Y23-7011_Technical_Specifications_Vol.2.pdf

PDF 2 MB Posted

Attached to
Orange County Landfill Cell 11, Phase 2, Bay 20-22 Expansion
Solicitation number
Y23-7011
Issued by
Orange County, Orlando City, Florida

About this file

The document is a technical specifications volume for a state and local government contract opportunity involving Orange County, Florida's Utilities Solid Waste Division for the construction of Cell 11, Bays 20-22 Expansion at the Orange County Landfill. The project involves constructing approximately 24 acres of lined Class I solid waste disposal area, including liner system installation, leachate collection systems, dual containment pipe systems, stormwater improvements, perimeter road construction, and site access ramps. The sealed bid solicitation is electronically submitted through the ProcureNow OpenGov e-Procurement Platform, with responses due by 4:00 pm EST on Thursday, August 24, 2023. The estimated project cost is $17,798,576.00, with a pre-bid question submission deadline of Friday, August 4, 2023 at 5:00 pm EST.

The project site is located on a former World War II training facility (Pinecastle Jeep Range) with potential unexploded ordnance considerations, requiring specialized safety protocols including 3R (recognize, retreat, report) training and a UXO (unexploded ordnance) technician on-site during earthmoving activities. The technical specifications detail extensive environmental and safety requirements, including geomembrane liner installation, leachate management, stormwater control, and specific surface preparation and coating standards. Bidders must comply with environmental regulations, obtain necessary permits, and follow detailed construction and quality control procedures. The contract includes provisions for testing, documentation, and certifications to meet Florida Department of Environmental Protection solid waste permit requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTILITIES SOLID WASTE DIVISION

ORANGE COUNTY, FLORIDA

CONTRACT DOCUMENTS

for the construction of

ORANGE COUNTY LANDFILL CELL 11

BAYS 20 - 22 EXPANSION

Contract No. ________

CH2M

Orlando, Florida

January 2023

© CH2M Owner Organization 2023. All rights reserved.

Project No. D3625200 Copy No.

ORANGE COUNTY - CELL 11, BAYS 20-22 DESIGN

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 TABLE OF CONTENTS

JANUARY 27, 2023 00 01 10 - 1

TABLE OF CONTENTS

Pages

VOLUME 1

CLIENT FRONT END

00 00 00 Orange County Front Ends

VOLUME 2

TECHNICAL SPECIFICATIONS

DIVISION 1—GENERAL REQUIREMENTS

01 11 00 Summary of Work ....................................................................... 1- 4 01 26 57 Change Order Procedures ............................................................ 1- 5

Supplement 1, Work Change Directive Form ............................... 1- 2 Supplement 2, Change Order Form .............................................. 1- 3 Supplement 3, Field Order by RPR Form ..................................... 1- 2 Supplement 4, Request for Proposal Form ................................... 1- 2

01 29 00 Measurement and Payment .......................................................... 1- 4 01 29 73 Schedule of Values ...................................................................... 1- 3 01 29 75 Applications for Payment............................................................. 1- 4

Supplement 1a, New Pay App Template ...................................... 1- 6 Supplement 1b, Estimate for Progress Payment ........................... 1- 54 Supplement 2, Materials Stored Onsite ........................................ 1- 1 Supplement 3, Partial Waiver of Lien .......................................... 1- 1 Supplement 4, Waiver of Lien ..................................................... 1- 1 Supplement 5, Notice of Acceptance and Recommendation for Final Payment ........................................................................ 1- 1

01 31 13 Coordination ................................................................................ 1- 17 Supplement 1, Electronic Media Release ..................................... 1- 2 Supplement 2, Contractor’s Verification of the Accuracy of Drawings and Specifications ........................................................ 1- 1 Supplement 3, Contract Clarification/Interpretation Request Form ......................................................................................... 1- 1 Supplement 4, Defective/Rejected Work Notification .................. 1- 1 Supplement 5, Notification of Correction of Defective/ Rejected Work ............................................................................. 1- 1

01 31 19 Project Meetings .......................................................................... 1- 5 01 32 00 Progress Schedules ...................................................................... 1- 10 01 32 23 Surveying .................................................................................... 1- 5 01 33 00 Submittals .................................................................................... 1- 7

Supplement 1, Transmittal of Contractor's Submittal ................... 1- 1 Supplement 2, Contractor’s Shop Drawing Certification Stamp ... 1- 1 Supplement 3, Submittal Review Comments ................................ 1- 1

Pages

TABLE OF CONTENTS PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

00 01 10 - 2 JANUARY 27, 2023

01 35 00 Health and Safety Requirements .................................................. 1- 5 Supplement 1, Investigation Area Legend .................................... 1- 1

01 41 26 Permits and Fees.......................................................................... 1- 2 01 42 13 Abbreviations .............................................................................. 1- 4 01 43 33 Manufacturer's Services ............................................................... 1- 4

Supplement 1, Manufacturer's Certificate of Proper Installation Form ........................................................................................... 1- 1

01 45 16.13 Quality Control, Quality Assurance and Testing Laboratory Services ..................................................................... 1- 7 Supplement 1, Test Request and Testing Result Summary ........... 1- 1

01 50 00 Construction Facilities and Temporary Controls .......................... 1- 14 Supplement 1, Visitor’s Sign-In Log............................................ 1- 1

01 57 13 Temporary Erosion and Sedimentation Control ........................... 1- 2 01 60 00 Material and Equipment .............................................................. 1- 8 01 77 00 Contract Closeout ........................................................................ 1- 7

Supplement 1, Punch List ............................................................ 1- 1 Supplement 2, Certificate of Substantial Completion ................... 1- 1

01 78 23 Operation and Maintenance Manuals and Data ............................ 1- 7 Supplement 1, Forms: Maintenance Summary Form .................... 1- 2

01 78 35 Warranties and Bonds .................................................................. 1- 2 Supplement 1, Supplement, Warranty for Item ............................ 1- 1

01 88 15 Anchorage and Bracing ............................................................... 1- 4

DIVISION 2—EXISTING CONDITIONS (NOT USED)

DIVISION 3—CONCRETE

03 30 10 Structural Concrete ...................................................................... 1- 16 Supplement 1, Concrete Mix Design, Class 4000F1S0W0C0....... 1- 1

03 63 00 Concrete Doweling ...................................................................... 1- 3

DIVISION 4—MASONRY (NOT USED)

DIVISION 5—METALS

05 05 19 Post-Installed Anchors ................................................................. 1- 7 05 50 00 Metal Fabrications ....................................................................... 1- 10

DIVISIONS 6 THROUGH DIVISION 8 (NOT USED)

DIVISION 9—FINISHES

09 90 00 Painting and Protective Coatings ................................................. 1- 23 Supplement 1, Paint System Data Sheet (PSDS) .......................... 1- 2 Supplement 2, Paint Product Data Sheet (PPDS) ......................... 1- 1

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 TABLE OF CONTENTS

JANUARY 27, 2023 00 01 10 - 3

DIVISION 10—SPECIALTIES

10 14 00 Equipment Labels and Signs ........................................................ 1- 3 Supplement 1, Identification Label and Sign Schedule ................. 1- 2

DIVISIONS 11 THROUGH 30 (NOT USED)

VOLUME 3

DIVISION 31—EARTHWORK

31 10 00 Site Preparation ........................................................................... 1- 3 31 23 13 Subgrade Preparation ................................................................... 1- 3 31 23 16 Excavation ................................................................................... 1- 3 31 23 19.01 Dewatering .................................................................................. 1- 4 31 23 23 Fill and Backfill ........................................................................... 1- 10 31 23 23.15 Trench Backfill ............................................................................ 1- 9 31 32 19.16 Geotextiles................................................................................... 1- 6 31 41 16 Sheet Piling ................................................................................. 1- 6

DIVISION 32—EXTERIOR IMPROVEMENTS

32 11 23 Base Course ................................................................................. 1- 3 32 12 16 Asphalt Concrete Pavement ......................................................... 1- 8 32 17 23 Pavement Marking ....................................................................... 1- 3 32 92 00 Lawns and Grasses ...................................................................... 1- 7

DIVISION 33—UTILITIES

33 05 01.10 High Density Polyethylene (HDPE) Geomembrane ..................... 1- 21 Supplement 1, HDPE Manufacturer’s Certification of Proper Installation ................................................................................... 1- 1

33 41 01 Storm Drain Piping ...................................................................... 1- 3 33 41 01.05 Data Sheets: Reinforced Concrete Pipe ........................................ 1- 2 33 46 23.19 Composite Drainage Net (CDN) .................................................. 1- 9 33 47 13.07 Geosynthetic Clay Liner .............................................................. 1- 10

Supplement 1, Manufacturer’s Certification of Subsurface Acceptability ............................................................................... 1- 1

DIVISIONS 34 THROUGH 39 (NOT USED)

DIVISION 40—PROCESS INTEGRATION

40 05 15 Piping Support Systems ............................................................... 1- 8 Supplement 1, Table 1, Areas ...................................................... 1- 1

40 27 00 Piping - General .......................................................................... 1- 19 Supplement 1, Piping Schedule Legend ....................................... 1- 1 Supplement 2, Piping Schedule .................................................... 1- 1

TABLE OF CONTENTS PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

00 01 10 - 4 JANUARY 27, 2023

40 27 00.08 Stainless Steel Pipe and Fittings – General Service ...................... 1- 2 40 27 00.14 High Density Polyethylene (HDPE) Pipe ..................................... 1- 2 40 27 01 Piping Specialties ........................................................................ 1- 8 40 27 02 Valves and Operators................................................................... 1- 9 40 80 01 Piping Leakage Testing ............................................................... 1- 7

DIVISIONS 41 THROUGH 49 (NOT USED)

EXHIBITS

EXHIBIT A—CONSTRUCTION QUALITY ASSURANCE PLAN – CELL 11‐

12 BASE LINER SYSTEM CONSTRUCTION

EXHIBIT B—GEOTECHNICAL AND HYDROLOGICAL

INVESTIGATION

Updated Geotechnical Report for Cell 11 – 12 Landfill Expansion Evaluation of Groundwater Elevations and Flow Patterns Beneath Cell 9 – 12, Orange County Landfill

EXHIBIT C—ERP AND FDEP SOLID WASTE PERMIT

EXHIBIT D—LIST OF APPROVED PRODUCTS, FEBRUARY 2011

DRAWINGS (BOUND SEPARATELY)

END OF SECTION

TECHNICAL

SPECIFICATIONS

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 SUMMARY OF WORK

JANUARY 26, 2023 01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 NOTICE TO CONTRACTOR

A. Prior to the construction of the previous landfill expansions in the Southern Expansion Area (SEA), the U. S. Army Corps of Engineers (USACOE) informed Orange County, Florida (Owner) that portions of the SES were included in the historical Pinecastle Jeep Range, a former World War II arms practice range and training facility. The Pinecastle Jeep Range was used for small arms firing, air tactics evaluations, and training demonstrations of strafing, practice bombing, air-to-ground rocket firing and high explosive bombing. USACOE Fact Sheet titled “Formerly Used Defense Site Program, Pinecastle Jeep Range,” dated July 2007, identifies two target areas on the SES east of State Road 417, one centered on the proposed Cell 11 area and one near the proposed Western Borrow Area (WBA).

B. Orange County had munitions Remedial Investigations (RIs) performed on three different occasions in 2008, 2009, and 2013. More than 5,000 subsurface anomalies were investigated during these RIs of which approximately 99 percent were culture debris (nails, railroad spikes, metal scrap). Further information and requirements regarding munitions are provided in Section 01 35 00, Health and Safety Requirements.

1.02 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work shall include, but not be limited to:

1. Construction of Bays 20, 21 and 22, encompassing approximately 24 acres of lined Class I solid waste disposal area contiguous and adjacent to existing Bay 19. The Work includes locating and exposing the liner anchor system southside of Bay 19, and construction of the interface with Bay 19 liner for a contiguous Bay 20 lined disposal area as shown on the plans and details.

2. The U. S. Army Corps of Engineers (USACOE) informed Orange County, Florida (Owner) that portions of the Southern Expansion Site (SES) were included in the Pinecastle Jeep Range, a former World War II arms practice range and training facility. The current risk level overall for the SES is “low risk” based on the hazard severity and an incident “probability of occurrence,” making the site suited for future planned activities. Prudent procedures working within the site should include 3R (recognize, retreat, and report) training, and a standard operating procedure for reporting future potential munitions and explosives of concern (MEC) and materials potentially presenting an explosive hazard (MPPEH) to the appropriate authorities. An area referred to as the

SUMMARY OF WORK PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 11 00 - 2 JANUARY 26, 2023

“disturbed area” was partially investigated and is considered as a “moderate risk.” A sketch showing the location of the “disturbed area” is provided in Section 01 35 00, Supplement 1. The eastern portion of Bay 20 shall be considered as potentially containing hazardous munitions, which will require “construction support” during this Project.

Contractor shall provide “construction support” as defined in Section 01 35 00, Health and Safety Equipment.

3. The bottom liner system for Bays 20, 21 and 22 disposal area is designed and permitted to be lined with two different bottom liner system. The western portion of the bays will be lined with a double liner system, and the eastern portion of the bays will be lined with a double composite liner system. The portion of the bottom liner system located below the apparent high seasonal groundwater table, as shown on the Drawings, is required to be constructed with the double composite liner system. The portion of the bottom liner system located above the high seasonal groundwater table, as shown on the Drawings, is required to be constructed with double liner system. The details of these liner systems are shown on the Drawings and summarized as follows:

a. The double liner system consists of (from bottom to top) prepared subgrade, a geosynthetic clay liner (GCL) layer, a 60-mil high density polyethylene (HDPE) geomembrane secondary layer, a composite drainage net secondary layer, a 60-mil HDPE geomembrane primary layer, a composite drainage net primary layer, and a sand drainage layer.

b. The double composite liner system consists of (from bottom to top) prepared subgrade, a GCL, a 60-mil HDPE geomembrane, a composite drainage net, a GCL, a 60-mil HDPE geomembrane, a composite drainage net, and a sand drainage layer.

4. Construction of the leachate gravity collection system consisting of primary and secondary HDPE leachate collection drain gravel, pipes, and sumps. The leachate gravity line is designed and permitted to penetrate the liner system at the sump as shown on the Drawings.

5. Construction of dual containment pipe system for primary and secondary leachate collection in Bays 20, 21 and 22, to connect to existing dual containment piping that is connected to primary and secondary manholes leachate collection manholes.

6. Construction coordination for proposed monitoring well cluster 415 by County-contracted well installer. MW 415 cluster is located just west of Stormwater Pond 9A and Bay 19 and will be constructed by others in compliance with the FDEP solid waste permit requirements.

7. Demolition by filling of existing sedimentation ponds located within the Bay 20-22 footprint and construction of minor stormwater improvements for new temporary sediment pond southeast of Bay 22 including piping to Pond 8 (east) with associated erosion control features.

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 SUMMARY OF WORK

JANUARY 26, 2023 01 11 00 - 3

8. Connection of western primary leachate cleanouts to existing landfill gas (LFG) main with vertical wellheads on the west side of proposed Bays 20, 21 and 22. Testing of LFG main section from east and west southern ends of Bay 19 to existing landfill gas loop pipe south of Bay

22. Note that air supply line, condensate stations and valves, as shown on the Drawings were installed in a prior phase of construction.

9. Construction of short segments of 28-foot-wide asphalt paved Cell 11 Perimeter Road on the east side, and construction of 16-foot-wide asphalt paved Cell 11 Perimeter Road on the west side as shown on the Drawings.

10. Repair and restoration of east-west limerock road along the southern boundary to connect the east and west perimeter roads, and limerock road along Pond 9A as shown on the Drawings.

11. Repair and restoration of the existing Contractor haul road along the western property line as impacted by the Contractor’s construction related hauling.

12. Construction of paved vehicle maintenance ramps on east and west sides of Bays 20, 21 and 22, used to service and maintain existing leachate manholes, and condensate pump stations, and proposed leachate cleanout.

13. Construction of Bay access ramp in Bay 20 used for entrance and exit of landfill equipment, transfer trailers and hauler vehicles, per the Drawings. Ramp construction includes grading, subbase stabilization limestone base and asphalt pavement, ramp sideslope grading, stabilization and sodding, and installation of Class V RCP culverts as shown on the Drawings and as specified.

14. Bidders are notified that dewatering will be required for the construction of the liner system, leachate gravity and force-main piping, road and ramp improvement, and stormwater structure installation and repairs and other construction included in this Project. The Contractor is required to employ a professional engineer registered in State of Florida to prepare a dewatering plan and obtain all permits necessary for dewatering operations during construction.

B. Pumping:

1. The Contractor using Contractor’s equipment shall perform all dewatering and pumping necessary to prevent flotation of any part of the structures, including, but not limited to the landfill liner system and manholes during construction operations.

2. If dewatering exceeds St. Johns River Water Management District (SJRWMD) construction thresholds, a dewatering plan must be prepared by the Contractor and submitted and approved by the SJRWMD prior to commencement of Work. Determination of dewaterting beyond the construction threshold, any permitted dewatering and compliance with dewatering regulations shall be the sole responsibility of the Contractor.

SUMMARY OF WORK PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 11 00 - 4 JANUARY 26, 2023

3. Contractor shall base their bid price on “worst case” conditions for dewatering requirements.

C. All quality assurance and quality control test data and certifications, Record Drawings, surveys, special warranties and/or guarantees, and other submittals necessary to file for FDEP Certification of Construction Completion for the above facilities shall be submitted to the Engineer by the Contractor prior to requesting the Substantial Completion inspection.

D. Where manufacturer’s products are referenced by name and/or model number in these Specifications, the intent is to provide a basis of design for general characteristics of the product. The Contractor shall be aware that reference to a product by manufacturer’s name and/or model number is not intended to and does not imply that the named product is the standard “off-the-shelf” product to be provided by the manufacturer or supplier. The Contractor shall note that these Specifications may include performance requirements, components, enhancements, warranties and guarantees, and control systems that exceed those typically provided by the manufacturer or supplier for the named product, and that it is the Contractor’s responsibility to provide the specified product with an and all enhanced components and features described in these Contract Documents at no additional cost to the Owner. The Contractor shall have full responsibility to coordinate with the manufacturers and suppliers to obtain the products specified on a timely manner within the approved schedule.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 CHANGE ORDER PROCEDURES

JANUARY 26, 2023 01 26 57 - 1

SECTION 01 26 57

CHANGE ORDER PROCEDURES

PART 1 GENERAL

1.01 REQUIREMENTS INCLUDED

A. Promptly implement Change Order procedures.

1. Provide full written data required to evaluate changes.

2. Maintain detailed records of work done on a time and material/force account basis.

3. Provide full documentation and breakdown of costs to Engineer on request.

B. Designate in writing the member of Contractor’s organization:

1. Who has been authorized to accept changes in the Work.

2. Who has the responsibility for informing others in the Contractor’s employ of the authorization of changes in the Work.

1.02 RELATED REQUIREMENTS

A. Schedule of Prices from Bid Form.

B. General and Supplemental Conditions of the Contract.

C. Section 01 29 73, Schedule of Values.

D. Section 01 29 75, Applications for Payment.

E. Section 01 77 00, Contract Closeout.

F. Forms attached to this section will be used for this Project.

1.03 DEFINITIONS

A. Change Order: See Orange County General Conditions.

1.04 PRELIMINARY PROCEDURES

A. Owner and Engineer may initiate changes by submitting a Request for Proposal (RFP) to the Contractor. Request will include:

1. Detailed description of the change, products, and location of the change in the Project anticipated.

2. Supplementary or revised Drawings and Specifications.

CHANGE ORDER PROCEDURES PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 26 57 - 2 JANUARY 26, 2023

3. The project time span for making the change and a specific statement as to whether overtime work is or is not authorized.

4. A specific period of time during which the requested price will be considered valid.

B. Contractor may initiate changes by submitting a written Notice of Proposed Change (NPC) to the Engineer, containing:

1. Description of the proposed changes.

2. Statement of the reason(s) for making the proposed changes.

3. Statement of the effect on the Contract Sum and the Contract Time.

4. Statement of the effect on the work of separate Contractors.

5. Documentation supporting any changes in Contract Sum or Contract

Time, as appropriate.

C. The Contractor’s NPC does not constitute a change in Contract, and the Contractor shall not proceed with any change in Work initiated by him until approved in writing by the Owner. The Owner may request the Engineer to issue an RFP to the Contractor for the proposed NPC.

D. The Contractor’s response to the Engineer’s RFP, once accepted by the Owner, will be an “Accepted Change in Contract” and will be incorporated into a Change Order. Contractor’s response to the Engineer’s RFP shall include a detailed breakdown of costs for each category of work showing the cost of labor, material, and O&P expenses. Submittal of response to RFP with insufficient cost breakdown detail will not be acceptable.

E. The Contractor shall not proceed with any change in Work unless the Engineer notifies him in writing that his response to RFP has been accepted by the Owner.

1.05 CONSTRUCTION CHANGE AUTHORIZATION

A. RFP’s that may result in a change will describe changes in the Work, both additions and deletions with attachments of revised Contract Documents to define details of the change and will designate the method of determining change in the Contract Sum and change in Contract Time.

B. The RFP, response to RFP from the Contractor, and letter of Owner acceptance from the Engineer shall be preliminary documents to a formal Change Order. All “Accepted Change in Contract” will be incorporated into a Change Order for approval by the Board of County commissioners.

1.06 DOCUMENTATION OF PROPOSALS AND CLAIMS

A. Support each quotation for a lump sum proposal, and for each unit price which has not previously been established, with sufficient substantiating data to allow the Engineer to evaluate the quotation.

JANUARY 26, 2023 01 26 57 - 3

B. On request, provide additional data to support time and cost computations:

1. Labor required.

2. Equipment required.

3. Products required.

a. Recommended source of purchase and unit cost.

b. Quantities required.

4. Taxes, insurance, and bonds.

5. Credit for work deleted from Contract, similarly documented.

6. Overhead and profit.

7. Justification for any change in Contract Time in accordance with

Section 01 32 00, Progress Schedules.

C. Support each claim for additional costs, and for work done on a time-and-material/force account basis, with documentation as required for a lump sum proposal, plus additional information.

1. Name of the Owner's authorized agent who ordered the work and date of the Order.

2. Dates and times work was performed and by whom.

3. Time record, summary of hours worked, hourly rates paid, and a copy of certified payroll documentation.

4. Receipts and invoices for:

a. Equipment used listing dates, and times of use.

b. Products used, listing of quantities.

c. Similar supporting documentation from subcontractors.

1.07 PREPARATION OF CHANGE ORDERS

A. Engineer will prepare each Change Order.

B. Form: Attached to this section.

C. Change Order will describe changes in the work, both additions and deletions, with attachments of revised Contract Documents to define details of the change.

D. Change Order will provide an accounting of the adjustment in the Contract Sum and in the Contract Time.

1.08 LUMP SUM/FIXED PRICE CHANGE ORDER

A. Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or both.

B. Once Engineer has completed the form, all copies will be sent to Contractor for signature and return to Engineer for approval. After endorsement by Engineer, all copies will be sent to Owner for approval. Engineer will distribute executed copies.

CHANGE ORDER PROCEDURES PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 26 57 - 4 JANUARY 26, 2023

1.09 UNIT PRICE CHANGE ORDER

A. Content of Change Orders will be based on either:

1. Engineer's definition of the scope of the required changes.

2. Contractor’s proposal for a change, as recommended by Engineer.

3. Survey of complete work.

B. The amounts of the unit prices to be:

1. Those stated in the Agreement.

2. Those mutually agreed upon between Owner and Contractor.

3. Those contained in the Schedule of Unit Prices for Change Orders.

C. When quantities of each of the items affected by the Change Order can be determined prior to start of the Work:

1. Owner and Engineer will execute a Work Directive Change as authorization for Contractor to proceed with the changes.

D. When quantities of the items cannot be determined prior to start of the Work:

1. Owner will issue a Work Directive Change directing the Contractor to proceed with the change on the basis of established unit prices.

2. Upon completion of the change, the Engineer will determine the cost of such work based on the unit prices and quantities used.

3. Engineer will sign and date the Change Order to establish the change in Contract Sum and in Contract Time.

4. Contractor will sign and date the Change Order to indicate their agreement with the terms therein.

5. Owner will then sign the change order.

1.10 TIME AND MATERIAL/FORCE ACCOUNT CHANGE

ORDER/CONSTRUCTION CHANGE AUTHORIZATION

A. Engineer and Owner will issue a Work Directive Change directing Contractor to proceed with the changes.

B. Upon completion of the change, the Contractor shall submit itemized accounting and supporting data as provided in the Article "Documentation of Proposals and Claims" of this section.

C. Engineer will determine the allowable cost of such work, as provided in General Conditions and Supplementary Conditions.

D. Engineer will sign and date the Change Order to establish the change in Contract Sum and in Contract Time.

JANUARY 26, 2023 01 26 57 - 5

E. Contractor will sign and date the Change Order to indicate agreement therewith.

F. Owner will then sign the Change Order.

1.11 CORRELATION WITH CONTRACTOR’S SUBMITTALS

A. Monthly, revise Schedule of Values and Request for Payment forms to record each change as a separate item of work and to record the adjusted Contract Sum.

B. Monthly, revise the Construction Schedule to reflect each change in Contract Time.

C. Upon completion of work under a Change Order, enter pertinent changes in Record Documents.

1.12 SUPPLEMENTS

A. The supplements listed below, following “END OF SECTION,” are part of this Specification.

1. Supplement 1, Work Change Directive Form.

2. Supplement 2, Change Order Form.

3. Supplement 3, Field Order by RPR Form.

4. Supplement 4, Request for Proposal Form.

PART 2 PRODUCTS (NOT USED)

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 WORK CHANGE DIRECTIVE FORM

JANUARY 27, 2023 01 26 57 SUPPLEMENT 1 - 1

WORK CHANGE DIRECTIVE

WORK CHANGE DIRECTIVE NO.

Directive Prepared By:

(Name) (Title)

Date Prepared:

PROJECT DATA CONTRACT DATA

Name: Contract Document Page Number:

Location: Orange County Landfill Drawing Number:

Owner’s Bid Number: Specification Section/Number:

WORK CHANGE DIRECTIVE DISTRIBUTION:

Owner’s Home Office:

Attn.:

No. Copies Date Sent:

Contractor’s Home Office:

Attn.:

No. Copies Date Sent:

Owner’s Field Office: No. Copies Date Sent:

Engineer’s Field Office: No. Copies Date Sent Contractor’s Field Office:

No. Copies Date Sent:

You are hereby directed to execute promptly this WORK CHANGE DIRECTIVE which orders an addition, deletion or revision in the Work, or responding to differing or unforeseen physical conditions under which the Work is to be performed as provided in the General Conditions, or emergencies as provided in the General Conditions, without change in Contract Price or Contract Time.

If CONTRACTOR determines that a change in Contract Price or Contract Time is required as a result of this WORK CHANGE DIRECTIVE, CONTRACTOR must make such a claim prior to starting the Work in accordance with the General Conditions of the Contract Documents. If a Change Order is issued in accordance with the Contract Documents, this WORK CHANGE DIRECTIVE will be invalidated;

otherwise, CONTRACTOR shall promptly proceed with the Work described in this WORK CHANGE DIRECTIVE pursuant to the applicable conditions of the Contract Documents.

DESCRIPTION OF CHANGE IN WORK:

WORK CHANGE DIRECTIVE FORM PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 26 57 SUPPLEMENT 1 - 2 JANUARY 27, 2023

DESCRIPTION OF CHANGE IN WORK:

ATTACHMENTS:

Description of Item Attached No. of Copies

1.

2.

3.

4.

5.

END OF WORK CHANGE DIRECTIVE FORM

ORANGE COUNTY UTILITIES

Contractor: Page 1 of

Vendor Code Date

Contract No. Original Contract Amount

Project Name Revised Contract Amount

Engineer

Sequence No.

Item No. Quantities Unit Unit Price Additions Deductions

$0.00 $0.00 Percent Complete Time

Days

Days

Days

0 Days

CONTRACTOR ORANGE COUNTY UTILITIES

By Date Chief Inspector Name:

BY By Date Manager

By Date Director Utilities

By Date Orange County Mayor

Total Time Previous Change Orders Total Time This Change Order

Original Contract Time

Revised Contract Time

This change order includes not only all direct costs of contractor such as labor, material , job overhead, and profit markup but also includes any costs for modifications or changes in sequence of work to be performed, delays rescheduling, disruptions, extended direct overhead, acceleration, material, or other escalation which includes wages, and other impact costs.

Date Contractor's Signature

$0.00

Totals

$0.00

$0.00

Change Order Number

Description

Percent Complete Cost:

Approval Recommended:

Revised Contract Dollar Amount

BY

Net Dollars This Change Order Net Dollars Previous Change Order Net Dollar Changes to Date Original Contract Dollar Amount $0.00

$0.00

Accepted for Contractor By: Print Name & Title

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

1/27/2023

CHANGE ORDER FORM

01 26 57 SUPPLEMENT 2 - 1

Contractor: Page 2 of

Vendor Code Date

Contract No. Original Contract Amount

Project Name Revised Contract Amount

Engineer

Item No. Quantities Unit Unit Price Additions Deductions

Change Order Number

Description

$0.00

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

1/27/2023

01 26 57 SUPPLEMENT 2 - 2

Contractor: Page 3 of

Vendor Code Date

Contract No. Original Contract Amount

Project Name Revised Contract Amount

Engineer

Item No. Quantities Unit Unit Price Additions

$0.00

Change Order Number

DeductionsDescription

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

1/27/2023

01 26 57 SUPPLEMENT 2 - 3

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 FIELD ORDER BY RPR

JANUARY 27, 2023 01 26 57 SUPPLEMENT 3 - 1

FIELD ORDER BY RPR

PROJECT DATA CONTRACT DATA

Name: Contract Document Page Number:

Location: Orange County Landfill Drawing Number:

Owner’s Bid Number: Specification Section/Number:

FIELD ORDER DISTRIBUTION:

Owner’s Home Office:

Attn.:

No. Copies Date Sent:

Contractor’s Home Office:

Attn.:

No. Copies Date Sent:

Owner’s Field Office: No. Copies Date Sent:

Engineer’s Field Office: No. Copies Date Sent Contractor’s Field Office: No. Copies Date Sent:

You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the work without change in contract price or contract time.

If CONTRACTOR determines that a change in Contract Price or Contract Time is required as a result of this FIELD ORDER, CONTRACTOR must make such a claim prior to starting the Work in accordance with the General Conditions of the Contract Documents. If a Change Order is issued in accordance with General Conditions of the Contract Documents, this FIELD ORDER will be invalidated; otherwise, CONTRACTOR shall promptly proceed with the Work described in this FIELD ORDER pursuant to the applicable conditions of the Contract Documents.

DESCRIPTION OF CHANGE IN WORK:

FIELD ORDER BY RPR PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 26 57 SUPPLEMENT 3 - 2 JANUARY 27, 2023

ATTACHMENTS:

Description of Item Attached No. of Copies

1.

2.

3.

4.

END OF FIELD ORDER

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 REQUEST FOR PROPOSAL

JANUARY 27, 2023 01 26 57 SUPPLEMENT 4 - 1

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL (RFP) FOR PROPOSED CHANGE NO.

RFP Prepared By:

(Name) (Title)

Date Prepared:

PROJECT DATA CONTRACT DATA

Name: Contract Document Page Number:

Location: Orange County Landfill Drawing Number:

Owner’s Bid Number: Specification Section/Number:

RFP DISTRIBUTION BY ENGINEER:

Owner’s Home Office:

Attn.:

No. Copies Date Sent:

Contractor’s Home Office:

Attn.:

No. Copies Date Sent:

Owner’s Field Office: No. Copies Date Sent:

Engineer’s Field Office: No. Copies Date Sent Contractor’s Field Office: No. Copies Date Sent:

Other:

Attn.:

No. Copies Date Sent:

Please provide the undersigned a proposal for the following change in the work within thirty

(30) calendar days from the above date of this request that this by the ______ day of ______________________________, 20_____. The written proposal must clearly delineate the scope of the proposed change in work by providing an itemized estimate of time and costs broken down by materials, labor (by trade), subcontracts, overhead costs, and profit. Any amount claimed for subcontracts must be similarly supported in detail. If this proposal is accepted and approved by the Owner, a change order will be issued for changes in the work of the Contract in accordance with the Contract Documents.

Type of Change Proposed:

(Deletion of Work (Addition of Work) (Revision of Work) (Other)

Please see reverse side for a detailed description of the proposed change in Work.

DESCRIPTION OF PROPOSED CHANGE IN WORK:

REQUEST FOR PROPOSAL PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 26 57 SUPPLEMENT 4 - 2 JANUARY 27, 2023

ATTACHMENTS:

Description of Item Attached No. of Copies

1.

2.

3.

4.

END OF REQUEST FOR PROPOSAL FORM

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 MEASUREMENT AND PAYMENT

JANUARY 26, 2023 01 29 00 - 1

SECTION 01 29 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.01 WORK REFERS TO FDOT SPECIFICATIONS

A. For work that refers to FDOT Specifications, measurement and payment specified in these Contract Documents, shall take precedence over the measurement and payment specified in the FDOT Specifications.

1.02 ADMINISTRATIVE SUBMITTALS

A. Schedule of Values: Submit schedule as specified in Section 01 29 73, Schedule of Values.

B. Schedule of Estimated Progress Payments:

1. Submit with initially acceptable schedule of values in conformance with the lump sum and unit price breakdown submitted with the Bid.

2. Submit adjustments thereto with Application for Payment.

C. Application for Payment: Submit as specified in Section 01 29 75, Applications for Payment.

D. Final Application for Payment: Submit as specified in Section 01 29 75, Applications for Payment.

1.03 MEASUREMENT—GENERAL

A. Weighing, measuring, and metering devices used to measure quantity of materials for Work shall be suitable for purpose intended and conform to tolerances and specifications as specified in National Institute of Standards and Technology, Handbook 44.

B. Units of measure shown on the Bid Form shall be as follows unless specified otherwise.

Item Method of Measurement AC Acre—Field Measure by Engineer CY Cubic Yard—Field Measure by Engineer within the limits specified or shown DAY Day EA Each—Field Count by Engineer

GAL Gallon—Field Measure by Engineer HR Hour

MEASUREMENT AND PAYMENT PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 29 00 - 2 JANUARY 26, 2023

Item Method of Measurement LB Pound(s)—Weight Measure by Scale LF Linear Foot—Field Measure by Engineer LS Lump Sum—Unit is one; no measurement will be made SF Square Foot SY Square Yard

TON Ton—Weight Measure by Scale (2,000 pounds)

C. Quantities for the Lump Sum portion of the contract will be based on ground profiles shown on the Drawings. Field surveys will not be made by the Owner to confirm accuracy of elevations shown for this part of the Contract.

1.04 PAYMENT

A. General:

1. Progress payments will be made monthly.

2. The date for Contractor’s submission of monthly Application for

Payment shall be established at the Preconstruction Conference.

B. This Contract includes both Lump Sum and Unit Prices. Payment for all Work shown or specified in the Contract Documents is included in the Contract Price.

C. No measurement or payment will be made for individual Lump Sum Work items. Payment for Lump Sum Work covers all Work specified or shown on the Drawings and Specifications except for those items specifically designated on the Bid Form and in this Section as Unit Price items.

D. No Separate Payment shall be Made for the Following Work, and its Cost shall be included in appropriate payment items:

1. Trench excavation, sheeting, shoring and bracing.

2. Dewatering, stormwater runoff management, and disposal of water during construction.

3. Erosion control, protection of work, and construction of temporary structures during construction.

4. Surveys, engineering, and Record Drawings.

5. Field verifications or locating buried utilities.

6. Hauling and disposal of vegetative waste.

7. Traffic control.

8. Silt fencing and turbidity barriers.

9. Taxes, insurance, overhead, and profit.

10. All other work required and incidental to the Lump Sum portion of the

Contract.

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 MEASUREMENT AND PAYMENT

JANUARY 26, 2023 01 29 00 - 3

E. Payment will Not be Made for the Following:

1. Loading, hauling, and disposing of rejected material.

2. Quantities of material wasted or disposed of in manner not called for under Contract Documents.

3. Rejected loads of material, including material rejected after it has been placed due to failure of Contractor to conform to provisions of Contract Documents.

4. Material not unloaded from transporting vehicle.

5. Defective Work not accepted by Owner.

6. Material remaining on hand after completion of Work.

7. Work not in compliance with the Drawings and/or Specifications.

F. Payment for Unit Price Items Covers all Work Necessary to Furnish and Install the Following Items:

1. Provide UXO Technician II for Observation of Earthwork:

Measurement: One UXO Technician II is required to be on site at all times when earthmoving activities are underway within the “moderate risk” area indicated in Section 01 35 00, Paragraph 3.03.D. Contractor shall provide UXO Technician II meeting the training requirement set forth in Section 01 35 00, Paragraph 3.03.G in accordance with Section 01 35 00, Paragraph 3.03.F. Hours on-site shall be measured and documented by Contractor’s time sheets and shall be reviewed weekly with the RPR.

Payment: Payment shall be per hour on-site by the UXO Technician II.

2. Provide “on-call” UXO Contractor:

Measurement: Contractor shall provide an “on-call UXO Contractor qualified to identify potential MEC and MPPEH encountered during construction and demilitarize the materials, if warranted. in accordance with Section 01 35 00, Paragraph 3.03.H. Days on-site shall be measured and documented by Contractor’s invoices for activities performed by the UXO Contractor and shall be reviewed on a case-by-case basis with the

RPR.

Payment: Payment shall be per day on-site.

3. Removal of Spoil with Off-site Disposal:

Measurement: When an area of existing muck or other deleterious is encountered in preparation of the subgrade, the Contractor shall notify the County’s Resident Project Representative (RPR) and if RPR concurs, excavate the questionable material, remove from the site and replace with clean granular fill. The backfill shall be compacted and graded in accordance with Section 31 23 23, Fill and Backfill, Section 31 23 13, Subgrade Preparation and/or Section 31 23 23.15, Trench Backfill depending on applicability. The Contractor’s surveyor shall probe the area to estimate the extent of the muck or other deleterious material that needs to be removed and prepare a special purpose survey to calculate the volume of the material to be removed in cubic yards.

MEASUREMENT AND PAYMENT PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 29 00 - 4 JANUARY 26, 2023

Payment: Payment shall be per cubic yard of muck or other deleterious material removed as certified by the registered surveyor. The unit price shall include all costs associated with the volume calculations, excavations, removal, transport off site and replacement with clean granular fill.

4. Removal of Spoil with On-site stockpile:

Measurement: When an area of existing muck or other deleterious is encountered in preparation of the subgrade, the Contractor shall notify the RPR and if RPR concurs, excavate the questionable material as required by the plans, transport to an on-site stockpile area as directed by the RPR and replace with clean granular fill. The backfill shall be compacted and graded in accordance with Section 31 23 23, Fill and Backfill, Section 31 23 13, Subgrade Preparation and/or Section 31 23 23.15, Trench Backfill depending on applicability. The Contractor’s surveyor shall probe the area to estimate the extent of the muck or other deleterious material that needs to be removed and prepare a special purpose survey to calculate the volume of the material to be removed in cubic yards.

Payment: Payment shall be per cubic yard of muck or other deleterious material removed as certified by the registered surveyor. The unit price shall include all costs associated with the volume calculations, excavations, removal, transport to the on-site stockpile area and replacement with clean granular fill.

1.05 PARTIAL PAYMENT FOR STORED MATERIALS AND EQUIPMENT

A. Partial Payment: No partial payments will be made for materials and equipment delivered or stored unless Shop Drawings, Submittals, or preliminary operation and maintenance manuals are acceptable to Engineer.

B. Final Payment: Will be made only for products incorporated in Work;

remaining products, which have not been incorporated in the Work, and for which partial payments have been made, shall revert to Contractor unless otherwise agreed. Amounts of payments made for items not incorporated into the work will be deducted from final payment.

PART 2 PRODUCTS (NOT USED)

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 SCHEDULE OF VALUES

JANUARY 27, 2023 01 29 73 - 1

SECTION 01 29 73

SCHEDULE OF VALUES

PART 1 GENERAL

1.01 DESCRIPTION

A. Scope of Work:

1. Prepare a separate Schedule of Values for each schedule of Work under the Contract.

2. Unit Price Work: Reflect unit price quantity and price breakdown from conformed Bid Form.

3. Lump Sum Work:

a. Reflect Schedule of Values format included in conformed Bid

Form, specified allowances, alternates, and equipment selected by Owner, as applicable.

b. List bonds and insurance premiums, mobilization, demobilization, facility startup, and Contract Closeout separately.

c. Break down by Divisions 02 through 49, for each Project facility.

4. An unbalanced or front-end loaded schedule will not be acceptable.

5. The total amount for both mobilization and demobilization shall not exceed 5 percent of the Total Bid Price.

6. At least 25 percent of the mobilization and demobilization value shall be designated for demobilization.

7. The Schedule of Value shall include a line item price for Progress

Schedule Updates.

8. Summation of the complete Schedule of Values representing all Work shall equal the Contract Price.

9. Submit Schedule of Values at the preconstruction meeting, and as otherwise specified or as may be requested to be submitted earlier as evidence of the apparent low Bidder’s qualifications.

10. Upon request of the Engineer, support the values with data, which will substantiate their correctness including the cost of material, labor and O&P.

11. The Schedule of Values shall establish the actual value of the component parts of the Work to be completed and shall be used as the basis of the Contractor’s Application for Payment.

1.02 FORM AND CONTENT OF SCHEDULE OF VALUES

A. The Schedule of Values shall be typed on an 8-1/2 inch by 11-inch white paper. Standard construction forms and computer format in MS-Excel spreadsheet will be considered acceptable by the Engineer. Identify schedule with:

1. Title of Project, location, Owner, Bid Number.

SCHEDULE OF VALUES PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200

01 29 73 - 2 JANUARY 27, 2023

2. Engineer and Engineer’s project number.

3. Name and address of Contractor.

4. Date of submission.

B. Identify each line item with the number and title of the respective major section of the Specifications.

C. For each major line item, list sub-values of major products or operations under the item.

D. For the Various Portions of the Work:

1. Each item shall include a directly proportional amount of the Contractor’s overhead and profit.

2. For Items on which Progress Payments will be Requested for Stored Materials provide:

a. The total installed value.

b. Information required under Paragraph 1.03.

3. Installed unit value multiplied by the quantity listed shall equal the cost of that item in the Schedule of Values.

E. The sum of all lump sum values plus all unit price values times the corresponding quantity of units to be constructed/installed shall equal the total Contract sum.

1.03 SUBSCHEDULE OF UNIT MATERIALS VALUES

A. Submit a sub-schedule of unit costs and quantities for products on which progress payments will be requested for stored products.

B. The form of submittal shall parallel that of the Schedule of Values, with each item identified the same as the line item in the Schedule of Values.

C. The unit values for the materials shall be broken down into the cost of the material, delivered and unloaded at the site, with taxes paid. Copies of paid invoices for component material shall be included with the payment request in which the material first appears.

1.04 REVIEW AND RESUBMITTAL

A. After review by Engineer, revise, and resubmit Schedule of Values and Schedule of Unit Material Values, as required.

B. Resubmit revised Schedules in same manner as previously submitted schedules.

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 SCHEDULE OF VALUES

JANUARY 27, 2023 01 29 73 - 3

1.05 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS

A. Show estimated payment requests throughout Contract Times aggregating initial Contract Price.

B. Base estimated progress payments on initially acceptable progress schedule.

Adjust to reflect subsequent adjustments in progress schedule and Contract Price as reflected by modifications to the Contract Documents.

PW\JACOBS AMERICA\ORANGE COUNTY FL\D3625200 APPLICATION FOR PAYMENTS

JANUARY 27, 2023 01 29 75 - 1

SECTION 01 29 75

APPLICATIONS FOR PAYMENTS

PART 1 GENERAL

1.01 DESCRIPTION

A. Scope of Work: Submit applications for payment to the Engineer in accordance with schedule established by Conditions of the Contract and Agreement between Owner and Contractor.

B. The accepted Section 01 29 73, Schedule of Values, shall be used as the basis for the Contractor’s Application for Payment.

1.02 FORMAT AND DATA REQUIRED

A. Submit applications on electronic Payment Application Files to be provided by the County in Excel format. Example copies of the forms are provided in Supplements 1 through 5 following this Section.

B. Provide itemized data on continuation sheets.

C. Provide an electronic file of the approved construction progress schedule in primavera schedule software showing the work performed to the date of the Application for Payment.

D. Contractor shall provide construction photographs in accordance with Section 01 31 13, Coordination. Submit construction photographs with each copy of Application for Payment.

E. Contractor shall maintain an updated set of Drawings to be used as Record Drawings in accordance with Section 01 77 00, Contract Closeout. As a prerequisite for monthly progress payments, Contractor shall exhibit updated Record Drawings for review by Owner and Engineer.

1.03 PREPARATION OF APPLICATION FOR EACH PROGRESS PAYMENT

A. Application Form:

1. Fill in required information, including that for Change Orders executed prior to date of Submittal of Application.

2. Fill in summary of dollar values to agree with respective totals indicated on continuation sheets.

3. Execute certification with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .