This document appears to be an architectural drawing set for the Woodside Elementary School Improvements project for West Ottawa Public Schools in Holland, Michigan for the year 2025. The files include demolition plans, first floor plans, and roof plans for three building units (A, B, and C).
The drawings detail comprehensive renovation plans for the elementary school, including:
- Demolition of existing walls, ceilings, floors, fixtures, and equipment across multiple rooms and spaces
- Removal and replacement of metal wall panels, window sills, and other architectural elements
- Installation of new millwork, casework, lockers, and built-in features
- Modifications to existing mechanical, electrical, and plumbing systems
- Roof improvements including membrane roofing, insulation, and drainage systems
The plans show detailed floor layouts with room-by-room specifications for classrooms, corridors, offices, restrooms, storage areas, mechanical spaces, and other school facilities. The drawings include alternate design options (Alt A-1) and provide specific notes about demolition, construction methods, and material specifications.
The project appears to be a comprehensive modernization and improvement of the existing Woodside Elementary School facility, with careful attention to architectural details, functional improvements, and system upgrades.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T
BF
BF
BF
BFBF BF
BF BF BF
BF
BF
BFBF
BF BF
BF BF
BFBF
BF
BF
BF BFBF BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
A4.01
COUNSELOR
B116
CONF.
B115
OFFICE
B114
CONF.
B117
WORK ROOM
B112
T.
B111
RECEPTION
B108
HEALTH
B110
SUPPLY
B109
WORK ROOM
B104
WORK ROOM
B103
VEST.
B101
CORRIDOR
B102
CORR.
B113
CORRIDOR
B122
VEST
B121
CLASSROOM
B125
SMALL GROUP
B126
CLASSROOM
B129
SMALL GROUP
B130
CLASSROOM
B133
SMALL GROUP
B134
CLASSROOM
B138
SMALL GROUP
B139
CLASSROOM
B123
SMALL GROUP
B124
CLASSROOM
B127
SMALL GROUP
B128
CLASSROOM
B131
SMALL GROUP
B132
CUSTODIAL
B135
T.
B136
T.
B137
SPECIAL
B120
BOYS T.
B119
CORRIDOR
A135
CUSTODIAL
A151
CLASSROOM
A153
SMALL GROUP
A154
CLASSROOM
A149
SMALL GROUP
A150
CLASSROOM
A147
SMALL GROUP
A148
CLASSROOM
A142
SMALL GROUP
A143
CLASSROOM
A144
STORAGE
A146
MUSIC ROOM
A138
SMALL GROUP
A137
CLASSROOM
A139
STORAGE
A141
T.
A140
CORRIDOR
A102
VEST.
A136
VEST.
A101
CLASSROOM
A132
T.
A134
T.
A133
BOYS T.
A127
CLASSROOM
A130
SMALL GROUP
A131
T.
A129
CORRIDOR
A119
VEST.
A121
OFFICE
A120
CLASSROOM
A124
SMALL GROUP
A125
T.
A123
CLASSROOM
A113
SMALL GROUP
A114
T.
A112
CLASSROOM
A117
SMALL GROUP
A118
T.
A116
CLASSROOM
A105
SMALL GROUP
A106
T.
A104 CLASSROOM
A109
SMALL GROUP
A110
T.
A108
CORRIDOR
B142
VEST.
B143 CORRIDOR
B155
STORAGE
B141
OFFICE
B140
STORAGE
B146 SPECIAL
B147
BOILER
B144
BOILER
B145
CLASSROOM
B148
SPECIAL
B156
SPECIAL
B157
SPECIAL
B158
SPECIAL
B159
SPECIAL
B161
SPECIAL
B160
T.
B152
T.
B154
SHOWER
B153
CORRIDOR
B162
MEDIA CENTER
B106
WORK ROOM
A152
WORK ROOM
A155
TELE.
A156
COMPUTER
B163
CORRIDOR
C107
VEST.
C109
ART
C121
ELEC.
C126
KILN
C123
T.
