Y25-785_Plan_Set.pdf
PDF 12 MB Posted
- Attached to
- Jones Avenue Pond Maintenance
- Solicitation number
- Y25-785
- Issued by
- Orange County, Orlando City, Florida
About this file
These construction plans for the Jones Avenue Pond Maintenance project are prepared for Orange County, Florida's Environmental Protection Division, Water Sciences, by Baxter & Woodman, Inc. The project involves comprehensive pond maintenance and restoration, specifically focused on removing emergent vegetation from the pond bottom and side slopes, with a total disturbed area of 14.3 acres. The project will include clearing and grubbing, performance turf sodding, herbicide application, and desilting existing culverts, with key activities such as removing vegetation to elevation 67 ft NAVD, applying approved herbicides, and reshaping side slopes to match existing grades.
The project is estimated to cost $398,345.00, with bids to be electronically submitted through the OpenGov e-Procurement Platform by 4:00 pm EST on Thursday, July 24, 2025. The construction plans detail specific erosion control measures, including silt fence installation, soil tracking prevention, and maintenance of water pollution control devices. The project will be funded through Orange County's Environmental Protection Division, with work to be completed in accordance with Florida Department of Transportation standard specifications and Orange County regulations. The scope includes comprehensive environmental controls, site stabilization, and maintaining uninterrupted access to driveways and side streets throughout the construction process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWNER
PREPARED FOR
ORANGE COUNTY, FLORIDA
P
O R
C T
Y \2
-J o n e s A v e n u e A lu m
I n \2
J o n e s A v e n u e \R o a d w a y \P o n d M a in te n a n c e D ra w in g s \1
K
E Y
S R
D
C o v e r
S h e e t.
d g n
:3
:1
P M
/2
/2
JOB NUMBER 210595
Water Sciences Division
Environmental Protection Orange County
CONSTRUCTION PLANS
Baxter & Woodman, Inc.
SOURCE OF BENCH MARK DATUM
TABLE OF CONTENTS
SHEET NO. DESCRIPTION
1 COVER SHEET
GENERAL NOTES
407-386-2249
200 E. Robinson St., Ste. 555, Orlando, FL 32801
EROSION CONTROL PLAN DETAILS
P.E. Number 35490
Claude L. Cassagnol, P.E.
IMPROVEMENTS.
AS-BUILT SURVEY BY CERTIFIED INDEPENDENT SURVEYOR OF SITE a.
1. SURVEY
MARCH 2025
AS-BUILT REQUIREMENTS
ccassagnol@baxterwoodman.com
407-386-2249
Orlando, FL 32801
200 E. Robinson St., Ste 555
Baxter & Woodman, Inc.
Orlando, FL 32803-3727
Suite 200
3165 McCrory Place
Protection Division
Orange County Environmental
ENGINEER
SHEET
1 of7
48 HOURS BEFORE YOU DIG. TELEPHONE 800-432-4770
CONTACT SUNSHINE STATE ONE-CALL OF FLORIDA, INC.
(FDOT GREEN BOOK) AND "ORANGE COUNTY REGULATIONS AND SPECIFICATIONS."
CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS, STATE OF FLORIDA"
ACCORDANCE WITH THE"MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN,
THE ENGINEER CERTIFIES THAT THESE CONSTRUCTION PLANS WERE PREPARED IN
AND CROSS SECTIONS
SUMMARY OF PAY ITEMS
PROPOSED CONDITIONS PLAN
EROSION CONTROL PLAN5
SURVEY SHEET (ORANGE COUNTY)7
COMMISSIONERS
BOARD OF COUNTY
DISTRICT 3
DISTRICT 5
MAYRA URIBE
KELLY MARTINEZ SEMRAD
CHRISTINE MOORE DISTRICT 2
MARIBEL G. CORDERO DISTRICT 4
JERRY L. DEMINGS, COUNTY MAYOR
MICHAEL SCOTT DISTRICT 6
CHANGED DUE TO REPRODUCTION.
NOTE: THE SCALE OF THESE PLANS MAY HAVE
AS AMENDED BY CONTRACT DOCUMENTS.
BRIDGE CONSTRUCTION DATED 2024-2025 RELEASED 04/03/2024,
AND STANDARD SPECIFICATIONS FOR ROAD AND
STANDARD PLANS DATED 2024-2025 RELEASED 7/11/2024,
FLORIDA DEPARTMENT OF TRANSPORTATION
GOVERNING STANDARDS AND SPECIFICATIONS:
NOTE:
ENGINEER:DATE: REG. NO.
State of Florida
TRANSPORTATION PURSUANT TO SUBSECTION 336.045(1) OF THE FLORIDA STATUTES.
HIGHWAYS" IN EFFECT ON THIS DATE AS ADOPTED BY THE FLORIDA DEPARTMENT OF
STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND
STANDARDS CONTAINED IN THE EDITION OF THE "MANUAL OF UNIFORM MINIMUM
OF THE FLORIDA STATUTES AND ARE IN SUBSTANTIAL CONFORMANCE WITH THE
CONSTRUCTION PLANS COMPLY WITH THE REQUIREMENTS OF SECTION 336.045
I HEREBY CERTIFY THAT THE DESIGN FOR THIS PROJECT AND THE ATTACHED
35490
CLAUDE L. CASSAGNOL, P.E.
CERTIFICATION TO PLANS
ELE= 72.164' (88 DATUM)
E= 454104.1453 N= 1598836.9788
SET 5/8" REBAR WITH O.C. TRAVERSE CAP
SITE BM#3:
ELE= 72.971' (88 DATUM)
E= 453450.8404 N= 1598915.4397
SET 5/8" REBAR WITH O.C. TRAVERSE CAP
SITE BM#2:
ELE= 72.366' (88 DATUM)
E= 452838.8193 N= 1598823.8028
SET 5/8" REBAR WITH O.C. TRAVERSE CAP
SITE BM#1:
ELE= 72.245' (88 DATUM)
E= 456960.3810 N= 1598893.8140
POINT 10 JONES AVENUE STORMWATER MASTER PLAN STA. 129-79.11).
SOUTH OF THE EDGE PAVEMENT OF JONES AVENUE (CONTROL
FOUND 5/8" REBAR CAP TRAVERSE POINT (LB2648) +/- 2'
POINT #1001:
ELE= 72.782' (88 DATUM)
E= 455391.5120 N= 1598886.7520
FOUND 5/8" REBAR CAP TRAVERSE POINT (LB2648)
POINT #1000:
ELE= 72.340' (88 DATUM)
E= 457880.46812 N= 1598880.32026.
DATUM REFERENCED TO THE FOLLOWING BENCH MARKS.
1. ALL ELEVATIONS SHOWN HEREON ARE FROM ORANGE COUNTY IN 88
SITE LOCATION
UTILITIES:
FOR
JONES AVENUE POND MAINTENANCE
DISTRICT 1NICOLE H. WILSON
PLANS WERE PREPARED ACCORDING TO AVAILABLE INFORMATION TO ADEQUATELY
ADDRESS CONDITIONS AS THEY EXISTED AT THE TIME OF PLANS PREPARATION.
NEEDS, CONDITIONS AND OWNERSHIP OF PROPERTIES MAY HAVE CHANGED SINCE
PROJECT DESIGN. THE COUNTY'S REPRESENTATIVE WILL ADDRESS CHANGES AND
NEEDS WITH THE PROPERTY OWNER OR THEIR REPRESENTATIVES. CONTRACTOR
SHALL WORK WITH THE COUNTY'S REPRESENTATIVE IN ADDRESSING AND MEETING
NEEDS AND CONDITIONS THAT MAY HAVE CHANGED SINCE PLANS PREPARATION.
JOSEPH KUNKEL, P.E. PUBLIC WORKS DIRECTOR
RENEE H. PARKER, LEP MANAGER, ORANGE COUNTY
ENVIRONMENTAL
PROTECTION DIVISION
800-778-9140
DUKE ENERGY
WATER/SEWER:
GAS:
POWER:
407-738-2464
CITY OF APOPKA
407-955-1812
LAKE APOPKA NATURAL GAS
LOCATION
PROJECT
N
GENERAL NOTES
UTILITIES ARE TO BE ADJUSTED BY OTHERS OR AS DIRECTED BY THE ENGINEER.
ALL (P.R.M.'s) IRONS AND MONUMENTS SHOWN ON PLANS, OR FOUND, SHALL BE
PRESERVED. THOSE SHOWN IN PROPOSED PAVEMENT SHALL BE PROTECTED WITH
A CAST IRON VALVE BOX.
ANY U.S.C. AND G.S. MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED.
PUBLIC LAND CORNERS WITHIN THE LIMITS OF CONSTRUCTION SHALL BE
PROTECTED. IF A CORNER MONUMENT IS IN DANGER OF BEING DESTROYED OR
DISTURBED, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE
NOTIFICATION.
THE DISPOSAL OF EXCESS EARTHWORK MATERIALS SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR. APPROVALS OF DISPOSAL SITES SHALL BE OBTAINED FROM ORANGE
COUNTY PRIOR TO DISPOSAL. ALL EXCESS MATERIAL IS THE PROPERTY OF THE
CONTRACTOR.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH AND CONFORM TO THE MOST
AND BRIDGE CONSTRUCTION (FDOT), AND SUPPLEMENTS THERETO, AND ORANGE
COUNTY ROAD CONSTRUCTION SPECIFICATIONS.
MATCH EXISTING TYPE SOD UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
OF UNDERGROUND AND OTHER UTILITIES IS BASED ON AVAILABLE RECORDS AND
SURVEYS BUT IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE
CONTRACTOR SHALL MAKE HIS OWN DETERMINATION AS TO THE TYPE AND LOCATION
OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO AND IS
RESPONSIBLE FOR COORDINATING UTILITY RELOCATION WITH PROJECT CONSTRUCTION.
PRIOR TO ORDERING DRAINAGE STRUCTURES, THE CONTRACTOR SHALL DETERMINE IF
DRAINAGE/UTILITY CONFLICTS EXIST. INFORMATION ON CONFLICTS IS TO BE
SUBMITTED TO THE ENGINEER AS SOON AS POSSIBLE AFTER DISCOVERY FOR
PRIOR TO BEGINNING ANY CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO
VERIFYING THE BENCHMARK ELEVATIONS AND THE REFERENCE POINT TIES SHOWN
ALL INLET/MANHOLE - PIPE JOINTS SHALL BE FILLED WITH NON-SHRINK GROUT,
COVERED WITH AN ASPHALTIC MASTIC COATING, AND WRAPPED WITH A
CONSTRUCTION SPECIFICATIONS.
OTHERWISE NOTED.
ALL MANHOLE COVERS SHALL INCLUDE THE ORANGE COUNTY LOGO AND BE IDENTIFIED
AS "ORANGE COUNTY SANITARY", "ORANGE COUNTY STORM", OR "ORANGE COUNTY
SOD ALL DISTURBED AREAS UNLESS OTHERWISE SHOWN ON THE PLANS. SOD SHALL
SAFETY ACT", TO PROTECT EXISTING PAVEMENT, STRUCTURES, FOUNDATIONS,
AND CONSTRUCTION PERSONNEL DURING CONSTRUCTION OF THE PROJECT.
ORANGE COUNTY HIGHWAY CONSTRUCTION DIVISION A SET OF FIELD NOTES
A SET OF FIELD NOTES FOR ALL ADDITIONAL BENCHMARK AND REFERENCE POINT
TIES PROPOSED TO BE USED IN CONSTRUCTING THE PROJECT SHALL BE PROVIDED WITH
THEIR LOCATION, DESCRIPTION AND ELEVATION, BASED ON ORANGE COUNTY DATUM.
REGISTERED IN THE STATE OF FLORIDA.
ALL SUBMITTALS SHALL BE SIGNED AND SEALED BY A PROFESSIONAL LAND SURVEYOR
IF IN DANGER OF DAMAGE, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER, ORANGE
SHALL PROVIDE WRITTEN FOLLOW UP CONFIRMATION WITHIN 48 HOURS OF TELEPHONE
ALL DRAINAGE PIPES SHALL BE STEEL REINFORCED CONCRETE PIPE, CLASS III, UNLESS
ON THE TITLE SHEET, SURVEY CONTROL SHEET, AND PLAN/PROFILE SHEETS, AND/OR
STRINGENT REQUIREMENT OF THE PROJECT SPECIFICATIONS, THE YEAR 2024 EDITION OF
WATER", AS APPROPRIATE. (SEE STANDARD DRAWINGS AND DETAILS SHEET)
MS 110
BUREAU OF SURVEY AND MAPPING
STATE GEODETIC ADVISOR,
3900 COMMONWEALTH BLVD.
TALLAHASSEE, FL 32399-3000
FAX: (850) 245-2645
PHONE: (850) 245-2555
FAX: (407) 836-8033
PHONE: (407) 836-7900
PUBLIC WORKS DEPT.
ENGINEERING DIVISION,
ORANGE COUNTY SURVEYOR
4200 S. JOHN YOUNG PARKWAY
ORLANDO, FL 32839-9205
COUNTY SURVEY SECTION AT 407-836-7947, AND BOTH SHALL NOTIFY:
THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD
ALL EXCAVATIONS SHALL BE REQUIRED TO CONFORM WITH THE PROVISIONS
THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION
1-800-432-4770.
RESOLUTION. SUNSHINE STATE ONE CALL MUST BE NOTIFIED FOR LOCATES AT
SOD ALL SLOPES ABOVE NORMAL WATER ELEVATION OF 67 AS SHOWN ON THE PLANS.
COUNTY SURVEYOR, WITHOUT DELAY, BY TELEPHONE (407-836-7900). THE CONTRACTOR
CONSTRUCTION MATERIALS IN TURBID WATERS, WATERWAYS, OR OFFSITE AREAS.
