Y26-707_Wekiwa_Phase_5A_Bid_Set_Specs.pdf

PDF 16 MB Posted

Attached to
Wekiwa Springs Septic Tank Retrofit Ph 5A, Carol Woods Way & Wekiva Ridge Road
Solicitation number
Y26-707
Issued by
Orange County, Orlando City, Florida

About this file

Summary of Wekiwa Springs Septic Tank Retrofit Phase 5A Bid Set Specifications

This technical specifications document, prepared by Tetra Tech, Inc. for Orange County Utilities Department in Orange County, Florida, provides comprehensive engineering specifications for the Wekiwa Springs Septic Tank Retrofit Project Phase 5A located on Carol Woods Way and Wekiva Ridge Road. The project involves the construction of a sewage collection and transmission system serving approximately 63 single-family homes and one institutional facility, with an estimated design flow of 15,435 gallons per day. The scope of work includes 3,417 linear feet of 8-inch PVC gravity sewer mains, 755 linear feet of 4-inch PVC force mains, one 133-gallon-per-minute duplex pump station, associated manholes, valves, and appurtenances. The sealed bid submission deadline is January 15, 2026, at 4:00 PM EST via the OpenGov e-Procurement Platform, with a question submission deadline of December 3, 2025, at 5:00 PM EST. A non-mandatory virtual pre-bid conference is scheduled for November 24, 2025, at 1:30 PM. The contractor must commence work within 14 days of receiving the Notice to Proceed and achieve substantial completion within 365 consecutive calendar days, with final completion within 395 consecutive calendar days.

The estimated project cost is $4,664,610.00, with mobilization costs capped at 5% of the total base bid. Contractors must provide three references demonstrating experience with submersible public raw wastewater pump station construction, force main installation, and gravity sanitary sewer installation. Insurance requirements include workers' compensation, commercial general liability of $1,000,000, and contractor's pollution liability of $1,000,000 per occurrence. Bid, payment, and performance bonds are required for this contract exceeding $100,000. Retainage is set at 5% on progress payments until substantial completion, with potential reduction at the Project Manager's discretion. Liquidated damages are assessed at $500 per calendar day for failure to achieve substantial or final completion by specified dates. The project requires integration with Orange County's existing SCADA system and compliance with Florida Statutes, Orange County ordinances, OSHA requirements, and the Florida Trench Safety Act. Geotechnical investigations have identified subsurface conditions consisting primarily of loose to medium-dense sands and clayey sands, with groundwater levels ranging from 6 to 15 feet below existing grade.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEKIWA SPRINGS

SEPTIC TANK RETROFIT PROJECT

PHASE 5A

CAROL WOODS WAY & WEKIVA RIDGE ROAD

TECHNICAL SPECIFICATIONS

ORANGE COUNTY

UTILITIES

DEPARTMENT

Prepared By:

Tetra Tech, Inc.

201 E. Pine Street, Suite 1000

Orlando, Florida 32801

SEPTEMBER 2025

BID SET

PORTION OF

ENGINEERING

DOCUMENTS FOR

WHICH RESPONSIBLE

NAME AND

LICENSE NUMBER

COMPANY ADDRESS

AND

BUSINESS NUMBER

SIGNATURE, SEAL, AND

DATE

GENERAL AND CIVIL

BURL REARDON

P.E. #64037

TETRA TECH, INC.

201 E. PINE STREET,

SUITE 1000

ORLANDO, FL 32801

BUSINESS NO. 2429

PUMP STATION

DANIEL MAGRO

P.E. #64708

ACLUS ENGINEERING,

LLC.

WINDERMEREDOWN

PLACE, WINDERMERE,

FL 34786

STRUCTURAL

SCOTT JENKINS

P.E. 89877

TETRA TECH, INC.

201 E PINE STREET,

SUITE 1000

ORLANDO, FL 32801

PLUMBING

FAISAL ALTWAL

P.E. # 92862

TETRA TECH, INC.

201 E PINE STREET,

SUITE 1000

ORLANDO, FL 32801

ELECTRICAL

NAHUEL BOTTARINI

P.E. # 99591

TETRA TECH, INC.

201 E PINE STREET,

SUITE 1000

ORLANDO, FL 32801

b.swartzentruber Stamp b.swartzentruber Snapshot b.swartzentruber Text Box THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY BURL REARDON ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

danie Text Box THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY DANIEL MAGRO ON THE DATE ADJACENT TO THE SEAL. PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

Bid Form

August 2025

ORANGE COUNTY UTILITIES DIVISION

ORANGE COUNTY, FLORIDA

CAPITAL PROJECT NO. XXXX-XXXX

WEKIWA SPRINGS SEPTIC TANK RETROFIT PHASE 5A

CAROL WOODS WAY AND WEKIVA RIDGE ROAD

BID FORM

Bidder is to understand that the Total Bid Price is based on the estimated quantities indicated as follows and will control in awarding the Contract as provided in the Instructions to Bidders. It is further understood that the quantities stated in the Schedule of Bid Prices for various items are estimated only and may be increased or decreased as provided in the Contract.

BID

ITEM

NO.

REF.

ID NO.

DESCRIPTION

EST.

QTY.

UNIT UNIT PRICE EXTENDED PRICE

1 10.110.110

Mobilization, Demobilization, Bonds, and Permits (not to exceed 5% of the total of all bid items except bid items under Section 10.1 General)

1 LS

2 10.120.110 Preconstruction Audio-Video Documentation 1 LS

3 10.130.110 Indemnification 1 LS

4 10.140.110

Project Record Documents (a minimum of 1% of the total of all bid items except bid items under Section 10.1 General)

5 10.150.110 Maintenance of Traffic 1 LS

6 10.160.110 Public Information Officer 1 LS

7 10.170.110 License Agreement / Notification to Homeowner 1 LS

8 11.110.110 Erosion and Sediment Control 1 LS

9 11.120.110 Unsuitable Materials 200 CY

10 11.130.110 Fill Dirt 200 CY

11 11.230.110 Milling and Resurfacing (SP 12.5 - 1.5" Thick)

1581 SY

12 11.241.110 Asphalt Pavement Removal and Replacement (Novella Eliza Lane)

1633 SY

13 11.250.111 Concrete Driveway Removal and Replacement (6" Thick)

7 EA

14 11.250.112 Concrete Driveway Removal and Replacement (8" Thick)

1 EA

15 11.252.110 Concrete Paver Driveway Replacement 7 EA

16 11.270.110 Storm Pipe Replacement (15" RCP) 1 EA

17 11.270.111 Storm Pipe Replacement (18" RCP) 2 EA

18 11.270.112 Storm Pipe Replacement (48" RCP) 2 EA

August 2025

ORANGE COUNTY UTILITIES DIVISION

ORANGE COUNTY, FLORIDA

CAPITAL PROJECT NO. XXXX-XXXX

WEKIWA SPRINGS SEPTIC TANK RETROFIT PHASE 5A

NO.

REF.

ID NO.

DESCRIPTION

EST.

QTY.

UNIT UNIT PRICE EXTENDED PRICE

19 11.270.113 Storm Structure Removal (Flume) 1 EA

20 11.270.114 FDOT Type “C” Inlet 4 EA

21 11.270.115 FDOT Mitered End Section 1 EA

22 11.270.116 18” Reinforced Concrete Pipe 273 LF

23 11.270.117 Concrete Weir 1 EA

24 11.420.110 Bypass Pump Station (<500 gpm) 1 EA

25 11.530.110 Remove Existing Pipe (3-Inch Forcemain) 650 LF

26 12.110.110 Water Main with Fittings and Restrained Joints (RJ) (4” Diameter PVC)

121 LF

27 12.110.111 Water Main with Fittings and Restrained Joints (RJ) (6” Diameter PVC)

130 LF

28 12.130.110 Forcemain with Fittings and Restrained Joints (RJ) (4” Diameter PVC)

755 LF

29 12.210.110 Gate Valve with Box (4-Inch Diameter) 1 EA

30 12.230.110 Blow Off Valve Assembly (2” Diameter Automatic)

1 EA

31 12.310.110 Tapping Sleeve and Valve Assembly (4” Diameter – Forcemain)

1 EA

32 12.310.111 Tapping Sleeve and Valve Assembly (6” Diameter – Water)

1 EA

33 12.530.110 Offset Air Release Valve Assembly (2” Diameter)

1 EA

34 12.560.110 Water Service Connection (Short, Single) W/Double Meter Box

3 EA

35 12.560.111 Water Service Connection (Long, Single) W/Double Meter Box

8 EA

36 12.560.112 Water Service Connection (Short, Double) W/Double Meter Box

13 EA

37 12.560.113 Water Service Connection (Long, Double) W/Double Meter Box

10 EA

38 13.310.110 Sanitary Sewer Main 8-Inch Diameter (0' to 6' Depth)

608 LF

39 13.310.111 Sanitary Sewer Main 8-Inch Diameter (0' to 6' Depth) (Novella Eliza Lane)

74 LF

40 13.310.112 Sanitary Sewer Main 8-Inch Diameter (8' to 10' Depth)

76 LF

41 13.310.113 Sanitary Sewer Main 8-Inch Diameter (10' to 12' Depth)

400 LF

August 2025

ORANGE COUNTY UTILITIES DIVISION

ORANGE COUNTY, FLORIDA

CAPITAL PROJECT NO. XXXX-XXXX

WEKIWA SPRINGS SEPTIC TANK RETROFIT PHASE 5A

NO.

REF. ID

NO.

DESCRIPTION

EST.

QTY.

UNIT UNIT PRICE EXTENDED PRICE

42 13.310.114 Sanitary Sewer Main 8-Inch Diameter (10' to 12' Depth) (Novella Eliza Lane)

520 LF

43 13.310.115 Sanitary Sewer Main 8-Inch Diameter (12' to 14' Depth)

1739 LF

44 13.410.110 Sanitary Manholes 4-Feet Diameter (0' - 6' Depth)

5 EA

45 13.410.112 Sanitary Manholes 4-Feet Diameter (8' – 10’ Depth)

1 EA

46 13.410.113 Sanitary Manholes 4-Feet Diameter (10' - 12' Depth)

2 EA

47 13.410.114 Sanitary Manholes 4-Feet Diameter (12' - 14' Depth)

3 EA

48 13.620.110 Install/Repair/Replace 6" Diameter Sanitary Sewer Lateral and Cleanout (0' to 5' Depth @ Main)

16 EA

49 13.620.111 Install/Repair/Replace 6" Diameter Sanitary Sewer Lateral and Cleanout (6' to 10’ Depth @ Main)

23 EA

50 13.620.112 Install/Repair/Replace 6" Diameter Sanitary Sewer Lateral and Cleanout (10' to 15' Depth @ Main)

18 EA

51 13.630.120 Install Sanitary Sewer Backwater Valve 7 EA

52 13.710.110 Septic Tank Abatement / House Lateral Installation

57 EA

53 14.110.110 Duplex Pump Station 1 LS

54 14.110.111 Temporary Paved Access, Fire Station Equipment Relocation, and Connection of Church Property Work