C122
OFFICE
C125
CLASSROOM
C120
SMALL GROUP
C118
T.
C119
CLASSROOM
C116
SMALL GROUP
C117
T.
C115
CLASSROOM
C112
SMALL GROUP
C113
T.
C111
CLASSROOM
C108
CORRIDOR
C128
VEST.
C127
RECEIVING
C129
STORAGE
B164
MULTI-PURPOSE
C130
ELEC.
B165
KITCHEN
C131
STORAGE
C136
T.
B149
T.
B150
SHOWER
B151
GIRLS T.
B166
BOYS T.
B167
GYMNASIUM
C133
OFFICE
C135
STORAGE
C134
MECH
C132
CLASSROOM
C105
CLASSROOM
C106
CORR.
C102
VEST.
C101
T.
B105
MEDIA BREAKOUT
B107
STORAGE
C124
FAN
C103
FAN
C104
GIRLS T.
B118
T.
A145
GIRLS T.
A126
CONF.
B100
A4.011
A4.01
A4.01
A4.01 6
A4.01
A4.01 4
A4.017
A4.01
A4.01 8
A4.01
A4.01
A4.0115
A4.01 14
A4.01
PROJECT NO.
DRAWN
REVIEWED
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATA BASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
ALL RIGHTS RESERVED
c
KEYPLAN
ISSUANCES
GMB COPYRIGHT
Au to de sk
D oc s:
//5
-6
W es t O tta w a W oo ds id e
El em en ta ry Im pr ov em en ts /5
-6
0A
5.
rv t
8/
/2
1:
:4
PM
A0.01
5-6250
OVERALL FIRST FLOOR PLAN
ERE
AMS
W O
O D
S
ID
E E
LE
M
E N
T A
R Y
S C
H O
O L
IM
P
R O
V E
M E
N T
S
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
H O
LL
A
N D
M
IC
H
IG
A
N
1/16" = 1'-0"
OVERALL FIRST FLOOR PLAN
UNIT A
UNIT B
UNIT C
08.28.2025 BIDS &
CONSTRUCTION
https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=e7254e73-e4ac-4045-a89b-c603c2dc1958
TAPERED RIGID INSULATION (4' - 0" SECTIONS)
1/4" PER FOOT SLOPE UNLESS OTHERWISE
NOTED
DIRECTION OF ROOF SLOPE.
WITH TAPERED INSULATION
ROOF HATCH
STANDARD ROOF DRAIN
LEGEND
GENERAL NOTES
ROOF WALKWAY PAD
(SEE SPEC. FOR
MATERIAL)
TAPERED RIGID INSULATION (4' - 0" SECTIONS
@ 1/4" SLOPE PER FOOT AT CRICKETS)
CRICKETS SLOPE TO ROOF DRAINS.
DIRECTION OF STRUCTURAL
ROOF SLOPE. (SEE STRUCTURAL
PLANS FOR ROOF FRAMING
SLOPES)
ROOF DRAIN LABELRD-A-1
THICKNESS OF TAPERED INSULATION AT
PERIMETER OR DRAIN (NOT INCLUDING
BASE INSULATION THICKNESS)
+ 7 1/4"
ROOF DRAIN NUMBER
ROOF AREA (SEE ROOF KEYPLAN)
RD OR ORD
EXISTING
EXISTING
CR#1 CORE SAMPLE LOCATIONS SEE
LEGEND FOR DESCRIPTION
CORE #1 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 3.5" OF
POLYISOCYANURATE INSULATION ON METAL DECK (SLOPED).
