICATES SWITCH LEG, 48" AFF (UON)

SINGLE POLE SWITCH OUTLET. LOWERCASE SUBSCRIPT, WHEN USED,

A CONDUIT

CROSS MARKS DENOTE NUMBER OF WIRES WHEN THERE ARE MORE THAN 3 IN

EMERGENCY LIGHTING UNITS, WALL MOUINTED, WITH BATTERY PACK

(15) = FUSE SIZE

30A = SWITCH SIZE

60" A.F.F. TO DISCONNECT HANDLE, U.O.N.

600V, 3-POLE, 30A SWITCH, 30A FUSES, IN NEMA 1 ENCLOSURE

FUSIBLE DISCONNECT SWITCH:

ZJX-1507025-E102

ZJX-1507025-E101

ZJX-1507025-M604

ZJX-1507025-M603

ZJX-1507025-M602

ZJX-1507025-M601

ZJX-1507025-M501

ZJX-1507025-M403

ZJX-1507025-M402

ZJX-1507025-M401

ZJX-1507025-M105

ZJX-1507025-M104

ZJX-1507025-M103

ZJX-1507025-M102

ZJX-1507025-M101

ZJX-1507025-A101

ZJX-1507025-G004

ZJX-1507025-G003

ZJX-1507025-G002

ZJX-1507025-G001

ENTERING WATER TEMPERATUREEWT

ELECTRICAL METAL TUBINGEMT

ELECTRIC/ELECTRICALELEC

ELEVATIONELEV

EXHAUST FANEF

ENTERING AIR TEMPERATUREEAT

DP SENSORDPS

DIFFERENTIAL PRESSUREDP

DIGITAL OUTPUTDO

DOWNDN

DISCONNECTDISC

DIAMETERDIA

DIRECT DIGITAL CONTROLDDC

DIRECT CURRENTDC

DOUBLEDBL

DRY BULB TEMPERATUREDB

DRAIND

CHILLED WATER SUPPLYCWS

CHILLED WATER RETURNCWR

DOMESTIC COLD WATERCW

CHECK VALVECV

REPRESENTATIVE

CONTRACTING OFFICERSCOR

CONTINUOUSCONT

CONNECTIONCONN

CONDENSATECOND

CONCRETECONC

COLUMNCOL

CLEAN OUTCO

CONCRETE MASONRY UNITCMU

CENTER LINECL

CIRCUITCKT

CIRCULATINGCIRC

CAST IN PLACECIP

CUBIC FEET PER MINUTECFM

CONDENSATE DRAINCD

COOLING COILCC

BACK WATER VLAVEBWV

BALL VALVEBV

BETWEENBTW

BTU PER HOURBTUH

BRITISH THERMAL UNITBTU

BASEMENTBSMT

BOTTOMBOTT

BOTTOM OF PIPEBOP

BOTTOM OF DUCTBOD

BUILDINGBLDG

BREAKERBKR

BUTTERFLY VALVEBFV

BACK FLOW PREVENTERBFP

AMERICAN WIRE GUAGEAWG

AUXILIARYAUX

ASSEMBLYASSY

AUXILIARY SUPPORT BUILDINGASB

ACHITECT/ARCHITECTURALARCH

APPROXIMATELYAPROX

ANALOG OUTPUTAO

AIR HANDLING UNITAHU

AIR FLOW METER/SENSORAFM

ABOVE FINISHED FLOORAFF

ACCESS DOORAD

ALTERNATING CURRENTAC

AMPA

POUNDS PER SQUARE INCHPSI

PRESSURE SWITCHPS

PRESSURE REDUCING VALVEPRV

POINT OF CONNECTIONPOC

PRESSURE INDICATORPI

PHASEPH

OUTSIDE DIAMETEROD

ON CENTEROC

OUTSIDE AIROA

NOT TO SCALENTS

NATIONAL PIPE THREADNPT

NOMINALNOM

NORMALY OPENNO

NOT IN CONTRACTNIC

NORMALY CLOSEDNO

MINIMUMMIN

MANUFACTURERMFG

MOTOR CONTROL CENTERMCC

MAIN CIRCUIT BREAKERMCB

1000 BTU PER HOURMBH

MAXIMUMMAX

LEAVING WATER TEMPERATURELWT

POUNDSLBS

LEAVING AIR TEMPERATURELAT

KILOWATTSKW

KILOVOLT AMPEREKVA

JUNCTION BOXJB

INDUSTRIAL WATERIW

INVERTINV

INCHIN

INSIDE DIAMETERID

HERTZHZ

HW CIRCULATION LOOPHWC

DOMESTIC HOT WATERHW

HUMIDIFIERHU

HUMIDITY SENSORHS

HOURHR

HORSE POWERHP

HAND CONTROL VALVEHCV

GATE VALVEGV

GALLONS PER MINUTEGPM

GALLONS PER HOURGPH

GROUNDGND

GROUND FAULT INTERRUPTERGFI

GALVENIZEDGALV

GUAGEGA

NATURAL GASG

FEETFT

FEET PER MINUTEFPM

FLOW METER/SENSORFM

FLANGEFLG

FLOW INDICATORFI

FIRE DAMPER OR FLOOR DRAINFD

FLOW CONTROL VALVEFCV

FAN COIL UNITFCU

YARD HYDRANTYH

TRAMSFORMERXFMR

TRANSFERXFER

WATER COLUMNWC

WET BULD TEMPERATUREWB

WITHW/

WATTSW

VIBRATION SENSORVS

VERIFY IN FIELDVIF

VARIABLE FREQUENCY DRIVEVFD

VERTICALVERT

VOLUME DAMPERVD

VARIABLE AIR VOLUMEVAV

VENT OR VOLTSV

UNIT HEATERUH

TYPICALTYP

TEMPERATURE SENSORTS

TOP OF PIPETOP

TEMPERATURE INDICATORTI

RESISTANT NYLON COATED

THERMOPLASTIC HIGH HEATTHHN

TEMPERATURETEMP

TOTAL DISSOLVED SOLIDSTDS

THERMOSTATT

SOLENOID VALVESV

STRUCTURESTR

STANDARDSTD

SPECIFICATIONSSPEC

SIMILARSIM

SMOKE DAMPERSD

SCHEDULESCH

SUPPLY AIRSA

REFRIGERANT VENTRV

REVOLUTIONS PER MINUTERPM

RIGID GALVENIZED STEELRGS

REQUIREDREQ'D

REINFORCINGREINF

REFERENCEREF

RECEPTICLEREC

RAISED ACCESS FLOORINGRAF

RETURN AIRRA

RADIUSRR

REV. DATE DESCRIPTION

ELECTRICAL PANEL SCHEDULES

ELECTRICAL NEW WORK PLAN

ELECTRICAL DEMOLITION PLAN

POINT FUNCTION SCHEDULE

CONTROL DIAGRAMS

SEQUENCE OF OPERATIONS

MECHANICAL SCHEDULES & AIR FLOW DIAGRAM

MECHANICAL DETAILS

HVAC EQUIPMENT NEW WORK

HVAC EQUIPMENT DEMOLITION PLAN

DDC NETWORK CONNECTION PLAN

MECHANICAL PLAN

FLOOR AND REFLECTED CEILING PLAN

DRAWING INDEX, LEGEND, AND ABBREVIATIONS

COVER SHEET AND VICINITY MAP

GENERAL LEGEND MECHANICAL LEGEND ELECTRICAL LEGEND

20X10

VD

FD SD

FD/SD

SPD

BDD

SIZE

DOOR LOUVER

MITERED ELBOW

HIDDEN DUCTWORK

OUTSIDE AIR INTAKE

DUCT RISE

DUCT DROP

(FIRST FIGURE IS SIDE SHOWN)

RECTANGULAR DUCT

WITH TURNING VANES

MITERED ELBOW

(DIAMETER)

ROUND DUCT

RECTANGULAR TO ROUND

TRANSITION

CONTROL DAMPER

VOLUME DAMPER,

SMOKE DAMPER

FIRE DAMPER

FIRE/SMOKE DAMPER

COMBINATION

BACKDRAFT DAMPER

SUPPLY DUCT DOWN

SUPPLY DUCT UP

RETURN DUCT UP

EXHAUST DUCT UP

THERMOSTAT

RETURN DUCT DOWN

INTERIOR DUCT LINER

FLEXIBLE DUCT

FLEXIBLE CONNECTION

STATIC PRESSURE DAMPER

RETURN GRILLE

SUPPLY GRILLE

EXHAUST DUCT DOWN

SS

TO BOTTOM OF PIPE

BRANCH CONNECTION

FLOOR DRAIN

POSITION OPEN/CLOSED

BALL VALVE WITH NORMAL

OR PIPING BELOW GROUND

SANITARY VENT

TO TOP OF PIPE

BRANCH CONNECTION

OR PIPING ABOVE GROUND

SANITARY SEWER/WASTE

FD

EQUIPMENT DESIGNATION

SIZE TYPE

SYMBOL

NUMBER

PIPE TURNING DOWN

PIPE TURNING UP

CAPPED PIPE/OUTLET

CONCENTRIC REDUCER

FIRE LIFE SAFETY LEGEND

1 HOUR RATED PARTITION

K zjx-1507025-g002

2023-01-26T11:51:21-0500

ROBERT L BELTON

2023-01-26T10:07:35-0500

STEVE VONG

File details come from the government source that posted it. Updated .