ZAN Boiler Chiller Valve Replacement 100 mech.pdf
PDF 653 KB Posted
- Solicitation number
- 697DCK-25-R-00333
About this file
This technical drawing set details a mechanical project for replacing boiler and chiller valves at the Anchorage Air Route Traffic Control Center (ARTCC) in Alaska. The documents include comprehensive engineering specifications for replacing modulating and bypass valves, with five technical drawings covering cover sheets, drawing indexes, abbreviations/legends, equipment schedules, and a boiler schematic diagram. The project involves replacing six specific valves (three control valves and three isolation valves) manufactured by Apollo, with each 6-inch valve sized for a 320 GPM flow rate and requiring new actuators compatible with the existing building automation system.
The technical specifications outline strict requirements for the contractor, including working at a secured, operational facility with 24/7 air traffic control operations. Key project constraints include normal work hours of 8:00 AM to 5:00 PM Monday through Friday, mandatory coordination with FAA personnel for system shutdowns, and rigorous documentation requirements including as-built drawings, operation manuals, and a one-year construction warranty. The project requires US citizen workers with proper identification, careful system isolation techniques, and minimal disruption to facility operations during valve replacement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLD DAVIS HIGHWAY
A D
M
I N I S T R A T
I O N
N
OI
TAIVALAREDE
F
DE
PA
RT
MENT OF TRANSPORTATION
UN I T ED STAT ES OF AMER
I C
A
ANCHORAGE, ALASKA (ZAN)
AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC)
BOILER/CHILLER MODULATING AND BYPASS MODULATING VALVES
CANADA
RUSSIA
ARCTIC OCEAN
ALASKA
PRUDHOE BAY
COLD BAY
BEAUFORT SEA
NOME
JUNEAU
ANCHORAGE
FAIRBANKS
GULF OF ALASKA
BERING SEA
CORDOVA
THIS
PROJECT
NOT TO SCALE
LOCATION MAP
PROJECT
LOCATION
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
05/16/2025
STEVE SCHREFFLER
ENROUT/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-19003935-G001
PJB
PJB
ARTCC
REPLACE BOILER/CHILLER VALVES
COVER SHEET
za n-
0-g0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
19003935
AK
NOT TO SCALE
VICINITY MAP
DRAWING NO.
DRAWING INDEX
DESCRIPTION
ZAN-19003935-G001 COVER SHEET
ZAN-19003935-G002 DRAWING INDEX
ZAN-19003935-M001 ABBREVIATIONS, SYMBOLS LEGEND AND MECHANICAL NOTES
ZAN-19003935-M002 EQUIPMENT SCHEDULES AND SPECIFICATIONS
ZAN-19003935-M003 BOILER SCHEMATIC DIAGRAM
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
OR
ED
M
05/16/2025
STEVE SCHREFFLER
ENROUTE/FSS MANAGER CENTER-ANC
ANCHORAGE
ZAN-19003935-G002
PJB
PJB
ARTCC
REPLACE BOILER/CHILLER VALVES
DRAWING INDEX
za n-
0-g0
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
19003935
AK
M
PIPING (CONT.) ABBREVIATIONSDOUBLE LINE DUCTWORKEQUIPMENT
GENERAL NOTES
SINGLE LINE
DUCTWORK
MISCELLANEOUS
HVAC LEGEND
FD SD
R
D
SPD
SIZE
CFM
AHU
U
T
F
C
C
H
C
E
SUPPLY DUCT (DOWN)
DOOR LOUVER
LINED DUCT
FLEXIBLE CONNECTION
MANUAL DAMPER
FIRE DAMPER, SMOKE DAMPER,
COMBINATION FIRE-SMOKE DAMPER
TURNING VANES
FLEXIBLE DUCT
DUCT RISE
DUCT DROP
STATIC PRESSURE DAMPER
TRANSITION-RECTANGULAR TO ROUND
EXHAUST AIR UP
EXHAUST AIR DOWN
EQUIPMENT DESIGNATION
SYMBOL ABBREVIATION DESCRIPTION
HIDDEN DUCTWORK
OUTSIDE AIR INTAKE
SUPPLY DUCT (UP OR OUT)
UNDERCUT DOOR
THERMOSTAT
ROUND DUCT
(DIAMETER)
RECTANGULAR DUCT
(FIRST FIGURE IS SIDE SHOWN)
SX
200 CFM
RG
EXHAUST GRILLE
CEILING PLENUM RETURN GRILLE, UNLESS
OTHERWISE NOTED
RETURN DUCT
(UP OR OUT)
RETURN DUCT
(DOWN)
FILTER
LOUVER
BACKDRAFT DAMPER
HEATING COIL
MOTORIZED OPPOSED
BLADE DAMPER
ELECTRIC HEATING COIL
FIRE/SMOKE DAMPER
HUMIDIFIER
COOLING COIL
UNIT HEATER
FAN
AIR FLOW MEASURING
STATION/STATIC PRESSURE
MEASURING STATION
MOTORIZED PARALLEL
BLADE DAMPER
FAN WITH VARIABLE
FREQ. MOTOR CONTROLLER