CONTRACTOR WILL ENSURE THAT THERE IS NO DIRECT OR INDIRECT DISCHARGE OF
HAS BEEN ESTABLISHED. MEASURES SHOWN ARE THE MINIMUM REQUIRED, AND THE
REQUIRED UNTIL THE CONTRACT IS COMPLETED AND SOILS ARE STABILIZED AND VEGETATION
MUST REMAIN IN PLACE AND IN GOOD CONDITION AT ALL LOCATIONS SHOWN IN PLANS OR AS
BARRIERS, SYNTHETIC BALES, AND ALL OTHER EROSION AND SEDIMENT CONTROL DEVICES
PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION. SILT FENCE, ROCK BAGS, TURBIDITY
REQUIREMENTS OF THE FLORIDA EROSION AND SEDIMENT CONTROL MANUAL, LATEST EDITION,
EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED IN ACCORDANCE WITH THE
OF TITLE XXXIII, PART III OF CHAPTER 553, F.S., ALSO KNOWN AS THE "TRENCH
AT ALL TIMES AND TO NOTIFY PROPERTY OWNERS FIVE DAYS PRIOR TO STARTING CONSTRUCTION.
CONTRACTOR IS TO MAINTAIN UNINTERRUPTED ACCESS TO ALL DRIVEWAYS AND SIDESTREETS
LENGTHS INSTALLED.
MEASUREMENT OF DRAINAGE PIPE FOR PAYMENT SHALL BE DETERMINED FROM ACTUAL
FILTER FABRIC MATERIAL PER SECTION 13.07 OF THE ORANGE COUNTY ROAD
G E
N E
R A
L N
O T
E S
THE CONTRACTOR SHALL NOTIFY ALL GAS UTILITY COMPANIES A MINIMUM OF TWO
WORKING DAYS PRIOR TO EXCAVATION AS REQUIRED BY CHAPTER 553.851 AND
556.105 OF THE FLORIDA STATUTES.
LIMITS OF CONSTRUCTION ARE TO REMAIN UNLESS OTHERWISE NOTED.
ALL EXISTING DRAINAGE PIPE AND STRUCTURES AND UTILITIES WITHIN THE
ALLEVIATED, SHALL BE BROUGHT TO THE ATTENTION OF THE ORANGE COUNTY PROJECT MANAGER.
ANY DRAINAGE PROBLEM CREATED BY CONSTRUCTION, OR EXISTING BEFORE CONSTRUCTION, NOT
CONSTRUCTION ACTIVITIES.
PROJECT MANAGER AND SURVEYOR OF THE CONDITIONS PRIOR TO COMMENCING HIS
ANYDISCREPANCIES SHOULD BE FOUND, THE CONTRACTOR SHALL NOTIFY THE ORANGE COUNTY
PRIOR TO THEIR USE DURING CONSTRUCTION WITH THE ORANGE COUNTY SURVEY DEPARMENT. IF
THE CONTRACTOR SHALL VERIFY AND LOCATE ALL VERTICAL AND HORIZONTAL CONTROL POINTS 22
HIS BID PRICING ACCORDINGLY.
AND FULLY SATISFY HIMSELF OF BOTH THE SURFACE AND SUBSURFACE CONDITIONS AND BASE
IT IS THE CONTRACTOR'S RESPONSIBILITY TO INVESTIGATE SITE CONDITIONS OF THE PROJECT 23
ITEM OF WORK.
INCIDENTAL TO OTHER CONSTRUCTION WITH NO EXTRA COMPENSATION BEING ALLOWED FOR THIS
EQUAL TO OR SUPERIOR TO THAT EXISTING PRIOR TO COMMENCEMENT OF WORK. COST SHALL BE
THE CONTRACTOR SHALL RESTORE ALL PROPERTY DISTURBED BY CONSTRUCTION TO A CONDITION 24
CLEANED OF DEBRIS AND ERODED MATERIAL AT LAST STAGES OF CONSTRUCTION.
ALL STORM SEWER LINES AND INLETS SHALL BE MAINTAINED DURING CONSTRUCTION AND
REQUIRED CROSS SECTION.
BACKFILL WITH SUITABLE MATERIAL WHICH SHALL BE COMPACTED AND SHAPED TO THE
THE PROJECT ENGINEER, UNSUITABLE, THE CONTRACTOR SHALL EXCAVATE SUCH MATERIAL AND
WHERE MUCK, ROCK, CLAY, ORGANICS, OR OTHER MATERIAL ENCOUNTERED IS, IN THE OPINION OF
MATERIAL SHALL BE USED FOR FILL UNLESS SPECIFICALLY ALLOWED.
OTHER SUITABLE MATERIAL APPROVED BY THE PROJECT ENGINEER. NEITHER ORGANIC NOR PEAT
MATERIAL USED FOR EMBANKMENT SHALL CONSIST OF SAND, GRAVEL, A MIXTURE THEREOF, OR
THE WORK.
NECESSARY CHANGES SHALL BE ADJUSTED, AS PROVIDED IN THE AGREEMENT FOR CHANGES IN
VARIANCE THEREWITH, HE SHALL PROMPTLY NOTIFY THE ENGINEER, IN WRITING, AND ANY
SPECIFIED. IF THE CONTRACTOR OBSERVES THAT THE DRAWING AND SPECIFICATIONS ARE AT
REGULATIONS AND PERMIT CONDITIONS BEARING ON THE CONDUCT OF THE WORK, AS DRAWN AND
THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, ALL DIMENSIONS ARE GIVEN IN FEET UNLESS OTHERWISE NOTED.
CONTRACT WITH THE CONTRACTOR.
AGENTS AND EMPLOYEES AND OTHER PERSONS PERFORMING ANY OF THE WORK UNDER A
AND OMISSIONS OF CONTRACTOR'S EMPLOYEES AND ALL HIS SUBCONTRACTORS AND THEIR
THE CONTRACTOR SHALL BE RESPONSIBLE TO THE OWNER AND THE ENGINEER FOR THE ACTS
PROTECTED, LOCATED OR ADJUSTED.
ARE ENCOUNTERED IN THE WORK IN ORDER THAT SUCH ITEMS MAY BE PROPERLY SUPPORTED,
OTHER SIMILAR FACILITIES, INCLUDING INCIDENTAL STRUCTURES CONNECTED THEREWITH THAT
TELEGRAPH FACILITIES SUCH AS PIPING, WIRES, CABLES, CONDUITS, POLES, WIRE GUYS, OR
OWNING OR CONTROLLING WATER, SEWER, GAS, ELECTRICAL, TELEPHONE, CABLE TV, AND
GOVERNMENTAL DEPARTMENTS, PUBLIC UTILITIES, SERVICE COMPANIES, AND CORPORATIONS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS WITH
APPLICABLE FEDERAL, STATE AND LOCAL BUILDING AND SAFETY CODES, LAWS AND ORDINANCES.
GOVERNED BY THE PLANS, APPLICABLE PERMITS, AND SPECIFICATIONS HEREIN, AND ALL
UNLESS OTHERWISE SPECIFIED IN THE GENERAL CONDITIONS, ALL CONSTRUCTION IS TO BE 32
SHALL IMMEDIATELY NOTIFY THE OWNER OR OWNER'S AGENT.
IN THE EVENT THE CONTRACTOR DISCOVERS ANY ERRORS OR OMISSIONS IN THE PLANS HE
FACILITIES FOR ACCESS AND INSPECTION.
AT ALL TIMES HAVE ACCESS TO THE WORK. THE CONTRACTOR SHALL PROVIDE PROPER
THE OWNER, OWNER'S AGENT AND INSPECTOR OF APPLICABLE GOVERMENT JURISDICTION, SHALL
IS PREVENTED.
AND PRUDENT STEPS TO INSURE THAT ACCESS TO EXCAVATION BY UNAUTHORIZED PERSONNEL
STORMWATER PONDS) CONTRACTOR SHALL INSTALL FENCES AND TAKE ALL OTHER REASONABLE
PRIOR TO INITIATING ANY EXCAVATION (INCLUDING BUT NOT LIMITED TO DITCHES OR
GOVERN.
CONFLICTING REQUIREMENTS, THE MORE STRINGENT INTERPRETATION OR REGULATION SHALL
REGULATIONS OF ANY PUBLIC OR OTHER AUTHORITY HAVING JURISDICTION. IN THE EVENT OF
LIKE ITEMS USED IN THE WORK SHALL CONFORM TO APPLICABLE SAFETY CODES AND
ALL WORK PERFORMED UNDER THE CONTRACT, AND ALL EQUIPMENT, APPLIANCES, TOOLS AND
THE CONDITION TO OWNER IN WRITING.
MATERIAL, CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AFFECTED AREA AND REPORT
A HAZARDOUS MATERIAL, OR ENCOUNTER MATERIAL REASONABLY BELIEVED TO BE A HAZARDOUS
PIPELINE, UNDERGROUND STORAGE TANK OR OTHER CONTAINER, OF ANY KIND, THAT MAY CONTAIN
IN THE EVENT CONTRACTOR OR ITS SUBCONTRACTORS ENCOUNTER ON THE PREMISES ANY
SPILL ON PERSONS OR PROPERTY, AND BE RESPONSIBLE FOR ALL CLEANUP COSTS.
TAKE SUCH ACTION AS MAY BE NECESSARY TO MINIMIZE THE DELETERIOUS EFFECT OF SUCH
OCCURRENCE, CONTRACTOR SHALL NOTIFY THE APPROPRIATE GOVERNMENTAL AGENCY AND SHALL
ON OR ABOUT THE JOB SITE. IN THE EVENT OF ANY SPILL, RELEASE OR ANY OTHER REPORTABLE
THE DISCHARGE, RELEASE OR DISPOSAL OF ANY HAZARDOUS MATERIAL CREATED BY ITS WORK
CONTRACTOR FURTHER AGREES THAT CONTRACTOR AND ITS SUBCONTRACTOR SHALL NOT CAUSE
MINIMIZE THE DELETERIOUS EFFECT OF SUCH SPILL ON PERSONS OR PROPERTY.
APPROPRIATE GOVERNMENTAL AGENCY AND SHALL TAKE SUCH ACTION AS MAY BE NECESSARY TO
RELEASE OR ANY OTHER REPORTABLE OCCURRENCE, CONTRACTOR SHALL NOTIFY THE
CONTRACTOR SHALL IMMEDIATELY SO INFORM OWNER IN WRITING. IN THE EVENT OF ANY SPILL, HAZARDOUS MATERIAL ON OR ABOUT THE JOB SITE IN VIOLATION OF THIS PARAGRAPH, SHOULD CONTRACTOR OR ITS SUBCONTRACTORS DISCHARGE, RELEASE OR DISPOSE OF ANY
WOODMAN TO JOIN THE THREE SURVEYS TOGETHER AT THE OVERLAPPING AREAS.
https://floridagio.gov/pages/lidar-resources. SLIGHT ADJUSTMENTS WERE MADE BY BAXTER &
67.0, AND LIDAR SURVEY FROM FLORIDA GEOGRAPHIC INFORMATION WEBSITE
WORKS SURVEY SECTION, A BATHYMETRIC SURVEY BY ERD, INC. FOR THE ELEVATIONS BELOW
TOP OF BANK AND SIDESLOPES TO ELEVATION 67.0 NAVD PERFORMED BY ORANGE COUNTY PUBLIC
THE EXISTING CONDITION MAP IS BASED ON A COMBINATION OF A FIELD SURVEY FOR THE POND
CONTRACTOR SHALL BE IN MATERIAL DEFAULT OF THIS CONTRACT.
PERIOD SPECIFIED BY ANY GOVERNMENTAL AGENCY, WHICHEVER PERIOD IS SHORTER,
ISSUES SUCH WRITTEN NOTICE OF NONCOMPLIANCE OR WITHIN THE TIME OF AN ABATEMENT
REQUIREMENTS OF THE PARAGRAPH WITHIN TWENTY-FOUR (24) HOURS FROM THE TIME OWNER
CONTRACTOR. SHOULD CONTRACTOR OR ITS SUBCONTRACTORS FAIL TO COMPLY WITH THE
SHEET, OWNER MAY, BUT IS NOT OBLIGATED TO, GIVE WRITTEN NOTICE OF VIOLATIONS TO
IF CONTRACTOR OR ITS SUBCONTRACTORS DO NOT COMPLY WITH THE REQUIREMENTS OF THIS
WATER OR RUNOFF.
IMPROVEMENTS, OR IN A POSITION CLOSE ENOUGH THERETO, TO BE WASHED AWAY BY HIGH
EXCAVATED MATERIAL SHALL NOT BE DEPOSITED IN RIVERS, STREAMS, CANALS OR
EXTENT REQUIRED TO CONSTRUCT THE IMPROVEMENTS.
CONTRACTOR SHALL PROVIDE CLEARING AND GRUBBING WITHIN THE LIMITS SPECIFIED TO THE
AT LOCATIONS DESIGNATED IN THE PLANS AND/OR DESIGNATED BY THE ENGINEER.
THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH ANY NECESSARY
PERMIT REQUIREMENTS. ENVIRONMENTAL CONTROLS SHALL BE USED
SLOPES 3:1 OR STEEPER SHALL BE PEGGED.
x x x IA
C L
C
IA
F lo ri d a O ra n g e C o u n ty
B a x te r
W o o d m a n
In c
JO
N
E S
A V
E N
U E
S T
O R
M W
A T
E R
P O
N D o f
SCALE:
/2
/2
:5
:0
P
M
REVISIONS
D A
T E
B Y
D E
S C
R
IP
T
IO
N
F
IE
L D
C A
D D
B Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
-3
-0
O rl a n d o F
L
E
R o b in so n S tr e e t, S u it e
C la u d e L
C a ss a g n o l, P
.E
P .E
N u m b e r
D
A T
E M
A R
C H
J O
B N
U M
B E
R S
H E
E T
P
O R
C T
Y \2
-J o n e s A v e n u e A lu m
I n
\2
J o n e s A v e n u e \R o a d w a y
\P o n d
M a in te n a n c e D ra w in g s \2
G
N N
T R
D
G e n e ra l N o te s .d g n
S U
M M
A R
Y O
F P
A Y
I T
E M
S A
N D
C R
O S
S S
E C
T
IO
N S
SUMMARY OF PAY ITEMS
ITEM
NUMBER
DESCRIPTION UNIT
QUANTITY TOTAL
PLANS FINAL
101-1 MOBILIZATION LS 1
102-1 MAINTENANCE OF TRAFFIC LS 1
104-14 PREVENTION, CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION LS
110-1-1 CLEARING & GRUBBING AC 14.3
570-1-2 PERFORMANCE TURF (SOD) SY
15,700
PAY ITEM FOOTNOTES
102-1
104-14
110-1-1
570-1-2
PLANS OR AS DIRECTED BY THE ENGINEER.