CORE SAMPLE DESCRIPTION
CORE #2 DURO-LAST PVC MEMBRANE, 4" OF POLYISOCYANURATE
INSULATION, EPDM MEMBRANE, 3" OF POLYISOCYANURATE
INSULATION, ON GYPSUM DECK (NO DISCERNABLE SLOPE).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ROOF DETAILS - LOCATED ON SHEET A0.02
ROOF DRAIN
ROOF OVERFLOW DRAIN
FASTENING ENHANCEMENT AT CORNER - SEE SPEC AND DETAIL
PLUMBING VENT
STACK FLASHING
METAL COPING SPLICE DETAIL
ROOF CURB DETAIL
RE-ROOFING EXISTING NAILERS / BLOCKING TO REMAIN:
CONTRACTOR TO FIELD VERIFY THE EXISTING NAILERS / BLOCKING
WILL COMPLY TO MEET THE WIND UP LIFT CRITERIA. REMOVE ALL
DAMAGED NAILERS / BLOCKING AND / OR INSTALL ADDITIONAL
FASTENER AS REQUIRED TO COMPLY.
REFER TO PLUMBING DRAWINGS FOR LOCATION AND NUMBER OF
PLUMBING VENTS THRU ROOF.
REFER TO MECHANICAL DRAWINGS TO COORDINATE ALL ROOF
PENETRATIONS & LOCATIONS.
PROVIDE 1/2" TAPERED CRICKETS AT ALL ROOF HATCHES AND
MECHANICAL ROOF PENETRATIONS UNLESS OTHERWISE NOTED.
TAPER SHALL PROVIDE DRAINAGE AROUND HATCH AND EQUIPMENT.
SEE SPECIFICATION FOR ROOFING SYSTEM TO BE USED AND ROOF
PLAN FOR LOCATIONS OF TAPERED INSULATION AND OR SLOPE
CHANGES OF ROOF.
CONTRACTOR RESPONSIBLE TO FIELD VERIFY ALL SQUARE
FOOTAGE VALUES NOTED ON PLANS
IN AREAS WHERE EXISTING ROOF DRAINS ARE BEING REPLACED
WITH NEW ROOF DRAIN TO BE INSTALLED IN THE EXACT LOCATION
OF EXISTING AND WILL BE CONNECTED TO EXISTING PIPING AS
REQUIRED.
SCUPPER LOCATIONS TO BE COORDINATED SO THAT THEY DO NOT
APPEAR OVER DOORS, WINDOWS OR MECHANICAL LOUVERS
STANDARD ROOF ABBREVIATIONS
RD = ROOF DRAIN
ORD = OVERFLOW ROOF DRAIN
EF = EXHAUST FAN
IV = INTAKE VENT
RTU = ROOF TOP UNIT
RV = RELIEF VENT
ST. SLOPE
SLOPE
CORE #4 DURO-LAST PVC MEMBRANE, 4" OF POLYISOCYANURATE
INSULATION, 1/4" FLEECE FABRIC, EPDM MEMBRANE, 3" OF
POLYISOCYANURATE INSULATION, ON GYPSUM DECK (NO
DISCERNABLE SLOPE).
CORE #5 DURO-LAST PVC MEMBRANE, 3" OF POLYISOCYANURATE
INSULATION, EPDM MEMBRANE, 3" OF POLYISOCYANURATE
INSULATION, ON GYPSUM DECK (NO DISCERNABLE SLOPE).
CORE #6 DURO-LAST PVC MEMBRANE, 1 3/4" OF POLYISOCYANURATE
INSULATION, EPDM MEMBRANE, 3" OF POLYISOCYANURATE
INSULATION, ON GYPSUM DECK (NO DISCERNABLE SLOPE).
CORE #7 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 3" OF
POLYISOCYANURATE INSULATION, ON METAL DECK (NO
DISCERNABLE SLOPE).
CORE #8 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 3" OF
POLYISOCYANURATE INSULATION, ON METAL DECK (SLOPED).
CUT #12 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 3 1/2" OF
POLYISOCYANURATE INSULATION, ON METAL DECK (SLOPED).
CUT #11 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 4" OF
POLYISOCYANURATE INSULATION, ON CONCRETE DECK (NO
DISCERNABLE SLOPE).
CUT #10 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 3" OF
POLYISOCYANURATE INSULATION, ON METAL DECK (SLOPED).