POINT OF DISCONNECTION
RECTANGULAR TO ROUND
TRANSITION
SQUARE REDUCER/
INCREASER
TO BE REMOVED
POINT OF CONNECTION OF
NEW TO EXISTING
NEW WORK -
DARK LINE WEIGHT
EXISTING -
LIGHT LINE WEIGHT
FLUID FLOW DIRECTION
PIPE TURNING UP
PIPE TURNING DOWN
PLUGGED PIPE/OUTLET
CONCENTRIC REDUCER
ECCENTRIC REDUCER
CAPPED PIPE/OUTLET
ANGLE VALVE
GLOBE VALVE
CHECK VALVE
UNION
CP
DIRECTION OF PITCH
GC
PV
GAS COCK
PLUG VALVE
AV
GLV
CV
P/TRV
U
FLEXIBLE HOSE (FLANGED ENDS)
FLEXIBLE HOSE (SCREWED ENDS)
FLEXIBLE PIPE CONNECTOR
AIR ELIMINATOR
TEST COCK
AUTOMATIC AIR VENT
FLOW CONTROL VALVE
FLOW METER
STRAP-ON SENSOR
WELD CAP
SOLENOID VALVE
PRESSURE REGULATING VALVE
THERMOMETER
PUMP
BUTTERFLY VALVEBFV
PRESSURE GAUGE
TI
PI
INLINE PUMP
PRESSURE/TEMPERATURE
RELIEF/SAFETY VALVE
HOT TAP/STOPPLE FITTING
MOTOR OPERATED 2-WAY CONTROL
VALVE
MOTOR OPERATED 3-WAY CONTROL
VALVE
STRAINER WITH BLOWDOWN VALVE
PIPE HEADER WITH BLIND
FLANGE
MANUAL AIR VENTAV
AAV
BALL VALVEBV
WATER METER
FCV FLOW CONTROL VALVE
PETE'S PLUG
SHUT-OFF VALVE
TEST AND BALANCE VALVE
GYPSUM
HEIGHT, HUMIDIFIER
HOSE BIBB
HEATING COIL
HEAD
HEAT EXCHANGER
HORIZONTAL
HORSEPOWER, HEAT PUMP
HOUR
HAND SWITCH
HEATING
HEATER
HOT TAP/ STOPPLE FITTING
HUMIDIFIER
HOT WATER COIL
HOT WATER PUMP
HOT WATER RETURN
HOT WATER SUPPLY
HEATING AND VENTILATION
HERTZ
INSULATION
INTEGRATED PART LOAD VALUE
IRON PIPE SIZE
INCH OR INCHES
INCHES WATER COLUMN
INCHES WATER GAUGE
INDUSTRIAL WATER
KILOWATT
LENGTH
LEAVING AIR TEMPERATURE
POUNDS
POUNDS PER HOUR
LEAVING DRY BULB TEMPERATURE
LINEAR FEET
LOUVERED PENTHOUSE
LOW PRESSURE STEAM
LOW VOLTAGE
LEAVING WET BULB TEMPERATURE
LEAVING WATER TEMPERATURE
MAXIMUM
THOUSAND BTU PER HOUR
MINIMUM CURRENT AMPACITY
MECHANICAL
MAXIMUM FUSE SIZE
MANUFACTURER
MINIMUM
MINIMUM EFFICIENCY REPORTING VALUE
MAXIMUM OVERCURRENT PROTECTION
MOTOR
MOUNTED
NORMALLY CLOSED, NOISE CRITERIA
NATIONAL ELECTRIC CODE
NOT IN CONTRACT
NORMALLY OPEN, NUMBER
NOMINAL
NON-STANDARD PART LOAD VALUE
NET POSITIVE SUCTION HEAD
NOT TO SCALE
OUTSIDE AIR
OUTSIDE AIR LOUVER
OPPOSED BLADE DAMPER
ON CENTER
OUTSIDE DIAMETER, OPEN DRAIN
OPEN END DUCT
OPENING
OPERATOR'S WORK STATION
PRESSURE DROP
PERFORATED, PERFORMANCE
PERPENDICULAR
PACKAGED FILTER, PREFILTER
PHASE
PLUMBING
PRESSURE REDUCING VALVE
PRESSURE
POUNDS PER SQUARE INCH
PSI GAUGE
PSI ABSOLUTE
POLYVINYL CHLORIDE
POWER
QUALITY
QUANTITY
RELOCATED, RISE
RETURN AIR
RADIATION, RADIANT HEATER
REMOVE
REQUIRED
RETURN GRILLE
RELATIVE HUMIDITY, RELIEF HOOD
REVOLUTIONS PER MINUTE
RETURN REGISTER
SUPPLY AIR, SOUND ATTENUATOR
SENSIBLE
SUPPLY FAN
SUPPLY GRILLE
GYP
H, (H)
HB
HC
HD
HE
HORZ
HP
HR
HS
HTG
HTR
HTP
HU
HWC
HWP
HWR
HWS
HV
HZ
INS
IPLV
IPS
IN
IN WC
IN WG
IW
KW
L, (L)
LAT
LBS
LBS/HR
LDB
LIN FT, LF
LP
LPS
LV
LWB
LWT
MAX
MBH
MCA
MECH
MFS
MFR
MIN
MERV
MOCP
MOT, MTR
MTD
NC
NEC
NIC
NO
NOM
NPLV
NPSH
NTS
OA
OAL
OBD
OC
OD
OED
OPNG
OWS
PD
PERF
PERP
PF
PH
PLUM
PRV
PRESS.
PSI
PSIG
PSIA
PVC
PWR
QUAL
QTY
R
RA
RAD
REM
REQ
RG
RH
RPM
RR
SA
SEN, SENS
SF
SG
A
ABV
AD
AFF/G
AAV
AC
ACGIH
ACT
ACM
ACU
AD
ADA
ADD
ADDL
ADH
ADJ
AF
AFF
AGG
AHU
AIA
ALT
AMB
AMP
ANCH
AP
APD
APPROX
APRVD
ARCH
AS
ATTEN
AV
AVG
B
BAS
BEL
BDD
BF
BFP
BHP
BM
BOD
BOT
BT
BTU
BTUH
C
CAP
CAV
CC
CD
CFM
CFR
CH
CLG
COMPR
COND
CONN
CONT
COR
CP
CU
CV
CVB
CW
CXN
D
DB
DCW
DDCS
DEG
DEGF
DEMO
DHW
DIAM, DIA
DMPR
DN
DP
DWG
E, (E)
EA
EAL
EAT
EDB
EER
EF
EFF
EH
EL
ELEC
ELEV
ENT
ER
EQUIP
ESP
ET
ETR
EWB
EWT
EX
EXH
EXP
F °F
FA
FC
FD
FF
FIN FL, FF
FLFLEX
FLR
FPM
FPS
FRP
FT
FT H20
FTR
FV
G, GA
GAL
GPH
GPM
AMPERES
ABOVE
ACCESS DOOR
ABOVE FINISHED FLOOR/GRADE
AUTOMATIC AIR VENT
AIR CONDITIONING
AMERICAN CONFERENCE OF GOVERNMENTAL
ACCOUSTICAL TILE, ACTUAL
ASBESTOS CONTAINING MATERIAL
AIR CONDITIONING UNIT
ACCESS DOOR
AMERICANS WITH DISABILITIES
ADDENDUM, ADDITION
ADDITIONAL
ADHESIVE
ADJACENT
AFTER FILTER, AIR FOIL
ABOVE FINISHED FLOOR
AGGREGATE
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
ALTERNATE, ALTITUDE
AMBIENT