TOTAL BID $

August 2025

ORANGE COUNTY UTILITIES DIVISION

ORANGE COUNTY, FLORIDA

CAPITAL PROJECT NO. XXXX-XXXX

WEKIWA SPRINGS SEPTIC TANK RETROFIT PHASE 5A

THIS PAGE LEFT BLANK INTENTIONALLY

-i- 2025-09 Wekiwa Springs Septic Ph 5A

WEKIWA SPRINGS SEPTIC TANK RETROFIT PROJECT

PHASE 5A

CAROL WOODS WAY & WEKIVA RIDGE ROAD

Table of Contents

DIVISION 1 – GENERAL REQUIREMENTS

01001 General Work Requirements rev January 2021

01010 Summary of Work rev November 2021

01021 Soils Report and Other Information

01025 Measurement and Payment rev November 2021

01027 Applications for Payment rev January 2016

01050 Surveying and Field Engineering rev January 2016

01065 Permits and Fees rev January 2021

01070 Abbreviations and Symbols

01091 Reference Specifications

01101 Special Requirements (Gravity Inspection Only)

01200 Project Meetings rev January 2016

01300 Submittals

01301 Product Substitutions

01310 Progress Schedules rev May 2013

01340 Web Based Project Controls System rev January 2022

01370 Schedule of Values rev December 2014

01380 Audio-Visual Documentation

01400 Quality Control

01410 Testing and Laboratory Services rev December 2014

01516 Collection System Bypass rev December 2020

01560 Erosion and Sedimentation Control rev November 2012

01570 Maintenance of Traffic rev March 2015

01580 Project Identification and Signs rev November 2021

01590 Construction Field Office

01610 Delivery Storage and Handling

01650 Pump Station Start-up and Testing

01700 Project Closeout

01720 Project Record Documents rev January 2016

01730 Pump Station Operation and Maintenance Manual 01740 Warranties and Bonds

DIVISION 2 – SITE WORK

02002 FDOT Standard Specifications for Road and Bridge Construction

02050 Demolition of Existing Structures

02080 Abandonment, Removal, and Salvage or Disposal of Existing Pipe

02102 Clearing and Grubbing

02140 Dewatering rev October 2020

02215 Finish Grading

02220 Excavating, Backfilling, and Compacting 02360 Sheet Steel Piling rev October 2020

-ii- 2025-09 Wekiwa Springs Septic Ph 5A

PHASE 5A

CAROL WOODS WAY & WEKIVA RIDGE ROAD

02570 Stabilized Subgrade

02573 Asphalt Pavement Removal and Replacement rev January 2021

02576 Concrete Sidewalks and Driveways rev January 2021

02577 Stormwater System

02578 Solid Sodding

02661 Wastewater Force Mains rev December 2020

02670 Pressure Main Sample Collection Systems

02761 Cleaning Sanitary Sewer Systems rev May 2013

02762 Televising Sanitary Sewer Systems rev May 2013

02763 Televising Sanitary Sewer Laterals

02764 Televising Existing Manholes

02774 Wastewater Gravity Collection System rev December 2021

02784 Chain Link Fences and Gates

DIVISION 3 – CONCRETE

03100 Concrete Formwork

03200 Concrete Reinforcement

03300 Cast-in-Place Concrete rev November 2020

03410 Precast Concrete Structures rev December 2021

DIVISION 4 – MASONRY (NOT USED)

DIVISION 5 – METALS

05500 Miscellaneous Metals rev November 2020

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES (NOT USED)

DIVISION 7 – THERMAL AND MOISTURE PROTECTION (NOT USED)

DIVISION 8 –OPENINGS

08350 Access Hatch Doors

DIVISION 9 – FINISHES

09865 Surface Preparation and Shop Prime Painting

09901 Coating and Linings rev January 2016

09905 Pump Station Valve Identification System

09910 Prefabricated Fiberglass Liners 09960 High Performance Ferrous Metal Coatings

-iii- 2025-09 Wekiwa Springs Septic Ph 5A

PHASE 5A

CAROL WOODS WAY & WEKIVA RIDGE ROAD

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT

11305 Submersible Pumps and Appurtenances rev May 2014

11305-A Submersible Pump Schedule rev October 2021

DIVISION 12 – FURNISHING (NOT USED)

DIVISION 13 – SPECIAL CONSTRUCTION

13423 Level Measurement - Have this in Specs

13430 Pump Station Control Panels rev September 2013 - Have this in Specs

13431 Pump Station SCADA Panels rev September 2019

DIVISION 14 – CONVEYING EQUIPMENT (NOT USED)

DIVISION 15 – MECHANICAL

15062 Ductile Iron Pipe and Fittings

15064 Polyvinyl Chloride (PVC) Pipe and Fittings rev December 2021

15065 Stainless Steel Pipe and Fittings

15100 Ancillary Equipment rev June 2021

15105 Check Valves 15110 Plug Valves rev October 2021

DIVISION 16 – ELECTRICAL

16010 Electrical General Provisions

16110 Raceways

16120 Wires and Cables

16135 Electrical Boxes and Fittings

16142 Electrical Connections for Equipment

16143 Wiring Devices

16170 Circuit and Motor Disconnects

16180 Over Current Protective Devices

16190 Supporting Devices

16195 Electrical Identification

16420 Service Entrance 16450 Grounding

-iv- 2025-09 Wekiwa Springs Septic Ph 5A

PHASE 5A

CAROL WOODS WAY & WEKIVA RIDGE ROAD

DIVISION 17 – GENERAL TESTING

17166 Field Testing

DIVISION 33 – SITE UTILITIES

330000 Petroleum Storage and Distribution Systems

APPENDIX A GEOTECHNICAL REPORT

Geotechnical Study Report for Wekiwa Springs Sanitary-Sewer Retrofit Phase 5A, Orange

County, Florida, prepared by Antillian Engineering Associates, Inc., dated May 5, 2025

APPENDIX B FORMS

Digital Data Submission rev January 2016

Pressure Main Sample Collection Submittal Form rev January 2016

Pressure Test rev October 2021

Pump Station Start-Up rev October 2021

License Agreement for work on private property rev December 2020

Risk Management Division Information Sheet

Water Main Disinfection Certification rev October 2021

System Connection rev October 2021

APPENDIX C PERMITS OBTAINED BY COUNTY

FDEP General Permit for Domestic Wastewater Collection/Transmission Systems

FDEP General Permit for Construction of Water Main Extensions for PWS

SJRWMD Fire Station ERP Modification (Pending)