CORE #3 DURO-LAST PVC MEMBRANE, 1 1/2" OF POLYISOCYANURATE
INSULATION, EPDM MEMBRANE, 3" OF POLYISOCYANURATE
INSULATION, ON GYPSUM DECK (SLOPED).
CORE #9 DURO-LAST PVC MEMBRANE, EPDM MEMBRANE, 3" OF
POLYISOCYANURATE INSULATION, ON METAL DECK (SLOPED).
AREAS WHERE PARAPET
NEEDS TO BE RAISED
CORE #1
CORE #2
CORE #4
CORE #3
CORE #5
CORE #6
CORE #7
CORE #8
CORE #9
CORE #10
CORE #11
CORE #12
ROOF LADDER B
ROOF LADDER C
ROOF LADDER A
ROOF AREA TO REMAIN
NO WORK IN THIS AREA
S.S. CLAMPING RING
FLASHING AS REQUIRED
ROOF LAP SEALANT CONT.
(TYPICAL)
PRE-MOLDED FLASHING &
METAL COLLAR
ROOF LAP SEALANT CONT.
(TYPICAL)
VENT PIPE SEE PLUMBING
DRAWINGS
MI
N.
1'
- 0
MEMBRANE ROOFING SYSTEM
FULLY ADHERED TO 1/2"
COVER BOARD WITH RIGID
INSULATION FASTENED TO
METAL DECK SEE ROOF PLAN
FOR ADDITIONAL NOTES
METAL DECK SEE STRUCTURAL
DRAWINGS
STEEL ANGLE FRAME
AROUND PERIMETER EXTEND
TO ROOF STRUCTURE - SEE
STRUCTURAL DRAWINGS
MEMBRANE ROOFING SYSTEM
FULLY ADHERED TO COVER
BOARD WITH RIGID INSULATION
FASTENED TO METAL DECK
SEE ROOF PLAN FOR
ADDITIONAL NOTES
EXTEND ROOF MEMBRANE
UP & OVER CURB
PRE-FABRICATED
INSULATED ROOF CURB
PROVIDE AT BALLASTED ROOF
AREAS ONLY - VAPOR BARRIER
TO RUN UP CURB & BE SEALED
TO INSIDE FACE OF CURB.
EQUIPMENT HOUSING OR
FLASHING - SEE
MECHANICAL DRAWINGS
TREATED 2x WOOD BLOCKING
AS REQUIRED AROUND CURB
OPENING PERIMETER
MI
N.8"
ROOF DRAIN WITH CAST
GRATING (NO PLASTIC
ALLOWED)
MEMBRANE ROOFING
SYSTEM FULLY ADHERED
TO 1/2" COVER BOARD WITH
RIGID INSULATION
FASTENED TO METAL DECK
SEE ROOF PLAN FOR
ADDITIONAL NOTES
METAL DECK - SEE
STRUCTURAL DRAWINGS
STEEL ANGLES - SEE
STRUCTURAL DRAWINGS
INSTALL INSULATION
UNDER DRAINS
DRAIN PIPE WITH INSULATION -
SEE PLUMBING DRAWINGS
DRAIN SUMP PAN
INSTALL 4'-0" x 4'-0" 1/2"
PER FOOT SLOPE PREFAB
INSULATED DRAINSET AT
EACH ROOF DRAIN TO
PROVIDE POSITIVE SLOPE
TO DRAIN
OVERFLOW ROOF DRAIN
WITH CAST GRATING (NO
PLASTIC ALLOWED)
MEMBRANE ROOFING SYSTEM
FULLY ADHERED TO 1/2"
COVER BOARD WITH RIGID
INSULATION FASTENED TO
METAL DECK SEE ROOF PLAN
FOR ADDITIONAL NOTES
METAL DECK - SEE
STRUCTURAL DRAWINGS
STEEL ANGLES - SEE
STRUCTURAL DRAWINGS
INSTALL INSULATION
UNDER DRAINS
DRAIN PIPE WITH INSULATION -
SEE PLUMBING DRAWINGS
DRAIN SUMP PAN
SEE PLANS FOR
HATCH HINGE
SIDE LOCATION
EXISTING ROOF HATCH
NEW PRE-FABRICATED
INSULATED ROOF CURB
NEW ROOFING MEMBRANE FULLY
ADHERED TO 1/2" COVER BOARD,
OVER TAPERED INSULATION
SYSTEM, (2) LAYERS OF 2.6" RIGID
INSULATION MECHANICALLY
FASTENED TO EXISTING GYPSUM
DECK
EXTEND ROOFING UP
& OVER ROOF CURB
PROVIDE ROOF WALKWAY
PAD AT LADDER SIDE OF
ALL HATCHES (TYPICAL)
TEMPERATURE APPROPRIATE
ELASTOMERIC SEALANT
DRAWBAND OR WELD
UMBRELLA TO STACK
UMBRELLA
STORM COLLAR
METAL DECK SEE STRUCTURAL
STACK PIPE SEE MECHANICAL
MIN.
