Y26-707_Wekiwa_Phase_5A_Drawings.pdf
PDF 39 MB Posted
- Solicitation number
- Y26-707
- Issued by
- Orange County, Orlando City, Florida
About this file
This file contains construction drawings and technical specifications for the Wekiwa Springs Septic Tank Retrofit Phase 5A project, prepared by Tetra Tech for Orange County Utilities Department in Orlando, Florida. The project involves the removal of existing septic tank systems and installation of new gravity sewer collection systems, force mains, and a duplex pump station to serve approximately 63 single-family residential properties and one institutional facility (Fire Station 27) located at Carol Woods Way and Wekiva Ridge Road. The scope of work includes 3,417 linear feet of 8-inch PVC gravity sewer mains, 755 linear feet of 4-inch PVC force mains, 11 sanitary sewer manholes, service laterals to individual properties, and a 133-gallon-per-minute duplex pump station with associated electrical, control, and SCADA integration systems. A non-mandatory virtual pre-bid conference is scheduled for November 24, 2025, at 1:30 PM EST, with sealed bids due electronically via the OpenGov e-Procurement Platform by January 15, 2026, at 4:00 PM EST. Questions must be submitted by December 3, 2025, at 5:00 PM EST. The contractor must commence work within 14 days of receiving the Notice to Proceed and achieve substantial completion within 365 consecutive calendar days and final completion within 395 consecutive calendar days.
The estimated project cost is $4,664,610.00, with mobilization costs limited to 5% of the total base bid. The project is funded through Orange County Utilities and may utilize state and federal sources subject to appropriated funds availability. Contractors must provide proof of three prior references demonstrating experience with submersible public raw wastewater pump station construction, force main installation, and gravity sanitary sewer installation. Required insurance includes workers' compensation, commercial general liability of $1,000,000, and contractor's pollution liability of $1,000,000 per occurrence. A bid bond, performance bond, and payment bond are required. Retainage is set at 5% on progress payments until substantial completion, with potential discretionary reduction by the Project Manager. Liquidated damages are assessed at $500 per calendar day for failure to meet substantial or final completion dates. The project must comply with Orange County Utilities Standards and Construction Specifications Manual, OSHA requirements, and Florida Statutes, and must integrate with Orange County's existing SCADA system. Geotechnical investigations have been completed, identifying subsurface conditions primarily consisting of loose to medium-dense sands and clayey sands with groundwater levels 6-15 feet below grade.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.tetratech.com
CLIENT INFORMATION:PROJECT LOCATION AND ADDRESSES:
Tt PROJECT No.:
ISSUED:
ORANGE COUNTY UTILITIES
PHASE 5A
CAROL WOODS WAY & WEKIVA RIDGE ROAD
200-10034-23007
ORANGE COUNTY UTILITIES
9150 CURRY FORD ROAD
ORLANDO, FLORIDA
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32803
407-839-3955 FAX: 407-839-3790
BID SET
SEPTEMBER 2025
PROJECT LOCATION MAP
ORANGE COUNTY MAYOR
JERRY L. DEMINGS
COUNTY ADMINISTRATOR
BYRON BROOKS, A.I.C.P.
DIRECTOR , ORANGE COUNTY UTILITIES DEPARTMENT
ED TORRES, M.S., P.E., LEED AP®
CONSTRUCTION DRAWINGS
FOR
PREPARED FOR
UTILITIES ENGINEERING
ORANGE COUNTY, FLORIDA
ORANGE COUNTY BOARD OF
COUNTY COMMISSIONERS
DISTRICT 1: NICOLE H. WILSON
DISTRICT 2: CHRISTINE MOORE
DISTRICT 3: MAYRA URIBE
DISTRICT 4: MARIBEL GOMEZ CORDERO
DISTRICT 5: KELLY MARTINEZ SEMRAD
DISTRICT 6: MICHAEL "MIKE" SCOTT
PROJECT LOCATION
N
PROJECT SEQUENCE No: 100386 SUB ORG No: 1505-0015 (GRAVITY)
SUB ORG No: 1559-0177 (PS) SUB ORG No: 1539-0079 (FM)
48 HOURS BEFORE DIGGING
1-800-432-4770
SUNSHINE STATE ONE CALL CENTER
CALL 811
TOLL FREE
OR
PROJECT LOCATION
CHKD:
DRWN:
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/0
2/
C :\U
SE
R
S\ B.
SW
AR
TZ
EN
TR
U
BE
R
\O N
ED
R
IV
E
- T
ET
R A
TE
C
H , I
N C
\D
ES
KT
O
P\
0-
4-
PH
AS
E
5A
ST
AN
D
AR
D \G
-1
S
IG
BA
TU
R E
SH
EE
T
AN
D
IN
D
EX
O F
D R
AW
IN
G S.
D W
G
SW
AR
TZ
EN
TR
U
BE
R
, B R
AN
D
O N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
200-10034-23007
W
EK
IW
A
SP
R
IN
G
S
SE
PT
IC
T
AN
K R
ET
R
O
FI
T
PR
O
JE
C T
- P H
AS
E
5A
O R
AN
G
E C
O U
N
TY
U
TI
LI
TI
ES
E.
P
IN
E
ST
R
EE
T, S U
IT
E
O R
LA
N
D O
, F L
(4
) 8
-3
BI
D
S
ET G-101
SI
G
N
AT
U R
E
SH
EE
T
AN
D
IN
D
EX
O
F D
R
AW
IN
G
S
BDR
BLS
JPJ
SHEET NUMBER SHEET TITLE
GENERAL
G-100 COVER SHEET
G-101 SIGNATURE SHEET AND INDEX OF DRAWINGS
G-102 GENERAL NOTES
G-103 GENERAL NOTES
G-104 LEGEND, ABBREVIATIONS AND UTILITY OWNERS CONTACT LIST
G-105 SANITARY SEWER SCHEMATIC, SCHEDULE AND, TEST HOLE DATA
G-106 SUMMARY OF PAY ITEMS
SURVEY
V-100 SURVEY CONTROL
V-101 TEMPORARY CONSTRUCTION EASEMENT
CIVIL
C-001 KEY PLAN- TEMPORARY ACCESS ROAD
C-002 DEMOLITION - TEMPORARY ACCESS ROAD
C-003 UTILITY RELOCATION PLAN - FIRE STATION 27
C-004 PLAN AND PROFILE - TEMPORARY ACCESS ROAD
C-005 AUTOTURN PLAN - TEMPORARY ACCESS ROAD
C-006 GRADING PLAN - TEMPORARY ACCESS ROAD STA. 100+00 TO 103+40
C-007 GRADING PLAN - TEMPORARY ACCESS ROAD STA. 103+40 TO END
C-008 GRADING PLAN - NOVELLA ELIZA LANE STA. 5+00 TO 6+40
C-009 GRADING PLAN - NOVELLA ELIZA LANE STA. 6+40 TO 9+00
C-010 GRADING PLAN - NOVELLA ELIZA LANE STA. 9+00 TO 11+60
C-011 GRADING CROSS SECTIONS
C-012 GRADING CROSS SECTIONS
C-100 KEY MAP, SOIL BORINGS, PAVEMENT CORES, AND NOTES
C-101 PLAN AND PROFILE - NOVELLA ELIZA LANE STA. 5+00 TO 6+40
C-102 PLAN AND PROFILE - NOVELLA ELIZA LANE STA. 6+40 TO 9+00
C-103 PLAN AND PROFILE - NOVELLA ELIZA LANE STA. 9+00 TO 11+60
C-104 PLAN AND PROFILE - CAROL WOODS WAY STA. 11+60 TO 16+80
C-105 PLAN AND PROFILE - CAROL WOODS WAY STA. 16+80 TO 22+20
C-106 PLAN AND PROFILE - CAROL WOODS WAY STA. 22+20 TO 24+60
C-107 PLAN AND PROFILE - WEKIWA SPRING RD STA. 30+00 TO 34+50
C-108 PLAN AND PROFILE - WEKIVA RIDGE RD STA. 40+00 TO 45+50
C-109 PLAN AND PROFILE - WEKIVA RIDGE RD STA. 45+50 TO 51+00
C-110 PLAN AND PROFILE - WEKIVA RIDGE RD STA. 51+00 TO END
C-201 RESTORATION - TEMPORARY ACCESS ROAD
C-202 RESTORATION - FIRE STATION 27 DETAIL
C-203 RESTORATION - FUEL PAD DETAIL
C-300 STORMWATER POLLUTION PREVENTION PLAN NOTES
C-301 STORMWATER POLLUTION PREVENTION PLAN
C-400 MAINTENANCE OF TRAFFIC GENERAL REQUIREMENTS
C-401 CONCEPTUAL MAINTENANCE OF TRAFFIC - WEKIWA SPRINGS RD
C-402 CONCEPTUAL MAINTENANCE OF TRAFFIC - SIDE STREETS
C-403 MAINTENANCE OF TRAFFIC DETAILS
C-404 MAINTENANCE OF TRAFFIC DETAILS
CIVIL DETAILS
C-501 STANDARD DETAILS
C-502 STANDARD DETAILS
C-503 STANDARD DETAILS
C-504 STANDARD DETAILS
C-505 STANDARD DETAILS
C-506 STANDARD DETAILS
C-507 STANDARD DETAILS
C-508 STANDARD DETAILS
C-509 STANDARD DETAILS
C-510 STANDARD DETAILS
C-511 STANDARD DETAILS
C-512 STANDARD DETAILS
C-513 STORMWATER POLLUTION PREVENTION PLAN DETAILS
PUMP STATION
PS-101 PUMP STATION F3470 DEMOLITION PLAN
PS-102 PUMP STATION F3470 PROPOSED SITE PLAN
PS-103 PUMP STATION F3470 PLAN AND PROFILE DETAIL
PS-104 PUMP STATION F3470 GRADING PLAN
PS-105 PUMP STATION F3470 OVERALL GRADING PLAN
PS-501 PUMP STATION F3470 DETAILS
PS-502 PUMP STATION F3470 DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES, ABBREVIATIONS, LEGEND & SYMBOLS
S-100 PUMP STATION F3470 RETAINING WALL PLAN
S-501 STRUCTURAL DETAILS
PLUMBING
P-001 MECHANICAL SYMBOLS & ABBREVIATIONS
P-101 MECHANICAL DEMOLITION & FUEL TANK PLAN
P-701
ELECTRICAL
E-001 ELECTRICAL LEGEND
E-002 ELECTRICAL LEGEND
E-003 ELECTRICAL NOTES & ABBREVIATIONS
E-101 ELECTRICAL SITE PLAN
E-102 ENLARGED ELECTRICAL SITE PLAN
E-103 FIRE STATION ELECTRICAL DEMOLITION PLAN
E-104 FIRE STATION ELECTRICAL PLAN
E-301 SINGLE-LINE DIAGRAM
E-302 FIRE STATION MODIFIED SINGLE LINE DIAGRAM
E-401 CONTROL PANEL LAYOUT
E-402 CONTROL PANEL WIRING DIAGRAM
E-403 CONTROL PANEL WIRING DIAGRAM
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-505 ELECTRICAL DETAILS
E-506 FIRE STATION TYPICAL ELECTRICAL DETAILS
ASBUILT TABLES
X-100 ASBUILT COORDINATE ASSET TABLE
X-101 ASBUILT COORDINATE ASSET TABLE
SHEET NUMBER SHEET TITLE
PS-101 PUMP STATION F3470 DEMOLITION PLAN
PS-102 PUMP STATION F3470 PROPOSED SITE PLAN
PS-103 PUMP STATION F3470 PLAN AND PROFILE DETAIL
PS-104 PUMP STATION F3470 GRADING PLAN
PS-501 PUMP STATION F3470 DETAILS
PS-502 PUMP STATION F3470 DETAILS
X-101 ASBUILT COORDINATE ASSET TABLE
RESPONSIBLE FOR:
ENGINEERING BUSINESS NO.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
BURL REARDON
TETRA TECH, INC.
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
GENERAL
CIVIL
RESPONSIBLE FOR:
TETRA TECH - LB NO.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
LAWRENCE JENKINS
TETRA TECH, INC.
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
SURVEY
RESPONSIBLE FOR:
ENGINEERING BUSINESS NO.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
SCOTT JENKINS
TETRA TECH, INC.
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
STRUCTURAL
RESPONSIBLE FOR:
ENGINEERING BUSINESS NO.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
NAHUEL BOTTARINI
TETRA TECH, INC.
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
ELECTRICAL
RESPONSIBLE FOR:
CERTIFICATE OF AUTHORIZATION NO: 30216
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
SHEET NUMBER SHEET TITLE
E-001 ELECTRICAL LEGEND
E-002 ELECTRICAL LEGEND
E-003 ELECTRICAL NOTES & ABBREVIATIONS
E-101 ELECTRICAL SITE PLAN
E-102 ENLARGED ELECTRICAL SITE PLAN
E-103 FIRE STATION ELECTRICAL DEMOLITION PLAN
E-104 FIRE STATION ELECTRICAL PLAN
E-301 SINGLE-LINE DIAGRAM
E-302 FIRE STATION MODIFIED SINGLE LINE DIAGRAM
E-401 CONTROL PANEL LAYOUT
E-402 CONTROL PANEL WIRING DIAGRAM
E-403 CONTROL PANEL WIRING DIAGRAM
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-504 ELECTRICAL DETAILS
E-505 ELECTRICAL DETAILS
E-506 FIRE STATION TYPICAL ELECTRICAL DETAILS
SHEET NUMBER SHEET TITLE
G-100 COVER SHEET
G-101 SIGNATURE SHEET AND INDEX OF DRAWINGS
G-102 GENERAL NOTES
G-103 GENERAL NOTES
G-104 LEGEND, ABBREVIATIONS AND UTILITY OWNERS CONTACT LIST
G-105 SANITARY SEWER SCHEMATIC, SCHEDULE AND, TEST HOLE DATA
G-106 SUMMARY OF PAY ITEMS
C-001 KEY PLAN- TEMPORARY ACCESS ROAD
C-002 DEMOLITION - TEMPORARY ACCESS ROAD
C-003 UTILITY RELOCATION PLAN - FIRE STATION 27
C-004 PLAN AND PROFILE - TEMPORARY ACCESS ROAD
C-005 AUTOTURN PLAN - TEMPORARY ACCESS ROAD
C-006 GRADING PLAN - TEMPORARY ACCESS ROAD STA. 100+00 TO 103+40
C-007 GRADING PLAN - TEMPORARY ACCESS ROAD STA. 103+40 TO END
C-008 GRADING PLAN - NOVELLA ELIZA LANE STA. 5+00 TO 6+40
C-009 GRADING PLAN - NOVELLA ELIZA LANE STA. 6+40 TO 9+00
C-010 GRADING PLAN - NOVELLA ELIZA LANE STA. 9+00 TO 11+60
C-011 GRADING CROSS SECTIONS
C-012 GRADING CROSS SECTIONS
C-100 KEY MAP, SOIL BORINGS, PAVEMENT CORES, AND NOTES
C-101 PLAN AND PROFILE - NOVELLA ELIZA LANE STA. 5+00 TO 6+40
C-102 PLAN AND PROFILE - NOVELLA ELIZA LANE STA. 6+40 TO 9+00
C-103 PLAN AND PROFILE - NOVELLA ELIZA LANE STA. 9+00 TO 11+60
C-104 PLAN AND PROFILE - CAROL WOODS WAY STA. 11+60 TO 16+80
C-105 PLAN AND PROFILE - CAROL WOODS WAY STA. 16+80 TO 22+20
C-106 PLAN AND PROFILE - CAROL WOODS WAY STA. 22+20 TO 24+60
C-107 PLAN AND PROFILE - WEKIWA SPRING RD STA. 30+00 TO 34+50
C-108 PLAN AND PROFILE - WEKIVA RIDGE RD STA. 40+00 TO 45+50
C-109 PLAN AND PROFILE - WEKIVA RIDGE RD STA. 45+50 TO 51+00
C-110 PLAN AND PROFILE - WEKIVA RIDGE RD STA. 51+00 TO END
C-201 RESTORATION - TEMPORARY ACCESS ROAD
C-202 RESTORATION - FIRE STATION 27 DETAIL
C-203 RESTORATION - FUEL PAD DETAIL
C-300 STORMWATER POLLUTION PREVENTION PLAN NOTES
C-301 STORMWATER POLLUTION PREVENTION PLAN
C-400 MAINTENANCE OF TRAFFIC GENERAL REQUIREMENTS
C-401 CONCEPTUAL MAINTENANCE OF TRAFFIC - WEKIWA SPRINGS RD
C-402 CONCEPTUAL MAINTENANCE OF TRAFFIC - SIDE STREETS
C-403 MAINTENANCE OF TRAFFIC DETAILS
C-404 MAINTENANCE OF TRAFFIC DETAILS
C-501 STANDARD DETAILS
C-502 STANDARD DETAILS
C-503 STANDARD DETAILS
C-504 STANDARD DETAILS
C-505 STANDARD DETAILS
C-506 STANDARD DETAILS
C-507 STANDARD DETAILS
C-508 STANDARD DETAILS
C-509 STANDARD DETAILS
C-510 STANDARD DETAILS
C-511 STANDARD DETAILS
C-512 STANDARD DETAILS
C-513 STORMWATER POLLUTION PREVENTION PLAN DETAILS
PS-105 PUMP STATION F3470 OVERALL GRADING PLAN
X-100 ASBUILT COORDINATE ASSET TABLE
DANIEL MAGRO
ACLUS ENGINEERING, LLC
1725 WINDERMEREDOWN PLACE
WINDERMERE, FLORIDA 34786
PUMP STATION
SHEET NUMBER SHEET TITLE
V-100 SURVEY CONTROL
V-101 TEMPORARY CONSTRUCTION EASEMENT
SHEET NUMBER SHEET TITLE
P-001 MECHANICAL SYMBOLS & ABBREVIATIONS
P-101 MECHANICAL DEMOLITION & FUEL TANK PLAN
P-701 MECHANICAL SCHEDULES & DETAILS
RESPONSIBLE FOR:
ENGINEERING BUSINESS NO.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
FAISAL ALTWAL
TETRA TECH, INC.
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
PLUMBING
SHEET NUMBER SHEET TITLE
S-001 GENERAL STRUCTURAL NOTES, ABBREVIATIONS, LEGEND & SYMBOLS
S-100 PUMP STATION F3470 RETAINING WALL PLAN
S-501 STRUCTURAL DETAILS
MECHANICAL SCHEDULES & DETAILS
b.swartzentruber Snapshot b.swartzentruber Stamp b.swartzentruber Snapshot
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/0
2/
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
W
EK
IW
A
SE
PT
IC
R
M
VL
\P R
O
JE
C T
FI
LE
S\ C
AD
\S
H
EE
TF
IL
ES
\2
-P H
5A \G
-1 0X
G
EN
ER
EA
L N
O
TE
S.
D
W G
SW
AR
TZ
EN
TR
U
BE
R , B
R
AN
D O
N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
200-10034-23007
W
EK
IW
A
SP
R
IN
G
S
SE
PT
IC
T
AN
K R
ET
R
O
FI
T
PR
O
JE
C T
- P H
AS
E
5A
O R
AN
G
E C
O U
N
TY
U
TI
LI
TI
ES
E.
P
IN
E
ST
R
EE
T, S U
IT
E
O R
LA
N
D O
, F L
(4
) 8
-3
BI
D
S
ET
48 HOURS BEFORE DIGGING
1-800-432-4770
SUNSHINE STATE ONE CALL CENTER
CALL 811
TOLL FREE
OR
G-102
G
EN
ER
AL
N O
TE
S
BDR
BLS
JPJ
*ALL WORK AND REQUIREMENTS FROM THE NOTES IN THIS PAGE SHALL BE A REQUIREMENT OF THE
CONTRACT AND EXECUTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO ORANGE COUNTY.
OCU STANDARD GENERAL NOTES
1. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN EXCAVATING IN PROXIMITY OF
INCLUDING, BUT NOT LIMITED TO; WATER MAINS, WASTEWATER FORCE MAINS, GRAVITY MAINS, RECLAIMED WATER MAINS, ELECTRIC, GAS, CABLE TV, TELECOMMUNICATIONS, STORM WATER, FIBER OPTIC AND OTHER UNDERGROUND FACILITIES. MAIN LOCATIONS SHOWN ON PLANS MAY
NOT BE EXACT. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING EXISTING UTILITY
LOCATIONS.
2. SHOULD A PIPE EMERGENCY OCCUR, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OCU
DISPATCH OPERATOR (407-836-2777) AND THE OCU INSPECTOR.
3. THE CONTRACTOR SHALL NOTIFY THE OCU CONSTRUCTION INSPECTION SECTION, FIELD
SERVICES DIVISION AT LEAST 10 CALENDAR DAYS PRIOR TO COMMENCEMENT OF THE
CONSTRUCTION PROJECT BY CALLING (407) 254-9798.
4. THE CONTRACTOR SHALL NOTIFY THE OCU CONSTRUCTION INSPECTOR IN ACCORDANCE WITH
TABLE 4110-1 "UTILITIES' SCHEDULE OF NOTIFICATIONS IN THIS MANUAL.
5. THE MATERIALS, PRODUCTS, AND CONSTRUCTION OF ALL UTILITIES CONNECTING TO THE OCU
SYSTEM SHALL BE IN CONFORMANCE WITH THE STANDARDS, CONSTRUCTION SPECIFICATIONS,
AND APPENDIX D IN THIS MANUAL.
6. ALL EXISTING UTILITIES INCLUDING BUT NOT LIMITED TO; WATER MAINS, FORCE MAINS, RECLAIMED WATER MAIN, SANITARY GRAVITY PIPES, STORM WATER PIPES, ELECTRIC, TELEPHONE, GAS, POLES AND STAYS, CABLE TV AND OTHER UTILITY FACILITIES WITHIN THE
LIMITS OF THE PROJECT WILL BE SUPPORTED AND PROTECTED AGAINST DAMAGE DURING
CONSTRUCTION.
7. THE CONTRACTOR SHALL ADJUST ALL EXISTING OCU MAINS AND FACILITIES IN CONFLICT WITH
NEW GRADE, NEW OR ALTERED ROADWAYS, SIDEWALKS, DRIVEWAYS, CURBS, OR STORM
WATER IMPROVEMENTS. OCU FACILITIES TO BE ADJUSTED INCLUDE, BUT ARE NOT LIMITED TO;
PIPELINES, PUMP STATIONS, VALVE BOXES, AIR RELEASE VALVES, FIRE HYDRANTS, MANHOLE
COVERS, AND METERS. ALL ADJUSTMENTS SHALL BE MADE TO CURRENT STANDARDS.
8. ONLY OCU PERSONNEL SHALL OPERATE EXISTING OCU WATER, WASTEWATER, AND
RECLAIMED WATER VALVES. THE CONTRACTOR IS RESPONSIBLE FOR OPERATING ANY NEWLY
INSTALLED VALVE THAT HAS NOT BEEN CLEARED FOR USAGE BY FDEP AND OCU. THE
CONTRACTOR SHALL COORDINATE VALVE OPERATION WITH THE OCU INSPECTOR. FOR
OPERATION OF MAINS NOT OWNED BY OCU, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE WITH THE APPROPRIATE UTILITY REPRESENTATIVE.
9. CONSTRUCTION ACTIVITIES SHALL NOT CAUSE INTERRUPTIONS IN WATER, WASTEWATER, OR
RECLAIMED WATER SERVICE. THE CONTRACTOR SHALL COORDINATE PRE-APPROVED
INTERRUPTIONS OF SERVICE WITH THE OCU INSPECTOR 7 WORKING DAYS IN ADVANCE AND
WRITTEN NOTICE SHALL BE GIVEN TO AFFECTED CUSTOMERS AT LEAST 4 WORKING DAYS IN
ADVANCE.
10. THE CONTRACTOR SHALL PROVIDE FOR BYPASSING AND / OR HAULING OF WASTEWATER
DURING APPROVED INTERRUPTIONS OF WASTEWATER FLOWS AND CONNECTIONS. THE
CONTRACTOR SHALL SUBMIT A BYPASS OR HAUL PLAN, REVIEWED AND APPROVED BY A
PROFESSIONAL ENGINEER TO OCU DEVELOPMENT ENGINEERING AND TO THE INSPECTOR FOR
APPROVAL PRIOR TO IMPLEMENTATION BY CONTRACTOR.
11. ALL VALVES INSTALLED AS PART OF THIS CONSTRUCTION PROJECT SHALL REMAIN CLOSED
DURING CONSTRUCTION. KEEP VALVES ON ALL WET TAPS CLOSED UNTIL CLEARED BY FDEP.
DO NOT CONNECT NEWLY CONSTRUCTED WATER MAINS TO ANY EXISTING WATER MAINS
UNLESS CLEARED BY FDEP AND OCU.
12. THE CONTRACTOR SHALL PROVIDE A JUMPER ASSEMBLY WITH AN APPROVED BACKFLOW
PREVENTER FOR MAKING TEMPORARY CONNECTIONS TO AN EXISTING POTABLE WATER
SOURCE IN ORDER TO CHLORINATE AND FLUSH NEW WATER MAINS WITH POTABLE WATER.
ANY TEMPORARY POTABLE WATER CONNECTIONS TO RECLAIMED WATER OR FORCE MAIN
SHALL ALSO BE EQUIPPED WITH AN APPROVED BACKFLOW PREVENTER.
13. FOR PVC PIPE, NO JOINT DEFLECTION OR PIPE BENDING IS ALLOWED. ALIGNMENT CHANGE
SHALL BE MADE ONLY WITH FITTINGS.
14. FOR DIP PIPE, LONG RADIUS CURVES, EITHER HORIZONTAL OR VERTICAL, MAY BE INSTALLED
WITH STANDARD PIPE BY DEFLECTIONS AT THE JOINTS. MAXIMUM DEFLECTIONS AT PIPE
JOINTS, FITTINGS AND LAYING RADIUS FOR THE VARIOUS PIPE LENGTHS SHALL NOT EXCEED 75
PERCENT OF THE PIPE MANUFACTURER'S RECOMMENDATION.
15. FOR APPROVED PVC OR HDPE PIPE USED IN A HORIZONTAL DIRECTIONAL DRILL INSTALLATION, THE CURVATURE AND/OR DEFLECTION SHALL NOT EXCEED THE PARAMETERS ESTABLISHED IN
THIS MANUAL.
16. ALL DAMAGE TO ORANGE COUNTY INFRASTRUCTURE, PIPELINES, AND ASSETS SHALL BE
REPAIRED IMMEDIATELY BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE WITH AN
APPROVED METHOD BY THE COUNTY. IF THE REPAIR IS NOT PERFORMED IN A TIMELY MANNER, AS DETERMINED BY THE ORANGE COUNTY UTILITY INSPECTOR, ORANGE COUNTY MAY
PERFORM REPAIRS AND THE CONTRACTOR WILL BE CHARGED FOR ALL EXPENSES
ASSOCIATED WITH THE REPAIR.
17. THE CONTRACTOR SHALL BE LIABLE FOR ANY AND ALL SANITARY SEWER OVERFLOWS (SSO)
ASSOCIATED WITH THE WORK, REGARDLESS OF FAULT. THE CONTRACTOR WILL BE ASSESSED
PENALTIES FOR ANY AND EACH SSO AS SPECIFIED IN SECTION 3110, GENERAL CONSTRUCTION
REQUIREMENTS.
PROJECT GENERAL NOTES
18. ALL UTILITIES FACILITIES CONSTRUCTION CONNECTING TO THE ORANGE COUNTY PUBLIC
UTILITIES SYSTEM SHALL CONFORM TO THE ORANGE COUNTY UTILITIES STANDARDS AND
CONSTRUCTION SPECIFICATIONS MANUAL, AND BE ONE OF THE APPROVED PRODUCTS LISTED
IN APPENDIX 'D' OF THE MANUAL.
19. BENCHMARK LOCATIONS AND ELEVATIONS ARE SHOWN IN THE PLANS AS REPRESENTED BY
THE SURVEYOR AT THE TIME OF SURVEY. CONTRACTOR SHALL VERIFY ITS CORRECTNESS AT
THE TIME OF CONSTRUCTION AND INSTALL HIS OWN TEMPORARY BENCHMARKS. ANY
DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OCU RESIDENT
PROJECT REPRESENTATIVE (RPR).
20. ALL NORTHING AND EASTING COORDINATES ARE BASED ON THE STATE PLANE COORDINATE
SYSTEM. STATIONING IS FOR REFERENCE ONLY.
21. COORDINATION AND COMMUNICATIONS WITH ORANGE COUNTY STAFF SHALL BE MADE
THROUGH THE OCU RPR.
22. ORANGE COUNTY UTILITIES DEPARTMENT TELEPHONE NUMBERS:
407-836-2777 ORANGE COUNTY UTILITIES DISPATCH
407-254-9798 ORANGE COUNTY UTILITIES CONSTRUCTION DIVISION
407-254-9680 ORANGE COUNTY UTILITIES WATER RECLAMATION DIVISION
407-254-9850 ORANGE COUNTY UTILITIES WATER DIVISION
407-254-9900 ORANGE COUNTY UTILITIES ENGINEERING DIVISION
23. THE CONTRACTOR SHALL NOTIFY THE ORANGE COUNTY PUBLIC SCHOOLS TRANSPORTATION
SERVICES 317-3800, TWO(2) WEEKS IN ADVANCE OF ANY PHASE OF CONSTRUCTION TO
COORDINATE SCHOOL BUS STOP RELOCATION OR BUS RE-ROUTING IF NECESSARY.
24. THE CONTRACTOR SHALL NOTIFY LYNX TRANSPORTATION SYSTEM (407) 841-2279, TWO(2)
WEEKS IN ADVANCE OF ANY PHASE OF CONSTRUCTION TO COORDINATE BUS STOP
RELOCATION OR BUS RE-ROUTING IF NECESSARY.
25. PRIOR TO THE START OF ANY WORK, THE CONTRACTOR SHALL PLAN AND SCHEDULE THE
SEQUENCE OF WORK IN ORDER TO PREVENT UNNECESSARY DELAYS OR COSTS ASSOCIATED
WITH CRITICAL PATH ITEMS OF THE WORK.
26. THE CONTRACTOR SHALL BRING ALL DESIGN DISCREPANCIES TO THE IMMEDIATE ATTENTION
OF THE ENGINEER, IN WRITING, PRIOR TO CONSTRUCTION OR AS SOON AS DISCOVERED.
27. THE OWNER SHALL FURNISH THE FDEP WASTEWATER PERMIT(S). THE CONTRACTOR SHALL
OBTAIN ALL OTHER PERMITS REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL BECOME
FAMILIAR WITH AND ABIDE BY ALL PERMIT CONDITIONS, INSPECTION SCHEDULES, AND OTHER
RELEVANT REGULATORY AGENCY RULES AND SPECIAL CONDITIONS.
28. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES AND STRUCTURES ARE
APPROXIMATE. WHILE CONSIDERABLE EFFORT HAS BEEN MADE BY THE OWNER, THE
SURVEYOR, THE VARIOUS UTILITY COMPANIES AND THE ENGINEER TO ACCURATELY LOCATE
EXISTING LINES AND APPURTENANCES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
ALL UTILITY AND STRUCTURE LOCATIONS, ELEVATIONS AND DIMENSIONS BY UTILIZING
EXPLORATORY EXCAVATION, WHICH SHALL BE MADE 7 DAYS OR 1000 FEET IN ADVANCE OF THE WORK, WHICHEVER IS GREATER. IF THERE IS A POTENTIAL CONFLICT, THE CONTRACTOR IS TO
NOTIFY THE ENGINEER IMMEDIATELY. NO CLAIMS FOR DELAYS WILL BE PAID UNLESS THIS
PROCEDURE HAS BEEN FULLY FOLLOWED. ANY DAMAGE TO UTILITIES, STRUCTURES AND/OR
SERVICES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, IN A MANNER APPROVED BY
AND COORDINATED WITH THE UTILITY OWNER. CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTACTING THE UTILITY OWNER OF ANY UNINTENDED INTERRUPTION TO SERVICE OR
DAMAGE TO EXISTING STRUCTURES OR UTILITIES.
29. IMMEDIATELY AT ONSET OF CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES CRITICAL TO COMPLETING THE PROJECT
(INCLUDING WATER, SEWER, RECLAIMED WATER, POWER, TELEPHONE, GAS, FIBER OPTIC AND
CABLE TV) AND SHALL EVALUATE POTENTIAL CONFLICTS IN A WRITTEN REPORT. ANY
CONFLICTS SHALL BE REPORTED TO ENGINEER/OWNER IMMEDIATELY UPON DISCOVERY AND
DETAILED IN THE REPORT.
30. CONTRACTOR SHALL COORDINATE WITH ALL OTHER UTILITY OWNERS FOR RESOLUTION OF
CONFLICTS. CONTRACTOR SHALL HAVE 48 HOURS TO DETERMINE THE RESOLUTION OF ANY
UNKNOWN OR UNFORESEEN CONFLICTS. COSTS INCURRED SHALL BE BORNE BY THE UTILITY
OWNER AND/OR CONTRACTOR AND NO CLAIMS MAY BE MADE AGAINST ORANGE COUNTY OR
THE ENGINEER FOR THESE CONFLICTS. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR
THE PERIOD OF TIME TO RESOLVE ANY CONFLICTS.
31. CONTRACTOR SHALL CONTACT UTILITY OWNERS FOR LOCATION OF ALL EXISTING FACILITIES.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH UTILITY OWNERS AND FOR
PROVIDING TEMPORARY SUPPORT AND PROTECT ALL EXISTING UTILITIES IN ACCORDANCE
WITH OCU STANDARD GENERAL NOTE #6. WHEN WORKING IN THE VICINITY OF FIBER OPTICS
AND/OR GAS MAINS, THE CONTRACTOR SHALL NOTIFY THE UTILITY OWNER SEVEN (7) DAYS
PRIOR TO ANY CONSTRUCTION. EXTREME CAUTION SHALL BE EXERCISED IN AREAS OF FIBER
OPTICS AND GAS MAINS.
32. EXISTING DRAINAGE PIPING AND/OR STRUCTURES TO BE SUPPORTED OR REMOVED AND
REPLACED AS REQUIRED TO ACCOMMODATE GRAVITY SEWER MAIN INSTALLATION.
CONTRACTOR IS RESPONSIBLE FOR CONTROLLING WATER LEVELS IN THE STORM WATER
SYSTEM IF NECESSARY, FOR CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
33. THE CONTRACTOR SHALL FIND AND MAINTAIN HIS OWN EQUIPMENT AND MATERIAL STORAGE
YARD AT NO COST TO THE COUNTY.
34. EXISTING CURB, SIDEWALK AND/OR CONCRETE DRIVES SHALL BE REMOVED AND REPLACED AS
REQUIRED TO ACCOMMODATE GRAVITY SEWER MAIN AND SEWER LATERAL INSTALLATION. ALL
CONCRETE TO BE REMOVED SHALL BE SAW CUT AT THE NEAREST GOOD JOINT. CURB/GUTTER
SHALL BE SAW CUT BETWEEN ASPHALT AND CONCRETE PRIOR TO REMOVAL. ALL SAW
CUTTING SHALL BE WET CUT TO CONTROL DUST. ALL CURB, SIDEWALK AND/OR CONCRETE
DRIVES DAMAGED OUTSIDE NORMAL TRENCH WIDTH CONSTRUCTION SHALL BE REPLACED BY
THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
35. PROTECT EXISTING IMPROVEMENTS TO THE MAXIMUM EXTENT POSSIBLE. RESTORE ALL
EXISTING IMPROVEMENTS AND DISTURBED AREAS TO ORIGINAL CONDITION. PAVEMENT TO BE
RESTORED IN ACCORDANCE WITH THE PAVEMENT RESTORATION DETAILS SHOWN ON THE
CONSTRUCTION DETAIL ALL DAMAGED MAILBOXES, IRRIGATION SYSTEMS, SOD, LANDSCAPING,
FENCING, SIDEWALK, ROADWAY PAVEMENT AND OTHER IMPROVEMENTS SHALL BE RESTORED
TO ORIGINAL OR BETTER CONDITION.
36. NO VALVE BOXES, METERS, PORTIONS OF MANHOLES, OR OTHER APPURTENANCES OF ANY
KIND RELATING TO ANY UNDERGROUND UTILITIES SHALL BE LOCATED IN ANY PORTION OF A
CURB-AND-GUTTER SECTION. CONTRACTOR SHALL ADVISE ENGINEER IMMEDIATELY UPON
DISCOVERY OF A POTENTIAL CONFLICT.
37. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER SALVAGE AND/OR DISPOSAL OF
ALL MATERIALS AND EQUIPMENT IN ACCORDANCE WITH THE SPECIFICATIONS AND AS
DIRECTED BY THE ORANGE COUNTY UTILITIES INSPECTOR.
38. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO, OR AS THE FIRST
STEP IN CONSTRUCTION AND ARE THE MINIMUM REQUIRED. CONTRACTOR SHALL FURNISH
ADDITIONAL CONTROLS AS NEEDED AT NO ADDITIONAL COST. MATERIALS FROM WORK ON THIS
PROJECT SHALL BE CONTAINED AND NOT ALLOWED TO COLLECT ON ANY OFF PERIMETER
AREAS OR IN WATERWAYS. SILK SCREENS, HAY BALES, AND TURBIDITY BARRIERS MUST
REMAIN IN PLACE AND IN GOOD CONDITION AT ALL LOCATIONS IN PLANS OR AS REQUIRED
UNTIL THE CONTRACT IS COMPLETED AND SOILS ARE STABILIZED AND VEGETATION IS
ESTABLISHED. MEASURES SHOWN ON THE PLANS ARE MINIMUM REQUIRED, AND THE
CONTRACTOR SHALL ENSURE THAT THERE IS NO DIRECT OR INDIRECT DISCHARGE OF
CONSTRUCTION MATERIALS IN TURBID WATERS TO OFF SITE AREAS OR WATERWAYS.
39. ALL EXISTING PAVEMENT MARKINGS AND MESSAGES, WHICH ARE TO BE DEMOLISHED, SHALL
BE INVENTORIED AND RESTORED TO ORIGINAL CONDITION AND DAMAGED ONES REPLACED
(UPON COMPLETION OF CONSTRUCTION AND PRIOR TO REINSTATING VEHICULAR TRAFFIC) BY
THE CONTRACTOR, UNLESS OTHERWISE SPECIFIED IN THE PLANS OR LATEST DESIGN
STANDARD. ALL PERMANENT PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC WITH
GLASS BEADS. TEMPORARY PAVEMENT MARKINGS MAY BE PAINT PRODUCTS AND
RETRO-REFLECTIVE PAVEMENT MARKERS (ON SURFACES TO BE MILLED AND RESURFACED) OR
TEMPORARY TAPE (ON ALL AREAS NOT BEING RESURFACED). TEMPORARY TAPE SHALL BE 3M
BRAND STAMARK REMOVABLE TAPE, SERIES 780, WET REFLECTIVE TEMPORARY TAPE OR
APPROVED EQUAL. THE USE OF "FOIL BLACK" TYPES OF TEMPORARY TAPE IS NOT PERMITTED.
3M BRAND REMOVABLE BLACK MASK TAPE, SERIES 145, IS THE ONLY APPROVED MATERIAL FOR
"BLACKING OUT" EXISTING PAVEMENT MARKINGS ON FINAL ROADWAY SURFACES OR
SURFACES NOT BEING PAVED. UNDER NO CIRCUMSTANCES WILL BLACK PAINT OR GRINDING
BE PERMITTED. ALL CONFLICTING EXISTING MARKINGS SHALL BE REMOVED.
40. CONTRACTOR'S USE OF THE PREMISES SHALL BE CONFINED TO THE LIMITS OF THE EXISTING
RIGHT OF WAY AND/OR EASEMENTS. ALL PUBLIC AND PRIVATE PROPERTY AFFECTED BY THE
CONSTRUCTION SHALL BE PROTECTED WHERE POSSIBLE. ALL AREAS DISTURBED AS PART OF
THIS WORK SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL
COST TO THE OWNER. ALL EXISTING SODDED AREAS DISTURBED DURING THE CONSTRUCTION
SHALL BE REPLACED WITH THE SAME TYPE OF SOD IN CONFORMANCE WITH THE STANDARD
SPECIFICATIONS. FIELD ENGINEER SHALL APPROVE THE REMOVAL AND REPLACEMENT OF
EXISTING IRRIGATION SYSTEMS, AS REQUIRED, AT NO ADDITIONAL COST TO THE COUNTY OR
PROPERTY OWNER. PROPER TEMPORARY ADJUSTMENTS SHALL BE DONE AT SUCH TIME TO
MAINTAIN IRRIGATION SYSTEMS FROM BEING INTERRUPTED FOR EXTENDED PERIODS DURING
CONSTRUCTION. CONTRACTOR SHALL REPAIR OR REPLACE, AT NO ADDITIONAL COST TO THE
OWNER, ALL TREES, LANDSCAPING AND SHRUBS. ALL ITEMS THAT ARE REPLACED SHALL BE OF LIKE SIZE AND SPECIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL
NEWLY PLANTED GRASS OR VEGETATION UNTIL WELL ESTABLISHED AND ACCEPTED BY THE
COUNTY.
41. GEOTECHNICAL REPORT FOR WEKIWA SPRINGS SEPTIC TANK REPLACEMENT - PHASE 5
ORANGE COUNTY, FLORIDA PROJECT NO 202403 BY ANTILLIAN ENGINEERING ASSOCIATES, INC.
WAS USED IN THE DESIGN OF THE PLANNED FACILITIES. THE CONTRACTOR SHALL USE THIS
INFORMATION TOGETHER WITH ANY OTHER INFORMATION AVAILABLE TO DETERMINE THE
NEED FOR AND COST OF DEWATERING. THE CONTRACTOR SHALL INCLUDE DEWATERING
COSTS WITH THE UNIT PRICE FOR ASSOCIATED BID ITEMS. NO SEPARATE DEWATERING COSTS
OR EXPENSES WILL BE APPROVED. EXCAVATION AND SHORING
42. ALL EXCAVATIONS SHALL CONFORM TO THE REQUIREMENTS OF THE OSHA TRENCH SAFETY
ACT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER STORAGE AND/OR DISPOSAL OF
ALL EXCESS OR UNSUITABLE EXCAVATED MATERIAL.
43. CONTRACTOR SHALL PROVIDE ENGINEERED SHORING SYSTEM PER SPECIFICATION SECTIONS 02220, SUBMIT AS SHOP DRAWING SIGNED AND SEALED BY A LICENSED FLORIDA P.E. SIGNED
AND SEALED PLANS SHALL BE SUBMITTED TO THE OWNER FOR REVIEW AND APPROVAL PRIOR
TO START OF CONSTRUCTION. THE COST OF ALL MATERIALS FOR SHORING OF EXCAVATIONS
SHALL BE INCLUDED IN THE UNIT PRICE FOR RELATED CONSTRUCTION PAY ITEMS.
44. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TEMPORARY CONTROLS AND/OR
STRUCTURES REQUIRED TO MAINTAIN SUITABLE AND SAFE WORKING CONDITIONS AT ALL
TIMES. SUCH ITEMS SHALL BE REMOVED ONCE THAT PORTION OF WORK HAS BEEN
COMPLETED.
45. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY OF EMBANKMENTS AND SHALL
REPLACE ANY PORTION WHICH, IN THE OPINION OF THE ENGINEER OR RPR, HAS BECOME
DISPLACED DUE TO EROSION OR DUE TO CARELESSNESS OR NEGLIGENCE ON THE PART OF
THE CONTRACTOR.
46. WHERE REQUIRED, AT NO ADDITIONAL COST TO THE COUNTY, THE CONTRACTOR SHALL USE
TEMPORARY SHEETING OR TRENCH BOXES TO MINIMIZE THE SIZE OF EXCAVATIONS AND
PROTECT EXISTING ROADWAYS, UTILITIES AND OTHER FACILITIES OR AS NEEDED TO REMAIN
WITHIN THE LIMITS OF CONSTRUCTION
BYPASS AND DEWATERING
47. COLLECTION SYSTEM BYPASS SHALL BE PROVIDED PER SPECIFICATION SECTION 01516.
TEMPORARY BYPASS PIPING SHALL BE LAID ABOVE GROUND WHERE PRACTICAL, AND LAID
WITHIN EXISTING RIGHT OF WAY AND EASEMENTS. TEMPORARY BYPASS PIPING SHALL BE LAID
BELOW GRADE AT ALL ROADWAY, DRIVEWAY AND SIDEWALK CROSSINGS.
48. ALL PAVED SURFACES DISTURBED FOR INSTALLATION OF BYPASS PIPING SHALL BE RESTORED.
WHERE SHOWN, LOCATION OF BYPASS PUMP SKIDS AND RESTORATION IS APPROXIMATE IN
NATURE AND DEPICTED FOR INFORMATION ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR
FINAL LOCATION OF BYPASS PUMPS AND RESTORATION AT NO ADDITIONAL COST TO THE
COUNTY.
49. ALL DRAINAGE FACILITIES THAT ARE CROSSED AND/OR DISTURBED DURING CONSTRUCTION SHALL REMAIN FUNCTIONAL AT ALL TIMES OR THE CONTRACTOR SHALL INSTALL FACILITIES TO
MAINTAIN THE FLOW, AT NO ADDITIONAL COST TO THE OWNER.
50. CONTRACTOR SHALL PROVIDE ENGINEERED DEWATERING SYSTEM PER SPECIFICATION
SECTION 02140. SHOP DRAWING SUBMITTAL SHALL BE SIGNED AND SEALED BY A LICENSED
FLORIDA GEOTECHNICAL ENGINEER. DEWATERING PLAN SHALL PROVIDE MEANS FOR
OVERCOMING EXISTING PIPE TRENCH AND BEDDING WHICH MAY INCLUDE STONE.
51. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DE-WATERING REQUIRED DURING
CONSTRUCTION AND TO OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR THE TEMPORARY
DE-WATERING.
52. MAINTAIN UTILITY SERVICES AT ALL TIMES. IF BY-PASS OR WELL POINT PUMPING IS
NECESSARY, USE DIESEL ENGINES WITH QUIET PACK SYSTEM OR ELECTRIC MOTORS, TO KEEP
NOISE TO AN ABSOLUTE MINIMUM (SPECIFICATION SECTION 01516). BY-PASS PUMPS SHALL
HAVE AT LEAST ONE (1) BACKUP UNIT IN PLACE, AND SHALL BE ATTENDED BY A COMPETENT
OPERATOR AT ALL TIMES WHEN IN USE. ALL DISCHARGE ACCESSORIES SHALL BE PVC, HARD
RUBBER OR OTHER SUITABLE MATERIAL WITH NO LEAKING JOINTS. SOFT/LAYFLAT STYLE HOSE
IS NOT ACCEPTABLE. SUBMITTALS FOR WELL POINT LAYOUT AND EQUIPMENT ARE REQUIRED
PRIOR TO START OF WORK. DEWATERING SYSTEM SHALL BE UTILIZED IN ACCORDANCE WITH
GOOD STANDARD PRACTICES AND MUST BE EFFICIENT ENOUGH TO LOWER THE WATER LEVEL
IN ADVANCE OF EXCAVATION TO KEEP THE TRENCH BOTTOM AND SIDES FIRM AND DRY. NO
POLLUTED WATERS SHALL BE DISCHARGED INTO STORM SYSTEM OR BODIES OF BEFORE
DISCHARGE OF PRODUCED GROUND WATER TO ANY SURFACE WATER OF THE STATE FROM A
NON-CONTAMINATED SITE, ANALYTICAL TESTS ON SAMPLES OF DISCHARGE WATER SHALL BE
PERFORMED TO DETERMINE CONTAMINATION. TEST RESULTS MUST MEET MINIMUM
REQUIREMENTS SET BY FDEP [DOCUMENT 62-621.300(2) GENERIC PERMIT FOR THE DISCHARGE
OF PRODUCED GROUNDWATER FROM NON-CONTAMINATED SITE ACTIVITY]. ANY DEWATERING
DRAINAGE DISCHARGED INTO SANITARY SEWERS MUST BE APPROVED BY ORANGE COUNTY
UTILITIES BEFORE DISCHARGING.
PROJ:
DESN:
w w w .te tra te ch .c om
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
BY
/0
2/
C
AD
\A
C C
D O
C S\
TE
TR
A
TE
C H
IN
C
\2
-1
-2
W
EK
IW
A
SE
PT
IC
R
M
VL
\P R
O
JE
C T
FI
LE
S\ C
AD
\S
H
EE
TF
IL
ES
\2
-P H
5A \G
-1 0X
G
EN
ER
EA
L N
O
TE
S.
D
W G
SW
AR
TZ
EN
TR
U
BE
R , B
R
AN
D O
N
A
B
C
D
E
F
2 3 4 5 6 7
Bar Measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
200-10034-23007
W
EK
IW
A
SP
R
IN
G
S
SE
PT
IC
T
AN
K R
ET
R
O
FI
T
PR
O
JE
C T
- P H
AS
E
5A
O R
AN
G
E C
O U
N
TY
U
TI
LI
TI
ES
E.
P
IN
E
ST
R
EE
T, S U
IT
E
O R
LA
N
D O
, F L
(4
) 8
-3
BI
D
S
ET G-103
G
EN
ER
AL
N O
TE
S
BDR
JPJ
UTILITY CONSTRUCTION
1. PIPE SIZES ON PLANS ARE NOMINAL IN DIAMETER.
2. PIPE LENGTHS SHOWN ON PLANS ARE APPROXIMATE. ACTUAL LENGTHS ARE TO BE
DETERMINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION.
3. ALL EXISTING AND NEW OCU WATER AND SEWER VALVES, VALVE BOXES, AND MANHOLES SHALL
BE PROTECTED AND ADJUSTED TO FINISHED GRADE AS SHOWN ON THE DRAWINGS. VALVE AND
VALVE BOXES SHALL REMAIN ACCESSIBLE AT ALL TIMES. ANY VALVES THAT MIGHT BE COVERED
DURING CONSTRUCTION SHALL BE MARKED WITH A MARKER (GREEN FOR SEWER, BLUE FOR
WATER, AND PURPLE FOR RECLAIMED WATER MAIN), A MINIMUM OF FOUR (4) FEET ABOVE
GRADE. ALL VALVES UNDER CONSTRUCTION ARE TO REMAIN CLOSED DURING CONSTRUCTION.
4. ALL PIPE AND STRUCTURES SHALL BE LAID IN THE DRY TRENCH TO THE ELEVATIONS AND SLOPE
SHOWN ON THE CONSTRUCTION DRAWINGS. LASER EQUIPMENT SHALL BE USED TO PROVIDE
LINE AND THE LASER EQUIPMENT SHALL HAVE A SLOPE INDICATOR TO FACILITATE CHECKING BY BOTH THE PIPE LAYING FOREMAN AND THE CITY ENGINEER. A ZERO TOLERANCE FOR ERRORS IN
LINE AND GRADE WILL BE ALLOWED. TOLERANCE FOR DEFLECTION SHALL BE BASED BY
INDUSTRY STANDARDS UNLESS OTHERWISE SPECIFIED.
5. ALL BACKFILL SHALL BE COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DRY DENSITY AS
MEASURED BY AASHTO T-180 METHOD 'D' TEST (MODIFIED PROCTOR) IN OPEN AREAS AND TO
NOT LESS THAN 98% MAXIMUM DRY DENSITY AS MEASURED BY AASHTO T-180 METHOD 'D' TEST
(MODIFIED PROCTOR) UNDER ASPHALT OR CONCRETE PAVEMENT AND WITHIN 3-FT OF
PAVEMENT. ALL SOIL TESTING TO BE CONDUCTED BY THE COUNTY. THE CONTRACTOR SHALL
PROVIDE ALL REASONABLE ASSISTANCE DURING SOIL TESTING.
6. CONTRACTOR SHALL USE WATERTIGHT PLUGS AT ALL TIMES. PLYWOOD, PLASTIC OR FILTER
FABRIC IN NOT ACCEPTABLE.
7. LIMITATION OF DISTURBED AREAS
a. CONTRACTOR SHALL BE LIMITED TO 2,100 LINEAR FEET OF DISTURBED AREA DURING
ANYTIME THROUGHOUT THE CONTRACT DURATION. THE WORK AREA ALLOWED SHALL BE
700 LINEAR FEET OF ASPHALT ROADWAY REMOVAL, 700 LINEAR FEET OF OPEN TRENCH
AND 700 LINEAR FEET OF ASPHALT ROADWAY RESTORATION. PRIOR TO DISRUPTION OF
THE NEXT SEGMENT OF ASPHALT ROADWAY REMOVAL, THE ASPHALT RESTORATION ON
THE PREVIOUS SEGMENT SHALL BE UNDERWAY.
b. CONTRACTOR SHALL SAFEGUARD ALL OPEN EXCAVATIONS FROM BOTH VEHICLE AND
PEDESTRIAN TRAFFIC.
c. NO TRENCHES SHALL REMAIN OPEN OVERNIGHT. PRIOR TO DAILY DEMOBILIZATION FROM
THE SITE, THE CONTRACTOR SHALL BACKFILL ALL EXCAVATIONS AND PROVIDE
TEMPORARY RESTORATION OF ALL DISTURBED AREAS.
d. THE CONTRACTOR SHALL COORDINATE THE WORK TO CONFORM TO THESE LIMITATIONS, UNLESS OTHERWISE APPROVED, IN WRITING, BY THE RESIDENT PROJECT
REPRESENTATIVE.
8. UPON COMPLETION OF THE WORK, THE SEWER LINES SHALL BE CLEANED, WITH ALL DEBRIS
REMOVED AT DOWNSTREAM MANHOLE. EACH SECTION OF SANITARY PIPE WILL BE TV
INSPECTED BY THE COUNTY TO INDICATE ANY PIPE DEFECTS. BELLIES OR OTHER DEFORMITIES WILL BE RE-LAID TO PROVIDE THE CORRECT LINE AND GRADE. OCU WILL BILL THE CONTRACTOR DIRECTLY FOR TV RE-INSPECTION PROVIDED BY THE COUNTY (PER LINEAR FOOT), IF THE LINE FAILS THE INITIAL INSPECTION. ALL MANHOLES SHALL BE EXAMINED FOR PROPER GRADE AND
WATER TIGHTNESS. THE CONTRACTOR SHALL ASSIST THE ENGINEER BY PROVIDING ALL
INSPECTION ASSISTANCE AS REQUIRED. THE CONTRACTOR SHALL MAKE NOTE OF ANY
CORRECTIONS REQUIRED AND SHALL PERFORM ALL REMEDIAL ACTIONS PRIOR TO THE FINAL
ACCEPTANCE BY THE RPR. THE ASPHALT SHALL BE PLACED AFTER THE PIPE WORK AND
TESTING ARE COMPLETED AND ACCEPTED BY THE COUNTY.
9. THE OWNER SHALL PROVIDE THE SERVICES OF A TESTING LABORATORY TO DETERMINE
WHETHER THE REQUIREMENTS FOR MATERIALS SPECIFICATIONS ARE MET. THE CONTRACTOR
SHALL GIVE THE RPR A MINIMUM OF 48 HOURS NOTICE WHEN REQUESTING FIELD TESTS. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS BEFORE STARTING ANY ACTIVITY THAT
REQUIRES TESTING.
10. THE CONTRACTOR MAY BE ALLOWED TO FURNISH AND PLACE EXCAVATABLE FLOWABLE FILL AS
A NO ADDITIONAL COST ALTERNATIVE TO BACKFILLING AND COMPACTING SOILS AS APPROVED
BY THE ENGINEER AND THE JURISDICTIONAL AUTHORITY RESPONSIBLE FOR THE RIGHT-OF-WAY.
11. BEFORE A CONNECTION IS TO BE MADE TO AN EXISTING PIPE OR MANHOLE, THE CONTRACTOR SHALL EXCAVATE THE AREA TO VERIFY THE TYPE, SIZE, ELEVATION, AND CONDITION OF THE
PIPE AND/OR MANHOLE, AND OBTAIN THE ENGINEER'S APPROVAL FOR THE PROPOSED
CONNECTION METHOD, UNLESS OTHERWISE DETAILED IN THE SPECIFICATIONS OR DRAWINGS.
12. LATERALS SHALL BE BURIED BETWEEN THREE (3) AND FIVE (5) FEET BELOW THE FINISH GRADE AT THE RIGHT OF WAY LINES. CLEANOUTS SHALL BE LOCATED AS CLOSE AS PRACTICAL TO THE R/W LINE, AS APPROVED BY THE ENGINEER. THE LOCATION OF LATERALS SHOWN ON PLANS IS APPROXIMATE. IF THERE IS NO EXISTING LATERAL, THE CONTRACTOR SHALL COORDINATE FINAL
LOCATION WITH PROPERTY OWNER PRIOR TO CONSTRUCTION. THE LOCATION OF LATERALS
SHALL BE MARKED WITH AN "S" ON THE TOP OF THE CURB, SIDEWALK OR EDGE OF PAVEMENT IF
NO CURB OR SIDEWALK EXISTS.
13. AVOID PLACEMENT OF CLEANOUTS IN DRIVEWAYS AND OTHER PAVED AREAS UNLESS
OTHERWISE INDICATED IN THE DRAWINGS, OR IF DIRECTED BY THE RPR TO DO SO. IN THESE
LOCATIONS ALL CLEANOUTS SHALL BE H20 TRAFFIC LOAD RATED WITH METAL LOCKABLE
COVERS STAMPED WITH THE WORD "SEWER".
14. USE EXTREME CAUTION WHEN EXCAVATING OR CONNECTING TO ASBESTOS CEMENT PIPE. THE
CONTRACTOR WILL BE REQUIRED TO SUPPLY TRUCKS CAPABLE OF PUMPING OUT THE PUMP
STATION UPSTREAM FROM BREAKS OR CONNECTION POINT. WHEN CONNECTING TO ASBESTOS
CEMENT WATER MAIN OR FORCE MAIN THE CONTRACTOR IS REQUIRED TO REPLACE ANY
DAMAGED LENGTHS OF PIPE. THE AMOUNT OF REPLACED PIPE WILL BE DETERMINED BY THE
ORANGE COUNTY UTILITIES INSPECTOR.
15. UNDER NO CIRCUMSTANCE SHALL THE ACTIVITIES OF THE CONTRACTOR OR HIS
SUBCONTRACTORS CAUSE ANY INTERRUPTIONS TO THE SERVICE OR OPERATION OF EXISTING
UTILITIES WITHOUT WRITTEN AUTHORIZATION FROM AN AUTHORIZED REPRESENTATIVE OF THE
UTILITY COMPANY OR ANY PIPING OR OTHER UTILITIES WHICH CAN BE REMOVED DURING
CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED
BY THE CONTRACTOR WITH THE PERMISSION OF THE ENGINEER AND THE UTILITY OWNER.
CONTRACTOR SHALL COPY ENGINEER OF ALL CORRESPONDENCE WITH UTILITY OWNER.
ORANGE COUNTY UTILITIES CONTRACTOR PROCEDURE TO CONNECT NEW WATER MAIN TO EXISTING
WATER MAIN:
16. ALL WORK TO BE COMPLETED BY CONTRACTOR UNLESS OTHERWISE NOTED.
17. THE ORANGE COUNTY UTILITIES CONSTRUCTION DIVISION (407-254-9798) SHALL BE NOTIFIED AT LEASE SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION ACTIVITY, OR PRIOR TO ANY ACTIVITY REQUIRING THE PRESENCE OF OR AN ACTION BY UTILITIES STAFF SUCH AS VALUE OPERATION, PRESSURE TESTING, PIPE CONNECTION, PUMP STATION OPERATION OR SHUTDOWN, ETC.
18. INSTALL NEW WATER MAIN.
19. MAKE TEMPORARY CONNECTIONS TO AN EXISTING POTABLE WATER SOURCE; FLUSH OUT NEW
WATER MAIN WITH POTABLE WATER (USE “JUMPER” ASSEMBLY WITH BACKFLOW PREVENTER).
20. FILL NEW WATER MAIN WITH POTABLE WATER AND PRESSURE TEST AT 150 PSI FOR 2 HOURS.
21. AS-BUILTS MUST BE COMPLETED AND SUBMITTED TO OCU INSPECTOR PRIOR TO WATER MAIN
CHLORINATION.
22. FLUSH HIGHLY CHLORINATED WATER OUT OF NEW WATER MAIN AND FILL WITH POTABLE WATER
AGAIN. CONTRACTOR TO MAINTAIN ADEQUATE CONTROLS AND DIVERSION DEVICES, CHECK
DAMS, HOLDING PONDS, DITCH BLOCKS, ETC. TO AVOID DIRECTLY DISCHARGING CHLORINATED
WATER TO ENVIRONMENTALLY SENSITIVE AREAS, WETLANDS OR WATER BODIES.
23. TAKE SAMPLES FOR BACTERIOLOGICAL TEST (TAKE SAMPLES ON TWO CONSECUTIVE DAYS).
24. AFTER ANALYSIS AND ACCEPTABLE RESULTS, SUBMIT TO ORANGE COUNTY UTILITIES
INSPECTOR WATER MAIN AND “CLEARANCE” PACKAGE INCLUDING BACTERIOLOGICAL TEST
RESULTS AS REQUIRED BY FDEP PERIMIT.
25. WAIT FOR PERMISSION FROM FDEP TO RELEASE NEW WATER MAIN FOR USE.
26. ONCE THE RELEASE IS RECEIVED, ORANGE COUNTY WATER DEPARTMENT NOTIFIES IN WRITING
(FLYERS ON ALL PEOPLE SERVICES BY THE EXISTING WATER MAIN THAT SERVICE WILL BE
INTERRUPTED (24 HOURS PRIOR TO INTERRUPTION) FOR CONNECTION TO THE NEW WATER
MAIN. CHLORINE RESIDUAL IS ONCE AGAIN VERIFIED.
27. ALL CONNECTIONS AND TAPS ON EXISTING MAINS SHALL MAINTAIN PRESSURE ON EXISTING MAIN (WET TAP). IF PRESSURE CANNOT BE MAINTAINED AND WITH PRIOR APPROVAL OF ORANGE COUNTY UTILTIIES INSPECTOR, THE PROCEDURE OUTLINED BELOW IN THE NOTES 13-21 SHALL
BE FOLLOWED. OTHERWISE SKIP THEM AND CONTINUE AT 22.
28. AFTER DEPARTMENT CLOSES UPSTREAM AND DOWNSTREAM VALVES INCLUDING LINE STOPS
VALVES TO ISOLATE PORTION OF EXISTING WATER MAIN AFFECTED.
29. THE EXISTING PIPE WILL BE FULLY EXCAVATED AND THE EXCAVATION DEWATERED SO THAT NO SOIL OR WATER IS WITHIN TWELVE INCHES OF THE BOTTOM OF THE WATER MAIN AT THE TIE-IN
SITE PRIOR TO INITIATING THE WORK.
30. THE PIPE SHALL BE BRUSHED CLEAN AND THE PIPE AND EXCAVATION TREATED WITH
HYDROCHLORIDE TO ASSIST WITH CONTAMINATION PREVENTION. (AWWA C651 STDS.)
31. A SECTION IS CUT FROM THE EXISTING WATER MAIN. WATER DRAINING FROM THE EXISTING
MAIN IS DIVERTED AND PUMPED SO THAT NO BACKFLOW OCCURS.
32. A FITTING OR PIPE SECTION IS INSTALLED (TYPICALLY NEED SLEEVE, PIPE SPOOL AND FILLER PIECE ARE PIPE AND FITTINGS ARE MECHANICALLY RESTRAINED; PRIOR TO INSTALLATION ALL
FITTINGS ARE SWABBED WITH CHLORINATED WATER. THE WATER LEVEL IN THE TRENCH IS
BELOW THE TRENCH BOTTOM. NO EXTERNAL WATER IS ALLOWED TO ENTER THE PIPE.
33. FITTING(S) OR TEE (USUALLY WITH VALVE) IS CONNECTED TO THE NEW WATER MAIN BY MEANS
OF FITTINGS NECESSARY.
34. VALVES ON EXISTING WATER MAIN ARE OPENED BY THE WATER DEPARTMENT AND WATER
FLOWS FROM EXISTING WATER MAIN TO NEW WATER MAIN. A VISUAL INSPECTION OF THE
CONNECTION IS MADE PRIOR TO BACKFILLING THE EXCAVATION TO INSURE THERE ARE NO
LEAKS.
35. THE CONNECTION PROCESS IS REPEATED ON BOTH ENDS OF THE NEW WATER MAIN.
36. IF THE EXISTING WATER MAIN IS TO REMAIN IN SERVICE, IT IS TO BE FLUSHED WITH POTABLE
WATER UNTIL NORMAL SYSTEM CHLORINE RESIDUAL IS OBTAINED. THE EXISTING WATER MAIN
WILL NOT BE CHLORINATED IF IT IS TO BE ABANDONED OR REMOVED.
37. COUNTY TAKES WATER SAMPLES FOR TWO CONSECUTIVE DAYS AND HAS THEM ANALYZED FOR
COLIFORM COUNT TO ENSURE WATER MEETS STANDARDS.
38. IF CUSTOMERS ARE SERVED FROM EXISTING POTABLE MAINS THAT ARE DEPRESSURIZED
DURING INSTALLATION OF NEW MAINS OR IF ANY OF THE BACTERIOLOGICAL SAMPLES ARE
POSITIVE, THE AREA WILL BE ISOLATED, SLUG CHLORINATION APPLIED AND THE BOIL WATER NOTICES DISTRIBUTED TO THE CUSTOMERS IN THE AFFECTED AREA. THE MAIN WILL BE BLOWN
OFF AGAIN AND SAMPLES RETAKEN. THIS PROCESS WILL BE REPEATED UNTIL PASSING
SAMPLES ARE ACHIEVED.
PUBLIC SIDEWALK CURB RAMPS
39. CONTRACTOR SHALL CONSTRUCT SIDEWALK CURB RAMPS CONFORMING TO FDOT INDEX
522-002 AND ADA STANDARDS AT INTERSECTIONS IMPACTED BY THE UTILITY CONSTRUCTION.
ACCESS AND MAINTENANCE OF TRAFFIC
40. CONTRACTOR SHALL SUBMIT A DETAILED MAINTENANCE OF TRAFFIC PLAN FOR PHASING OF
WORK IN THE SUBDIVISION. MAINTENANCE OF TRAFFIC AND PHASING PLANS SHALL BE
APPROVED BY THE PROJECT OWNER BEFORE IT CAN BE IMPLEMENTED IN THE FIELD.
CONTRACTOR SHALL SEQUENCE WORK TO MINIMIZE DISRUPTION OF VEHICULAR AND
PEDESTRIAN TRAFFIC. CONTRACTOR SHALL INCLUDE SIGN BOARDS A MINIMUM OF ONE WEEK IN
ADVANCE OF ROAD CLOSURES OR AS DEFINED BY ORANGE COUNTY PUBLIC WORKS AND THE
MOT PERMIT.
41. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF
ADEQUATE TRAFFIC CONTROL DEVICES AND BARRIERS, FOR THE PROTECTION OF VEHICLES,
PEDESTRIANS AND THE WORKERS. THE COST OF TRENCH BOXES IF REQUIRED BY TO
IMPLEMENT THE APPROVED M.O.T. PLAN, SHALL BE INCLUDED IN THE UNIT PRICE FOR UTILITY CONSTRUCTION. ALL WORK SHALL BE IN ACCORDANCE WITH THE F.H.W.A. MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES AND F.D.O.T. SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION, LATEST EDITION AND REVISION, AND MEET WITH THE APPROVAL OF ORANGE
COUNTY PUBLIC WORKS DEPARTMENT.
42. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING EACH EMPLOYEE SUPERVISING THE
SELECTION AND PLACEMENT OF M.O.T. CONTROL DEVICES SHALL BE PROPERLY TRAINED AND
CERTIFIED BY ATTENDING AND SUCCESSFULLY COMPLETING A FDOT APPROVED MOT COURSE.
THE TRAINING SHALL BE AT A LEVEL APPLICABLE TO THE EMPLOYEE'S LEVEL OF INVOLVEMENT.
ALL M.O.T. CERTIFICATIONS SHALL BE PROVIDED BY THE CONTRACTOR.
43. PEDESTRIAN CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH FDOT INDEX 102-660.
PEDESTRIAN CONTROL SHALL BE MAINTAINED ON ONE SIDE OF THE ROAD AT ALL TIMES. IF
UNABLE TO DO SO, THE CONTRACTOR SHALL PROVIDE TEMPORARY WALKWAYS, BOARDWALKS,
AND/OR TEMPORARY CONCRETE SIDEWALK.
44. LOCAL RESIDENTIAL ACCESS SHALL BE MAINTAINED AT ALL TIMES. PROVIDE WRITTEN
NOTIFICATION TO RESIDENTS SEVEN (7) DAYS PRIOR TO IMPLEMENTING ANY ROADWAY OR
DRIVEWAY CLOSURE.
45. ALL SIGNS AND TRAFFIC CONTROL DEVICES SHALL BE NEW OR LIKE NEW CONDITION. ALL SIGNS
SHALL BE POST MOUNTED UNLESS OTHERWISE INDICATED. EXISTING REGULATORY AND
WARNING SIGNS ARE TO BE MAINTAINED AT ALL TIMES UNLESS OTHERWISE NOTED.
CHANNELING DRUMS SHALL BE USED ON NEWLY PAVED ROADWAYS. WATER FILLED BARRIER
SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. DURING NON-WORKING HOURS,
NO EQUIPMENT, VEHICLES OR MATERIAL SHALL BE PARKED OR STORED WITHIN THE CLEAR
ZONE OF A ROADWAY OPEN TO VEHICULAR TRAFFIC. ON STREET PARKING IS FOR THE GENERAL
PUBLIC AND SHALL NOT BE USED FOR ANY OF THE FOLLOWING: CONTRACTOR OR
SUBCONTRACTOR PARKING, CONSTRUCTION STAGING, TRUCK STAGING, STORING OF
MATERIALS. DELIVERY TRUCKS SHALL NOT BLOCK TRAFFIC.
46. CONTRACTOR TO COMPLETE HIS WORK AT THE END OF EACH DAY AND REOPEN SIDEWALKS FOR
PUBLIC USE. SIDEWALKS SHALL CONSIST OF A STABILIZED ASPHALTIC SURFACE, OR EQUAL,
SUITABLE FOR PUBLIC FOOT TRAFFIC. MATERIAL TO BE USED SHALL BE APPROVED BY THE
COUNTY PRIOR TO INSTALLATION.
47. ALL TEMPORARY ROAD REPAIR SHALL HAVE A SMOOTH DRIVING SURFACE.
48. CONTRACTOR SHALL PROVIDE TEMPORARY REPAIR OF ALL DRIVEWAYS ON THE SAME DAY THE
PIPE IS INSTALLED.
49. CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE EMERGENCY RESPONSE
DEPARTMENT SERVING THE PROJECT AREA PRIOR TO EACH MOT/PHASING PLAN
IMPLEMENTATION AND ENSURE SAFE AND UNOBSTRUCTED PASSAGE THROUGH WORK ZONE BY
EMERGENCY VEHICLES TO EACH PROPERTY WITHIN THE PROJECT LIMIT. TEMPORARY DRIVING
SURFACE CAPABLE OF SUPPORTING FIRE DEPARTMENT’S APPARATUS LOAD AND MOVEMENT
GEOMETRY SHALL BE PROVIDED IF REQUIRED. SUCH TEMPORARY DRIVING SURFACE SHALL
ALSO ACCOMMODATE PASSENGER VEHICLES WITH LOW GROUND CLEARANCE. THE COSTS FOR
SUCH TEMPORARY DRIVING SURFACE AND RELATED DEMOLITION AND RESTORATION WORK
SHALL BE INCLUDED IN THE CONTRACTOR’S BID.
50. CONTRACTOR SHALL NOTIFY AND COORDINATE WITH OTHER ESSENTIAL SERVICE PROVIDERS
SUCH AS GARBAGE COLLECTION, MAIL AND PARCEL DELIVERY SERVICES PRIOR TO EACH
MOT/PHASING PLAN IMPLEMENTATION AND MAKE TEMPORARY PROVISIONS TO ENSURE
HOMEOWNERS’ ACCESS TO SUCH SERVICES ARE NOT INTERRUPTED. ANY
CHANGE/INTERRUPTION TO PROPERTY OWNERS’ NORMAL SERVICES INCLUDING SERVICE
LOCATIONS SHALL BE APPROVED BY THE PROJECT OWNER IN ADVANCE.
51. CONTRACTOR SHALL ABIDE BY THE WORKING HOURS ESTABLISHED BY THE PROJECT OWNER.
THE NORMAL WORK HOURS ARE DEFINED AS.
52. AT THE END OF EACH WORK PERIOD, CONTRACTOR SHALL RESTORE THE ROADWAY SURFACE
TO TRAFFIC WORTHY CONDITION TO ALLOW TWO-WAY VEHICULAR TRAFFIC. ALL EQUIPMENT,
MATERIALS, AND DEVICES TO REMAIN IN THE PROJECT LIMIT DURING THE AFTER HOURS SHALL
BE PROPERLY SECURED TO PROTECT PUBLIC SAFETY. AFTER HOURS SECURITY SHALL BE
PROVIDED IF REQUIRED.
EMERGENCY AND SPILLS
53. DURING CONSTRUCTION OF THIS PROJECT, THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL SAFETY STANDARDS.
54. IN THE EVENT OF A MAIN BREAK, SPILL OR OTHER EMERGENCY ASSOCIATED WITH ORANGE
COUNTY UTILITY LINES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY ORANGE COUNTY
UTILITY DISPATCH 836-2777 ANYTIME 24/7. THE CONTRACTOR SHALL PROVIDE TANKERS TO
IMMEDIATELY CLEAN UP ANY WASTEWATER SPILLS.
55. THE CONTRACTOR SHALL PROVIDE A WEATHERPROOF ENCLOSURE CONTAINING A LEGIBLY AND
ACCESSIBLE LIST OF EMERGENCY CONTACTS AND PHONE NUMBERS. THIS LIST SHALL BE
MAINTAINED AND ACCESSIBLE AT ALL TIMES THROUGH THE DURATION OF THE PROJECT.
56. ALL DAMAGE TO ORANGE COUNTY MAINS SHALL BE REPAIRED IMMEDIATELY BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE. IF THE REPAIR IS NOT DONE IN A TIMELY
MANNER, AS DETERMINED BY THE ORANGE COUNTY UTILITY INSPECTOR, ORANGE COUNTY MAY
PERFORM REPAIRS AND THE CONTRACTOR WILL BE CHARGED FOR SAID REPAIRS.
TREE REMOVAL / CLEARING AND GRUBBING NOTES:
57. WITHIN APPLICABLE AREAS, CONTRACTOR SHALL COMPLETELY CLEAR, GRUB, AND REMOVE OR
COMPLETELY GRIND ALL STUMPS THROUGH WOODED AND/OR UNIMPROVED AREAS, 10 FEET
CENTERED ON THE PROPOSED PIPELINE.
58. CONTRACTOR SHALL BE AWARE THAT TREES SMALLER THAN 10" CALIPER DIAMETER MAY NOT
APPEAR ON THE SURVEY.
59. WITHIN EACH SUBDIVISION ALL TREES REQUIRING REMOVAL SHALL BE REPLACED WITH A 4"
CALIPER DIAMETER LIVE OAK NEAR THE EXISTING LOCATION TO BE DETERMINED BY OCU.
60. THE CONTRACTOR SHALL PROVIDE A STATE OF FLORIDA CERTIFIED ARBORIST FOR ALL TREE LIMB AND TREE ROOT PRUNING AND PROTECTION ACTIVITIES. ARBORIST SHALL BE CERTIFIED
BY THE INTERNATIONAL SOCIETY OF ARBORICULTURE OR A FLORIDA LICENSED LANDSCAPE
ARCHITECT.
61. ALL TREES TO REMAIN WHOSE ROOTS MUST BE CUT DURING CONSTRUCTION SHALL HAVE ALL
CUT ROOTS TREATED TO GIVE THE TREE THE BEST CHANCE OF SURVIVAL.
62. LATERAL ROUTES MUST BE COORDINATED WITH ORANGE COUNTY PRIOR TO THE START OF
CONSTRUCTION.
X
X-XX
X
X-XX
SECTION REFERENCE
A
AAP ALARM ANNUNCIATOR PANEL
AARV AUTOMATIC AIR RELEASE
VALVE
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABAN ABANDON(ED)
ABRSV ABRASIVE
ABS ACRYLONITRILE BUTADIENE
STYRENE
ABV ABOVE
AC ALTERNATING CURRENT
ACCMP ASPHALT-COATED
CORRUGATED METAL PIPE
ACP ASBESTOS CEMENT PIPE
ADDM ADDENDUM
ADH ADHESIVE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AHD AHEAD
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
AMT AMOUNT
APRX APPROXIMATE(LY)
ARCH ARCHITECT(URAL)
AS ALUM SOLUTION
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
A/C AIR CONDITIONING
A/VV AIR/VACUUM AIR VALVE
B
BAF BAFFLE
BCV BALL CHECK VALVE
BF BLIND FLANGE
BFV BUTTERFLY VALVE
BHP BRAKE HORSEPOWER
BI BLACK IRON
BITUM BITUMINOUS OR BITUMASTIC
B/L BASELINE
BLDG BUILDING
BLK BLOCK
BM BENCH MARK
BOC BACK OF CURB
BOT BOTTOM
BP BASE PLATE
BRG BEARING
BSP BLACK STEEL PIPE
BV BALL VALVE
BW BOTH WAYS
BWW BACKWASH WATER
C
CAP CAPACITY
CA COMPRESSED AIR
CAV COMBINATION AIR VALVE
CB CATCH BASIN
CCC CHLORINE CONTACT CHAMBER
CE CHLORINATED EFFLUENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CV CHECK VALVE
CI CAST IRON
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
CJ CONSTRUCTION JOINT
CKT CIRCUIT
C/L CENTER LINE
CL2 CHLORINE GAS
CLF CHAIN LINK FENCE
CLR CLEAR OR CLEARANCE
CLVT CULVERT
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE
ARCH
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNR CORNER
CO CLEAN OUT
CO2 CARBON DIOXIDE
COAG COAGULANT
COL COLUMN
COM COMMON
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCT(ION)
CONT CONTINUOUS
CONTR CONTRACT(OR)
COORD COORDINATE
CO COMPANY
CP CONCRETE PIPE
CPA CONCRETE PIPE ARCH
CPLG COUPLING
CPVC CHLORINATED POLYVINYL
CHLORIDE
CR CONCENTRIC REDUCER
CS CHLORINE SOLUTION
CSG CASING
CTV CABLE TELEVISION
CY CUBIC YARD
CYL CYLINDER
C&G CURB AND GUTTER
C/C CENTER TO CENTER
D
DAT DATUM
DBL DOUBLE
DC DIRECT CURRENT
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DF DIESEL FUEL
DI DUCTILE IRON
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DISCH DISCHARGE
DIR DIRECTION
DMH DROP MANHOLE
DN DOWN
DR DRAIN
DV DIAPHRAGM VALVE
DW DRIVEWAY
DWG DRAWING
DWV DRAIN, WASTE, AND VENT
E
E EAST
EA EACH
ECC ECCENTRIC
EF EACH FACE
EFF EFFLUENT
E/L EASEMENT LINE
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
EMER EMERGENCY
ENC ENCASE(MENT)
ENGR ENGINEER
EP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EPRF EXPLOSION PROOF
EQUIP EQUIPMENT
ER ECCENTRIC REDUCER
ESMT EASEMENT
EST ESTIMATE(D)
EW EACH WAY
EXC EXCAVATE
EXP EXPANSION
EXST EXISTING
EXST GR EXISTING GRADE
EXT EXTERIOR
EXTN EXTENSION
F
FAB FABRICATE(D)
FCA FLANGED COUPLING ADAPTER
FB FLAT BAR
FCV FLOW-CONTROL VALVE
FD FLOOR DRAIN
FDN FOUNDATION
FE FILTER(ED) EFFLUENT
FHY FIRE HYDRANT
FIG FIGURE
FIN FINISH(ED)
FIN FLR FINISH FLOOR
FIN GR…