This document is a comprehensive technical specification for a Gravity Main Cured-in-Place-Pipe (CIPP) Lining Term Contract issued by Orange County Utilities in Florida. The contract, designated as Y25-153, is for rehabilitation of existing gravity sewer collection systems through the installation of cast-in-place pipe (CIPP) liners, with an estimated project cost of $880,140.00. The solicitation will accept sealed bids electronically via the OpenGov e-Procurement Platform until 4:00 pm EST on March 6, 2025, with a contract term of 12 months from the award date and an option to renew at the County's discretion. The project objectives include structural and hydraulic renewal of sewer systems, with work encompassing cleaning sanitary sewers, closed-circuit television (CCTV) inspections, and CIPP liner installations for gravity mains.
The contract is structured as a unit price contract with estimated quantities in the bid schedule, and the County is not obligated to purchase a minimum or maximum amount during the contract term. Projects will be authorized through numbered delivery orders, with work to be completed on an as-needed basis. Contractors must meet specific qualifications, including having completed a minimum of 100,000 linear feet of CCTV inspections within the previous 10 years, possessing specific equipment requirements, and maintaining a documented quality assurance/quality control plan. The specifications detail extensive technical requirements for the CIPP lining process, including cleaning, inspection, liner installation, service lateral reconnections, and post-installation testing, with a focus on maintaining continuous wastewater service and minimizing disruption to existing infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Orange County Utilities
GRAVITY LINING
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01001 General Work Requirements 01010 Summary of Work 01025 Measurement and Payment 01065 Permits and Fees 01070 Abbreviations and Symbols 01091 Reference Specifications 01101 Special Requirements (Gravity Inspection Only) 01300 Submittals 01301 Product Substitutions 01400 Quality Control 01410 Testing and Testing Laboratory Services 01516 Collection System Bypass 01560 Erosion and Sedimentation Control 01570 Maintenance of Traffic 01610 Delivery, Storage, and Handling 01700 Project Closeout 01740 Warranties and Bonds
DIVISION 2 - SITE WORK
02140 Dewatering 02215 Finish Grading 02220 Excavating, Backfilling and Compacting
Roadwork 02578 Solid Sodding
Pressure Pipe – Not Used
Wastewater Gravity System Inspection 02761 Cleaning Sanitary Sewer Systems 02762 Televising Sanitary Sewer Systems
Wastewater Gravity System 02771 Cure-In-Place Pipe for Sanitary Sewer Renewal
Pump Station – Not Used
DIVISION 3 – CONCRETE - NOT USED
DIVISION 4 - MASONRY- NOT USED
DIVISION 5 - METALS- NOT USED
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES - NOT USED
DIVISION 7 - THERMAL AND MOISTURE PROTECTION - NOT USED
DIVISION 8 - OPENINGS - NOT USED
DIVISION 9 - FINISHES- NOT USED
DIVISION 10 - SPECIALTIES - NOT USED
DIVISION 11 – EQUIPMENT- NOT USED
DIVISION 12 - FURNISHINGS - NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION - NOT USED
DIVISION 14 - CONVEYING EQUIPMENT - NOT USED
DIVISION 15 - MECHANICAL
15064 Polyvinyl Chloride (PVC) Pipe and Fittings
DIVISION 16 – ELECTRICAL- NOT USED
APPENDIX
APPENDIX D LIST OF APPROVED PRODUCTS (title sheet) Appendix D Orange County Utilities - List of Approved Products
APPENDIX G DEWATERING DISCHARGE OFF-SITE (title sheet) Appendix G FDEP Notice of New Method for Mercury Testing Appendix G FDEP Generic Permit for the Discharge of Produced Groundwater From a Non-Contaminated Site Activity Appendix G Memo – EPA –Analytical Methods for Mercury in NPDES Permits Appendix G Orange County EPD Work Instruction
THIS PAGE LEFT BLANK INTENTIONALLY
01001 - 1 of 20
SECTION 01001
GENERAL WORK REQUIREMENTS
PART 1 - GENERAL
1.01 NOTICES
A. All notices or other papers required to be delivered by the Contractor to the County shall be delivered to the office of the Field Services Division, Orange County Utilities Department, 8100 Presidents Drive, Suite A, Orlando, FL 32809.
1.02 TERM CONTRACT
A. The Contract is a term contract that shall commence on the date of award and terminate 12 months after the award date with the option to renew at the County’s discretion.
B. The Contract is a Unit Price contract with the total estimated base bid equal to the sum of the pay item totals from the bid schedule. All quantities on the bid schedule are estimates and the County is not obligated to purchase a minimum or maximum amount during the Contract term.
C. Projects will be authorized by issuance of a numbered delivery order. The delivery order will specify the location, description and completion time for the Project. Delivery orders will be emailed and mailed to the Contractor. The emailed copy of the delivery order shall be official Notice to Proceed.
1.03 METHOD OF ORDERING
A. Routine Orders:
1. Utilities will initiate a Work Request which shall include, but not be limited to the following: Date of request, an asset listing of work to be completed with estimated quantities, map(s) of the work area. The Work Request will be emailed to the Contractor, however, due to size limitations some maps will need to be picked up at 8100 Presidents Drive Orlando, FL 32809.
2. The Contractor shall, upon receiving the Work Request from Utilities, visit the site and familiarize themselves with the site conditions and the requested Work. The Contractor shall submit their Job Cost Proposal (quote) and confirm or adjust the estimated quantities and use the unit prices in the Contract. The Job Cost Proposal shall be emailed to the Orange County Utilities designated personnel within four (4) calendar days following the date of emailed Work Request.
3. Utilities will review and approve the Contractor’s submitted Job Cost Proposal and process a Delivery Order authorization. If the submitted Job Cost Proposal contains quantities different from the estimated quantities, Utilities will work with the Contractor
01001 - 2 of 20 to confirm actual quantities before issuing the Delivery Order.
4. A copy of the Delivery Order will be emailed to the Contractor and will include job location, Work description, and completion due date. The emailed Delivery Order shall serve as the official Notice to Proceed. Work shall commence as soon as possible after receipt of Delivery Order by email.
5. Changes to the scope of work after the Delivery Order has been issued must be approved by the County, in writing and a new Job Cost Proposal must be submitted showing the originally approved line items and quantities and the new line items and their respective quantities.
6. Delivery Orders will not be issued for Job Cost Proposals under 500 dollars.
B. Emergency Orders:
1. Contractor shall be available to commence emergency work on an on-call basis.
2. Emergency work may be required on a twenty-four hour, seven (7) day/week basis as requested. Emergency work requests shall be responded to no later than (2) two hours after notification to the Contractor, by the County, so the Contractor can begin to assess the needs for the emergency work request. The emergency work shall begin as agreed on by the Project Manager or Designee and be continuous until all emergency work is complete. The County may waive cost estimates and the issuance of a Delivery Order prior to the start of emergency work. The Contractor will be required to submit a formal quote using the appropriate bid schedule line items to including quantities with pricing used in the completion of the emergency work as soon as possible but no more than two
(2) days after emergency work commences. A Delivery Order will then be processed based on that quote after it has been reviewed and approved by the Project Manager or his Designee.
1.04 WORK TO BE DONE
A. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all work required by these specifications and as shown on the Drawings, at a rate of progress which will ensure completion of the Work within the Contract Time stipulated.
B. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean up, replacements, and restoration required as a result of damages caused during this construction.
C. The Contractor shall comply with all City, County, State, Federal, and other codes, which are applicable to the proposed Work.
D. All newly constructed Work shall be carefully protected from injury in any way. No wheeling, walking, or placing of heavy loads on it shall be allowed and all portions
01001 - 3 of 20 damaged shall be reconstructed by the Contractor at his own expense.
E. Scope of Work: See Section 01010, Summary of Work and the Bid Schedule for details.
1.05 DRAWINGS AND PROJECT MANUAL
A. The Work shall be performed in accordance with the Drawings and Specifications prepared by the County/Professional. All work and materials shall conform to the Orange County Utilities Standards and Construction Specifications Manual, latest edition or as indicated in these Specifications or Drawings.
B. The Contractor shall verify all dimensions, quantities and details shown on the Drawings, Supplementary Drawings, Schedules, Specifications or other data received from the County/Professional, and shall notify same, in writing, of all errors, omissions, conflicts and discrepancies found therein. Failure to discover or correct errors, conflicts or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory Work, faulty construction or improper operation resulting there from, nor from rectifying such conditions at his own expense.
C. All schedules are given for the convenience of the County and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for the making of estimates of the size, kind, and quantity of materials and equipment included in the Work to be done under this Contract.
D. Intent:
1. All Work called for in the Specifications applicable to this Contract, but not shown on the Drawings in their present form, or vice versa, shall be of like effect as if shown or mentioned in both. Work not specified either in the Drawings or in the Specifications, but involved in carrying out their intent or in the complete and proper execution of the Work, is required and shall be performed by the Contractor as though it were specifically delineated or described.
2. Items of material, equipment, machinery, and the like may be specified on the Drawings and not in the Specifications. Such items shall be provided by the Contractor in accordance with the specification on the Drawings.
3. The apparent silence of the Specifications as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of these Specifications shall be made upon that basis.
E. Refer to the Contract for the order of precedence of items and documents.
1.06 PROTECTION AND RESTORATION
01001 - 4 of 20
A. The Contractor shall be responsible for the preservation of all public and private property, and shall use every means of protection necessary to prevent damage thereto. If any direct or indirect damage is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the Work on the part of the Contractor, such property shall be restored by the Contractor, at his expense, to a condition similar or equal to that existing before the damage was done, or the Contractor shall make good the damage in other manner acceptable to the County/Professional.
B. Protection of Trees and Shrubs
1. Protect with boxes or other barricades.
2. Do not place excavated material so as to injure trees or shrubs.
3. Install pipelines in short tunnels between and under root systems.
4. Support trees to prevent root disturbance during nearby excavation.
C. Tree and Limb Removal
1. Tree limbs, which interfere with equipment operation and are approved for pruning, shall be neatly trimmed and the tree cut coated with tree paint.
2. The County may order the Contractor, for the convenience of the County, to remove trees along the line or trench excavation. The Contractor shall obtain any permits required for removal of trees. Ordered tree removal shall be paid for under the appropriate Contract Items.
D. Trees or shrubs destroyed by negligence of the Contractor or his employees shall be replaced by the Contractor with new stock of similar size and age, at the proper season and at the sole expense of the Contractor.
E. Lawn Areas: All lawn areas disturbed by construction shall be replaced with like kind to a condition similar or equal to that existing before construction. Where sod is to be removed, it shall be carefully removed, and the same re-sodded, or the area where sod has been removed shall be restored with new sod in the manner described in Section 02578, Solid Sodding.
F. Where fencing, walls, shrubbery, grass strips or area must be removed or damaged incident to the construction operation, the Contractor shall, after completion of the work, replace or restore to the original condition.
G. The cost of all labor, materials, equipment, and work for restoration shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made therefore.
1.07 PUBLIC NUISANCE
01001 - 5 of 20
A. The Contractor shall not create a public nuisance including, but not limited to, encroachment on adjacent lands, flooding of adjacent lands, or excessive noise.
B. Sound levels measured by the County/Professional shall not exceed 45 dBA from 8 p.m. to 8 a.m. or 55 dBA 8 a.m. to 8 p.m. This sound level shall be measured at the exterior of the nearest exterior wall of the nearest residence. Levels at the equipment shall not exceed 85 dBA at any time. Sound levels in excess of these values are sufficient cause to have the Work halted until equipment can be quieted to these levels. Work stoppage by the County/Professional for excessive noise shall not relieve the Contractor of the other portions of this specification including, but not limited to, completion dates and bid amounts.
C. No extra charge may be made for time lost due to work stoppage resulting from the creation of a public nuisance.
1.08 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK
A. County Inspector Work Hours: Normal work hours for the County’s inspector(s) are defined as any 8-hour period between the hours of 7:00 a.m. and 7:00 p.m. on the weekdays of Monday through Friday. Any County Inspector(s) work beyond the aforementioned normal work hours shall be requested in writing 48-hours in advance. All overtime, any County holidays or weekend work compensation for the County’s Inspector(s) to work beyond the normal working hours are considered overtime compensation and shall be paid for by the Contractor. The overtime pay rate will be $51.00 per hour or the most current rate as listed in the County Fee Directory prepared by the Office of Management and Budget, in section “Orange County Utilities Engineering & Construction”, under the heading of “Inspection Fee other than Normal Working Hours”. The Contractor agrees that the County shall deduct charges for work outside normal work hours and for overtime pay from payments due the Contractor.
B. The County will determine if an inspector needs to be onsite during the timeframe listed in the request.
1.09 MAINTENANCE OF SERVICE
A. Unless noted otherwise on the plans, the operation of the existing water, reclaimed water or wastewater facility on each of the respective locations shall remain in service until the transfer of service has been completed. The Contractor shall, prior to interrupting any utility service (water, sewer, etc.) for the purpose of making cut-ins to the existing lines or for any other purposes, contact the County and make arrangements for the interruption which will be satisfactory to the County.
B. Utility lines that are damaged during construction shall be repaired by the Contractor and service restored within 4-hours of the breakage. The County retains the option of repairing any damage to utility pipes in order to expedite service to the customers. The Contractor will remain responsible for all costs associated with the repair.
01001 - 6 of 20
1.10 TRANSFER OF SERVICE
A. When the County has accepted a proposed facility and placed it into operation, the transfer of service is complete. The Contractor may begin the work of removing the existing or temporary facilities.
1.11 LABOR
A. Supervision:
1. The Contractor shall designate, at minimum, one (1) Project Manager, who has demonstrated sufficient knowledge to oversee, manage, direct, and resolve issues for all aspects of direct and indirect work associated with this contract.
2. The Contractor’s Project Manager shall have full authority by the Contractor to direct the performance of the Work and arrange for all necessary materials, equipment, and labor without delay.
3. The Contractor’s Project Manager shall not be replaced without written notice to the County's Representative at least twenty-four (24) hours prior to their replacement.
4. The Contractor’s Project Manager shall be the County’s main point of contact throughout the duration of work at each site, be available to respond to and resolve issues or shortcomings found during the course of normal work activities. If requested by the County the Contractor’s Project Manager(s) shall respond to and arrive, in person, to the designated worksite within forty-five (45) minutes of the request.
5. The Contractor’s Project Manager shall be readily available to the County’s Representative and the County’s Representative will be entitled at all times to be advised, at his/her request, as to the status and details of all work being quoted, performed, and completed by the Contractor in a format he/she requires. The Contractor shall maintain coordination with the County’s Representative at all times. Either party may request and be granted a formal conference upon request in a timely manner.
6. In order to effectively communicate with County staff while in the field, the Contractor’s Project Manager shall have available communication devices with internet access (including email) (e.g. cellular phone, laptop computer, smart phone, etc.). This mandatory requirement ensures proper communication and documentation of problems while performing operations in contracted areas. All conversations with County staff, including but not limited to delays due to weather or unusual conditions, contractual issues, instructions given by County staff, etc., shall be documented via email.
NOTE: The County shall discuss and resolve all issues with the Primary Contractor only.
County staff shall not provide direction or instructions to Sub-Contractors, and Sub- Contractors shall not represent the Primary Contractor on projects.
B. Jurisdictional Disputes: It shall be the responsibility of the Contractor to pay all costs that may be required to perform any of the Work shown on the Drawings or
01001 - 7 of 20 specified herein to avoid any work stoppages due to jurisdictional disputes. The basis for subletting work in question, if any, shall conform to precedent agreements and decisions on record with the Building and Construction Trades Department, AFL-CIO, dated June, 1973, including any amendments thereto.
C. Apprenticeship: The Contractor shall comply with all of the requirements of the State of Florida Statutes, Chapter 446, for all contracts in excess of $25,000 excluding roadway, highway or bridge contracts and the Contractor agrees to insert in any subcontract under this Contract the requirements of this Article.
1.12 MATERIALS AND EQUIPMENT
A. MANUFACTURER
1. All transactions with the manufacturers or Subcontractors shall be through the Contractor, unless the Contractor and the County/Professional request that the manufacturer or Subcontractor communicate directly with the County/Professional. Any such transactions shall not in any way release the Contractor from his full responsibility under this Contract.
2. All workmanship and materials shall be of the highest quality. The equipment shall be the product of manufacturers who are experienced and skilled in the field with an established record of research and development. No equipment will be considered unless the manufacturer has designed and manufactured equipment of comparable type and size and have demonstrated sufficient experience in such design and manufacture.
3. No material shall be delivered to the Site without prior approval of the County/Professional.
4. All apparatus, mechanisms, equipment, machinery, and manufactured articles for incorporation into the Project shall be the new (most current production at time of bid) and unused standard products of recognized reputable manufacturers.
5. Manufactured and fabricated products:
a. Design, fabricate and assemble in accord with the best engineering and shop practices.
b. Manufacture like parts of duplicate units to standard sizes and gauges, to be interchangeable.
c. Any two or more pieces of material or equipment of the same kind, type or classification, and being used for identical types of service, shall be made by the same manufacturer.
d. Products shall be suitable for service conditions as specified and as stated by manufacturer.
01001 - 8 of 20
e. Equipment capacities, sizes and dimensions shown or specified shall be adhered to unless variations are specifically approved in writing.
f. Do not use material or equipment for any purpose other than that for which it is designed or is specified.
1.13 MANUFACTURER'S SERVICE
A. Where service by the manufacturer is specified to be furnished as part of the cost of the item of equipment, the Work shall be at the Contractor's expense.
B. The services provided shall be by a qualified manufacturer's service representative to check and verify the completed installation, place the equipment in operation, and instruct the County's operators in the operation and maintenance procedures. Such services are to be for period of time and for the number of trips specified. A working day is defined as a normal 8-hour working day on the job and does not include travel time.
C. The services shall further demonstrate to the County/Professional’s complete satisfaction that the equipment will satisfactorily perform the functions for which it has been installed.
1.14 INSPECTION AND TESTING
A. General
1. All materials and equipment furnished by the Contractor shall be subject to the inspection, review and acceptance of the County and meet the requirements as outlined in the Orange County Utilities Standards and Construction Specifications Manual. If in the testing of any material or equipment it is ascertained by the County/Professional that the material or equipment does not comply with the Contract, the Contractor shall be notified thereof, and the Contractor will be directed to refrain from delivering said material or equipment, or to remove it promptly from the Site or from the Work and not accepted by the County shall be replaced with acceptable material, without cost to the County.
2. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized test codes of the ANSI, ASME, or the IEE, except as may otherwise be stated herein.
3. The Contractor shall give notice in writing to the County sufficiently in advance of his intention to commence the manufacture or preparation of materials especially manufactured or prepared for use in or as part of the permanent construction. Such notice shall contain a request for inspection, the date of commencement and the expected date of completion of the manufacture or preparation of materials. Upon receipt of such notice, the County shall arrange to have a representative present at such times during the manufacture as may be necessary to inspect the materials; or the County will notify the Contractor that the inspection will be made at a point other than the point of manufacture;
or the County will notify the Contractor that inspection will be waived.
01001 - 9 of 20
4. When inspection is waived or when the County/Professional so requires, the Contractor shall furnish to the County authoritative evidence in the form of Certificates of Manufacture that the materials to be used in the Work have been manufactured and tested in conformity with the Contract Documents. These certificates shall be notarized and shall include five (5) copies of the results of physical tests and chemical analysis, where necessary, that have been made directly on the product or on similar products of the manufacturer.