AMPERE
ANCHOR
ACCESS PANEL
AIR PRESSURE DROP
APPROMIXATE, APPROXIMATELY
APPROVED
ARCHITECT
AIR SEPARATOR
ATTENUATION
MANUAL AIR VENT
AVERAGE
BOILER
BUILDING AUTOMATION SYSTEM
BELOW
BACK DRAFT DAMPER
BLIND FLANGE
BACK FLOW PREVENTER
BRAKE HORSEPOWER
BEAM
BOTTOM OF DUCT, BASIS OF DESIGN
BOTTOM
BOTTOM THROAT, BUFFER TANK
BRITISH THERMAL UNIT
BTU PER HOUR
CONDENSER
CAPACITY
CONSTANT AIR VOLUME
COOLING COIL
CEILING DIFFUSER, CONTROL DAMPER
CUBIC FEET PER MINUTE
CODE OF FEDERAL REGULATIONS
CHILLER
CEILING
COMPRESSOR
CONDENSATE
CONNECTION
CONTINUATION
CONTRACTING OFFICER'S REPRESNTATIVE
CONTROL PANEL
CONDENSING UNIT
CONSTANT VOLUME, CONTROL VALVE
CONTROL VALVE
COLD WATER
CONNECTION
DROP, DRAIN
DRY BULB
DOMESTIC COLD WATER
DIRECT DIGITAL CONTROL SYSTEM
DEGREE
DEGREES FAHREINHEIT
DEMOLITION
DOMESTIC HOT WATER
DIAMETER
DAMPER
DOWN
DIFFERENTIAL PRESSURE
DRAWING
EXISTING
EXHAUST AIR
EXHAUST AIR LOUVER
ENTERING AIR TEMPERATURE
ENTERING DRY BULB TEMPERATURE
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EFFICIENCY
ELECTRIC HUMIDIFIER
ELEVATION
ELECTRIC, ELECTRICAL
ELEVATION
ENTERING
EXISTING RELOCATED, EXHAUST REGISTER
EQUIPMENT
EXTERNAL STATIC PRESSURE
EXPANSION TANK
EXISTING TO REMAIN
ENTERING WET BULB
ENTERING WATER TEMPERATURE
EXISTING
EXHAUST
EXPANSION
FILTER
DEGREES FAHREINHEIT
FREE AREA (SQ.FT)
FLEXIBLE CONNECTION
FIRE DAMPER
FINAL FILTER
FINISHED FLOOR
FLOORFLEXIBLE
FLOOR
FEET PER MINUTE
FEET PER SECOND
FIBERGLASS REINFORCED PIPE
FEET
FEET OF WATER
FINNED TUBE RADIATION
FACE VELOCITY
GAUGE
GALLON
GALLONS PER HOUR
GALLONS PER MINUTE
AIR FLOW RATE (CFM)
DIFFUSER, GRILLE, OR REGISTER
DESIGNATION
M
M
H U
M
ID
20X10
20"
S
M
NUMBER
FD/FSD/SD HORIZONTAL DAMPER IN DUCT RISER, SEE
TAILS FOR TYPE
MOTORIZED, AUTOMATIC, OPPOSED BLADE
DAMPER, BACKDRAFT DAMPER
M A OBD BBD
M
FLOW CONTROL VALVEFCV
M
FLEXIBLE DUCT
ABBREVIATIONS (CONT.)
SMOKE DETECTOR
STATIC PRESSURE
SPECIFICATION
SUPPLY REGISTER
THROAT
TRANSFER AIR
TOTAL DYNAMIC HEAD
TEMPERATURE
TIGHT TO STRUCTURE
TOTAL STATIC PRESSURE
THERMOSTAT
TURNING VANES
TYPICAL
TOILET EXHAUST
SD
SP
SPEC
SR
T
TA
TDH
TEMP
TS
TSP
TSTAT
TV
TYP
TX
UNIT HEATER
UNLESS OTHERWISE NOTED
VOLTS
VACUUM
VELOCITY
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRIVE
WIDTH
WITH
WITHOUT
WET BULB
WIRE MESH SCREN
WORKING PRESSURE
WATER PRESSURE DROP
UH
UON
V
VAC
VEL
VFD
VSD
W, (W) W/ W/O
WB
WMS
WP
WPD
FSD
CR
CWS
CWR
CTS
CTR
FOR
FOS
RV
D
HWS
HWR
SAN
COND
IW
PIPING
SIZE (IN)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
FUEL OIL RETURN
FUEL OIL SUPPLY
REFRIGERANT VENT
DRAIN
STEAM CONDENSATE RETURN
COOLING TOWER WATER SUPPLY
COOLING TOWER WATER RETURN
HOT WATER SUPPLY
HOT WATER RETURN
SANITARY DRAIN
CONDENSATE
INDUSTRIAL WATER
GR
GS
GLYCOL RETURN
GLYCOL SUPPLY
GWR
GWS
GROUNDWATER RETURN
GROUNDWATER SUPPLY
CD CONDENSATE DRAIN
A. ALL ABBREVIATIONS SHOWN MAY NOT BE USED ON THIS PROJECT.
B. INSTALLATION MUST PROVIDE READY ACCESS TO VALVES. ACCESS DOORS SHALL BE INSTALLED TO
PROVIDE ADEQUATE CLEARANCES FOR DIRECT ACCESS WHERE REQUIRED.
C. DESIGNATE A PERSON TO BE RESPONSIBLE FOR FIRE PROTECTION DURING WELDING AND CUTTING OPERATIONS. PERSON PERFORMING FIRE PROTECTION DUTIES MUST NOT BE SAME INDIVIDUAL THAT IS PERFORMING WELDING OPERATIONS. COMPLY WITH OSHA STANDARDS FOR WELDING IN 29 CFR-1910 AND 29 CFR-1926. PROVIDE TEMPORARY FIRE EXTINGUISHERS DURING CONSTRUCTION. WELDING MUST BE SCHEDULED IN WRITING WITH COR AND MUST BE PERFORMED OUTSIDE OF FACILITY OR IN SAFE
LOCATION TO BE DETERMINED BY COR.
D. FOR WELDING THAT MUST BE PERFORMED INSIDE THE BUILDING, PROVIDE LOCAL MECHANICAL VENTILATION DURING WELDING DUCTED TO OUTSIDE, APPROVED BY FAA AND AMERICAN CONFERENCE
OF GOVERMENTAL INDUSTRIAL HYGIENISTS (ACGIH).
E. NO WELDING MUST BE POWERED FROM FACILITY ELECTRICAL SYSTEM. CONNECT METAL TO BE WELDED TO A GOOD EARTH GROUND. FACILITY STRUCTURAL STEEL OR PIPING MUST NOT BE USED AS A GROUND
PATH.
F. EQUIPMENT MUST BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.
G. LOCATIONS, SIZES, CLEARANCES AND CONFIGURATIONS OF EQUIPMENT SHOWN ARE BASED ON SPECIFIC
SCHEDULED MANUFACTURERS AND MODEL NUMBERS. SUBSTITUTION OF SUCH EQUIPMENT
MANUFACTURERS WILL REQUIRE THE CONTRACTORS PRIOR VERIFICATION OF CONFORMANCE PER THE
REQUIREMENTS OF LOCATION, SIZE CLEARANCES AND CONFIGURATION AS COMPARED TO SPACE
ALLOCATED TO HOUSE SPECIFIC EQUIPMENT. RESUBMIT PROPOSED EQUIPMENT TO CONTRACTING
OFFICER'S REPRESENTATIVE (COR) FOR APPROVAL, PRIOR TO INSTALLATION.
H. PROVIDE LOCAL VENTILATION DURING APPLICATION OF PRODUCTS WHICH MAY CAUSE ACUTE OR CHRONIC HEALTH OR SAFETY EFFECTS TO FACILITY OCCUPANTS IN ACCORDANCE WITH OSHA AND ACGIH
REQUIREMENTS. SUBMIT VENTILATION PLAN TO COR FOR APPROVAL.
I. PROVIDE A DETAILED SCHEDULE FOR DEMOLITION OF HVAC EQUIPMENT AND INSTALLATION OF NEW HVAC SYSTEMS. COORDINATE WITH COR PRIOR TO REMOVAL OF EQUIPMENT. HVAC SYSTEMS MUST
REMAIN IN OPERATION THROUGHOUT REMOVAL AND REPLACEMENT OF EQUIPMENT.
J. PRIOR TO THE DEMOLITION OF ITEMS WHICH HAVE UTILITIY CONNECTIONS (WATER, ELECTRICITY, GAS
ETC.) ARRANGE WITH COR TO LOCATE SHUT-OFF VALVES, PANEL BOXES AND OTHER CONTROL
ELEMENTS. FAA PERSONNEL MUST SHUT OFF, ISOLATE EQUIPMENT AND BRING EQUIPMENT BACK ONLINE.
K. ANY WORK CAUSING EXCESSIVE NOISE MUST BE COORDINATED WITH COR.
L. ALL ITEMS REMOVED FOR REUSE MUST BE INSPECTED FOR STATUS AND REPORTED TO COR. ANY
DEFICIENCIES MUST BE NOTED PRIOR TO REMOVAL.
TEMPERATURE SENSORTSTS
IS
SU
ED
F
O R
ED
M
05/16/2025
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-19003935-M001
PJB
PJB
ARTCC
REPLACE BOILER/CHILLER VALVES
ABBREVIATIONS, SYMBOL LEGEND AND
MECHANICAL NOTES
za n-
0-m
1.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
19003935
AK
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
HUMIDIFIER SCHEDULE
TAG FUNCTION TYPE
PIPE SIZE
(IN)
VALVE SIZE (IN)
FLOW RATE
(GPM)
PD (FT. HD) MIN. VALVE CV MAKE MODEL NOTES
(B)FCV-21 B-100 CONTROL VALVE AHU-304 6 6 320 - - APOLLO 88A-200 SERIES SEE NOTE 1 AND 2
(B)FCV-22 B-200 CONTROL VALVE AHU-245A 6 6 320 - - APOLLO 88A-200 SERIES SEE NOTE 1 AND 2
(B)FCV-23 B-300 CONTROL VALVE AHU-245B 6 6 320 - - APOLLO 88A-200 SERIES SEE NOTE 1 AND 2
(B)FCV-21 B-100 ISOLATION VALVE AHU-304 6 6 320 - - APOLLO 88A-200 SERIES SEE NOTE 1
(B)FCV-22 B-200 ISOLATION VALVE AHU-245A 6 6 320 - - APOLLO 88A-200 SERIES SEE NOTE 1
(B)FCV-23 B-300 ISOLATION VALVE AHU-245B 6 6 320 - - APOLLO 88A-200 SERIES SEE NOTE 1
1. PROVIDE NEW VALVE, GASKETS, MOUNTING HARDWARE, AND FILLER FLANGE OF APPROPRIATE WIDTH IF REQUIRED
2. PROVIDE NEW ACTUATOR AND ASSOCIATED APPURTENANCES. ACTUATOR MUST BE CAPABLE OF INTERFACING WITH EXISTING BAS SYSTEM VIA BACNET.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
05/16/2025
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-19003935-M002
PJB
PJB
ARTCC
REPLACE BOILER/CHILLER VALVES
EQUIPMENT SCHEDULES AND SPECIFICATIONS
za n-
0-m
2.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
19003935
AK
GENERAL SPECIFICATIONS
PLANS
THE CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. THE DRAWINGS ARE PARTLY DIAGRAMMATIC, NOT NECESSARILY SHOWING ALL OFFSETS OR EXACT LOCATIONS OF PIPING UNLESS SPECIFICALLY DIMENSIONED.
CODE
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE INTERNATIONAL BUILDING CODE (IBC); INTERNATIONAL MECHANICAL CODE (IMC); UNIFORM PLUMBING CODE
(UPC); INTERNATIONAL FUEL GAS CODE (IFGC); AND NATIONAL ELECTRICAL CODE (NEC).
ELECTRICAL WORK
ALL ELECTRICAL WORK IS TO BE PERFORMED BY A LICENSED ELECTRICIAN.
INSURANCE
CONTRACTOR MUST PROVIDE BUILDERS' ALL RISK INSURANCE, WORKERS' COMPENSATION INSURANCE, AND GENERAL LIABILITY INSURANCE AT ALL TIMES WHILE WORKING ON THIS PROJECT.
WARRANTY
ALL WORK PERFORMED UNDER THIS CONTRACT TO BE FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM ACCEPTANCE. ANY FAULTY MATERIALS OR WORKMANSHIP SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE FAA DURING THE GUARANTEE PERIOD.
SALVAGE EQUIPMENT
PRESENT ALL REMOVED EQUIPMENT TO THE FAA. THE FAA RETAINS THE RIGHT TO CLAIM ANY AND ALL SALVAGED EQUIPMENT AND MATERIALS. THOSE ITEMS THAT ARE NOT CLAIMED BY THE
FAA ARE TO BE HAULED OFF AND PROPERLY DISPOSED OF BY THE CONTRACTOR.
MATERIALS
ALL MATERIALS SHALL BE NEW AND UNUSED UNLESS OTHERWISE INDICATED, INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S DIRECTIONS AND IN THE BEST PRACTICE OF THE CRAFT. OBTAIN FAA'S APPROVAL OF ALL PRODUCTS PRIOR TO ORDERING OR INSTALLING ANY PART OF ANY SYSTEM.
EQUIPMENT SUBSTITUTIONS
ALL EQUIPMENT LISTED IS REPRESENTATIVE OF THE STANDARD OF QUALITY AND PERFORMANCE REQUIRED. “OR EQUAL” SUBSTITUTIONS WILL BE CONSIDERED IF THE SUBSTITUTES ARE SHOWN TO BE EQUAL OR BETTER QUALITY, INCLUDING EFFICIENCY OF PERFORMANCE, SIZE AND WEIGHT.
SUBMITTALS
THE CONTRACTOR SHALL SUBMIT PRODUCT DATA IN THE FORM OF ELECTRONIC SUBMITTALS. ALL PRODUCT DATA SHALL BE SUBMITTED AT ONE TIME, PARTIAL SUBMITTALS WILL BE RETURNED WITHOUT REVIEW. PRODUCT DATA SHALL BE APPROPRIATELY MARKED TO INDICATE PROPOSED PRODUCT. PROVIDE BOOKMARKS WHEN MORE THAN 1 PIECE OF EQUIPMENT IS
INCLUDED IN THE SUBMITTAL.
ACCESS
PROVIDE WORKABLE ACCESS TO ALL SERVICEABLE AND/OR OPERABLE EQUIPMENT.
MECHANICAL IDENTIFICATION
VALVES AND EQUIPMENT SHALL BE PROVIDED WITH IDENTIFICATION. IN THE FORM OF PLASTIC NAMEPLATES.
INSULATION
GROUND WATER, HEATING WATER/GLYCOL, AND CHILLED WATER/GLYCOL PIPING SHALL BE INSULATED WITH ONE INCH PRE-FORMED FIBERGLASS INSULATION WITH FACTORY APPLIED VAPOR BARRIER JACKET AND PREMANUFACTURED PLASTIC FITTING INSULATION. VALVES SHALL BE INSUALTED USING INSULATION JACKETS OF THE APPROPRIATE SIZE AND PROVIDING MINIMUM 1”
THICK FIBERGLASS INSULATION.
VALVES
ALL PROVIDED VALVES SHALL BE BALL VALVES. GATE VALVES AND GLOBE VALVES ARE NOT ACCEPTABLE.
CONTROLS SYSTEMS
THE CONTRACTOR SHALL PROVIDE ACTUATORS AND CONTROLS AS REQUIRED TO PROVIDE VALVE CONTROL AND SHALL MATCH EXISTING CONTROL CONDITIONS. THE CONTROL SYSTEM SHALL BE A DDC TYPE CONTROL SYSTEM AND MUST INTEGRATE WITH EXISTING SYSTEM AND PROVIDE CONTROL AND MONITORING FOR ALL VALVES/ACTUATORS. SCHNEIDER ELECTRIC HOLDS THE SOLE SOURCE CONTRACT THE FACILITIES BUILDING AUTOMATION CONTROLS. ANY CHANGES TO CONTROL WIRING, EQUIPMENT, OR PROGRAMMING MUST BE COORDINATED WITH
THEM.
ZAN SITE SPECIFICATIONS
A. THESE CONTRACT DOCUMENTS COVER THE REQUIREMENTS OF THE FEDERAL AVIATION ADMINISTRATION (FAA), ALASKAN REGION, HEREINAFTER REFERRED TO
AS THE GOVERNMENT LOCATED AT 700 NORTH BONIFACE PARKWAY, ANCHORAGE, ALASKA. THE FAA FACILITY DESIGNATION IS ZAN.
B. THE WORK IS AT A SECURED, LIMITED ACCESS FACILITY THAT WILL BE OCCUPIED DURING THE WORK AND WILL REMAIN OPERATIONAL 24 HOURS A DAY, 7 DAYS A WEEK. THE CONTRACTOR MUST NOT INTERFERE WITH OR DISRUPT AIR TRAFFIC OPERATIONS. THE WORK SHALL NOT DISCHARGE STATIC ELECTRICITY, DAMAGE, OR INTERFERE WITH OTHER EQUIPMENT AT THE FACILITY, NOR COMPROMISE SECURITY.
C. ALL WORKERS ON SITE MUST BE U.S. CITIZENS WITH PROPER GOVERNMENT-ISSUED PHOTOGRAPHIC IDENTIFICATION, SUCH AS A VALID DRIVER'S LICENSE.
D. THE CONTRACT PRICE CONSTITUTES FULL COMPENSATION FOR THE CONTRACTOR FOR FURNISHING ALL PLANT, LABOR, MATERIALS, APPURTENANCES, AND INCIDENTALS, AND PERFORMING ALL OPERATIONS NECESSARY TO CONSTRUCT AND COMPLETE THE ITEMS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
PAYMENT FOR EACH ITEM WILL BE CONSIDERED AS FULL COMPENSATION, NOTWITHSTANDING THAT NOT ALL FEATURES MAY BE MENTIONED HEREIN. NO SEPARATE PAYMENT WILL BE MADE FOR THE WORK, SERVICES, OR OPERATIONS REQUIRED BY THE CONTRACTOR, TO COMPLETE THE PROJECT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS; ALL COSTS THEREOF WILL BE CONSIDERED AS INCIDENTAL TO THE WORK.
E. NORMAL WORK HOURS ARE 8:00 A.M. TO 5:00 P.M., MONDAY THROUGH FRIDAY NOT INCLUDING FEDERAL HOLIDAYS. NO WORK WILL BE PERFORMED OUTSIDE THESE HOURS WITHOUT PRIOR COORDINATION AND APPROVAL FROM THE COR. IF THE CONTRACTOR INTENDS TO WORK OTHER THAN NORMAL WORK HOURS, THEY MUST REQUEST APPROVAL FROM THE COR AT LEAST 2 WORK DAYS IN ADVANCE, INCLUDING FOR NIGHT, WEEKEND, OR HOLIDAY WORK. THE CONTRACTOR SHALL NOTIFY THE FAA IF PERSONNEL WILL NOT REPORT TO THE JOB SITE ON A NORMAL WORKDAY SO THAT THE FAA CAN PLAN ACCORDINGLY.