SJRWMD Novella Eliza Lane ERP Verification of Exemption (Pending)

Orange County Building Permit (Pending)

APPENDIX D LIST OF APPROVED PRODUCTS

Orange County Utilities – Approval Process for New Products rev October 2021

Orange County Utilities – List of Approved Products rev October 2021

APPENDIX E PUMP STATION EASEMENT

Pump Station Easements and Legal Description

APPENDIX F DEWATERING DISCHARGE OFF-SITE

Orange County EPD Work Instruction

FDEP Generic Permit for the Discharge of Produced Groundwater

FDEP Notice of New Method for Mercury Testing

Memo – EPA – Analytical Methods for Mercury in NPDES Permits

-v- 2025-09 Wekiwa Springs Septic Ph 5A

PHASE 5A

CAROL WOODS WAY & WEKIVA RIDGE ROAD

APPENDIX G TEMPORARY PAVED ACCESS

Church Property Temporary Construction Agreement, Easements and Legal Description

01001 - 1 of 18 OCU Master CIP Technical Specifications rev: January 2025

SECTION 01001

GENERAL WORK REQUIREMENTS

PART 1 - GENERAL

1.01 NOTICE AND SERVICE

1.02 WORK TO BE DONE

1.03 DRAWINGS AND PROJECT MANUAL

1.04 PROTECTION AND RESTORATION

1.05 PUBLIC NUISANCE

1.06 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK

1.07 MAINTENANCE OF SERVICE

1.08 TRANSFER OF SERVICE

1.09 LABOR

1.10 MATERIALS AND EQUIPMENT

1.11 MANUFACTURER'S SERVICE

1.12 INSPECTION AND TESTING

1.13 PROJECT SITE AND ACCESS

1.14 UTILITIES

1.15 RELATED CONSTRUCTION REQUIREMENTS

1.16 CONSTRUCTION NOT PERMITTED

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

01001 - 2 of 18

SECTION 01001

GENERAL WORK REQUIREMENTS

PART 1 - GENERAL

1.01 NOTICES

A. All notices or other papers required to be delivered by the Contractor to the County shall be delivered to the office of the Engineering Division, Orange County Utilities

Department, 9150 Curry Ford Road, Orlando, FL 32825.

1.02 WORK TO BE DONE

A. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all work required by these specifications and as shown on the

Drawings, at a rate of progress which will ensure completion of the Work within the

Contract Time stipulated.

B. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean up, replacements, and restoration required as a result of damages caused during this construction.

C. The Contractor shall comply with all City, County, State, Federal, and other codes, which are applicable to the proposed Work.

D. All newly constructed Work shall be carefully protected from injury in any way. No wheeling, walking, or placing of heavy loads on it shall be allowed and all portions damaged shall be reconstructed by the Contractor at his own expense.

E. Scope of Work: See Section 01010 "Summary of Work" and the Bid Schedule for details.

1.03 DRAWINGS AND PROJECT MANUAL

A. The Work shall be performed in accordance with the Drawings and Specifications prepared by the County/Professional. All work and materials shall conform to the

Orange County Utilities Standards and Construction Specifications Manual, latest edition or as indicated in these Specifications or Drawings.

B. The Contractor shall verify all dimensions, quantities and details shown on the Drawings, Supplementary Drawings, Schedules, Specifications or other data received from the

County/Professional, and shall notify same, in writing, of all errors, omissions, conflicts and discrepancies found therein. Failure to discover or correct errors, conflicts or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory

Work, faulty construction or improper operation resulting there from, nor from rectifying such conditions at his own expense.

01001 - 3 of 18

C. All schedules are given for the convenience of the County and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for the making of estimates of the size, kind, and quantity of materials and equipment included in the

Work to be done under this Contract.

D. Intent:

1. All Work called for in the Specifications applicable to this Contract, but not shown on the Drawings in their present form, or vice versa, shall be of like effect as if shown or mentioned in both. Work not specified either in the Drawings or in the

Specifications, but involved in carrying out their intent or in the complete and proper execution of the Work, is required and shall be performed by the Contractor as though it were specifically delineated or described.

2. Items of material, equipment, machinery, and the like may be specified on the

Drawings and not in the Specifications. Such items shall be provided by the

Contractor in accordance with the specification on the Drawings.

3. The apparent silence of the Specifications as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of these Specifications shall be made upon that basis.

E. Refer to the Contract for the order of precedence of items and documents.

1.04 PROTECTION AND RESTORATION

A. The Contractor shall be responsible for the preservation of all public and private property, and shall use every means of protection necessary to prevent damage thereto. If any direct or indirect damage is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the Work on the part of the

Contractor, such property shall be restored by the Contractor, at his expense, to a condition similar or equal to that existing before the damage was done, or the Contractor shall make good the damage in other manner acceptable to the County/Professional.

B. Protection of Trees and Shrubs

1. Protect with boxes or other barricades.

2. Do not place excavated material so as to injure trees or shrubs.

3. Install pipelines in short tunnels between and under root systems.

4. Support trees to prevent root disturbance during nearby excavation.

C. Tree and Limb Removal

1. Tree limbs, which interfere with equipment operation and are approved for pruning, shall be neatly trimmed and the tree cut coated with tree paint.

2. The County may order the Contractor, for the convenience of the County, to remove trees along the line or trench excavation. The Contractor shall obtain any permits required for removal of trees. Ordered tree removal shall be paid for under the appropriate Contract Items.

01001 - 4 of 18

D. Trees or shrubs destroyed by negligence of the Contractor or his employees shall be replaced by the Contractor with new stock of similar size and age, at the proper season and at the sole expense of the Contractor.

E. Lawn Areas: All lawn areas disturbed by construction shall be replaced with like kind to a condition similar or equal to that existing before construction. Where sod is to be removed, it shall be carefully removed, and the same re-sodded, or the area where sod has been removed shall be restored with new sod in the manner described in the applicable section.

F. Where fencing, walls, shrubbery, grass strips or area must be removed or damaged incident to the construction operation, the Contractor shall, after completion of the work, replace or restore to the original condition.

G. The cost of all labor, materials, equipment, and work for restoration shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made therefore.

1.05 PUBLIC NUISANCE

A. The Contractor shall not create a public nuisance including, but not limited to, encroachment on adjacent lands, flooding of adjacent lands, or excessive noise.

B. Sound levels measured by the County/Professional shall not exceed 45 dBA from 8 p.m. to 8 a.m. or 55 dBA 8 a.m. to 8 p.m. This sound level shall be measured at the exterior of the nearest exterior wall of the nearest residence. Levels at the equipment shall not exceed 85 dBA at any time. Sound levels in excess of these values are sufficient cause to have the

Work halted until equipment can be quieted to these levels. Work stoppage by the

County/Professional for excessive noise shall not relieve the Contractor of the other portions of this specification including, but not limited to, completion dates and bid amounts.

C. No extra charge may be made for time lost due to work stoppage resulting from the creation of a public nuisance.

1.06 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK

A. County Inspector Work Hours: Normal work hours for the County’s inspector(s) are defined as any 8-hour period between the hours of 7:00 a.m. and 7:00 p.m. on the weekdays of Monday through Friday. Any County Inspector(s) work beyond the aforementioned normal work hours shall be requested in writing 48-hours in advance. All overtime, any County holidays or weekend work compensation for the

County’s Inspector(s) to work beyond the normal working hours are considered overtime compensation and shall be paid for by the Contractor. The overtime pay rate will be $51.00 per hour or the most current rate as listed in the County Fee

Directory prepared by the Office of Management and Budget, in section “Orange

County Utilities Engineering & Construction”, under the heading of “Inspection Fee

01001 - 5 of 18 other than Normal Working Hours”. The Contractor agrees that the County shall deduct charges for work outside normal work hours and for overtime pay from payments due the Contractor.

1.07 MAINTENANCE OF SERVICE

A. Unless noted otherwise on the plans, the operation of the existing water, reclaimed water or wastewater facility on each of the respective locations shall remain in service until the transfer of service has been completed. The Contractor shall, prior to interrupting any utility service (water, sewer, etc.) for the purpose of making cut-ins to the existing lines or for any other purposes, contact the County and make arrangements for the interruption which will be satisfactory to the County.

B. Utility lines that are damaged during construction shall be repaired by the

Contractor and service restored within 4-hours of the breakage. The County retains the option of repairing any damage to utility pipes in order to expedite service to the customers. The Contractor will remain responsible for all costs associated with the repair.

1.08 TRANSFER OF SERVICE

A. When the County has accepted a proposed facility and placed it into operation, the transfer of service is complete. The Contractor may begin the work of removing the existing or temporary facilities.

1.09 LABOR

A. Supervision: The Contractor shall supervise and direct the Work efficiently and with his best skills and attention. The Contractor shall have a competent, English speaking superintendent or representative, who shall be on the site of the Project at all working hours, and who shall have full authority by the Contractor to direct the performance of the Work and make arrangements for all necessary materials, equipment, and labor without delay.

B. Jurisdictional Disputes: It shall be the responsibility of the Contractor to pay all costs that may be required to perform any of the Work shown on the Drawings or specified herein to avoid any work stoppages due to jurisdictional disputes. The basis for subletting work in question, if any, shall conform to precedent agreements and decisions on record with the Building and Construction Trades Department, AFL-CIO, dated June, 1973, including any amendments thereto.

C. Apprenticeship: The Contractor shall comply with all of the requirements of Section

446, Florida Statutes, for all contracts in excess of $25,000 excluding roadway, highway or bridge contracts and the Contractor agrees to insert in any subcontract under this Contract the requirements of this Article.

01001 - 6 of 18

1.10 MATERIALS AND EQUIPMENT

A. MANUFACTURER

1. All transactions with the manufacturers or Subcontractors shall be through the

Contractor, unless the Contractor and the County/Professional request that the manufacturer or Subcontractor communicate directly with the County/Professional.

Any such transactions shall not in any way release the Contractor from his full responsibility under this Contract.

2. All workmanship and materials shall be of the highest quality. The equipment shall be the product of manufacturers who are experienced and skilled in the field with an established record of research and development. No equipment will be considered unless the manufacturer has designed and manufactured equipment of comparable type and size and have demonstrated sufficient experience in such design and manufacture.

3. No material shall be delivered to the Site without prior approval of the

County/Professional.

4. All apparatus, mechanisms, equipment, machinery, and manufactured articles for incorporation into the Project shall be the new (most current production at time of bid) and unused standard products of recognized reputable manufacturers.

5. Manufactured and fabricated products:

a. Design, fabricate and assemble in accord with the best engineering and shop practices.

b. Manufacture like parts of duplicate units to standard sizes and gauges, to be interchangeable.

c. Any two or more pieces of material or equipment of the same kind, type or classification, and being used for identical types of service, shall be made by the same manufacturer.

d. Products shall be suitable for service conditions as specified and as stated by manufacturer.

e. Equipment capacities, sizes and dimensions shown or specified shall be adhered to unless variations are specifically approved in writing.

f. Do not use material or equipment for any purpose other than that for which it is designed or is specified.

1.11 MANUFACTURER'S SERVICE

A. Where service by the manufacturer is specified to be furnished as part of the cost of the item of equipment, the Work shall be at the Contractor's expense.

B. The services provided shall be by a qualified manufacturer's service representative to check and verify the completed installation, place the equipment in operation, and instruct the County's operators in the operation and maintenance procedures. Such services are to be for period of time and for the number of trips specified. A working day is defined as a normal 8-hour working day on the job and does not include travel time.

C. The services shall further demonstrate to the County/Professional’s complete satisfaction that the equipment will satisfactorily perform the functions for which it has been installed.

01001 - 7 of 18

1.12 INSPECTION AND TESTING

A. General

1. All materials and equipment furnished by the Contractor shall be subject to the inspection, review and acceptance of the County and meet the requirements as outlined in the Orange County Utilities Standards and Construction Specifications

Manual. If in the testing of any material or equipment it is ascertained by the

County/Professional that the material or equipment does not comply with the

Contract, the Contractor shall be notified thereof, and the Contractor will be directed to refrain from delivering said material or equipment, or to remove it promptly from the Site or from the Work and not accepted by the County shall be replaced with acceptable material, without cost to the County.

2. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized test codes of the ANSI, ASME, or the IEE, except as may otherwise be stated herein.

3. The Contractor shall give notice in writing to the County sufficiently in advance of his intention to commence the manufacture or preparation of materials especially manufactured or prepared for use in or as part of the permanent construction. Such notice shall contain a request for inspection, the date of commencement and the expected date of completion of the manufacture or preparation of materials. Upon receipt of such notice, the County shall arrange to have a representative present at such times during the manufacture as may be necessary to inspect the materials; or the County will notify the Contractor that the inspection will be made at a point other than the point of manufacture; or the County will notify the Contractor that inspection will be waived.

4. When inspection is waived or when the County/Professional so requires, the

Contractor shall furnish to the County authoritative evidence in the form of

Certificates of Manufacture that the materials to be used in the Work have been manufactured and tested in conformity with the Contract Documents. These certificates shall be notarized and shall include five (5) copies of the results of physical tests and chemical analysis, where necessary, that have been made directly on the product or on similar products of the manufacturer.

5. The Contractor must comply with these provisions before shipping any material.

Such inspections by the County shall not release the Contractor from the responsibility for furnishing materials meeting the requirements of the Contract

Documents.

B. Cost

1. County shall employ and pay for the services of an independent testing laboratory to perform testing indicated on the Contract Documents, or at the County’s discretion to ensure conformity with the Contract Documents.

2. The cost of field leakage and pressure tests and shop tests of materials and equipment specifically called for in the Contract Documents shall be borne by the Contractor.

Such costs shall be deemed to be included in the Contract price.

3. The Contractor shall notify the County laboratory a minimum of 48-hours in advance of operations for scheduling of tests. When tests or inspections cannot be performed after such notice, the Contractor shall reimburse County for expenses incurred.

01001 - 8 of 18

4. The Contractor shall pay for all work required to uncover, remove, replace, retest, etc., any work not tested due to the Contractor's failure to provide the 48-hours advance notice or due to failed tests. The Contractor shall also provide compensation for the County/Professional’s personnel for required re-testing due to failed or rescheduled testing.

C. Shop Testing

1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance, function or special requirements are specified shall be tested in the shop of the manufacturer in a manner which shall conclusively prove that its characteristics comply fully with the requirements of the Contract Documents. No such equipment shall be shipped to the worksite until the County/Professional notifies the Contractor, in writing, that the results of such tests are acceptable.

2. The manufacturing company shall provide five (5) copies of the manufacturer's actual shop test data and interpreted results signed by a responsible official of the manufacturing company and notarized, showing conformity with the Contract

Documents as a prerequisite for the acceptance of any equipment. The cost of shop tests (excluding cost of County's representative) and of furnishing manufacturer's preliminary and shop test data of operating equipment shall be borne by the

Contractor and shall be included in the Contract price.

D. Field Testing:

1. The County shall employ and pay for services of an independent testing laboratory to perform testing specifically indicated in the Contract Documents. Employment of the laboratory shall in no way relieve Contractor's obligations to perform the Work of the

Contract. The Contractor shall provide compensation for retesting of all failed tests.

2. The County may at any time during the progress of the Work, request additional testing beyond that which is specified in the Contract. This testing will be at the

County's expense. Contractor shall:

a. Cooperate with laboratory personnel, provide access to the Project.

b. Secure and deliver to the laboratory adequate quantities of representative samples of materials proposed to be used and which require testing.

c. Provide to the laboratory the preliminary design mix proposed to be used for concrete, and other material mixes, which require control by the testing laboratory.

E. Demonstration Tests: Upon completion of the Work and prior to final payment, all equipment and piping installed under this Contract shall be subjected to acceptance or demonstration tests as specified or required to provide compliance with the Contract

Documents. The Contractor shall furnish all labor, fuel, energy, water and all other equipment necessary for the demonstration tests at no additional cost to the County.

F. Final Inspection: Prior to preparation of the final payment application, a final inspection will be performed by the County to determine if the Work is properly and satisfactorily constructed in accordance with the requirements of the Contract Documents. See also

Section 01700 "Project Closeout."

01001 - 9 of 18

G. Inspection by existing utility owners: The Contractor shall pay for all inspections during the progress of the work required and provided by the owner of all existing public utilities paralleling or crossing the Work, as shown on the Drawings. All such inspection fees shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made therefore.

H. Inspection by Other Agencies: The Florida Department of Transportation, the Florida

Department of Environmental Protection, and other authorized governmental agencies shall have free access to the site for inspecting materials and work, and the Contractor shall afford them all necessary facilities and assistance for doing so. Any instructions to the Contractor resulting from these inspections shall be given through the County. These rights of inspections shall not be construed to create any contractual relationship between the Contractor and these agencies.

1.13 PROJECT SITE AND ACCESS

A. RIGHT-OF-WAY AND EASEMENTS

1. The use of public streets and alleys shall be such as to provide a minimum of inconvenience to the public and to other traffic. Any earth or other excavated material shall be removed by the Contractor and the streets cleaned to the satisfaction of the County.

2. The Contractor shall not enter or occupy private land outside of easements, except by written permission of the property owner.

3. At the time of the Pre-Construction meetings, the Contractor shall become fully acquainted with the status of all easements. Should easements not be acquired by the

County in specific areas of the Work, the Contractor shall sequence and schedule his work therein so as not to interfere with the progress of work in other areas of the

Project. Any rescheduling of work due to easement acquisitions shall be performed by the Contractor at no additional cost to the County. The County agrees that it will make every effort to acquire all remaining easements with all speed and diligence possible so as to allow the completion of the Work within the Contract time.

B. ACCESS

1. Neither the material excavated nor the materials or equipment used in the construction of the Work shall be so placed as to prevent free access to all fire hydrants, valves or manholes.

2. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business access with the business

Owner. Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored and all construction debris removed within 48-hours of backfilling trench.

3. Contractor agrees that representatives of the County and any governmental agents will have access to the Work wherever it is in preparation or progress and that the

Contractor shall provide facilities for such access and inspection.

01001 - 10 of 18

1.14 UTILITIES

A. UTILITY CONSTRUCTION

1. Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, house service connections, vaults, manholes and all other appurtenances and facilities pertaining thereto, whether owned or controlled by governmental bodies or privately owned by individuals, firms or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage or water. Other public or private property, which may be affected by the Work, shall be deemed included hereunder.

2. All open excavations shall be adequately safeguarded by providing temporary barricades, caution signs, lights and other means. The Contractor shall, at his own expense, provide suitable and safe bridges and other crossings for accommodating travel by pedestrians and workmen. Bridges provided for access to private property during construction shall be removed when no longer required.

3. The length of open trench will be controlled by the particular surrounding conditions, but shall always be confined to the limits described by the County. If any excavation becomes a hazard, or if it excessively restricts traffic at any point, the County may require special construction procedures. As a minimum, the Contractor shall conform to the following restoration procedures:

a. Interim Restoration: All excavations shall be backfilled and compacted as specified by the end of each working day. For excavations within existing paved areas; recycled concrete aggregate (RCA) base material per FDOT section all shall be spread and compacted to provide a relatively smooth surface free of loose aggregate material. At the end of each workweek, the SP-9.5 asphaltic surface course shall be completed and opened to traffic. Contractor shall coordinate his construction activity including density tests and inspections to allow sufficient time to achieve this requirement. All driveway cuts shall be backfilled, compacted, and base spread and compacted immediately after installation.

Contractor shall coordinate with the individual property owners prior to removing the driveway section. Any utility crossing an existing roadway, parking lot or other paved area shall be patched by the end of the working day.

b. All pipe and fittings shall be neatly stored in a location, which will cause the least disturbance to the public. All debris shall be removed and properly disposed of by the end of each working day.

c. Final Restoration Overlay: After completing all installations, and after testing of the pipe (but no sooner than 30-days after applying the SP-9.5 asphaltic surface), final restoration shall be performed. In no event shall final restoration begin after substantial completion. Final restoration shall provide an SP-9.5 asphaltic overlay as specified in an uninterrupted continuous operation until completion. Any additional restoration required after testing shall be repaired in a timely manner at no additional cost to the County.

d. Maintenance of all restored facilities shall be the Contractor’s responsibility. This maintenance shall be performed on an on-going basis during the course of construction. The Contractor’s Progress Schedule shall reflect the above restoration requirements.

01001 - 11 of 18

e. Additional Restoration for Work in Business or Commercial Districts: The

Contractor shall restore all private property, damaged by construction, to its original condition. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business accesses with the business owner. Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored within 24-hours of backfilling trench.

B. EXISTING UTILITIES

1. The locations of all existing underground piping, structures and other facilities are shown based on information received from the respective owner. The locations are shown without express or implied representation, assurance, or guarantee that they are complete or correct or that they represent a true picture of underground piping, conduit and cables to be encountered. It is the Contractor’s responsibility to verify all existing underground piping, structures and other facilities.

2. The Contractor shall, at all times, employ acceptable methods and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage or destruction of existing utility installations and structures; and shall, at all times in the performance of the Work, avoid unnecessary interference with, or interruption of, utility services;

and shall cooperate fully with the owners thereof to that end.

3. When existing facilities are found to be in conflict with the Work, the County reserves the right to modify alignments to avoid interference with existing facilities.

4. All utilities, which do not interfere with the work, shall be carefully protected against damage. Any existing utilities damaged in any way by the Contractor shall be restored or replaced by the Contractor at his expense as directed by the County. Any existing facilities, which require operation to facilitate repairs, shall be operated only by the owner of the respective utility.

5. It is the responsibility of the Contractor to ensure that all utility and/or poles, the stability of which may be endangered by the proximity of excavation, be temporarily stayed and/or shored in position while work proceeds in the vicinity of the pole and that the utility or other companies concerned be given reasonable advance notice of any such excavation.

C. NOTICES

1. All governmental utility departments and other owners of public utilities, which may be affected by the Work, will be informed in writing by the Contractor two (2) weeks after the execution of the Contract or Contracts covering the Work. Such notice will be sent out in general, and directed to the attention of the governmental utility departments and other owners of public utilities for such installations and structures as may be affected by the Work.

2. The Contractor shall comply with Florida Statute 553.851 regarding protection of underground gas pipelines. Evidence of notification to the gas pipeline owner shall be furnished to the County within two (2) weeks after the execution of the Contract.

3. It shall be the Contractor's responsibility to contact utility companies at least 72-hours in advance of breaking ground in any area or on any unit of the work so maintenance personnel can locate and protect facilities, if required by the utility company.

01001 - 12 of 18

4. The Contractor shall give a minimum five (5) working day notice to utility personnel prior to interrupting a utility service (water, sewer, etc.).

D. EXPLORATORY EXCAVATIONS

1. Exploratory excavations shall be conducted by the Contractor for the purpose of locating underground pipelines or structures in advance of the construction. Test pits shall be excavated in areas of potential conflicts between existing and proposed facilities and at piping connections to existing facilities a minimum of 48-hours or

1,000-feet in advance of work. If there is a potential conflict, the Contractor shall notify the County/Professional immediately. Information on the obstruction to be furnished by the Contractor shall include: Location, Elevation, Utility Type, Material and Size. Test pits shall be backfilled immediately after their purpose has been satisfied and the surface restored and maintained in a manner satisfactory to the

County.

E. UTILITY CROSSINGS

1. It is intended that wherever existing utilities must be crossed, deflection of the pipe within specified limits and cover shall be used to satisfactorily clear the obstruction unless otherwise indicated on the Drawings. However, when in the opinion of the

County this procedure is not feasible, the County may direct the use of fittings for a utility crossing or conflict transition as detailed on the Drawings.

F. RELOCATIONS

1. Relocations shown on the Drawings: Public utility installations or structures, including but not limited to poles, signs, fences, piping, conduits and drains that interfere with the positioning of the work which are shown on the Drawings to be removed, relocated, replaced or rebuilt by the Contractor shall be considered as part of the general cost of doing the Work and shall be included in the prices bid for the various contract items. No separate payment shall be made therefore.

2. Relocations not shown on the Drawings

a. Where public utility installations or structures are encountered during the course of the work, and are not indicated on the Drawings or in the Specifications, and when, in the opinion of the County, removal, relocation, replacement or rebuilding is necessary to complete the Work, such work shall be accomplished by the utility having jurisdiction, or such work may be ordered, in writing by the

County, for the Contractor to accomplish.

b. If such work is accomplished by the utility having jurisdiction, it will be carried out expeditiously and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement or rebuilding as required.

c. If such work is accomplished by the Contractor, it will be paid for as a Change

Order.

3. All existing castings, including valve boxes, junction boxes, manholes, hand holes, pull boxes, inlets and similar structures in the areas of construction that are to remain in service and in areas of trench restoration and pavement replacement, shall be adjusted by the Contractor to bring them flush with the surface of the finished work.

01001 - 13 of 18

4. All existing utility systems which conflict with the construction of the work herein, which can be temporarily removed and replaced, shall be accomplished at the expense of the Contractor. Work shall be done by the utility unless the utility approves in writing that the Work may be done by the Contractor.

1.15 RELATED CONSTRUCTION REQUIREMENTS

A. PUBLIC INFORMATION OFFICER

1. The Contractor shall provide community interaction and coordination through a designated Public Information Officer (PIO). The PIO will provide resolution to complaints and problems from community members affected by the construction for the entire project duration. The PIO will manage a 24-hour hotline phone number for citizens to call. The PIO will field these calls, provide answers to questions, research issues with the project team or appropriate agencies and follow up each complaint in a timely manner. All after hour calls will be reported to the County’s Representative the following business day.

2. The PIO will maintain a daily diary of call and/or interactions with the community, as well as a complaint log chronicling all issues and proposed resolutions. This report shall be sent to the County on Monday and Friday of each week. When applicable, all associated correspondence, bulletins, notifications and reports shall be managed in the project Contract Manager.

3. The PIO shall create and maintain the project stakeholder list. The PIO will create the flyer notification to alert stakeholders and local residents/businesses of project start and potential impacts. The PIO will work closely with Orange County Utilities staff for flyer notification approval. The PIO should have in-house graphic design and mailing capabilities for flyer distributions. The County shall have 10 days to make comments, review, and provide approval or revision requests.

4. Mailers shall be sent out at least 10 days prior to the start of the work. Door hangers shall be sent out at least 3 prior before the start of the work.

5. The PIO shall attend the project progress meetings and provide the project team with a report of public issues since the last progress meeting. The PIO will be engaged though project final completion. The PIO will also disseminate roadway closures, sewer hookups, temporary and permanent restoration and other relevant construction information to the community, as well as, when appropriate, to the media, emergency services personnel and other interested agencies. Any major public issues will be reported to the County’s project representative daily.

6. The designated PIO shall have a minimum of 2 previous years’ experience in providing similar services on Orange County Utilities, Orange County Public Works or FDOT construction projects. The PIO shall be fluent in English and Spanish and shall visit the construction site, meeting locations and affected resident’s homes as required.

7. The PIO shall be a third-party marketing communications/public relations business with a minimum of 10 years demonstrated experience with public sector infrastructure projects. In-house contractor staff or HOA staff is not acceptable.

8. Potential PIO specialists that may meet the qualifications requirements as noted above include the following:

a. Quest Corporation of America

01001 - 14 of 18

B. TRAFFIC MAINTENANCE

1. Refer to Section 01570 – Maintenance of Traffic

C. BARRIER AND LIGHTS

1. The Contractor shall exercise extreme care in the conduct of the Work to protect health and safety of the workmen and the public. The Contractor shall provide all protective measures and devices necessary, in conformance with applicable local, state and federal regulations. Protective measures shall include but are not limited to barricades, warning lights/flashers and safety ropes.

2. All equipment and vehicles operating within 10-feet of the roadway shall have flashing strobe lights attached.

D. DEWATERING AND FLOTATION

1. The Contractor, with his own equipment, shall do all pumping necessary to dewater any part of the work area during construction operations to insure dry working conditions. The Contractor shall take the necessary steps to protect on-site and off-site structures. Damage to any structures due to dewatering shall be repaired or the structures replaced at the Contractor's expense.

2. The Contractor shall be completely responsible for any tanks, wetwells or similar structures that may become buoyant during the construction and modification operations due to the ground water or floods and before the structure is put into operation. The proposed final structures have been designed to account for buoyancy; however the Contractor may employ methods, means and techniques during construction which may affect the buoyancy of structures. The Contractor shall take the necessary steps to protect structures.