5. The Contractor must comply with these provisions before shipping any material. Such inspections by the County shall not release the Contractor from the responsibility for furnishing materials meeting the requirements of the Contract Documents.
B. Cost
1. County shall employ and pay for the services of an independent testing laboratory to perform testing indicated on the Contract Documents, or at the County’s discretion to ensure conformity with the Contract Documents.
2. The cost of field leakage and pressure tests and shop tests of materials and equipment specifically called for in the Contract Documents shall be borne by the Contractor. Such costs shall be deemed to be included in the Contract price.
3. The Contractor shall notify the County laboratory a minimum of 48-hours in advance of operations for scheduling of tests. When tests or inspections cannot be performed after such notice, the Contractor shall reimburse County for expenses incurred.
4. The Contractor shall pay for all work required to uncover, remove, replace, retest, etc., any work not tested due to the Contractor's failure to provide the 48-hours advance notice or due to failed tests. The Contractor shall also provide compensation for the County/Professional’s personnel for required re-testing due to failed or rescheduled testing.
C. Shop Testing
1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance, function or special requirements are specified shall be tested in the shop of the manufacturer in a manner which shall conclusively prove that its characteristics comply fully with the requirements of the Contract Documents. No such equipment shall be shipped to the worksite until the County/Professional notifies the Contractor, in writing, that the results of such tests are acceptable.
2. The manufacturing company shall provide five (5) copies of the manufacturer's actual shop test data and interpreted results signed by a responsible official of the manufacturing company and notarized, showing conformity with the Contract Documents as a prerequisite for the acceptance of any equipment. The cost of shop tests (excluding cost of County's representative) and of furnishing manufacturer's preliminary and shop test data of operating equipment shall be borne by the Contractor and shall be included in the Contract price.
01001 - 10 of 20
D. Field Testing:
1. The County shall employ and pay for services of an independent testing laboratory to perform testing specifically indicated in the Contract Documents. Employment of the laboratory shall in no way relieve Contractor's obligations to perform the Work of the Contract. The Contractor shall provide compensation for retesting of all failed tests.
2. The County may at any time during the progress of the Work, request additional testing beyond that which is specified in the Contract. This testing will be at the County's expense. Contractor shall:
a. Cooperate with laboratory personnel, provide access to the Project.
b. Secure and deliver to the laboratory adequate quantities of representative samples of materials proposed to be used and which require testing.
c. Provide to the laboratory the preliminary design mix proposed to be used for concrete, and other material mixes, which require control by the testing laboratory.
E. Demonstration Tests: Upon completion of the Work and prior to final payment, all equipment and piping installed under this Contract shall be subjected to acceptance or demonstration tests as specified or required to provide compliance with the Contract Documents. The Contractor shall furnish all labor, fuel, energy, water and all other equipment necessary for the demonstration tests at no additional cost to the County.
F. Final Inspection: Prior to preparation of the final payment application, a final inspection will be performed by the County to determine if the Work is properly and satisfactorily constructed in accordance with the requirements of the Contract Documents. See also Section 01700, Project Closeout.
G. Inspection by existing utility owners: The Contractor shall pay for all inspections during the progress of the work required and provided by the owner of all existing public utilities paralleling or crossing the Work, as shown on the Drawings. All such inspection fees shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made therefore.
H. Inspection by Other Agencies: The Florida Department of Transportation, the Florida Department of Environmental Protection, and other authorized governmental agencies shall have free access to the site for inspecting materials and work, and the Contractor shall afford them all necessary facilities and assistance for doing so. Any instructions to the Contractor resulting from these inspections shall be given through the County. These rights of inspections shall not be construed to create any contractual relationship between the Contractor and these agencies.
1.15 PROJECT SITE AND ACCESS
01001 - 11 of 20
A. RIGHT-OF-WAY AND EASEMENTS
1. The use of public streets and alleys shall be such as to provide a minimum of inconvenience to the public and to other traffic. Any earth or other excavated material shall be removed by the Contractor and the streets cleaned to the satisfaction of the County.
2. The Contractor shall not enter or occupy private land outside of easements, except by written permission of the property owner.
3. At the time of the Pre-Construction meetings, the Contractor shall become fully acquainted with the status of all easements. Should easements not be acquired by the County in specific areas of the Work, the Contractor shall sequence and schedule his work therein so as not to interfere with the progress of work in other areas of the Project.
Any rescheduling of work due to easement acquisitions shall be performed by the Contractor at no additional cost to the County. The County agrees that it will make every effort to acquire all remaining easements with all speed and diligence possible so as to allow the completion of the Work within the Contract time.
B. ACCESS
1. Neither the material excavated nor the materials or equipment used in the construction of the Work shall be so placed as to prevent free access to all fire hydrants, valves or manholes.
2. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business access with the business Owner.
Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored and all construction debris removed within 48-hours of backfilling trench.
3. Contractor agrees that representatives of the County and any governmental agents will have access to the Work wherever it is in preparation or progress and that the Contractor shall provide facilities for such access and inspection.
1.16 UTILITIES
A. UTILITY CONSTRUCTION
1. Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, house service connections, vaults, manholes and all other appurtenances and facilities pertaining thereto, whether owned or controlled by governmental bodies or privately owned by individuals, firms or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage or water. Other public or private property, which may be affected by the Work, shall be deemed included hereunder.
01001 - 12 of 20
2. All open excavations shall be adequately safeguarded by providing temporary barricades, caution signs, lights and other means. The Contractor shall, at his own expense, provide suitable and safe bridges and other crossings for accommodating travel by pedestrians and workmen. Bridges provided for access to private property during construction shall be removed when no longer required.
3. The length of open trench will be controlled by the particular surrounding conditions, but shall always be confined to the limits described by the County. If any excavation becomes a hazard, or if it excessively restricts traffic at any point, the County may require special construction procedures. As a minimum, the Contractor shall conform to the following restoration procedures:
a. Interim Restoration: All excavations shall be backfilled and compacted as specified by the end of each working day. For excavations within existing paved areas; limerock base or soil cement base (match existing) shall be spread and compacted to provide a relatively smooth surface free of loose aggregate material.
At the end of each workweek, the S-I asphaltic surface course shall be completed and opened to traffic. The Contractor shall coordinate his construction activity including density tests and inspections to allow sufficient time to achieve this requirement. All driveway cuts shall be backfilled, compacted, and limerock base spread and compacted immediately after installation. Contractor shall coordinate with the individual property owners prior to removing the driveway section. Any utility crossing an existing roadway, parking lot or other paved area shall be patched by the end of the working day.
b. All pipe and fittings shall be neatly stored in a location, which will cause the least disturbance to the public. All debris shall be removed and properly disposed of by the end of each working day.
c. Final Restoration Overlay: After completing all installations, and after testing of the pipe (but no sooner than 30-days after applying the S-I asphaltic surface), final restoration shall be performed. In no event shall final restoration begin after substantial completion. Final restoration shall provide for base and asphaltic overlay as specified by the requirements of the Florida Department of Transportation permit issuer or the Public Works Utilization of Right of Way specifications, in an uninterrupted continuous operation until completion. Any additional restoration required after testing shall be repaired in a timely manner at no additional cost to the County.
d. Maintenance of all restored facilities shall be the Contractor’s responsibility. This maintenance shall be performed on an on-going basis during the course of construction. The Contractor’s Progress Schedule shall reflect the above restoration requirements.
e. Additional Restoration for Work in Business or Commercial Districts: The Contractor shall restore all private property, damaged by construction, to its original condition. Access to businesses located adjacent to the project site must
01001 - 13 of 20 be maintained at all times. Contractor may prearrange the closing of business accesses with the business owner. Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored within 24-hours of backfilling trench.
B. EXISTING UTILITIES
1. The locations of all existing underground piping, structures and other facilities are shown based on information received from the respective owner. The locations are shown without express or implied representation, assurance, or guarantee that they are complete or correct or that they represent a true picture of underground piping, conduit and cables to be encountered. It is the Contractor’s responsibility to verify all existing underground piping, structures and other facilities.
2. The Contractor shall, at all times, employ acceptable methods and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage or destruction of existing utility installations and structures; and shall, at all times in the performance of the Work, avoid unnecessary interference with, or interruption of, utility services; and shall cooperate fully with the owners thereof to that end.
3. When existing facilities are found to be in conflict with the Work, the County reserves the right to modify alignments to avoid interference with existing facilities.
4. All utilities, which do not interfere with the work, shall be carefully protected against damage. Any existing utilities damaged in any way by the Contractor shall be restored or replaced by the Contractor at his expense as directed by the County. Any existing facilities, which require operation to facilitate repairs, shall be operated only by the owner of the respective utility.
5. It is the responsibility of the Contractor to ensure that all utility and/or poles, the stability of which may be endangered by the proximity of excavation, be temporarily stayed and/or shored in position while work proceeds in the vicinity of the pole and that the utility or other companies concerned be given reasonable advance notice of any such excavation.
C. NOTICES
1. All governmental utility departments and other owners of public utilities, which may be affected by the Work, will be informed in writing by the Contractor two (2) weeks after the execution of the Contract or Contracts covering the Work. Such notice will be sent out in general, and directed to the attention of the governmental utility departments and other owners of public utilities for such installations and structures as may be affected by the Work.
2. The Contractor shall comply with Florida Statute 553.851 regarding protection of underground gas pipelines. Evidence of notification to the gas pipeline owner shall be furnished to the County immediately as needed.
01001 - 14 of 20
3. It shall be the Contractor's responsibility to contact utility companies at least 72-hours in advance of breaking ground in any area or on any unit of the work so maintenance personnel can locate and protect facilities, if required by the utility company.
4. The Contractor shall give a minimum five (5) working day notice to utility personnel prior to interrupting a utility service (water, sewer, etc.).
D. EXPLORATORY EXCAVATIONS
1. Exploratory excavations shall be conducted by the Contractor for the purpose of locating underground pipelines or structures in advance of the construction. Test pits shall be excavated in areas of potential conflicts between existing and proposed facilities and at piping connections to existing facilities a minimum of 48-hours or 1,000-feet in advance of work. If there is a potential conflict, the Contractor shall notify the County/Professional immediately. Information on the obstruction to be furnished by the Contractor shall include: Location, Elevation, Utility Type, Material and Size. Test pits shall be backfilled immediately after their purpose has been satisfied and the surface restored and maintained in a manner satisfactory to the County.
E. UTILITY CROSSINGS
1. It is intended that wherever existing utilities must be crossed, deflection of the pipe within specified limits and cover shall be used to satisfactorily clear the obstruction unless otherwise indicated on the Drawings. However, when in the opinion of the County this procedure is not feasible, the County may direct the use of fittings for a utility crossing or conflict transition as detailed on the Drawings.
F. RELOCATIONS
1. Relocations shown on the Drawings: Public utility installations or structures, including but not limited to poles, signs, fences, piping, conduits and drains that interfere with the positioning of the work which are shown on the Drawings to be removed, relocated, replaced or rebuilt by the Contractor shall be considered as part of the general cost of doing the Work and shall be included in the prices bid for the various contract items. No separate payment shall be made therefore.
2. Relocations not shown on the Drawings
a. Where public utility installations or structures are encountered during the course of the work, and are not indicated on the Drawings or in the Specifications, and when, in the opinion of the County, removal, relocation, replacement or rebuilding is necessary to complete the Work, such work shall be accomplished by the utility having jurisdiction, or such work may be ordered, in writing by the County, for the Contractor to accomplish.
b. If such work is accomplished by the utility having jurisdiction, it will be carried out expeditiously and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement or rebuilding as required.
01001 - 15 of 20
c. If such work is accomplished by the Contractor, it will be paid for as a Change Order.
3. All existing castings, including valve boxes, junction boxes, manholes, hand holes, pull boxes, inlets and similar structures in the areas of construction that are to remain in service and in areas of trench restoration and pavement replacement, shall be adjusted by the Contractor to bring them flush with the surface of the finished work.
4. All existing utility systems which conflict with the construction of the work herein, which can be temporarily removed and replaced, shall be accomplished at the expense of the Contractor. Work shall be done by the utility unless the utility approves in writing that the Work may be done by the Contractor.
G. TRAFFIC MAINTENANCE
1. Maintain public highway traffic within the limits of the Project for the duration of the construction period, including any temporary suspensions of work. Work shall also include construction and maintenance of any necessary detour facilities; furnishing, installing and maintaining of traffic control and safety devices, control of dust, or any other special requirements for safe and expeditious movement of vehicular and pedestrian traffic.
2. Traffic Control shall be provided at the Contractor's expense by the Contractor's personnel or off-duty uniformed police officer, depending on and as required by the applicable traffic control requirements jurisdictional to the construction or road.
3. The Contractor shall prepare and submit a Maintenance of Traffic plan (MOT) to the County/Professional and to the agency with jurisdiction for MOT (Orange County Public Works, FDOT, local municipalities, etc.) for review and acceptance prior to commencing any work. The Traffic Control Plan shall detail procedures and protective measures proposed by the Contractor to provide for protection and control of traffic affected by the Work consistent with the following applicable standards:
a. Standard Specifications for Road and Bridge Construction, Latest Edition including all subsequent supplements issued by the Florida Department of Transportation.
b. Manual of Traffic Control and Safe Practices for Street and Highway Construction, Maintenance and Utility Operations, FDOT.
c. Right-of-Way Utilization Regulations, Orange County, Florida, latest edition. All references to the respective agency in the above referenced standards shall be construed to also include the County for this Work.
4. The Contractor will notify the public one (1) week in advance of any scheduled work via the use of portable message boards. The message boards shall be located at each approach to the construction area.
01001 - 16 of 20
5. Before closing any thoroughfare, the Contractor shall give written notice to, and if necessary, obtain a permit or permits from the duly constituted public authority having jurisdiction over the thoroughfare. Notice shall be given no less than 72-hours in advance of the time when it may be necessary in the process of construction to close such thoroughfare, or as may be otherwise provided in the acceptable Maintenance of Traffic plan.
6. The Contractor shall sequence and plan construction operations and shall generally conduct his work in such a manner as not to unduly or unnecessarily restrict or impede existing normal traffic through the streets of the local community.
7. If required by duly constituted public authority, the Contractor shall, at his own expense, construct bridges or other temporary crossing structures over trenches so as not to unduly restrict traffic. Such structures shall be of adequate strength and proper construction and shall be maintained by the Contractor in such a manner as not to constitute an undue traffic hazard.
8. The Contractor shall make provisions at all "open cut" street crossings to allow a minimum of one lane to be open for vehicular traffic at all times. Lane closing shall be as permitted by the local governing authority and shall be repaired to a smooth, safe driving surface immediately following the installation of pipe or conduit.
9. The Contractor shall make provisions at cross streets for the free passage of vehicles and pedestrians, either by bridging or otherwise, and shall not obstruct the sidewalks, gutters, or streets, nor prevent in any manner the flow of water in the latter, but shall use all proper and necessary means to permit the free passage of surface water along the gutters.
10. The Contractor shall immediately cart away all offensive matter; exercising such precaution as may be directed by the County. All material excavated shall be so disposed of as to inconvenience the public and adjacent tenants as little as possible and to prevent injury to trees, sidewalks, fences and adjacent property of all kinds.
H. BARRIER AND LIGHTS
1. The Contractor shall exercise extreme care in the conduct of the Work to protect health and safety of the workmen and the public. The Contractor shall provide all protective measures and devices necessary, in conformance with applicable local, state and federal regulations. Protective measures shall include but are not limited to barricades, warning lights/flashers and safety ropes.
2. All equipment and vehicles operating within 10-feet of the roadway shall have flashing strobe lights attached.
I. DEWATERING AND FLOTATION
1. The Contractor, with his own equipment, shall do all pumping necessary to dewater any part of the work area during construction operations to insure dry working
01001 - 17 of 20 conditions. The Contractor shall take the necessary steps to protect on-site and off-site structures. Damage to any structures due to dewatering shall be repaired or the structures replaced at the Contractor's expense.
2. The Contractor shall be completely responsible for any tanks, wetwells or similar structures that may become buoyant during the construction and modification operations due to the ground water or floods and before the structure is put into operation. The proposed final structures have been designed to account for buoyancy; however the Contractor may employ methods, means and techniques during construction which may affect the buoyancy of structures. The Contractor shall take the necessary steps to protect structures. Damage to any structures due to floating or flooding shall be repaired or the structures replaced at the Contractor's expense.
3. Contractor shall be responsible for any required permits for the discharge of ground water.
J. DUST AND EROSION CONTROL
1. The Contractor shall prevent dust nuisance from his operations or from traffic.
2. Contractor is responsible for providing effective temporary erosion and sediment control measures during construction or until final controls become effective.
3. Temporary erosion controls include, but are not limited to, grassing, mulching, netting, watering and reseeding on-site surfaces and soil and borrow area surfaces and providing interceptor ditches at ends of berms and at those locations which will ensure that erosion during construction will be either eliminated or maintained within acceptable limits as established by the County, FDEP and any other agency having jurisdiction.
4. Temporary sedimentation controls include, but are not limited to; silt dams, traps, barriers, and appurtenances at the foot of sloped surfaces which will ensure that sedimentation pollution will be either eliminated or maintained within acceptable limits as established by the County, FDEP and any other agency having jurisdiction.
5. The construction of temporary erosion and sedimentation control facilities shall be in accordance with the technical provision of Section 104, Prevention, Control, and Abatement of Erosion and Water Pollution, of the FDOT Standard Specifications for Road and Bridge Construction, latest edition.
K. LINES AND GRADES
1. All Work under this Contract shall be constructed in accordance with the lines and grades shown on the Drawings, or as given by the County/Professional.
2. When the location of the Work is dimensioned on the Drawings, it shall be installed in that location; when the location of the Work is shown on a scaled drawing, without dimensions, the Work shall be installed in the scaled location unless the County approves an alternate location for the piping. Where fittings are noted on the Drawings, such notation is
01001 - 18 of 20 for the Contractor's convenience and does not relieve the Contractor from laying and jointing different or additional items where required. The County/Professional may require detailed pipe laying drawings and schedules for project control.
3. The Contractor shall, at his own expense, establish all working or construction lines and grades as required from the project control points set by the County, and shall be solely responsible for the accuracy thereof.
4. Water main and forcemain shall be installed to provide long uniform gradient or slope to pipe to minimize air pockets and air release valves. The stationing shown on the Drawings for air and vacuum release valve assemblies are approximate and the Contractor shall field adjust these locations to locate these valves at the highest point in the pipeline installed. All locations must be accepted by the County.
5. To ensure a uniform gradient for gravity pipe and pressure pipe, all lines shall be installed using the following control techniques as a minimum:
a. Gravity lines; continuous control, using laser beam technology.
b. Pressure lines; control stakes set at 50-foot intervals using surveyors’ level instrument.
L. TEMPORARY CONSTRUCTION
1. Temporary fences: If, during the course of the Work, it is necessary to remove or disturb any fencing, the Contractor shall at his own expense, provide a suitable temporary fence which shall be maintained until the permanent fence is replaced.
2. Responsibility for Temporary Structures: In accepting the Contract, the Contractor assumes full responsibility for the sufficiency and safety of all temporary structures or work and for any damage which may result from their failure or their improper construction, maintenance or operation.
M. DAILY REPORTS
1. The Contractor shall submit to the County’s Representative daily reports for current project activities no later than the 2 days after the work was performed The reports shall be complete, legible, in detail and shall include but…