TO SYNTHETIC BALES, TURBIDITY BARRIERS, SILT FENCES AND TEMPORARY GRASSING AS SHOWN IN THE
INCLUDES THE COST OF ALL ITEMS REQUIRED FOR EROSION CONTROL INCLUDING, BUT NOT LIMITED
UNTIL FINAL PROJECT ACCEPTANCE BY THE COUNTY.
REQUIRED FOR ESTABLISHMENT OF PERMANENT SODDING. ALSO INCLUDES THE COST OF MOWING
INCLUDES THE COST OF SOD (MATCH EXISTING), PEGGING THE SOD, FERTILIZER AND WATER AS
BARRICADES AND REMOVAL OF EXISTING STRIPING & RPM'S.
ALSO INCLUDES THE COST FOR SAWCUTTING EXISTING PAVEMENT OR CONCRETE, TREE PROTECTION
PAVEMENT, BASE, AND TRIMMING OF TREES AND SHRUBS AS REQUIRED TO CONSTRUCT THE PROJECT.
REMOVAL AND DISPOSAL OF SEPTIC TANKS AND DRAIN FIELDS, UNDERGROUND STORAGE TANKS, DRIVEWAYS, STRUCTURES, WALLS, BRICK WALLS, VARIOUS TYPES OF FENCES, CAPPING WELLS, INCLUDES, BUT IS NOT LIMITED TO, THE COST OF REMOVAL AND DISPOSAL OF CONCRETE CURBS, REGISTERED IN THE STATE OF FLORIDA.
BY THE CONTRACTOR SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER
SUBMITTED TO AND APPROVED BY THE COUNTY. THE MAINTENANCE OF TRAFFIC PLAN DONE
PLAN SHOWN IN THE CONSTRUCTION PLANS IS FOR INFORMATION ONLY, FINAL PLAN TO BE
DIRECTED TO THE 102-600 INDEX NUMBER. NOTE THAT THE MAINTENANCE OF TRAFFIC
AND THE FDOT STANDARD PLANS FOR ROAD CONSTRUCTION, 2020-2021 EDITION. ATTENTION IS
REQUIRED TO MAINTAIN TRAFFIC DURING CONSTRUCTION IN ACCORDANCE WITH THE MUTCD
VIA HYDRO BLASTING, PORTABLE CHANGEABLE MESSAGE SIGNS, SIGNING, FLAGGERS, ETC.
ALSO INCLUDES ALL TEMPORARY STRIPING, REMOVAL OF EXISTING AND TEMPORARY STRIPING
OF THE PLANS BY ORANGE COUNTY TRAFFIC ENGINEERING AND HIGHWAY CONSTRUCTION.
THE DESIGN OF THE MAINTENANCE OF TRAFFIC PLAN BY THE CONTRACTOR AND APPROVAL
INCLUDES ALL ITEMS OF MAINTENANCE OF TRAFFIC INCLUDING, BUT NOT LIMITED TO,
900-3
900-2
HERBICIDE APPLICATION AC 14.3
INDEMNIFICATION LS 1
900-1 AS-BUILT PLANS LS 1
430-94 DESILT PIPE CULVERTS AND STORM SEWERS LF 782
x x x IA
C L
C
IA
F lo ri d a O ra n g e C o u n ty
B a x te r
W o o d m a n
In c
JO
N
E S
A V
E N
U E
S T
O R
M W
A T
E R
P O
N D o f
SCALE:
/3
/2
:1
:4
A
M
REVISIONS
D A
T E
B Y
D E
S C
R
IP
T
IO
N
F
IE
L D
C A
D D
B Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
-3
-0
O rl a n d o F
L
E
R o b in so n S tr e e t, S u it e
C la u d e L
C a ss a g n o l, P
.E
P .E
N u m b e r
D
A T
E M
A R
C H
J O
B N
U M
B E
R S
H E
E T
P
O R
C T
Y \2
-J o n e s A v e n u e A lu m
I n
\2
J o n e s A v e n u e \R o a d w a y
\P o n d
M a in te n a n c e D ra w in g s \3
C
E S
S U
W
S u m m a ry o f
P a y
I te m s
C ro s s S e c ti o n
.d g n
E le v a ti o n
Station
SECTION A-A PROFILE
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+0022+08
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00
NWL = 67.0
11+00
.8
.8
12+00
.0
.0
13+00
.1
.0
14+00
.0
.0
15+00
.8
.8
16+00
.5
.5
17+00
.3
.2
18+00
.0
.0
19+00
.0
.9
20+00
.4
.4
21+00
.0
.0
22+00
.1
.0
E le v a ti o n
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+0017+53
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+0017+53
NWL = 67.0
11+00
.6
.6
12+00
.0
.0
13+00
.0
.0
14+00
.0
.0
15+00
.3
.3
16+00 17+00
Station
SECTION C-C PROFILE
E le v a ti o n
E le v a ti o n
10+00 11+00 12+00 13+00 14+00 15+00 15+79
10+00 11+00 12+00 13+00 14+00 15+00 15+79
NWL = 67.0
11+00
.5
.5
12+00
.0
.0
13+00
.2
.2
14+00
.8
.8
15+00
Station
SECTION D-D PROFILE
E le v a ti o n
E le v a ti o n
10+00 11+00 12+00 13+00 14+00 15+00 16+0016+00
10+00 11+00 12+00 13+00 14+00 15+00 16+00
NWL = 67.0
11+00
.4
.4
12+00
.8
.8
13+00
.0
.0
14+00
.6
.6
15+00
.2
.2
16+00
Station
SECTION B-B PROFILE
E le v a ti o n
E le v a ti o
P R
O P
O S
E D
C O
N D
IT
IO
N S
P L
A N
N
1"=60'
68.50
IA
IAC
L
C
X X
X
REMAIN (TYP.)
STRUCTURE TO
EXISTING OUTFALL
LIMITS OF CLEARING AND GRUBBING
NORMAL WATER ELEVATION
LIMITS OF SOD
LEGEND:
ELEVATION OF 67 FT NAVD.
GRADE AND RESODDED TO THE CONTROL
SIDE SLOPE GRADES ARE TO BE MAINTAINED AT THE EXISTING
VEGETATION. THE POND TOP OF THE BANK AND EMBANKMENT
POND SIDE SLOPES AND BOTTOM TO ELIMINATE ANY REMNANT
APPROVED BY ORANGE COUNTY EPD IS TO BE APPLIED TO THE
SIDE SLOPES AND BOTTOM IS TO BE REMOVED. AN HERBICIDE
EXPOSE THE POND BOTTOM. ALL VEGETATION FROM THE POND
SIDE SLOPES. THE CONTRACT0R WILL DEWATER THE POND TO
VEGETATION THAT HAS GROWN IN THE POND BOTTOM AND
THE INTENT OF THE PROJECT IS TO REMOVE THE EMERGENT
xx x
IA
C
LC
IA
F lo ri d a O ra n g e C o u n ty
B a x te r
W o o d m a n
In c
JO
N
E S
A V
E N
U E
S T
O R
M W
A T
E R
P O
N D o f
SCALE:
/5
/2
:4
:2
A M
REVISIONS
D A
T E
B Y
D E
S C
R
IP
T
IO
N
F
IE
L D
C A
D D
B Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
-3
-0
O rl a n d o F
L
E
R o b in so n S tr e e t, S u it e
C la u d e L
C a ss a g n o l, P
.E
P .E
N u m b e r
D
A T
E M
A R
C H
J O
B N
U M
B E
R S
H E
E T
P
O R
C T
Y \2
-J o n e s A v e n u e A lu m
I n \2
J o n e s A v e n u e \R o a d w a y \P o n d M a in te n a n c e D ra w in g s \4
D
R M
P R
D
E x is ti n g C o n d it io n s P la n .d g n
.6
.8
(60' RIGHT OF WAY PER DEED BOOK 512, PAGE 420)(60' RIGHT OF WAY PER DEED BOOK 512, PAGE 420)
LINE
RIGHT OF WAY
LINE
RIGHT OF WAY
65.8
64.6
66.3
67.1
66.9
65.2
65.7
66.2
65.6
66.4
68.8
65.8
67.2
65.8
69.2
65.8
67.4
65.7
67.1
67.8 68.4
60.9
60.8
66.5
64.9
64.7
66.3
64.7 65.2
67.5
W.E.
66.4
W.E.
65.4
W.E.
64.9
W.E.60.2
63.7
SECTION A-A
S E
C T
IO
N
D -D
SECTION B-B
SECTION C-C
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00
10+00 11+00 12+00 13+00 14+00 15+00 16+00
10+00
11+00
12+00 13+00 14+00 15+00 16+00
WETLANDS
POND
EXISTING
WETLANDS
WETLANDS
WETLANDS
WETLANDS
ELEVATION=67
WATER
NORMAL
ELEVATION=67
WATER
NORMAL
JONES AVE
AeccDbCogoPoint (AeccLand130)
AeccDbNetwork (AeccNetwork130) AeccDbStructure (AeccNetwork130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbStructure (AeccNetwork130)
.0
66.00
.0
.0
66.0
.0
.0
66.00
67.
.0
.0
.0
67.00
.0
67.00
.0
67.00
67.00
67.00
67.00
68.00 69.00
65.00
60.00
.00
57.0057.00 57.00
.00
56.00
.0
.00
67.00
70.00 70.00
65.00
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0 .0
65.00
54.00
.0
.0 0 55
.0
.00
.00
.00
.00
.00
.00
.0
0 6 .0
.0
.0
.0
.0
.0
.0
.0
.0
.5
67.
LINE
RIGHT OF WAY
68.0 068.00
.0
68.00
68.0
.00
68.00
.0
.0
68.00
67.00
68.00
67.00 65.00
60.00
57.00
57.0
55.00
.0
.0
.0
70.
68.
0068.
69.
67.
71.
0071.
56.0
56.00
60.00
65.00
70.00
67.00
56.00
60.00
65.00
70.00
71.00
71.0075.00
71.00
70.00
65.00
58.00
58.0
60.00
60.00
65.00
70.00
75.00
77.00 75.00
.0
.0
65.00
70.00
.0
.0
57.00
.00
65.00
67.
.00
69.00
67.00
67.00
.5
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.0
.0
.0
69.00
.00
.0
69.00
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.0
70.00
.0
.0
.0
.0
70.00
70.0
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.00
AeccDbCogoPoint (AeccLand130)
JONES AVE
E R
O S
IO
N
C O
N T
R O
L P
L A
N
N
1"=60'
68.50
IA
IAC
L
C
X X
X
CONSTRUCTION ENTRANCE
DEVICES AT THE
TRACKING PREVENTION
PROVIDE SOIL
CONTRACTOR TO
SILT FENCE
NORMAL WATER EL. = 67.0'
SILT FENCE
NORMAL WATER EL. = 67.0'
REMAIN (TYP)
STRUCTURE TO
EXISTING OUTFALL
LIMITS OF CLEARING AND GRUBBING
LIMITS OF CLEARING AND GRUBBING
ELEVATION=67
WATER
NORMAL
ELEVATION=67
WATER
NORMAL
SILT FENCE
DEWATERED
POND HAS BEEN
PROTECTION WHEN
TEMPORARY RIPRAP
PROVIDE 20' X 10'
CONTRACTOR TO
SILT FENCE
SILT FENCE
SILT FENCE
SILT FENCE
LIMITS OF CLEARING AND GRUBBING
SILT FENCE
CONSTRUCTION ENTRANCE
INLET PROTECTION
LEGEND:
INLET PROTECTION
bgugliot@sjrwmd.com.
BEN GUGLIOTTI AT 407-215-1476 OR
NOTIFY THE LAKE APOPKA LAND MANAGER
THE WILDLIFE DRIVE AND CONTRACTOR MUST
CONTRACTOR MUST NOT BLOCK ENTRY/EXIT OF
NOTE: IF WORK TAKES PLACE ON FRIDAY,
LEVEL CANAL ROAD
WEST SIDE OF THE LAKE
THE EXISTING CANAL ON THE
EXISTING STRUCTURE INTO
EXISTING POND THROUGH THIS
ROUTE THE WATER IN THE
FOR DEWATERING THE POND,
DEWATERED
POND HAS BEEN
PROTECTION WHEN
TEMPORARY RIPRAP
PROVIDE 10' X 10'
CONTRACTOR TO
EACH
CULVERTS 3 @ 140 LF
DESILT EXISTING
CULVERT 73 LF
DESILT EXISTING
AND NO LONGER IN USE
THIS EXISTING INLET IS BLOCKED
EACH
CULVERTS 3 @ 65 LF
DESILT EXISTING
CULVERT 94 LF
DESILT EXISTING
xx x
IA
C
LC
IA
F lo ri d a O ra n g e C o u n ty
B a x te r
W o o d m a n
In c
JO
N
E S
A V
E N
U E
S T
O R
M W
A T
E R
P O
N D o f
SCALE:
/3
/2
:1
:4
A
M
REVISIONS
D A
T E
B Y
D E
S C
R
IP
T
IO
N
F
IE
L D
C A
D D
B Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
-3
-0
O rl a n d o F
L
E
R o b in so n S tr e e t, S u it e
C la u d e L
C a ss a g n o l, P
.E
P .E
N u m b e r
D
A T
E M
A R
C H
J O
B N
U M
B E
R S
H E
E T
P
O R
C T
Y \2
-J o n e s A v e n u e A lu m
I n \2
J o n e s A v e n u e \R o a d w a y \P o n d M a in te n a n c e D ra w in g s \5
S
W P
P R
D
E ro s io n C o n tr o l
P la n .d g n
.6
.8
(60' RIGHT OF WAY PER DEED BOOK 512, PAGE 420)(60' RIGHT OF WAY PER DEED BOOK 512, PAGE 420)
LINE
RIGHT OF WAY
LINE
RIGHT OF WAY
65.8
64.6
66.3
67.1
66.9
65.2
65.7
66.2
65.6
66.4
68.8
65.8
67.2
65.8
69.2
65.8
67.4
65.7
67.1
67.8 68.4
60.9
60.8
66.5
64.9
64.7
66.3
64.7 65.2
67.5
W.E.
66.4
W.E.
65.4
W.E.
64.9
W.E.60.2
63.7
SECTION A-A
S E
C T
IO
N
D -D
SECTION B-B
SECTION C-C
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00
10+00 11+00 12+00 13+00 14+00 15+00 16+00
10+00
11+00
12+00 13+00 14+00 15+00 16+00
WETLANDS
POND
EXISTING
WETLANDS
WETLANDS
WETLANDS
WETLANDS
JONES AVE
AeccDbCogoPoint (AeccLand130)
AeccDbNetwork (AeccNetwork130) AeccDbStructure (AeccNetwork130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbStructure (AeccNetwork130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.0
66.00
.0
.0
66.0
.0
.0
66.00
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
Pipe - (15) INVERT:61.19' 18" RCP
DROP INLET - (1)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
67.
.0
.0
.0
67.00
.0
67.00
.0
67.00
67.00
67.00
67.00
68.00 69.00
65.00
60.00
.00
57.0057.00 57.00
.00
56.00
.0
.00
67.00
70.00 70.00
65.00
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0 .0
65.00
54.00
.0
.0 0 55
.0
.00
.00
.00
.00
.00
.00
.0
0 6 .0
.0
.0
.0
.0
.0
.0
.0
.0
AeccDbCogoPoint (AeccLand130)
Pipe - (14) INVERT:61.65' 30" RCP
Pipe - (13) INVERT:61.65' 30" RCP
DROP INLET - (2)
.5
67.
LINE
RIGHT OF WAY
68.0 068.00
.0
68.00
68.0
.00
68.00
.0
.0
68.00
67.00
68.00
67.00 65.00
60.00
57.00
57.0
55.00
.0
.0
.0
70.
68.
0068.
69.
67.
71.
0071.
56.0
56.00
60.00
65.00
70.00
67.00
56.00
60.00
65.00
70.00
71.00
71.0075.00
71.00
70.00
65.00
58.00
58.0
60.00
60.00
65.00
70.00
75.00
77.00 75.00
.0
.0
65.00
70.00
.0
.0
57.00
.00
65.00
67.
.00
69.00
67.00
67.00
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.5
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.0
.0
.0
69.00
.00
.0
69.00
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.0
70.00
.0
.0
.0
.0
70.00
70.0
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
.00
AeccDbCogoPoint (AeccLand130)
JONES AVE
Pipe - (47) INVERT:66.96' 24" RCP
Pipe - (6) INVERT:63.73' 36" RCP
STORM MANHOLE - (1)
SWPPP / EROSION CONTROL PLAN
CONTRACTOR CERTIFICATION:
" I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH
THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC PERMIT FOR
STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES AND
THIS STORMWATER POLLUTION PREVENTION PLAN THEREUNDER."
CONTRACTING FIRM:
ADDRESS:
NAME: TITLE:
TELEPHONE # : DATE:
PROJECT ENGINEER.
AND BRIDGE CONSTRUCTION", SECTIONS 570 OR 580, AT THE DISCRETION OF THE CONTRACTOR WITH THE COORDINATION OF THE
FERTILIZERS AND PESTICIDES WILL BE USED ON THIS PROJECT IN ACCORDANCE WITH "FDOT STANDARD SPECIFICATIONS FOR ROAD
(3) APPLICATION OF FERTILIZERS AND PESTICIDES
(B) EXCESS DIRT ON ROAD WILL BE REMOVED DAILY
(A) LOADED HAUL TRUCKS ARE TO BE COVERED BY A TARPAULIN AT ALL TIMES
(2) OFF SITE VEHICLE TRACKING - WILL BE CONTROLLED BY THE FOLLOWING METHODS:
AS REQUIRED BY STATE REGULATIONS.
(d) ALL SANITARY WASTE WILL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR
ON SITE.
(c) NO SOLID MATERIALS, INCLUDING BUILDING AND CONSTRUCTION MATERIALS, SHALL BE DISCHARGED TO WETLANDS OR BURIED
PRACTICES AS DETAILED BY THE MANUFACTURER.
(b) ALL FERTILIZER AND CHEMICAL CONTAINERS SHALL BE DISPOSED OF BY THE CONTRACTOR ACCORDING TO EPA'S STANDARD
ACTIVITIES.
(a) THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT BOUNDARIES DURING CONSTRUCTION
(1) WASTE DISPOSAL
III. OTHER CONTROLS:
FROM CONSTRUCTION SITE. CONTRACTOR CANNOT PUMP TURBID WATER INTO STORM SEWER, PONDS, DITCHES OR LAKES.
WELL POINTS, HORIZONTAL SOCK DRAINS OR ANY OTHER METHOD THAT WILL PREVENT DISCHARGE OF TURBID WATER ABOVE 29 NTU
(7) REQUIRED DEWATERING BMP:
PROJECT NAME: JONES AVENUE POND MAINTENANCE
(3) THE CONTRACTOR SHALL USE A CITY APPROVED CONSTRUCTION INSPECTION REPORT FOR DAILY INSPECTIONS.
OF THE EROSION CONTROL DEVICES OR LUMP SUM COST OF THE PROJECT.
THE CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION, SHALL BE INCLUDED IN THE INDIVIDUAL COSTS
(2) PREPARATION OF ALL THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTENANCE AND REPAIRS REQUIRED FOR
REPORTS AND COMPLETE ALL SWPPP INSPECTION FORMS.
MAINTENANCE OR REPAIRS TO THE SEDIMENT CONTROL DEVICES. THE CONTRACTOR SHALL MAINTAIN ALL REQUIRED
(1) THE CONTRACTOR SHALL SUBMIT A WEEKLY REPORT TO THE COUNTY DOCUMENTING THE DAILY INSPECTIONS AND
VI. TRACKING AND REPORTING:
(3) THE CONTRACTOR SHALL COMPLETE ALL SWPPP INSPECTION REPORT FORMS REQUIRED FOR THE NPDES PERMIT.
PERFORMED IMMEDIATELY.
WHO ARE F.D.E.P. CERTIFIED STORMWATER MANAGEMENT INSPECTORS. ANY NECESSARY REMEDIES SHALL BE
DAILY AND WITHIN 24 HOURS AFTER EACH 0.5 INCH OR GREATER RAINFALL EVENT BY CONTRACTOR'S PERSONNEL
(2) ALL EROSION AND WATER POLLUTION ABATEMENT AND CONTROL MEASURE INSPECTIONS WILL BE CONDUCTED
CONTRACTOR.
RAINFALL IN ACCORDANCE WITH NPDES PERMIT. ALL CONTROL MEASURES WILL BE MAINTAINED DAILY BY THE
(1) THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES ON THE PROJECT SITE AND RECORD WEEKLY
V. INSPECTION:
MAINTAINED TO PREVENT CLOGGING OF ROCK BEDDING WHICH MAY IMPEDE THE USEFULNESS OF THE STRUCTURE.
TO BLOCK OR IMPEDE STORMWATER FLOW OR DRAINAGE. STABILIZED CONSTRUCTION ENTRANCES SHALL BE
SHALL BE REPLACED EVERY TWELVE (12) MONTHS OR WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS NOT
SERVED THEIR USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORM WATER FLOW OR DRAINAGE. SILT FENCES
HEALTHY GROWTH. SYNTHETIC HAY BALES SHALL BE REPLACED EVERY THREE (3) MONTHS OR WHEN THEY HAVE
ONE QUARTER OF THE HEIGHT OF THE FENCE. SODDING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND
(4) STRUCTURAL PRACTICES - BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED
OF NOTICE.
MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS
GENERAL - ALL CONTROL MEASURES WILL BE MAINTAINED DAILY BY THE CONTRACTOR. ALL MEASURES WILL BE
(3) THE FOLLOWING PRACTICES WILL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROLS:
THE LUMP SUM COST OF THE PROJECT.
AND WATER POLLUTION SHALL BE INCLUDED IN THE INDIVIDUAL COSTS OF THE EROSION CONTROL DEVICES OR
(2) INSTALLATION, MAINTENANCE, REPAIR AND REMOVAL REQUIRED FOR THE CONTROL AND ABATEMENT OF EROSION
DEVICES, AND REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES WHEN NOTICE OF TERMINATION IS MAILED.
(1) THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REPAIRS OF EROSION AND SEDIMENT CONTROL
IV. MAINTENANCE
(3) SITE DATA: TOTAL DISTURBED AREA IS 14.3 ACRES. THE DISTURBED AREA IS THE SAME AS THE SITE AREA.
GRASSING IS ESTABLISHED.
(g) DO NOT REMOVE PERIMETER CONTROLS UNTIL AFTER ALL UPSTREAM AREAS ARE FULLY STABILIZED AND PERMANENT
(f) TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT FROM SEASONAL CLIMATE CHANGES OR WEATHER EVENTS.
(e) DO NOT DISTURB AN AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION TO PROCEED.
(d) COVER OR STABILIZE DISTURBED AREAS AS SOON AS POSSIBLE.
(c) PROVIDE SYNTHETIC HAY BALES AT INLET OPENINGS.
CONTROLS BEFORE THE LAND IS DISTURBED.
(b) INSTALL SILT FENCE WHERE LISTED IN THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN FOR PERIMETER
THAT PHASE.
(a) ALL EROSION CONTROL DEVICES FOR EACH PHASE OF WORK ARE TO BE INSTALLED PRIOR TO BEGINNING WORK ON
(2) GENERAL NOTES:
IC HAY BALES). INSTALLATION OF PERIMETER SILT FENCE, AND INLET PROTECTION (SYNTHET
AND PERMANENT SOIL DISTURBING ACTIVITIES ON ALL PORTIONS OF THE PROJECT. INITAL SEQUENCE WILL INCLUDE
CONSTRUCTION SCHEDULE TO INDICATE DATES OF MAJOR GRADING ACTIVITIES AND DETERMINE SEQUENCES OF TEMPORARY
THE CONTRACTOR SHALL BE REQUIRED TO PREPARE A SITE SPECIFIC EROSION CONTROL PLAN ALONG WITH A DETAILED
(1) SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES:
I. SITE DESCRIPTION:
FOR MODIFYING THE SYSTEM OR PROCEDURES AS NEEDED.
OF STOCKPILED OR EXCAVATED MATERIAL IF IMMEDIATELY ADJACENT TO A PUBLIC ROADWAY. THE ENGINEER SHALL BE RESPONSIBLE
SOIL TRACKING PREVENTION DEVICES (SEE DETAIL THIS SHEET) SHALL BE PROVIDED FOR BOTH ON-SITE AND OFF-SITE LOCATIONS
(4) CONSTRUCTION ENTRANCES/EXITS:
(b) STOCKPILE AREAS SHALL INCLUDE SILT FENCE AROUND THE PERIMETER.
RIGHT OF WAY WHERE THERE IS POTENTIAL FOR SEDIMENT TO BE DIRECTED OFFSITE.
(a) SILT FENCE SHALL BE USED ALONG THE LENGTH OF THE PROJECT WHERE THE EXISTING GROUND SLOPES AWAY FROM THE
(3) SILT FENCE LOCATIONS:
(b) SOIL TRACKING PREVENTION DEVICES AT CONSTRUCTION ENTRANCES/EXITS
(a) SILT FENCES
(2) STRUCTURAL PRACTICES INCLUDE:
SHALL THE TIME BE GREATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES.
IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE
STABILIZATION MEASURES, SUCH AS SODDING OR SEEDING OF SIDE SLOPES SHALL BE INITIATED AS SOON AS PRACTICABLE
(1) STABILIZATION PRACTICES
II. CONTROLS - EROSION AND SEDIMENT CONTROLS
A
A
GROUND
EXISTING
6" MIN.
ROCK
2" TO 4"
50' MIN.
10' MIN.
CLOTH
FILTER
LINE
PROPERTY
SIDEWALK
5-FOOT
EXISTING
12' MIN.
50' MIN.
(n.t.s.)
SIDE VIEW
(n.t.s.)
PLAN VIEW
(n.t.s.)
SECTION A-A
ROCK
2" TO 4"
CLOTH
FILTER
12' MIN.
24'
SOIL TRACKING PREVENTION DEVICE DETAIL
6" MIN. 3" MIN.
10' MIN.
LINE
PROPERTY
5'
2%
(3000 PSI)
DRIVEWAY
6" CONCRETE
VARIES
Optional Post Positions
Filter Fabric
Silt Flow
V e r t ic a l
Type III Silt Fence
MANUAL TO BE USED FOR EROSION CONTROL PLANS.
NOTE: FLORIDA EROSION AND SEDIMENT CONTROL
(Canted 20° toward flow) Principle Post Position
20°
E R
O S
IO
N
C O
N T
R O
L P
L A
N D
E T
A
IL
S
CURB
PAVEMENT
EDGE OF
CURB
CURB
TRANSITION
CURB
DRIVEWAY
x x x IA
C L
C
IA
F lo ri d a O ra n g e C o u n ty
B a x te r
W o o d m a n In c
JO
N
E S
A V
E N
U E
S T
O R
M W
A T
E R
P O
N D o f
SCALE:
/2
/2
:0
:2
A
M
REVISIONS
D A
T E
B Y
D E
S C
R
IP
T
IO
N
F
IE
L D
C A
D D
B Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
-3
-0
O rl a n d o F
L
E
R o b in so n S tr e e t, S u it e
C la u d e L
C a ss a g n o l, P
.E
P .E
N u m b e r
D A
T E
M A
R C
H
J O
B N
U M
B E
R S
H E
E T
P
O R
C T
Y \2
-J o n e s A v e n u e A lu m
I n \2
J o n e s A v e n u e \R o a d w a y \P o n d M a in te n a n c e D ra w in g s \6
S
W P
P R
D
E ro s io n C o n tr o l
D e ta il s .d g
File details come from the government source that posted it. Updated .