YTPM 25-3002 Wage Determination MA20260019_2026.01.02.pdf
PDF 2 MB Posted
- Attached to
- Repair Airfield Pavement Crack Seal
- Solicitation number
- FA660626B0002
About this file
This is a General Decision wage determination document (MA20260019) issued by the U.S. Department of Labor on January 2, 2026, establishing prevailing wage rates for highway construction projects in Hampden County, Massachusetts. The document supersedes the previous wage determination MA20250019 and applies to construction type highway projects within the specified geographic area.
The wage determination lists prevailing wage rates and fringe benefits for multiple job classifications across several wage rate identifiers and effective dates. Key classifications include Power Equipment Operators (Groups 1-4), Ironworker (Ornamental and Structural), Laborers (various specialties including Traffic Control and Common/General), Painters (Steel and Spray Linestriping), Carpenters, Cement Masons/Concrete Finishers, Electricians, Reinforcing Ironworkers, and Truck Drivers (Concrete, Dump, and Flatbed). Hourly rates range from $33.03 to $57.83, with fringe benefit rates ranging from 0.00 to 36.00 dollars per hour. The document also contains explanatory notes regarding Executive Orders 13706 and 13658 addressing paid sick leave and Davis-Bacon Act minimum wage requirements, respectively, along with instructions for filing wage determination appeals with the U.S. Department of Labor's Wage and Hour Division.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .