Y25-726_FDOT_LAP_Volume_I.pdf

PDF 2 MB Posted

Attached to
Orange County Traffic Signal Upgrade Phase I and Phase II
Solicitation number
Y25-726-MB
Issued by
Orange County, Orlando City, Florida

About this file

This is a Scope of Work document for the Florida Department of Transportation (FDOT) Local Agency Program (LAP) Volume I, supporting Orange County, Florida's Traffic Signal Upgrade Phase I and Phase II project. The project encompasses the upgrade and modernization of traffic signal infrastructure across Orange County, with Phase I and Phase II components designed to improve traffic flow, safety, and operational efficiency. The sealed response submission deadline is 4:00 pm EST on Thursday, September 17, 2026, with all responses required to be submitted electronically through the OpenGov e-Procurement Platform. Hand-delivered, mailed, faxed, or emailed offers will not be accepted, and any responses received after the deadline or submitted outside the designated platform will be rejected.

The estimated cost for Phase I is $5,551,459.51, and the estimated cost for Phase II is $5,417,649.62, for a total project value of approximately $10.97 million. This project is being executed under the FDOT Local Agency Program framework, which provides state funding and oversight for local transportation improvement projects. The work includes detailed specifications and requirements outlined in the project documentation, and respondents must comply with all submission requirements and procurement procedures as outlined in the contract opportunity notice.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Bid Package Coversheet Coversheet Page: 1 of 1

Orange County, Florida Procurement Division

Construction Bid Package

IFB#: Y25-726-MB

Project Title: Orange County Traffic Signal Upgrade Phase 1 and 2

FPN: 448728-1-58-01 & 448728-2-58-01

FAN: D524 075 B & D524 076 B

Department: Public Works Department Division: Engineering Division

Solicitation Schedule

EVENT DATE

IFB Issue Date August 17, 2026

Pre-Bid Conference N/A

Question Deadline September 3, 2026

Submittal Deadline September 17, 2026

Notice: The above-referenced IFB contemplated the award of a Federal-Aid Construction Contract originating from the Local Agency Program as administered by the Florida Department of Transportation. Prequalification requirements may apply. See Vol. I., Art. 2., Section B.2. (“FDOT Prequalification Requirements”) of this Bid Package for more information.

Sealed electronic Bid Responses will be accepted up to 4:00 P.M. (local time) on the date of the above-noted Submittal Deadline and are required to be submitted using the OpenGov Procurement portal located at the follow web address:

https://secure.procurenow.com/portal/orangecountyfl

Bidders shall not be permitted to hand-deliver, mail, telephone, fax, or email offers. Bid Responses received after the Submittal Deadline or that are transmitted outside of the designated ProcureNow OpenGov Procurement portal will be rejected.

Volume I: Invitation for Bids (“IFB”) Table of Contents Page: 1 of 3

IFB#: Y25-726-MB 2

Project Title: Orange County Traffic Signal Upgrade Phase 1 and 2 4

FAN: D524 075 B & D524 076 B 6

TABLE OF CONTENTS

Article 1: Bid Submittal Instructions ........................................................................... 1 10

Section A: Definitions (Alphabetical Order)

Section B: Introduction ...................................................................................................... 3 12

1. Agency Background

2. Project-Specific Information ....................................................................................... 3 14

3. Number of Awards

4. Notice of Federally Funded Project ........................................................................... 3 16

5. Pre-Bid Conference

6. Lobbying Blackout Period .......................................................................................... 4 18

7. Bid-Related Costs

8. Bidders’ Obligation to Examine Site .......................................................................... 5 20

Section C: Bid Submittal

1. Submittal Deadline .................................................................................................... 5 22

2. Method of Submitting Bid Responses

3. Deviations .................................................................................................................. 6 24

4. Withdrawal of Bid/Bid Acceptance Period

5. Cancellation of Solicitation ........................................................................................ 7 26

Section D: Questions and Addenda

1. Method of Submitting Questions ................................................................................ 7 28

2. Proprietary or Restrictive Specifications

3. Contract Exceptions .................................................................................................. 8 30

4. Modifications to IFB Documents

5. Addenda .................................................................................................................... 8 32

Section E: Bid Opening

Section G: Posting of Recommended Award and Bid Protests ..................................... 9 34

1. Award of Contract/Rejection of Bids

2. Bid Errors .................................................................................................................. 9 36

3. Posting of Recommended Award

Table of Contents Page: 2 of 3

4. Bid Protests ............................................................................................................. 10 38

Article 2: Bid Terms and Conditions

Section A: Incorporation ................................................................................................. 10 40

1. Bid Submittal Instructions

2. Invitation for Bids ..................................................................................................... 10 42

3. Litigation Provisions

4. LAP Division I Specifications ................................................................................... 10 44

Section B: Bidder Qualifications

1. Bid Response Submittal Forms ............................................................................... 10 46

2. FDOT Prequalification Requirements

3. Development or Assistance with Specifications ....................................................... 11 48

4. Certification of Current Capacity

5. Joint Ventures .......................................................................................................... 11 50

6. Florida Business Authorization

7. Public Entity Crime .................................................................................................. 12 52

8. Scrutinized Companies

9. Suspension and Debarment .................................................................................... 13 54

10. E-Verify

11. Required Disclosures .............................................................................................. 13 56

Section C: Licenses, Permits, and Fees

1. Generally ................................................................................................................. 13 58

