YTPM 26-5001 Statement of Work.pdf

PDF 10 MB Posted

Attached to
Repair Basketball Court B1700
Solicitation number
FA660626R0007
Issued by

About this file

This is a Statement of Work (SOW) for Project YTPM 26-5001 issued by the Air Force Reserve Command's 439th Civil Engineering squadron at Westover Air Reserve Base in Chicopee, Massachusetts, dated March 12, 2026.

The project scope involves complete resurfacing of the basketball court at the Westover Fitness Center (Building B1700), requiring the contractor to provide all necessary labor, materials, and equipment to strip, repair, repaint, and refinish the court floor to meet or exceed accepted commercial industry standards. The performance period is ninety (90) calendar days from Notice to Proceed, with work to begin within ten (10) calendar days of NTP and all on-site work to be completed within ninety (90) calendar days of mobilization. Work hours are 7:00 AM to 4:00 PM, Monday through Friday, excluding federal holidays. The contractor must obtain MFMA accreditation with gymnasium flooring refinishing experience and comply with specific technical specifications including wood athletic flooring sanding and refinishing per MFMA standards, sealing and finishing conforming to Group III specifications, game line marking in NCAA-compliant full-court configuration with 3-point markings, and volleyball court markings centered on the basketball court. Additional requirements include site preparation with removal and storage of bleachers and rubber base molding, a designated safety zone on court ends and sides, reinstatement of the 439th Airlift Wing logo in the center circle (12-foot diameter), application of dust and debris control measures, and proper cleaning and restoration upon completion. Submittals required within thirty (30) days of NTP include product data for sealer, surface finish, game line paint, adhesives, and indoor air quality certifications meeting CDPH and SCAQMD emissions standards. A final inspection will be conducted upon work completion with punch list items to be corrected within ten (10) calendar days. The warranty shall be issued in accordance with RFO 52.246-21 Warranty of Construction, with extended warranties from contractors and subcontractors acceptable at government discretion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .