Wray and Yuma - Advertisement.pdf
PDF 399 KB Posted
- Attached to
- CDOT Yuma and Wray Building Repairs
- Solicitation number
- 2025-01
- Issued by
- Yuma County, Colorado
About this file
This is an Advertisement for Bids (AFB) issued by the Colorado Department of Transportation (CDOT) for the Yuma and Wray Building Repairs project. The solicitation seeks qualified general contractors to replace damaged building components at CDOT facilities in Yuma and Wray, Colorado, with an estimated contract cost of $600,000. The project requires a single lump sum bid for replacing all identified components, with no construction drawings or specifications provided. A mandatory pre-bid conference is scheduled for April 15, 2025, with site visits in Yuma at 11:00 AM and Wray at 1:00 PM. Sealed bids are due on April 29, 2025, by 2:00 PM, with anticipated contract approval and notice to proceed on May 29, 2025. The project has a substantial completion timeline of 180 calendar days, with final acceptance expected by January 9, 2026.
Bidders must meet specific minimum requirements, including having completed at least two projects over $600,000 in the last three years, demonstrating general contracting experience, and providing proof of bonding capacity. The project is subject to Davis-Bacon Act wage requirements, with prevailing wage rates to be followed. Bid bonds and proposal guaranties are required for contracts valued at $50,000 or more, with a 5% minimum bid bond. Preference will be given to Colorado resident bidders and labor. Contractors must submit various documentation, including labor and material bonds, performance bonds, certificates of insurance, and a labor burden spreadsheet. The solicitation includes multiple appendices detailing scopes of work, photo summaries, and property aerials for both Yuma and Wray locations.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1
REV 7/2021
ADVERTISEMENT FOR BIDS
Design/Bid/Build State of Colorado
Colorado Department of Transportation Notice Number: 2025-01
Project No:
Project Title: CDOT Yuma and Wray Building Repairs Estimated Contract Cost: $600,000.00
Project Description
CDOT is requesting bids from qualified general contractors for replacement of damaged building components at the CDOT Yuma and Wray facilities. All building components to be replaced were identified by Unified Building Sciences. Contractor is provide a single lump sum bid to replace all components and all quantities in-kind. No construction drawings or specifications are available for this project, contractor is responsible for means and methods.
Contractor to provide a single lump sum price for the entire project on the State’s bid and bid bond form (Advertisement Appendix B, B1). After award the contractor will be required to provide a schedule of values breaking the contract value out over a similar format to the Unified Building Science’s scopes of work (Advertisement Appendix J-U).
Minimum Requirements
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. To be considered as qualified, interested firms shall have, as a minimum:
1. Provided Contracting services within the last three (3) years for at least two (2) projects each in excess of $600,000.00 (hard costs), utilizing the expertise present in their Colorado Office; and
2. Demonstrated specific General Contracting experience in projects of similar scope and complexity; and
3. Demonstrated bonding capability up to $600,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity; and
4. Attended and signed in at the Mandatory Pre-Bid Conference
5. Not previously terminated by CDOT for non-performance or disqualified as a non-responsible bidder on a State Buildings contract or procurement.
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
BidNet.com
Other Information
1. The contract shall be awarded with reasonable promptness by written notice to the low responsible bidder whose bid meets the requirements and criteria set forth in the invitation for bids. In the event that all bids for a State Buildings project exceed available funds, as certified by the appropriate fiscal officer, the responsible officer is authorized, in situations where time or economic considerations preclude resolicitation of work of a reduced scope, to negotiate an adjustment of the bid price with the low responsible bidder in order to bring the bid within the amount of available funds; except that the functional specifications integral to completion of the project may not be reduced in scope, taking into account the project plan, design, and specifications and quality of materials. (Procurement Code 24-92-103 (7)
2. CDOT reserves the right to waive informalities or irregularities and to reject any and all Bids.
3. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
4. The Principal Representative has determined that the entire project shall be substantially complete within 180 calendar days from the date of the Notice to Proceed and the project shall be finally complete, including the delivery of any or all guarantees and warranties, the submittal of sales and use tax payment forms, the completion of the final punch list and the calling for final inspection, within 44 calendar days, if applicable, from the date of substantial completion.
In accordance with Article 46 of the General Conditions of the Contract, Time of Completion and Liquidated Damages, failure to complete the work within the agreed number of calendar days shall be considered breach of contract and subject the bidder to liquidated damages to the extent specified in Article 54D of the General Conditions of the Contract. If this project is awarded under $150,000 and a Purchase Order is used in lieu of a State Buildings Contract, then Liquidated Damages will not apply.
5. C.R.S. §24-92-202 applies to this Advertisement for Bid because it advertises a Colorado Department of Transportation public project, as defined by C.R.S. §24-92- 201(5). All employees of the selected Bidder/Proposer/Vendor and all employees of any subcontractor who perform work under the contract issued pursuant to this Advertisement for Bid must be paid in accordance with the wage requirements of the federal Davis-Bacon Act, 40 U.S.C. §3141 et. seq., and Related Federal Acts, see also 40 U.S.C. §276(a), 29 C.F.R. Parts 1, 3, 5, 6, and 7, collectively referred to as “DBRA” and receive the minimum compensation as required by the DBRA. Any DBRA requirement that addresses the payment of wages, including when wages and overtime must be paid, will be required. Any requirement of DBRA that addresses reporting is not required. CDOT will require the contractor to fill out, sign and submit the Contractor Wage Compliance Certification with each Pay Application. The minimum DBRA wages to be paid are established by the U.S. Department of Labor. The applicable DBRA wages for the Public Project work to be performed pursuant to this Solicitation are attached as Appendix E. All subcontracts must contain this requirement and the selected Bidder/Proposer/Vendor shall, and shall ensure that all subcontractors, maintain and make available for review, inspection, and audit by the State all project records as are necessary to document compliance with applicable portions of the DBRA.
6. Labor and Material, Performance Bonds (if bid is over $150,000), Certificates of Insurance, Labor Burden Spreadsheet will be required at contract signing.
7. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
8. Per C.R.S. §24-105-201 If the contract value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
Pre-Bid Meeting
A mandatory Pre-Bid Meeting will be held onsite. Contractors will be required to sign-in and sign liability waivers at each site in order to place a bid.
Yuma Address: 5053 CR 37, Yuma, Colorado Date/Time: Wednesday April 15, 2025 11:00 AM
Wray Address: 30137 US 34, Wray, Colorado Date/Time: Wednesday April 15, 2025 1:00 PM
Schedule/Submission Details
1. The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:
Advertisement 04/04/2025 Mandatory Pre-Bid Conference and Tour 04/15/2025 Date Email Questions Due 04/17/2025 Date Email Answers Issued 04/22/2025 Sealed Bids Due/Public Bid Opening 04/29/2025 Anticipated Contract Approval 05/29/2025 Anticipated Notice to Proceed 05/29/2025 Anticipated Substantial Completion (180 days) 11/26/2025 Anticipated Final Acceptance (44 days) 01/09/2026
2. One (1) electronic copy of the sealed bid are due Tuesday April 29, 2025 and shall be received no later than 2:00 PM (MD/ST), and shall be submitted/accepted via BidNet at the following address:
Agency: Colorado Department of Transportation Contact Name: Robert Wilson Address: www.bidnet.com
Comments: Late sealed bids will be rejected without consideration. The Colorado Department of Transportation and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on BidNet.com. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
Point of Contact/Clarification
Name: Robert L. Wilson Agency: Colorado Department of Transportation (CDOT) Phone: 303-548-6819 Email: Robert.L.Wilson@state.co.us
This Notice is also available on the web at:
www.Bidnet.com Publication Dates: 04/02/2025 – 04/23/2025
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12)
Appendix B: Bid Form (SBP-6.13) – required bid submittal
Appendix B1: Bid Bond (SBP-6.14) – required bid submittal
Appendix C: Direct Labor Burden Calculation (SBP-6.18)
Appendix D: Applicable Prevailing Wage Rates
Appendix E: Contractor Wage Compliance Statement
Appendix F: Performance Bond (if over $150,000)
Appendix G: Labor and Material Bond (if over $150,000)
Appendix H: Sample Contract
Appendix I: Procedural Docs
Appendix J: Yuma Maintenance Shed – Scope of Work
Appendix K: Yuma Office Garage – Scope of Work
Appendix L: Yuma Sand Shed – Scope of Work
Appendix M: Yuma Storage Shed Patrol – Scope of Work
Appendix N: Yuma Storage Tuff Shed – Scope of Work
Appendix O: Yuma Photo Summary http://www.bidnet.com/
Appendix P: Yuma Property Aerial
Appendix Q: Wray Sand Shed – Scope of Work
Appendix R: Wray Maintenance Building – Scope of Work
Appendix S: Wray Storage Shed - Scope of Work
Appendix T: Wray Photo Summary
Appendix U: Wray Property Aerial
Appendix V: CDOT Waiver of Liability Required to sign-in at the pre-bid meeting
Schedule/Submission Details
File details come from the government source that posted it. Updated .