2. Public Bid Disclosure

3. Licensure Requirements .......................................................................................... 14 60

Section D: Ethics

1. State Conflict of Interest Requirement ..................................................................... 15 62

2. County Ethics Compliance

3. Federal Lobbying Certification ................................................................................. 15 64

4. Non-Collusion

Section E: Bonding .......................................................................................................... 16 66

1. Payment and Performance Bonds

2. Bid Bond .................................................................................................................. 16 68

3. Bid Bond Forfeiture

4. Qualifications of Surety Companies ......................................................................... 17 70

Section F: General Bid Requirements

1. Execution of Written Contract .................................................................................. 18 72

2. Federal and State Tax

3. Substitute Material and Equipment .......................................................................... 19 74

4. Schedule of Price

5. Unbalanced Pricing ................................................................................................. 20 76

6. Payment Terms

7. Insurance and Indemnification Requirements ......................................................... 21 78

Table of Contents Page: 3 of 3

8. Trade Secret Information

Section G: State/Federal Bid Requirements .................................................................. 24 80

1. Prevailing Minimum Wage (Davis Bacon Act)

2. Buy America ............................................................................................................ 24 82

3. Prohibition Against Convicted Produced Materials

4. Patented/Proprietary/Sole Sourced Materials .......................................................... 25 84

5. Trench Safety Act

6. Occupational Safety and Health Act (O.S.H.A.)....................................................... 25 86

7. Drug-Free Workplace

8. State Inspector General Compliance ....................................................................... 25 88

9. Additional Federal Provisions

Section H: Disadvantaged Business Enterprises (“DBE”) ........................................... 26 90

Section I: Subcontracting

1. Subcontract/Supplier Information ............................................................................ 26 92

2. Subcontractor/Supplier Past Performance

3. Subcontracting Restriction (National Highway System Projects) ............................. 26 94

4. Subcontracting Restriction (State Highway System Projects)………………………..27

Section J: Similar Projects/References .......................................................................... 27 96

Section K: State and Federally Required Exclusions/Elections

1. Contractor Purchased Equipment for State or Local Ownership ............................. 28 98

2. Foreign Contractor and Supplier Restriction

3. Incentive/Disincentive Clauses ................................................................................ 28 100

4. Indian Preference on Federal-Aid Projects (Labor & Employment)

5. State/Local Preferences .......................................................................................... 28 102

6. Owner Force Account/Cost-Effective Justification

7. Public Agencies in Competition with the Private Sector .......................................... 29 104

8. Publicly Owned Equipment

9. State/Local Owned Furnished/Designated Materials ............................................... 29 106

10. On the Job Training

Volume I Appendix: Bid Response Submittal Forms .............................................. 30 108

Construction Bid Package | IFB# Y25-726-MB Volume I: Invitation for Bids (“IFB”) Page: 1 of 30

IFB No. Y25-726-MB 112

Article 1: Bid Submittal Instructions

Section A: Definitions (Alphabetical Order) 114

The words and expressions (or pronouns used in their stead) defined in this Section shall, wherever they appear in this Bid Package, be construed as follows unless a different meaning 116 is clear from the context.

"Addenda" shall mean any additional IFB-related provisions issued in writing by the County prior to the Submittal Deadline. 120

"Bidder" shall mean any person, firm or corporation submitting a Bid for the Work. The terms 122 “Bidder” and “Respondent” are used interchangeably.

“Bid Package” shall mean all solicitation documents related to IFB# Y25-726-MB, including but not limited to Volume I: Invitation for Bids (“IFB”), Volume II: Project-Specific Information, 126 Volume III: Draft Contract, as well as any forms, documents, and attachments attached to such Volumes or otherwise provided by the County through the ProcureNow OpenGov web portal. 128

"Bid Response” shall mean the offer or proposal of the Bidder submitted in compliance with 130 this IFB that sets forth the prices for the Work to be performed. The terms “Bid Response”, “Bid Proposal”, and “Solicitation Response” are used interchangeably. 132

"Board of County Commissioners" shall mean the Board of County Commissioners of Orange 134 County, Florida. The terms “Board of County Commissioners”, “Board”, and “BCC” are used interchangeably. 136

“Business Day” shall mean Monday through Friday, except for the days on which the County 138 is closed for business operations.

"Contract" shall mean the written agreement between the County and the Selected Bidder covering the Work to be performed, a draft of which is provided in Volume III: Draft Contract of 142 this Bid Package.

"County" shall mean Orange County, Florida, or its duly authorized representative(s), for whom the Work is being performed. 146

"Day" shall mean one calendar day unless otherwise expressly stated. 148

"Drawings" shall mean only those drawings specifically referred to as such in Volumes I-III of 150 these documents or in any Addenda. Drawings issued after the execution of the Contract to

Volume I: Invitation for Bids (“IFB”) Page: 2 of 30 explain further, to illustrate, or to show changes in the Work will be known as "Supplementary 152 Drawings" and shall be binding upon the Contractor with the same force as the Drawings.

“FDOT” shall mean the State of Florida, Department of Transportation.

“IFB” shall mean Volume I: Invitation for Bids (“IFB”), of this Bid Package regarding Invitation for Bids #Y25-726-MB. 158

"Notice of Award" shall mean the written notice of award of the Contract given by the County 160 to the apparent Selected Bidder.

"Professional" shall mean the professional independent Architectural/Engineering firm designated to assist the County in the work by a prior agreement entered into by the County and 164 the said firm. The terms “Professional”, “Engineer-of-Record”, “Design Professional”, and "Architect" are used interchangeably. 166

"Project" shall mean the entire improvement contemplated in this Bid Package, and which bears 168 the following title: “Orange County Traffic Signal Upgrade Phase 1 and 2 FPN: 448728-1-58-

01 & 448728-2-58-01 FAN: D524 075 B & D524 076 B”. 170

"Project Manager" shall be the duly authorized representative of the County during the 172 construction period. This individual may also be referred to as the “Project Engineer”, “Engineer”, “Project Administrator”, or “Resident Project Representative”. 174

“Question Deadline” shall mean the time and date on which the County will stop receiving 176 questions or other IFB-related requests via email to the “Point of Contact” provided in Volume II:

Project-Specific Information and by which any question submitted thereafter will be considered 178 untimely. For the purposes of this IFB, the Question Deadline is 5:00 P.M. (local time) on September 3, 2026. 180

"Selected Bidder” shall mean the successful Bidder hat is selected by the County for award 182 and into which the County enters the Contract. The “Selected Bidder” may also be referred to as the “Contractor”. 184

"Site" shall mean the area upon or in which the Project is or will be located and upon which 186 operations are to be carried out by the Contractor and such other areas adjacent thereto as may be designated as such by the Project Manager. 188

"Specifications" or “Standard Specifications” shall mean Divisions II and III of FY 2026-27 190 Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction, and supplements thereto (unless otherwise noted) and as found in Technical 192 Provisions/Specifications which is attached to Volume III: Draft Contract of this Bid Package.

"Subcontractor" shall mean any person, company, or other business enterprise that is contracted to provide, or actually has provided, goods, materials, labor, or services to the 196 Contractor, if any such goods, materials, labor, or services are procured or used in fulfillment of

Volume I: Invitation for Bids (“IFB”) Page: 3 of 30 the Contractor’s obligations arising from the Contract with the County. A “Supplier” is a type of 198 “Subcontractor”.

“Submittal Deadline” shall mean the time and date on which the County will stop receiving Bid Proposals. For this IFB, the Submittal Deadline is 4:00 P.M. (local time) on September 17, 2026. 202

"Surety" shall mean any corporation that executes, as a surety, the Contractor's Bid Bond 204 securing the Selected Bidder’s Response or their Payment and Performance Bond securing the performance of this Contract. 206

"Work" shall mean any and all obligations, duties, and responsibilities necessary to the 208 successful completion of the construction assigned to or undertaken by the Contractor under the Contract, including the furnishing of all labor, goods, materials, services, equipment, and other 210 incidentals.

Section B: Introduction

1. Agency Background 214

Orange County, Florida, is a political subdivision of the State of Florida and charter county and thusly exercises any and all rights and privileges conveyed to it by the State of Florida, 216 and the Orange County Charter. It presently operates with an elected chief executive officer, the Orange County Mayor, and six elected single district commissioners, who together 218 comprise the Board of County Commissioners.

Procurement is an essential function of the County, affecting all operational departments, ongoing projects, and future initiatives. The Orange County Procurement Division operates 222 under the leadership of Carrie Mathes, MPA, NIGP-CPP, CFCM, CPPO, CPPB, as Procurement Division Manager and Chief Procurement Official in accordance with the 224 Orange County Procurement Ordinance found in Chapter 17, Article III, of the Orange County Code. 226

2. Project-Specific Information 228

Project-specific information regarding this IFB may be found in Volume II: Project-Specific Information. This includes but is not limited to the Scope of Work, FDOT Prequalification 230 Requirements, Technical Specifications, and other project-specific information.

3. Number of Awards

There will be one award issued under this IFB. 234

4. Notice of Federally Funded Project 236

This IFB is for a Federal-Aid Construction Project funded by the Federal Highway Association (“FHWA”) and administered by FDOT through the Local Agency Program (“LAP”). 238

By submitting a Bid Response, each Bidder hereby acknowledges to the following: 240

Volume I: Invitation for Bids (“IFB”) Page: 4 of 30

A. The County is prohibited from executing any contract or obligating itself in any manner 242 requiring disbursement of the federal funds, including consultant or construction contracts of amendments thereto, with any third party with respect to the Project without FDOT’s 244 written approval.

B. FDOT has reserved the right to review the qualifications of any consultant or contractor and to approve or disapprove the employment of such consultant or contractor. 248

C. The Selected Bidder will be required to comply with the provisions of EXH-1: County’s 250 FDOT Agreement, as may be amended between the County and FDOT, and EXH-3:

FHWA-1273 – Required Contract Provisions Federal-Aid Construction Contracts, 252 as well as any applicable federal, state, and local laws and regulations while performing under the Contract. Both such exhibits may be found attached to Volume III: Draft 254 Contract of this Bid Package.

5. Pre-Bid Conference

Please refer to the cover page of this Bid Package and Volume II: Project-Specific 258 Information for information regarding whether there is a pre-bid conference associated with this IFB. 260

If there is a pre-bid conference and it is mandatory, failure to attend such conference is 262 disqualifying. While failure to attend a voluntary pre-bid conference is not disqualifying, Bidders will not be permitted to use their failure to attend such conference as a reason for 264 any error or oversight they may make in their Bid Response.

6. Lobbying Blackout Period

A lobbying blackout period shall commence upon issuance of the solicitation until the Board 268 selects the Contractor. For procurements that do not require Board approval, the blackout period commences upon solicitation issuance and concludes upon contract award. 270

The County may void any contract where the County Mayor, one or more County 272 Commissioners, or a county staff person has been lobbied in violation of the black-out period restrictions of Ordinance No. 2002-15. 274

See the following website for more information: 276 http://www.orangecountyfl.net/OpenGovernment/LobbingAtOrangeCounty.aspx

7. Bid-Related Costs

By submission of a Bid Response, Bidders agree that any and all costs associated with the 280 preparation of their Bid Responses will be the sole responsibility of each individual Bidder.

Bidders also agree that the County shall bear no responsibility for any costs associated with 282 the preparation of their Bid Responses including, but not limited to, any administrative or judicial proceedings resulting from the solicitation process. 284

Volume I: Invitation for Bids (“IFB”) Page: 5 of 30

8. Bidders’ Obligation to Examine Site 286

Before submitting bids, Bidders must carefully examine the Site of the proposed Work and make all necessary investigations to inform themselves thoroughly as to all difficulties 288 involved in the completion of all Work required pursuant to the mandates and requirements of this Bid Package. 290

The County shall grant reasonable access to the entire Project Site to each Bidder. Bidders 292 are responsible for obtaining approval from all the regulatory agencies that have jurisdiction for investigative work. When requested and if applicable to the Project, a Right-of-Way 294 Utilization Permit will be issued by the County’s Highway Construction Division for performing borings within the Site’s limits. Bidders are instructed to contact the Highway Construction 296 Division obtain information regarding such Right-of-Way Utilization Permit.

Each Bidder shall ensure that all areas disturbed by their examinations, investigations, or inspections are restored to as good as or better than the existing conditions. Bidders shall be 300 responsible to comply with all permit conditions, rules, and regulations including but not limited to those related to NPDES and threatened and endangered species. 302

No plea of ignorance of conditions or difficulties that may hereafter exist, or of conditions or 304 difficulties that may be encountered in the execution of the work pursuant to the Contract as a result of the Bidder’s failure to make the necessary examinations and investigations will be 306 accepted as an excuse for any failure or omission on the part of the Contractor to fulfill, in every detail, all of the requirements of the Contract, nor will they be accepted as a basis for 308 any claims whatsoever for extra compensation or for an extension of time.

Refer to the “Site Investigation” and “Utility Coordination” provisions in Volume III: Draft Contract for further information. 312

Section C: Bid Submittal 314

1. Submittal Deadline

Sealed bids responsive to this IFB will be accepted up to the Submittal Deadline. 316

The time/date stamp clock located in the electronic submittal portal shall serve as the official 318 authority to determine lateness of any bid. The Submittal Deadline shall be scrupulously observed. Under no circumstances shall bids delivered after the time specified be 320 considered.

The County’s decision to refuse to consider a Bid Response that was received beyond the Submittal Deadline shall not be the basis for a protest pursuant to the Orange County 324 Procurement Ordinance.

Volume I: Invitation for Bids (“IFB”) Page: 6 of 30

2. Method of Submitting Bid Responses

The County is only accepting electronic bid submittals using the ProcureNow OpenGov e-328 Procurement Platform. Bidders shall create a free account with ProcureNow OpenGov by signing up at: https://secure.procurenow.com/signup. 330

Bidders are required to submit their Bid Responses electronically via the ProcureNow 332 OpenGov e-Procurement Platform, in the form of a single PDF document inclusive of all required attachments. Bidders shall not be permitted to hand-deliver, mail, telephone, fax, 334 or email offers. Bid Responses received after the submission deadline or transmitted outside of the designated ProcureNow OpenGov e-Procurement Platform shall be rejected. 336

Once a Bidder has completed account registration, it should navigate to this IFB’s 338 ProcureNow OpenGov portal page, click on "Submit Response", and follow the instructions to submit the electronic Bid Response. 340

The timely transmittal of a Bid Response to the Procurement Division prior to the Submittal 342 Deadline is solely and strictly the responsibility of the Bidder. The County shall not be responsible for delays caused by any occurrence, including a Bidder's network delays, 344 bandwidth issues, internet outages, or other technical difficulties.

For technical support, Bidders may reach the ProcureNow OpenGov Service Desk in the following manner: 348

Chat (preferred): Click the button in the lower right-hand corner of the portal 350 Email: support@procurenow.com Phone: +1 (855) 680-4747 Hours: Mon-Fri 8am - 8pm EST 352

3. Deviations 354

Bidders are solely responsible for reading and completely understanding the requirements and the specifications, provisions, terms, and conditions of this IFB, inclusive of all Volumes 356 of the Bid Package. The County will only consider Bid Responses that meet such specifications, provisions, terms, and conditions. In instances where a deviation is stated or 358 otherwise discovered in a Bid Response, such Bid Response will be subject to rejection by the County in recognition of the fact that it did not meet the exact requirements imposed by 360 this IFB or otherwise found in the Bid Package.

4. Withdrawal of Bid/Bid Acceptance Period

Bid Responses may be withdrawn or modified only before the appointed bid opening date. 364 As of the bid opening date, Bid Responses shall be considered an irrevocable offer in full force and effect for a period of 90 days after the bid opening date (the “Bid Acceptance 366 Period”).

Bidders may not assign or otherwise transfer their obligations or liabilities under the Bid Response. 370

Volume I: Invitation for Bids (“IFB”) Page: 7 of 30

In the event that an award is not made by the County prior to the conclusion of the Bid 372 Acceptance Period, Bidders may withdraw their offer or provide a written extension without modification. 374

5. Cancellation of Solicitation 376

The County reserves the right, and the Manager of the Procurement Division, has the absolute and sole discretion to cancel a solicitation at any time prior to approval of the award 378 by the Board of County Commissioners when such approval is required. The decision to cancel a solicitation cannot be the basis for a protest pursuant to the Orange County Code. 380

Section D: Questions and Addenda 382

1. Method of Submitting Questions

The ProcureNow OpenGov question-and-answer module will not be utilized for this IFB. Any 384 questions or other IFB-related requests for consideration for modification or alteration of any of the information or documents shall be submitted via email to the “Point of Contact” 386 provided in Volume II: Project-Specific Information prior to Question Deadline.

Bidders are instructed not to contact the initiating division directly.

No oral interpretation of the meaning of the plans, specifications, or other documents related to the Project or the Bid Package shall be considered binding. The County shall be bound by 392 information and statements only when such information or statements are written and executed under the authority of the Procurement Division Manager. 394

Answers for timely questions and other IFB-related requests will be addressed in the 396 ProcureNow OpenGov Addenda & Notices module as an addendum to this IFB depending on volume. Prospective Bidders are encouraged to subscribe as a follower and monitor all 398 notifications.

This provision exists solely for the convenience and administrative efficiency of the County.

No respondent or other third party gains any rights by virtue of this provision or the application 402 thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. 404

Untimely questions or other IFB-related requests are unable to be submitted in the 406 ProcureNow OpenGov question-and-answer module, thereafter respondents raising critical concerns must email the “Point of Contact” provided in Volume II: Project-Specific 408 Information.

Please note that critical clarifications may be made via addenda, however, untimely questions may not be considered. 412

Volume I: Invitation for Bids (“IFB”) Page: 8 of 30

2. Proprietary or Restrictive Specifications 414

If a Bidder considers a specification or requirement contained in this Bid Package to be proprietary or restrictive in nature, thus potentially resulting in reduced competition, it is urged 416 to submit a question via email to the Point of Contact provided in Volume II: Project Specific Information prior to the Question Deadline. Specifications or requirements which are 418 unrelated to performance may be considered by the County for deletion or modification via addendum. 420

3. Contract Exceptions 422

A draft of the Contract may be found in Volume III: Draft Contract of this Bid Package.

Bidders with exceptions to any provision of the Draft Contract must timely submit any 424 requests for amendments to the Draft Contract’s terms and conditions by use via email to the Point of Contact provided in Volume II: Project Specific Information The County will review 426 such amendment requests and issue a response by addendum.

By submitting a Bid Response, each Bidder acknowledges and agrees that the County has no obligation to acquiesce to any changes later requested by the Selected Bidder if such 430 changes were not timely and appropriately requested by such Bidder prior to the Question Deadline. 432

4. Modifications to IFB Documents 434

Bidders must use the documents and forms provided in or attached to this IFB as provided and without modification. Failure to do so may lead to disqualification of the Bidder. 436

Modification or alteration of the documents or forms contained in or attached to this 438 solicitation shall only be made upon receipt of prior written consent of the County, which may be obtained via email to the Point of Contact provided in Volume II: Project Specific 440 Information by submittal of a timely question.

5. Addenda

Questions, answers, and any and all modifications, clarifications, interpretations, and 444 supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All such addenda shall become part of the “Contract Documents” 446 (as defined in Volume III: Draft Contract in this Bid Package) and receipt of each shall be acknowledged by use of the ProcureNow OpenGov addendum acknowledgment feature. 448

Section E: Bid Opening 450

Public Bid Response openings are held each Wednesday at 9:30 A.M. and Friday at 9:30 A.M.

local time. A public opening of all Bid Responses will be conducted at the next posted 452 Procurement Public Meeting following the Submittal Deadline. In the event of a County Holiday or unforeseen delay, responses shall remain sealed until the next available public meeting. 454

Volume I: Invitation for Bids (“IFB”) Page: 9 of 30

Bidders and members of the public will be able to attend the public opening virtually. To do so, 456 see the following instructions:

Visit: https://ocfl.webex.com/ocfl/j.php?MTID=m59bb20319c748f1e60a933cf59c7125b Meeting Number: 286 177 361 Password: Go2Meeting

Join by phone Option 1: 1-408-792-6300 Access Code: 286 177 361 Join by phone Option 2: 1-617-315-0740 Access Code: 286 177 361 Join by phone Option 3: 1-602-666-0783 Access Code: 286 177 361

Bidders and members of the public who prefer to attend a public opening in person may do so 462 at the following address: 400 E. South Street, 2nd Floor, Orlando, Florida 32801.

Bid tabulations shall be available thirty (30) days after opening on the County’s website at:

http://apps.ocfl.net/orangebids/bidresults/results.asp or upon notice of intended action, 466 whichever is sooner.

Section G: Posting of Recommended Award and Bid Protests

1. Award of Contract/Rejection of Bids 470

The County reserves the right to award either the Base Bid or the Alternate Bid, at its sole discretion, based on the best interest of the County. Award shall be made to the lowest 472 responsive and responsible Bidder for the selected option—either the Base Bid or the Alternate Bid. Bidders must submit pricing for both the Base Bid and the Alternate Bid as 474 specified. Failure to provide complete pricing for both may render the bid non-responsive.

Cash discounts for prompt payment shall not be considered in determining the lowest net cost for bid evaluation purposes. 478

The County, in its sole discretion, reserves the right to reject any and all Bid Responses and 480 to waive any informality concerning Bid Responses whenever such rejection or waiver is in the best interest of the County. Nothing contained herein shall place a duty upon the County 482 to reject bids or award a Contract based upon anything other than its sole discretion as described herein. 484

2. Bid Errors 486

Where bid forms have erasures or corrections, each erasure or correction must be initialed in ink by the Bidder. In case of unit price bid items, if an error is committed in the extension 488 of an item, the unit price as shown in OC-1: Bid Response Submittal Form will govern.

Errors between any sum computed by the Bidder and the correct sum thereof will be resolved 490 in favor of the correct sum. Any discrepancy between words and numbers will be resolved in favor of the written words. 492

Volume I: Invitation for Bids (“IFB”) Page: 10 of 30

3. Posting of Recommended Award 494

The recommended award will be posted for review by interested parties at the Procurement Division and at: http://apps.ocfl.net/OrangeBids/AwardsRec/default.asp prior to submission 496 through the appropriate approval process and will remain posted for a period of five full business days. 498

4. Bid Protests 500

Failure to file a protest with the Procurement Division Manager by 5:00 P.M. on the fifth full business day after posting, shall constitute a waiver of bid protest proceedings. For more 502 information regarding Bid Protests, please review the procedure found on following website:

http://www.orangecountyfl.net/VendorServices/VendorProtestProcedures.aspx 504

Article 2: Bid Terms and Conditions 506

Section A: Incorporation

1. Bid Submittal Instructions 508

The provisions of Art. 1. (“Bid Submittal Instructions”) are hereby incorporated into these IFB Terms and Conditions. 510

2. Invitation for Bids 512

By submission of a Bid Response, Bidders acknowledge and agree that the terms and conditions of this IFB will be incorporated into the Contract and into any purchase orders that 514 may be issued for the work.

3. Litigation Provisions

The “Attorneys’ Fees and Cost”, “Governing Law”, “Jury Waiver”, and “Venue” provisions in 518 Volume III: Draft Contract of this Bid Package are hereby applicable to any and all legal actions that may arise from or are associated with this IFB or that are otherwise related to 520 the County’s procurement solicitation for the Project.

4. LAP Division I Specifications

Certain provisions of the FY 2026-27 LAP Division I Specifications are applicable to this 524 Project. Such provisions may be found in EXH-2: FDOT Division I Specifications Package for Local Agencies, which is attached to Volume III: Draft Contract and hereby 526 incorporated into this Bid Package.

Section B: Bidder Qualifications

1. Bid Response Submittal Forms 530

All Bidders shall complete and submit OC-1: Bid Response Submittal Form, as well as all required forms and attachments listed therein and, if applicable, any conditional or additional 532

Volume I: Invitation for Bids (“IFB”) Page: 11 of 30 forms or documents required in this IFB and Bid Package as part of its Bid Response. Failure to submit any such documents will result in disqualification. 534

Any questions concerning any forms, attachments, or any other documents required by this 536 IFB should be submitted via email to the Point of Contact provided in Volume II: Project Specific Information prior to the Question Deadline. 538

2. FDOT Prequalification Requirements 540

For all awards that meet or exceed $250,000 in value, Bidders are required to be currently pre-qualified with the FDOT. To determine if FDOT Prequalification is required for this 542 Project, refer to Volume II: Project-Specific Information of this Bid Package.

If FDOT Prequalification is required for this Project, failure to submit proof of FDOT prequalification for the minimum number of major classes of work in the manner required in 546 Volume II: Project-Specific Information may result in disqualification.

For more information regarding this requirement, see Section 2-1 of EXH-2: FDOT Division I Specifications Package for Local Agencies, which is attached to Volume III: Draft 550 Contract of this Bid Package, and the contents of Volume II: Project-Specific Information.

3. Development or Assistance with Specifications

Firms or individuals who assisted in the development or drafting of the specifications, 554 requirements, statements of work, or other documents contained within this Bid Package are excluded from competing in this solicitation. 556

4. Certification of Current Capacity 558

Each Bidder must certify that it has the financial capacity to complete the Project. To meet this requirement, all Bidders must complete and submit FDOT-1: #525-010-46 – LAP 560 Certification of Current Capacity with their Bid Responses.

Such form shall be kept confidentially but may be reviewed by and transmitted between the County, the Orange County Comptroller’s Office, the State of Florida, and the Federal 564 Government.

5. Joint Ventures

Bidders submitting as a Joint Venture shall submit a “Joint Venture Eligibility Form” with their 568 Bid Response, to which a fully executed copy of the relevant joint venture agreement must be attached. If FDOT prequalification is required for the Project, Joint Ventures are not 570 permitted.

Joint Ventures must be properly registered with the Florida Division of Corporations before the Contract Award and the name of the Joint Venture must by the same used in this Bid 574 Response.

Volume I: Invitation for Bids (“IFB”) Page: 12 of 30

If applicable, the following may result in disqualification of the Bid Response under this provision: 578

A. Failure to timely submit the required “Joint Venture Eligibility Form” as found on the County’s Forms and Resources website (https://www.ocfl.net/vfr); 580

B. Failure to timely submit a fully executed copy of the relevant joint venture agreement; or

C. Failure of the Joint Venture to be timely and properly registered with the Florida Division 582 of Corporations.

6. Florida Business Authorization

Bidders must be authorized to do business in the State of Florida. Bidders who are 586 nonresident corporations shall furnish to the County a duly certified copy of their permit to transact business in the State of Florida along with their Bid Response. Failure to promptly 588 submit this evidence or qualification to do business in the State of Florida may be basis for rejection of a Bid Response. 590

7. Public Entity Crime 592

By submitting a Bid Response, each Bidder hereby certifies that such submittal does not violate the provisions of Section 287.133, Florida Statutes, which prohibits a person or 594 affiliate who has been placed on the State of Florida’s “Convicted Vendor List” from submitting a bid on a contract with a public entity for the construction or repair of a public 596 building or public work, submitting bids on leases of real property to a public entity, being awarded or performing work as a contractor, supplier, subcontractor, or consultant under a 598 contract with a public entity, and transacting business with any public entity in excess of the threshold amount provided in Section 287.017, Florida Statutes, for CATEGORY TWO, for a 600 period of 36 months from the date of being placed on the Convicted Vendor List.

8. Scrutinized Companies

By submitting a Bid Response, each Bidder hereby certifies that they are eligible to submit 604 such response under Section 287.135, Florida Statutes, which makes companies ineligible to bid on, submit a proposal for, or enter into or renew a contract with a local government 606 under the following circumstances:

A. For contracts for any value, if the Bidder is on the State of Florida’s “Scrutinized

Companies that Boycott Israel List”, or is otherwise engaged in a boycott of Israel; and 610

B. For contracts for one million dollars ($1,000,000) or more, if the Bidder is on the State of 612 Florida’s “Scrutinized Companies with Activities in Sudan List”, on the State of Florida’s “Scrutinized Companies with Activities in Iran List”, or is otherwise engaged in business 614 operations in Cuba or Syria.

Volume I: Invitation for Bids (“IFB”) Page: 13 of 30

9. Suspension and Debarment

As this IFB is for the award of a Federal-Aid Construction Contract, each Bidder must certify 618 to certain provisions regarding debarment, suspension, ineligibility, and voluntary exclusion.

To meet this requirement, all Bidders must complete and submit FDOT-2: #375-030-32 – Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion 622 with their Bid Responses.

For more information regarding this requirement, see Section X of EXH-3: FHWA-1273 – Required Contracts Provisions Federal-Aid Construction Contracts, which is attached 626 to Volume III: Draft Contract of this Bid Package.

10. E-Verify

Bidders shall be required to be registered with the U.S. Department of Homeland Security’s 630 E-Verify system. For more information on this process, please refer to United States Citizenship and Immigration Service site at: http://www.uscis.gov/portal/site/uscis. 632

By submission of a bid in response to this solicitation, Bidders must certify that all employees 634 in the above categories shall undergo e-verification before placement on this Contract. To meet this requirement, all Bidders must complete and submit OC-2: E-Verify Certification 636 Form with their Bid Responses.

For more information about this requirement, see the “E-Verify” provision of Volume III: Draft Contract and Section 7-29 of EXH-2: FDOT Division I Specifications Package for Local 640 Agencies which is attached to Volume III: Draft Contract of this Bid Package.

11. Required Disclosures

As further detailed in OC-1: Bid Response Submittal Form, the Bidder is required to make 644 certain disclosures regarding previous, current, and pending felony proceedings, governmental litigation, and regulatory/civil actions. 646

Failure to provide such required disclosures in the manner required in OC-1: Bid Response 648 Submittal Form may result in disqualification. If the Bidder is selected for award, any such failure may be considered cause to terminate or void the Contract by the County should a 650 misrepresentation or omission the County deems to be material be discovered.

Section C: Licenses, Permits, and Fees

1. Generally 654

The Selected Bidder will be required to procure and pay for all requisite permits, licenses, charges, and fees and give all notices necessary and incidental to the due and lawful 656 prosecution of the Work.

Volume I: Invitation for Bids (“IFB”) Page: 14 of 30

The cost of all permits, fees, etc. shall be included in the fee schedule except where otherwise noted in the specifications or other bid documents. 660

2. Public Bid Disclosure 662

In compliance with the Public Bid Disclosure Act, Section 218.80, Florida Statutes, the County is required to discloses all County-level permits or fees, including, but not limited to, 664 all license fees, permit fees, impact fees, or inspection fees, payable by the successful Contractor to the County. 666

The required disclosure for this IFB may be found in Volume II: Project-Specific 668 Information.

The Orange County Government Fee Directory, incorporated herein by reference, contains a list of Orange County licenses, permits, and fees that may apply to this project. The fee 672 directory link “Fees” is available at:

http://www.orangecountyfl.net/portals/0/resource%20library/open%20government/FeeDirec674 tory.pdf Licenses, permits, and fees which may be required by the State of Florida, State Agencies, or by other local governmental entities or agencies other than the County are not included in 678 this disclosure. Bidders are required to review all applicable licenses, permits, and fees and to contact the applicable agency if there are any questions. 680

The foregoing notwithstanding, the County has identified certain non-County permits, 682 determinations, and waivers that are applicable to the Project. Such non-County permits, determinations, and waivers may be found in DOC-4: Non-County Permitting Information, 684 which is attached to Volume II: Project-Specific Information of this Bid Package.

By submitting a Bid Response, each Bidder hereby acknowledges and affirms that: (A) the County does not make any assurances that the contents of DOC-4: Non-County Permitting 688 Information is a complete account of all non-County permits, determinations, or waivers that may be applicable to the Project; and (B) it shall be the selected Bidder’s sole responsibility 690 to ensure that all Work provided on the Project is properly permitted and performed in compliance with all applicable licensing and permitting requirements, laws, and regulations. 692

3. Licensure Requirements 694

The Bidder shall be properly licensed and in good standing with any regulatory authority that regulates any and all of the Work. 696

Any such licenses shall be in the Bidder’s name as it appears in the Bid Response. The cost 698 of all permits, fees, etc. shall be included in the bid offer except where otherwise noted in the specifications or other bid documents. 700

Volume I: Invitation for Bids (“IFB”) Page: 15 of 30

The Bidder shall attach copies of all appropriate licenses, inclusive of their numbers and 702 expiration dates, to their Bid Response. Failure to hold and provide proof of proper licensing, certification, and registration shall be grounds for rejection of the Bid Response. 704

Any subcontractors that a Bidder intends to use should it be selected for award shall be 706 licensed in their respective fields and, when required, obtain construction permits from the County. Such licenses must be in the name of the subcontractors listed by the Bidder on OC-708 3: Subcontractor/Supplier Schedule, which Bidders must complete and submit with their Bid Responses. 710

Section D: Ethics 712

1. State Conflict of Interest Requirement

No member, officer, or employee of the County, during their tenue or for two (2) years 714 thereafter shall have any interest, direct or indirect, in the Contract or the proceeds thereof.

Neither the Selected Bidder, nor their subcontractors, may enter into any contract, subcontract, or arrangement in connection with the Project or any property included or 718 planned to be included in the Project in which any member, officer, or employee of Orange County, Florida, during their tenure or for two (2) years thereafter has any interest, direct or 720 indirect.

For more information about this requirement, see the “Conflicts of Interest” provision in Volume III: Draft Contract of this Bid Package. 724

2. County Ethics Compliance 726

The County has the following specific regulations regarding ethics compliance:

A. Bidders are required to complete and submit OC-4: Relationship Disclosure Form, which documents any relationships between a Bidder and the Mayor or member of the 730 Orange County Board of County Commissioners, with their Bid Responses.

B. Bidders are required to complete and submit OC-5: Orange County Specific Project

Expenditure Report, which documents any expenses incurred by a lobbyist for the 734 purposes described in Section 2-351, Orange County Code, with their Bid Responses.

3. Federal Lobbying Certification

In accordance with federal law, prospective contractors and subcontractors pursuing federal-738 aid construction contracts in excess of one-hundred thousand dollars ($100,000) must file certain lobbying certifications and disclosures. 740

To meet this requirement, all Bidders must complete and submit FDOT-3: #375-030-33 – 742 Certification for Disclosure of Lobbying Activities on Federal-Aid Contracts (Compliance with 49 CFR, Section 20.100 (b)) and FDOT-4: #375-030-34 – Disclosure 744 of Lobbying Activities with their Bid Responses.

Volume I: Invitation for Bids (“IFB”) Page: 16 of 30

For more information regarding this requirement, see Section XI of EXH-3: FHWA-1273 – Required Contracts Provisions Federal-Aid Construction Contracts, which is attached 748 to Volume III: Draft Contract of this Bid Package.

4. Non-Collusion

Each Bidder shall file a statement executed by, or on behalf of the person, firm, association, 752 or corporation submitting the Bid Response certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in 754 any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted Bid Response. Failure to submit the executed statement as 756 part of the Bid Response will make such response nonresponsive and not eligible for award consideration. 758

To meet this requirement, all Bidders must complete and submit FDOT-5: #575-060-13 – 760 Non-Collusion Declaration and Compliance with 49 CFR 29 with their Bid Responses.

Section E: Bonding

1. Payment and Performance Bonds 764

Pursuant to Section 255.05, Florida Statutes, any person or entity entering into a formal contract with the County for the construction of a public building, for the prosecution and 766 completion of a public work, or for repairs upon a public building or public work is required, before commencing the work or before recommencing the work after a default or 768 abandonment, to execute and record in the public records of Orange County, Florida, a payment and performance bond with a surety insurer authorized to do business in the State 770 of Florida as surety.

The “Payment Bond Template” and the “Performance Bond Template” that the Selected Bidder will be required to utilize may be found on the County’s Forms and Resources website 774 (https://www.ocfl.net/vfr). Such Payment Bond and Performance Bond must be properly completed and executed by the Surety Company and the successful Bidder within 10 days 776 after receipt of notification from the County of its award of the Contract.

No payment will be made to the selected contractor until it has provided a certified copy of the properly recorded bonds to the Manager of the Orange County Procurement Division. 780

The County reserves the right to issue an award to the next lowest responsive and 782 responsible Bidder should the Selected Bidder not timely provide a certified copy of the recorded bonds to the County. 784

2. Bid Bond 786

Submission of an electronic Bid Bond with a surety insurer authorized to do business in the State of Florida as a surety shall be completed and signed by all required parties and 788 submitted using the “Bid…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .