Y27GA_LibertyCountySchoolSystem_ERateRFP_Cate.xlsx

XLSX spreadsheet 93 KB Posted

Attached to
REQUEST FOR COMPETITIVE BIDS AND PROPOSALS FOR INTERNAL CONNECTIONS
Solicitation number
PE-68910-NONST-2024-000000008
Issued by
Georgia

About this file

This document is a Request for Proposal (RFP) issued by the Liberty County School System (LCSS) for E-Rate eligible and ineligible wireless access points and network infrastructure cable drops. The RFP outlines the requirements for the installation of 977 Cisco Meraki MR44 wireless access points across 18 eligible school sites and 74 access points at 6 ineligible sites. The project must be completed by June 30, 2024, with some sites requiring installation by May 15, 2024. The RFP includes detailed installation instructions and a mandatory site walkthrough on February 19, 2024. Bidders must submit pricing using the provided spreadsheet templates, which include requirements for labeling, testing, cabling, and as-built documentation. The quantities provided are estimates, and the district reserves the right to adjust them as needed.

The RFP specifies that the lowest corresponding price (LCP) must be provided, ensuring that applicants receive competitive pricing. Bidders may propose functionally equivalent products that are interoperable and compatible with the existing Meraki network. Taxes, shipping, and other fees must be included in the bid. The district will not be able to provide lifts for installations exceeding 20 feet, and the vendor is responsible for providing this equipment. The RFP also outlines requirements for handling returns, exchanges, and troubleshooting of any defective equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directions MANDATORY WALKTHROUGH DATE: February 19, 2024 There will be a mandatory bid meeting for this RFP.

WALKTHROUGH: To begin February 19, 2024 at 8:00 AM at the Liberty County High School, 3216 East Oglethorpe Hwy, Hinesville, GA 31313.

DIRECTIONS FOR THE PRICING SPREADSHEET:

Please fill in the following spreadsheets with Description of Products, Part Numbers (if applicable), Quantity, and Price for the items proposed by your company.

Additional line items or parts may be added if needed to reflect a complete proposal.

Formulas included in the spreadsheet are for convenience only - each bidder is required to confirm that the pricing and formulas are correct.

Please include this pricing workbook in a digital format with the RFP response.

LOWEST CORRESPONDING PRICE (LCP):

Lowest corresponding price is defined as the lowest price that a service provider charges to nonresidential customers who are similarly situated to a particular applicant (school, library, or consortium) for similar services. See 47 C.F.R. § 54.500.

Service providers cannot charge applicants a price above the LCP for E-rate Program services. See 47 C.F.R. § 54.511(b).

This ensures that: 1) service providers do not charge applicants more than they would charge their other customers for the same services. See First Report and Order, 12 FCC Rcd 8776, 9031-32, para. 484; and 2) any lack of experience in negotiating in a service market does not prevent applicants from receiving competitive prices. See First Report and Order, 12 FCC Rcd 8776, 9031, para. 484.

A service provider – regardless of the size of the company or the category of service provided – must ensure that the LCP is provided to applicants. The applicant is not obligated to ask for it, but must receive it. See 1996 Universal Service Order, 12 FCC Rcd 87, 383, para. 540.

Vendor Information and SPIN

SERVICE PROVIDER INFORMATION

COMPANY NAME:

E-RATE SPIN NUMBER

ADDRESS:

CITY, STATE ZIP:

Company Contact:
(This person must be able to answer questions about the quote submitted.)

Contact Phone:

Contact Email:

IMPORTANT INSTALL & CONFIG INFO

Wireless Access Point Installation Instructions

1. Mount and configure Meraki MR-44 access points

2. Install right angle, angle-UP, 1' or greater, Cat5e or greater, cable on each access point to existing jack.

3. Mounting points are as high as 34 feet.

4. Vendor is responsible for supplying scissor lift and ladders when necessary.

5. Vendor must use floor protection in the gymnasium.

6. Second shift and weekend installation will be required to complete three of the sites prior to the end of the school year.

7. Vendor is responsible for removing all boxes, packaging and other installation debris from the campus daily.

8. Vendor is required to label each new access point with the Serial #.

9. Vendor must submit a sample label to the district for approval prior to labeling.

10. Location of the label on the access point will be determined after the sample label has been approved by the district.

11. Vendor is required to re-label each access port at the patch panel using an updated naming convention provided by the district.

12. Vendor must remove existing access points and securely pack in vendor provided storage boxes that will then be stored in designated locations at each site. Each box must be labeled with the contents of each box.

13. Vendor is responsible for handling returns and exchanges of defective equipment, and installation of replacement equipment, until the project is verified complete.

14. Vendor is responsible for troubleshooting and diagnosing any connectivity issues of new access points.

15. Vendor must provide an editable spreadsheet of each access point purchased that includes the Serial #, MAC, Site, Room or Location Description.Eligible Sites for InstallationIneligible Sites for Installation
SiteAPsDeadlineSiteAPsDeadline
Button Gwinnett Elementary606/30/24LCSS Central Office136/30/24
Bradwell Institute1456/30/24LCSS Coastal Academy56/30/24
Frank Long Elementary656/30/24LCSS Performing Arts Center46/30/24
Horizons Learning Center156/30/24Liberty County Pre-K466/30/24
Joseph Martin Elementary566/30/24LCSS Maintenance26/30/24
Liberty College Career Academy196/30/24LCSS Transportation46/30/24
Liberty County High946/30/24
Liberty Elementary796/30/24
Lewis Frasier Middle806/30/24
Lyman Hall Elementary576/30/24
Midway Middle825/15/24
Cable Drop Installation Instructions.

The District is requesting a qty of 10 network infrastructure cable drops. No drop will exceed 300 feet and patch cables will be required. Drops will terminate into service provider installed jacks above ceiling grids and into preexisting patch panels at the closet end (vendor needs to provide the terminating keystone jack and patch cable that will be used in the existing patch panels).

Drops to be labeled on both ends and use raceways that are in place. Most ceilings are 10 to 12 feet, but there are some that are taller/vaulted up to 20 feet. If a lift is needed to install the cable drop the district will NOT be able to provide one. All drops are to be labeled, tested, and verified.

As built drawings are required when the job is completed. Project to be completed by June 30, 2024 at the latest.Olvey Field36/30/24
Snelson Golden Middle856/30/24
Taylors Creek Elementary695/15/24
Waldo Pafford Elementary685/15/24

Bill of Materials- Eligible

Liberty County School System
The District will accept Functionaly Equivalent Products

Equivalent Products must be Interoperable and Compatible with Existing Meraki Network

WIRELESS EQUIPMENT
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
MR44-HWCisco Meraki MR44 - wireless access point - Wi-Fi 6 - cloud-managed977$0.00$0.00
InstallationSee tab labeled "IMPORTANT INSTALL & CONFIG INFO" for the Statement of Work Associated with the Installation Services1$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
DATA DROPS AND PATCH CABLES
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
Plenum Cat 5e(or greater) Cable DropsCat 5e (or greater) Blue Cable Copper Drops not to exceed 300 feet (Needs to include, but not limited to: terminating and testing cables, provide and install j-hooks and EMT conduit sleeves where needed, provide and install raceway where needed, provide and install fire stopping for any of our penetrations if required, and terminate to patch panel and test all cables) Copper should be terminated into each rack utlizing existing patch panels where possible, otherwise new patch panels will need to be installed. Installation must include labeling each end, testing, and certification with detailed report and as-built drawings provided at the end of installation.10$0.00$0.00
Cat 5e(or greater)
Patch Cable - 3'Three feet (3') or greater, patch cable - blue, one end has right angle, angle-UP, connector to connect APs to existing jack991$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
The quantities shown on the spreadsheets are estimates. The District reserves the right to increase or decrease quantities or timeframes as is needed to meet District needs.
Please include all part numbers being proposed, even if not included above. Feel free to correct any existing part numbers if different in the proposed solution
If licensing or other items are required for the solution being proposed, please include.
Please add additional rows if necessary.
The Service Provider is responsible for pricing and formulas in this spreadsheet.

Bill of Materials-Ineligible

Liberty County School System
The District will accept Functionaly Equivalent Products

Equivalent Products must be Interoperable and Compatible with Existing Meraki Network

WIRELESS EQUIPMENT
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
MR44-HWCisco Meraki MR44 - wireless access point - Wi-Fi 6 - cloud-managed74$0.00$0.00
InstallationSee tab labeled "IMPORTANT INSTALL & CONFIG INFO" for the Statement of Work Associated with the Installation Services1$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
PATCH CABLES
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
Cat 5e(or greater)
Patch Cable - 3'Three feet (3') or greater, patch cable - blue, one end has right angle, angle-UP, connector to connect APs to existing jack74$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
The quantities shown on the spreadsheets are estimates. The District reserves the right to increase or decrease quantities or timeframes as is needed to meet District needs.
Please include all part numbers being proposed, even if not included above. Feel free to correct any existing part numbers if different in the proposed solution
If licensing or other items are required for the solution being proposed, please include.
Please add additional rows if necessary.
The Service Provider is responsible for pricing and formulas in this spreadsheet.

File details come from the government source that posted it. Updated .