F. UNLESS ALLOWED OTHERWISE BY THE FAA, NO WORK SHALL BE SCHEDULED OR TAKE PLACE DURING SCHEDULED OR UNSCHEDULED MORATORIUMS, INCLUDING MILITARY EXERCISES, SUCH AS RED FLAG, AND THE WEEK OF AND WEEKENDS PRECEDING AND FOLLOWING THE THANKSGIVING, CHRISTMAS, AND NEW YEAR'S HOLIDAYS. ONLY EMERGENCY WORK TO RESTORE CRITICAL SERVICES TO THE FACILITY WILL BE CONSIDERED, AND A MORATORIUM WAIVER MUST BE SUBMITTED AND APPROVED IN ADVANCE. THE MORATORIUM PERIOD WILL NOT BE COUNTED AGAINST THE CONTRACT CONSTRUCTION DURATION OF THE PROJECT. VERIFY EXACT DATES WITH THE COR AND INCLUDE MORATORIUM DATES IN THE CONSTRUCTION SCHEDULE.
G. SCHEDULE, CONDUCT, AND DOCUMENT WEEKLY PROGRESS AND COORDINATION MEETINGS ON SITE WITH THE FAA DURING CONSTRUCTION. THE CONTRACTOR'S SUPERINTENDENT OR FOREMAN TYPICALLY LEADS THE MEETINGS. THE WEEKLY PROGRESS AND COORDINATION MEETINGS ARE IN ADDITION TO SPECIFIC
MEETINGS HELD FOR OTHER PURPOSES, SUCH AS PRE-INSTALLATION MEETINGS.
H. PROVIDE A DETAILED CONSTRUCTION SCHEDULE. INCLUDE FABRICATION, TRANSPORTATION, SITE WORK, DEMOLITION, INSTALLATION, TESTING, AND FINAL
COMPLETION.
I. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT INJURY TO THE PUBLIC, OCCUPANTS, OR DAMAGE TO PROPERTY OF OTHERS. THE PUBLIC AND OCCUPANTS INCLUDES ALL PERSONS NOT EMPLOYED BY THE CONTRACTOR OR SUBCONTRACTORS.
J. WHEREVER PRACTICAL, THE WORK AREA SHALL BE FENCED, BARRICADED, OR OTHERWISE BLOCKED OFF FROM OCCUPANTS OR THE PUBLIC TO PREVENT
UNAUTHORIZED ENTRY INTO THE WORK AREA.
1. PROVIDE CONSTRUCTION ZONE/AUTHORIZED PERSONNEL ONLY/HARD HAT ONLY TYPE SIGNS JUST INSIDE EACH ENTRY TO THE CONTRACTOR'S WORK AREAS
TO EXCLUDE OCCUPANTS AND OTHERS.
2. PROVIDE TRAFFIC BARRICADES AND TRAFFIC CONTROL SIGNS WHERE CONSTRUCTION ACTIVITIES OCCUR IN VEHICULAR AREAS.
3. CORRIDORS, AISLES, STAIRWAYS, DOORS, AND EXITWAYS SHALL NOT BE OBSTRUCTED OR USED IN A MANNER TO ENCROACH UPON ROUTES OF INGRESS OR
EGRESS UTILIZED BY OCCUPANTS OR THE PUBLIC, OR TO PRESENT AN UNSAFE OR UNHEALTHY CONDITION TO OCCUPANTS OR THE PUBLIC.
4. USE, STORE, OR POSITION EQUIPMENT, TOOLS, MATERIALS, SCRAPS, AND TRASH IN A MANNER THAT DOES NOT PRESENT A HAZARD TO OCCUPANTS OR THE
PUBLIC BY ACCIDENTAL SHIFTING, IGNITION, OR OTHER ACTIONS.
5. STORE AND TRANSPORT REFUSE AND DEBRIS IN A MANNER TO PREVENT UNSAFE OR UNHEALTHY CONDITIONS FOR OCCUPANTS, THE PUBLIC, AND
ENVIRONMENT. COVER REFUSE CONTAINERS AND REMOVE REFUSE ON A FREQUENT REGULAR BASIS ACCEPTABLE TO THE COR. USE TARPAULINS OR OTHER
MEANS TO PREVENT LOOSE TRANSPORTED MATERIALS FROM DROPPING FROM TRUCKS.
K. FURNISH MATERIALS AND EQUIPMENT NEEDED FOR CLEANING AND PROTECTING SURFACES. USE CLEANERS AND PRODUCTS RECOMMENDED BY THE
MANUFACTURER FOR THE INDIVIDUAL MATERIAL.
L. ALL VACUUMS AND AIR FILTERING DEVICES SHALL USE HEPA FILTERS AND SHALL BE CLEANED OR REPLACED PRIOR TO EACH USE.
M. THE CONTRACTOR MUST PROVIDE WRITTEN NOTIFICATION TO THE COR AT LEAST ONE WEEK IN ADVANCE FOR EACH OF THE FOLLOWING ITEMS THAT REQUIRE
INSPECTION.
1. PRE-SUBSTANTIAL COMPLETION
2. SUBSTANTIAL COMPLETION
3. FINAL COMPLETION
N. PRE-SUBSTANTIAL COMPLETION. WHEN THE CONTRACTOR CONSIDERS THE WORK SUBSTANTIALLY COMPLETE AND READY FOR INSPECTION, THE CONTRACTOR MUST REQUEST A PRE-SUBSTANTIAL COMPLETION INSPECTION AND PROVIDE A PRELIMINARY PUNCH LIST OF WORK REMAINING TO BE COMPLETED BY THE CONTRACTOR. AFTER THE PRE-SUBSTANTIAL COMPLETION INSPECTION, THE COR WILL REVIEW THE PRELIMINARY PUNCH LIST AND ISSUE THE INITIAL PUNCH LIST
OF WORK REMAINING TO BE COMPLETED BY THE CONTRACTOR.
O. SUBSTANTIAL COMPLETION.
1. PRIOR TO THE SUBSTANTIAL COMPLETION INSPECTION, THE CONTRACTOR MUST PERFORM THE FOLLOWING ITEMS.
a. COMPLETE ALL INITIAL PUNCH LIST ITEMS.
b. REMOVE ALL TOOLS, EQUIPMENT, AND EXCESS MATERIALS FROM IN AND AROUND THE BUILDING TO THE STAGING AREA.
c. RESTORE ITS WORK AREAS IN AND AROUND THE BUILDING, INCLUDING REPAIR OF DOORS, WINDOWS, WALLS, FLOORS, CEILINGS, HALLS, LAWNS, CURBS, SIDEWALKS, ET CETERA AS NEEDED.
d. CLEAN UP ITS WORK AREAS IN AND AROUND THE BUILDING.
e. PROVIDE ALL REQUIRED PROJECT RECORD DOCUMENTS, INCLUDING MATERIAL FINISH SCHEDULES, OPERATION AND MAINTENANCE MANUALS, WARRANTIES, AND AS-BUILT REDLINE DRAWINGS.
2. AFTER COMPLETION OF THE ABOVE, AS INSPECTED AND APPROVED BY THE COR, THE CONTRACTOR MUST REQUEST A SUBSTANTIAL COMPLETION
INSPECTION. THE COR WILL ARRANGE THE SUBSTANTIAL COMPLETION INSPECTION WITH THE CONTRACTOR AND FACILITY PERSONNEL. DURING THE SUBSTANTIAL COMPLETION INSPECTION, THE CONTRACTOR MUST PROVIDE TRAINING BY SKILLED TECHNICIANS AND DEMONSTRATE THE COMPLETE TESTING, OPERATION, AND MAINTENANCE OF ALL WORK. AFTER THE SUBSTANTIAL COMPLETION INSPECTION, THE COR WILL DEVELOP A FINAL PUNCH LIST OF WORK TO
BE COMPLETED BY THE CONTRACTOR.
P. FINAL COMPLETION.
1. PRIOR TO THE FINAL COMPLETION INSPECTION, THE CONTRACTOR MUST PERFORM THE FOLLOWING ITEMS.
a. COMPLETE ALL FINAL PUNCH LIST ITEMS.
b. PROVIDE ANY REMAINING REQUIRED DOCUMENTATION.
c. REMOVE ALL CONTRACTOR OFFICE TRAILERS, STORAGE AND WASTE CONTAINERS, EQUIPMENT, TOOLS, EXCESS MATERIALS, ET CETERA FROM THE
FACILITY, STAGING AND PARKING AREAS, AND CONSTRUCTION TRAFFIC ROUTES THROUGH THE FACILITY UNLESS NEEDED FOR CONTINUING WORK
SERVICES AS APPROVED BY THE COR.
d. RESTORE ITS WORK AREAS IN THE FACILITY, STAGING AND PARKING AREAS, AND CONSTRUCTION TRAFFIC ROUTES THROUGH THE FACILITY AS NEEDED.
e. CLEAN UP ALL WORK AREAS IN AND AROUND THE FACILITY.
f. SUBMIT THE COMPLETION CERTIFICATE (SEE BELOW).
2. COMPLETION CERTIFICATION. THE CONTRACTOR MUST SUBMIT WRITTEN COMPLETION CERTIFICATION TO THE COR IN WHICH THE CONTRACTOR CERTIFIES
THE FOLLOWING.
a. CONTRACT DOCUMENTS HAVE BEEN REVIEWED.
b. THE WORK HAS BEEN INSPECTED BY THE CONTRACTOR FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS.
c. EQUIPMENT AND SYSTEMS HAVE BEEN FULLY TESTED AND ARE FULLY OPERATIONAL.
d. THE REQUIRED OPERATION AND MAINTENANCE MANUALS WITH MAINTENANCE SCHEDULES, PARTS LISTS, AND WARRANTIES HAVE BEEN SUBMITTED.
e. THE REQUIRED AS-BUILT REDLINE DRAWINGS HAVE BEEN SUBMITTED.
f. THE REQUIRED INSTRUCTION AND TRAINING OF FACILITY OPERATIONS AND MAINTENANCE PERSONNEL HAVE BEEN PERFORMED.
g. THE WORK IS COMPLETE, THE PREMISES CLEANED, AND THE WORK IS READY FOR ACCEPTANCE.
3. AFTER COMPLETION OF THE ITEMS ABOVE, AS INSPECTED AND APPROVED BY THE COR, THE CONTRACTOR MUST REQUEST A FINAL COMPLETION INSPECTION.
AFTER THE FINAL COMPLETION INSPECTION, THE COR WILL NOTIFY THE CONTRACTOR OF ANY REMAINING WORK TO BE COMPLETED, IF ANY.
Q. LIST ALL INCOMPLETE ITEMS AND ITEMS NEEDING CORRECTION, INCLUDING ANY AREAS DISTURBED BY THE CONTRACTOR THAT REQUIRE RESTORATION.
1. AT THE TOP OF EACH PAGE, INCLUDE THE PROJECT NAME, CONTRACT NUMBER, THE CONTRACTOR'S NAME, DATE, AND PAGE NUMBER.
2. FOR EACH PUNCH LIST ITEM, PROVIDE AN ITEM NUMBER, NAME, DETAILED LOCATION, INCLUDING THE FLOOR AND ROOM NUMBER AND DISTANCES AND
HEIGHTS FROM KEY FEATURES IF NEEDED, AND A DESCRIPTION OF THE REMAINING WORK.
3. ORGANIZE THE LIST BY SPECIFICATION SECTION, THEN WITHIN MAJOR DIVISIONS BY FLOOR FROM THE LOWEST TO HIGHEST FLOOR, THEN WITHIN FLOORS BY
MAJOR ELEMENT FROM HIGH TO LOW IN GENERAL ORDER OF THE SPECIFICATION SECTIONS, SUCH AS CEILINGS, INDIVIDUAL WALLS, FLOORS, MECHANICAL
EQUIPMENT, AND ELECTRICAL ITEMS.
R. PREPARE AND SUBMIT A COMBINED O&M MANUAL FOR THE PROJECT. INCLUDE COMPLETE INFORMATION FOR ALL INSTALLED PRODUCTS, EQUIPMENT, AND
BUILDING OPERATING SYSTEMS. PREPARE AND SUBMIT THE FOLLOWING.
1. DRAFT TABLE OF CONTENTS.
2. DRAFT O&M MANUAL. AFTER RECEIPT OF THE DRAFT TABLE OF CONTENTS REVIEW COMMENTS, MAKE CORRECTIONS AND PROVIDE ONE, COMPLETE, COLOR, HARD COPY SET OF THE DRAFT O&M MANUAL IN THREE-RING BINDERS, TABBED, BUT WITHOUT THE ELECTRONIC COPY.
3. FINAL O&M MANUAL. AFTER RECEIPT OF THE DRAFT O&M MANUAL REVIEW COMMENTS, MAKE CORRECTIONS AND PROVIDE TWO, COMPLETE, COLOR, HARD
COPY SETS OF THE O&M MANUAL, EACH WITH A COMPLETE COLOR ELECTRONIC (PDF) COPY ON COMPACT DISK OR THUMB DRIVE.
S. PROVIDE A CONTRACTOR'S ONE-YEAR CONSTRUCTION WARRANTY ON COMPANY LETTERHEAD AND SIGNED BY A COMPANY PRINCIPLE. THE CONTRACTOR'S ONE-YEAR CONSTRUCTION WARRANTY WILL COVER THE WORK. THE WARRANTY WILL BEGIN ON THE DATE OF ACCEPTANCE BY THE CONTRACTING OFFICER (CO).
INCLUDE A COPY OF THE CONTRACTOR'S WARRANTY IN THE O&M MANUAL.
T. SUBMIT THE FOLLOWING AS-BUILT REDLINE DRAWINGS WHEN THE WORK IS SUBSTANTIALLY COMPLETE, AT LEAST ONE WEEK BEFORE THE SUBSTANTIAL
COMPLETION INSPECTION.
1. SUBMIT TWO, COLOR, FULL SIZE, COMPLETE, HARD COPY SETS OF ALL AS-BUILT REDLINE DRAWINGS.
2. SUBMIT ONE, COMPLETE, COLOR, ELECTRONIC (PDF) COPY SET ON COMPACT DISK OR THUMB DRIVE.
3. INCLUDE COPIES IN THE O&M MANUAL.
B
B
B
M
TS
M
TS
M
TS
TS
PS
PS
PS
PS
EXPANSION
TANK
AIR
SEPARATOR
TSPS
6"
6"
6"6"
6"
6"
6" H
W R
8" H
W R
8" H
W R
6" HWS
6" 6"
6" 6"
6"
6"
6" H
W S
8" H
W S
8" H
W S
6" HWS
4" H
W R
4" H
W
S4" HWR
4" HWS
6" HWR 6" HWR
6" H
W S
8" H
W S
8" H
W S
6" H
W S
2 3
2 3
2 3
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN REDLINE
DATE APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
$D
AT
E$ $T
IM
E$
$N
AM
E$
APPROVED
DATE
$F
IL
ES
8 234567
H
G
F
E
D
C
A
B
IS
SU
ED
F
O R
ED
M
05/16/2025
STEVE SCHREFFLER
INFRASTRUCTURE ENG CENTER-ANC
ANCHORAGE
ZAN-19003935-M003
PJB
PJB
ARTCC
REPLACEBOILER/CHILLER VALVES
BOILER SCHEMATIC DIAGRAM
za n-
0-m
2.
dw g
INFRASTRUCTURE
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS WESTERN SERVICE AREA
C O
N
ST
R U
C
TI
O N
ALASKA CENTER
DRAWING PRODUCED ON WSA ANCHORAGE CAD SYSTEM
PETER BREWER
PROJECT ENGINEER
19003935
AK
SCALE: NA
BOILER SCHEMATIC DIAGRAM
N
KEY NORTH
3 4
8 8
KEY NOTES:
ENSURE SYSTEM IS DEPRESSURIZED BY SHUTTING OFF APPROPRIATE PUMPS
AND EXISTING ISOLATION VALVES. COORDINATE WITH FAA PERSONNEL. ONLY
FAA PERSONNEL MAY SHUT ON/OFF VALVES, ISOLATE EQUIPMENT, OR BRING
EQUIPMENT BACK ONLINE.
REMOVE/DEMOLISH EXISTING BALL VALVE. CAREFULLY DETACH VALVE FROM
FLANGES, USING A VALVE SPREADER IF NECESSARY. CLEAN FLANGE FACES TO
REMOVE DEBRIS OR OLD GASKET MATERIAL. INSPECT FLANGES FOR DAMAGE
AND REPLACE IF NECESSARY. INSTALL NEW VALVE. TIGHTEN FLANGE
CONNECTION BOLTS AND STEM NUTS TO SPECIFIED TORQUE. SLOWLY
PRESSURIZE SYSTEM AND CHECK FOR LEAKS.
DISCONNECT AND REMOVE CONTROL VALVE ACTUATOR AND REPLACE WITH
NEW. PROTECT EXISTING CONTROL WIRING AND RECONNECT. OLD EQUIPMENT
TO BE TURNED OVER TO FAA FOR USE AS SPARE PARTS. VERIFY ACTUATOR IS
CONNECTED AND FUNCTIONAL THROUGH EXISTING BAS SYSTEM.
STRAINER AND FLEX CONNECTION TO BE RETAINED FOR REUSE.
SHEET NOTES:
1. EXISTING SYSTEMS SHOWN ON THE DRAWINGS ARE FROM RECORD
DRAWINGS AND NON-DESTRUCTIVE WALK-THROUGHS OF THE FACILITY.
ACTUAL SYSTEMS MAY VARY FROM THE INFORMATION INDICATED ON
THE DRAWINGS. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS,
LOCATIONS, AND SIZES BEFORE START OF WORK.
2. BUILDING COMPONENTS DAMAGED BY ASSOCIATION TO REMODEL WORK
THAT ARE TO REMAIN SHALL BE PATCHED AND REPAIRED TO MATCH
EXISTING. COORDINATE WITH ARCHITECTURAL.
3. PROTECT ALL MECHANICAL EQUIPMENT, CONTROL WIRING, PIPING, AND
DUCTWORK THAT IS TO REMAIN FROM DAMAGE DURING REMODEL..
4. DO NOT ROUTE ANY PIPING IN EXTERIOR WALLS UNLESS OTHERWISE
INDICATED.
5. PRESENT ALL REMOVED AND SALVAGED EQUIPMENT TO THE FAA. IF NOT
DESIRED TO BE KEPT BY THE FAA, CONTRACTOR SHALL HAUL OFF AND
PROPERLY DISPOSE OF REMOVED EQUIPMENT.
6. PRESERVE THE INTEGRITY OF THE COMMUNICATION NETWORK
THROUGHOUT PROJECT CONSTRUCTION WORK. DO NOT DISCONNECT
AND/OR REMOVE EXISTING DDCS NETWORK WITHOUT PROPER
NOTIFICATION AND/OR PRIOR WRITTEN APPROVAL FROM COR.
7. TO THE EXTENT POSSIBLE EXISTING ISOLATION AND MODULATING
VALVES SHALL BE USED TO ISOLATE PORTIONS OF SYSTEM UNDER
CONSTRUCTION. WHERE THIS IS NOT POSSIBLE PIPE FREEZING WILL BE
REQUIRED. CONTRACTOR TO COORDINATE ALL PIPE FREEZING, VALVE
ISOLATION, AND SYSTEM SHUT-OFFS TO MINIMIZE DOWNTIME AND
MAINTAIN OPERATIONAL INTEGRITY OF THE FACILITY.
| Sheets and Views |
| zan-19003935-g001-G001 |
| zan-19003935-g002-G002 |
| zan-19003935-m001-zan-1303170-m001 |
| zan-19003935-m002-zan-19003935-m002 |
| zan-19003935-m003-zan-19003935-m005 |