4"
MEMBRANE ROOFING
SYSTEM FULLY ADHERED
TO 1/2" COVER BOARD WITH
RIGID INSULATION
FASTENED TO METAL DECK
SEE ROOF PLAN FOR
ADDITIONAL NOTES
1" AIR GAP TO
PIPE (TYP.)
MI
N.
1'
- 6
1"
12" O.C. SPACING (STAGGERED)
FIRST 8' - 0" TYPICAL
" O
.C . S
PA
CI
NG
(S
TA
GG
ER
ED
FI
RS
T 8'
0"
T
YP
IC
AL
6"
1' - 0"
1' - 0"
2' - 0"
TYPICAL FASTENING SPACING
2'-0" O.C. AFTER 8'-0" CORNERS
NOTE:
TYPICAL STARTING NAILING
SPACING AT CORNERS AND
CONTINUED NAILING PATTERN
ALONG WALL
1'
- 0
6"
2'
- 0
1'
- 0
TY
PI
CA
L F
AS
TE
NI
NG
S
PA
CI
NG
2'- 0"
O .C
. A
FT
ER
8'
-0 " C
OR
NE
RS
8" M
IN
MEMBRANE ROOFING
SYSTEM FULLY ADHERED
TO COVER BOARD WITH
RIGID INSULATION
FASTENED TO METAL DECK
SEE ROOF PLAN FOR
ADDITIONAL NOTES
1" INSULATION OVER
EQUIPMENT RAILS. TYP.
(4) SIDES BY ROOFING
CONTRACTOR
EQUIPMENT RAIL
FLASHING ON
MEMBRANE UP & OVER
EQUIPMENT RAIL
EQUIPMENT HOUSING
SEE MECHANICAL
TAPERED INSULATION
AS REQUIRED
SE
E
ME
CH
AN
IC
AL
EQUIPMENT RAIL BY MECHANICAL
PLAN VIEW
ELEVATION
3/4" DIA. RUNGS
AT 12" O.C.
2 1/2"x 3/8" RAILS W/ TOP
END ROUNDED
2 1/2"x 3/8" BENT PLATES AT
TOP, BOTTOM 7'-0" O.C. MAX. W/
HY-270 1/2" DIA. ANCHORS
2' - 0"
3'
- 6
1'
- 0
1' - 6"
7"
LADDER LOCATION LANDING
ELEVATION
TOP RUNG
ELEVATION
LADDER SCHEDULE
EL. 119'-8" V.I.F.EL. 111'-8" V.I.F.ROOF LADDER A
ALL STEEL USED SHALL
BE GALVANIZED
LADDER
MATERIAL
STEEL
EL. 124'-8" V.I.F.EL. 117'-0" V.I.F.ROOF LADDER B STEEL
EL. 117'-6" V.I.F.EL. 111'-6" V.I.F.ROOF LADDER C STEEL
PROJECT NO.
DRAWN
REVIEWED
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATA BASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
ALL RIGHTS RESERVED
c
KEYPLAN
ISSUANCES
GMB COPYRIGHT
Au to de sk
D oc s:
//5
-6
W es t O tta w a W oo ds id e
El em en ta ry Im pr ov em en ts /5
-6
0A
5.
rv t
8/
/2
7:
:0
PM
A0.02
5-6250
OVERALL ROOF PLAN
RAM
AMS
W O
O D
S
ID
E E
LE
M
E N
T A
R Y
S C
H O
O L
IM
P
R O
V E
M E
N T
S
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
H O
LL
A
N D
M
IC
H
IG
A
N
2025UNIT A
UNIT B
UNIT C
1/16" = 1'-0"
OVERALL ROOF PLAN
A0.02 1 1/2" = 1'-0"
1 SINGLE ROOF DRAIN DETAIL
A0.02 1 1/2" = 1'-0"
5 TYPICAL ROOF CURB DETAIL
A0.02 1 1/2" = 1'-0"
3 TYPICAL PLUMBING VENT DETAIL
A0.02 1 1/2" = 1'-0"
2 ROOF DRAIN OVERFLOW DETAIL
A0.02 3/4" = 1'-0"
8 EXISTING THERMALLY BROKEN ROOF HATCH
A0.02 1 1/2" = 1'-0"
4 STACK FLASHING DETAIL
A0.02 3/4" = 1'-0"
9 WOOD NAILER SECUREMENT CRITERIA
08.28.2025 BIDS &
CONSTRUCTION
A0.02 1/2" = 1'-0"
6 TYPICAL LADDER DETAIL
A0.02 1 1/2" = 1'-0"
7 TYP. EQUIPMENT RAIL
https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12
AC
S
AC
S
ACS
BF
BF
BFBF
BF BF BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
DEMOLITION LEGEND
EXISTING WALL TO BE DEMOLISHED
PORTION OF EXISTING WALL TO BE DEMOLISHED
EXISTING OBJECT TO BE DEMOLISHED
EXISTING WALLS TO REMAIN
EXISTING OBJECTS TO REMAIN
XX DEMOLITION TAG: SEE DEMOLITION NOTES
AREA OF FLOOR CUTTING
ROOM NAME
CEILING FINISH
FLOOR FINISH
EXISTING ROOM FINISH INFORMATION:
ROOM NAME, FLOORING TYPE, CEILING TYPE
AREA OF CEILING REMOVAL AND REINSTALL
05 05 05
05 05
05 10
131313
05 05
05 10
04 04
04 04
06 06
04 04
06 04
06 04
04 04
04 04
09 09
09 09
09 09
181818
04 04
19 19
19 19
191919
19 19
19 19
19 19 19
ALT A-1
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
4'
- 7
2'
- 6
3'
- 3
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE ANY
EXISTING
CHALKBOARDS
AND REPLACE
WITH 4' MB
DEMOLITION NOTES
01 REMOVE EXISTING WALL INCLUDING DOORS, WINDOWS, BORROWED LITES, AND ANY EQUIPMENT OR FURNISHINGS ATTACHED TO WALL OR PORTION OF EXISTING WALL AS SHOWN ON FLOOR PLAN (MIN. 4" BELOW FLOOR SLAB) AND AS REQUIRED FOR NEW CONSTRUCTION. FLOOR SURFACE TO BE PATCHED AS REQUIRED TO RECEIVE NEW FLOOR MATERIAL. WALL SURFACE TO BE PATCHED AS REQUIRED TO RECEIVE NEW WALL FINISH. SEE MECHANICAL & ELECTRICAL DEMOLITION NOTES FOR RELATED ITEMS. SUPPORT
UNBRACED SECTIONS OF WALL OR ROOF AS REQUIRED.
02 REMOVE EXISTING BORROWED LITE OR DOOR & DOOR FRAME. (DOOR LINTEL TO REMAIN UNLESS OTHERWISE NOTED ON PLAN - SEE STRUCTURAL FOR ADDITIONAL INFORMATION). WHERE DOOR FRAMES ARE TO REMAIN, PROTECT FRAMES FROM DAMAGE. SAND AND PREP FOR NEW PAINT FINISH UNDER SECTION 09 90 00 SEE DOOR SCHEDULE FOR REQUIRED NEW DOORS AND FRAMES OR ONLY NEW DOORS.
03 SAW CUT AND REMOVE FLOOR OR PORTION OF EXISTING FLOOR SLAB AS SHOWN OR DIMENSIONED ON FLOOR PLAN. FLOOR CUTS SHOWN REPRESENT APPROXIMATE SIZE, LOCATION AND INTENT OF FLOOR
CUTTING, FLOOR CUTTING MAY VARY FROM SHOWN, COORDINATE WITH ARCHITECT/ENGINEER.
EXCAVATE, FILL & COMPACT SOIL AS REQUIRED FOR NEW SLAB- COORDINATE WITH MECHANICAL/ ELECTRICAL DEMOLITION NOTES FOR RELATED ITEMS & LOCATIONS. INSTALL NEW SLAB TO MATCH EXISTING
ELEVATION. SEE STRUCTURAL FOR ADDITIONAL INFORMATION REGARDING SLAB REMOVAL.
04 REMOVE EXISTING CASEWORK/MILLWORK, COUNTER TOPS & BACK SPLASH. SAVE ITEMS AT OWNER'S
REQUEST.
05 REMOVE EXISTING SUSPENDED/PLASTER CEILING - EXISTING GRID TO REMAIN UNLESS NOTED OTHERWISE.
REPLACE PER REFL. CEILING PLANS.
06 SEE MECHANICAL DEMOLITION NOTES FOR REMOVAL OF EXIST. PLUMBING/MECHANICAL (i.e. LAVATORIES, SINKS, WATER CLOSETS, URINALS, FIN TUBE, MECH. DUCTWORK, UNIT VENTS, ETC.)
07 REMOVE EXISTING WINDOW, WINDOW WALL WITH ALUMINUM FRAMING WITH METAL PANELS BELOW WINDOW, FRAME, SILL & GLAZING INCLUDING ALL EXISTING WOOD BLOCKING AND FRAMING ABOVE
WINDOWS TO ROOF AND/OR MASONRY TIES AT BRICK PIERS AND SIDE WALLS.
08 REMOVE EXISTING EQUIPMENT OR FURNISHINGS SECURED TO FLOOR, WALL OR CEILING AND STORE FOR
REUSE BY OWNER.
09 REMOVE EXISTING CHALK, TACK OR WHITE BOARD. REMOVE ALL GLUE RESIDUE, ETC. FROM BLOCK BEHIND
BOARD AND PREPARE SURFACE FOR NEW FINISH MATERIALS WHERE REQUIRED.
16 REMOVE EXISTING BASKETBALL BACKBOARD AND ALL RELATED HANGERS, FASTENERS AND FRAMING TO
STRUCTURE ABOVE.
11 REMOVE PORTION OF EXISTING ROOF & STRUCTURE (AS SHOWN ON DEMOLITION PLAN). PROVIDE TEMPORARY WEATHER PROTECTION AS NEEDED AROUND PERIMETER OF ROOF REMOVAL AS REQUIRED.
PROVIDE TEMPORARY SHORING & BRACING AS REQUIRED.
12 REMOVE EXISTING TOILET PARTITION, DISPENSERS AND/OR TOILET ACCESSORIES AND REPAIR ADJACENT
SURFACES TO RECEIVE NEW FINISHES.
13 REMOVE EXISTING LOCKERS AND LOCKER BASE. CUT SLOPED LOCKER TOP & BASE AS NECESSARY.
RE-USE/RELOCATE EXISTING END PANEL(S) AS REQUIRED. REVISE & PREPARE FOR NEW FINISHES.
10 REMOVE EXISTING FLOOR COVERING AND BASE, INCLUDING ALL GLUE RESIDUE, MUDBEDS, ETC. FROM FLOORS & WALLS AND PREPARE SURFACE FOR NEW FINISH MATERIALS, INCLUDING GRINDING, PATCHING AND/OR SELF-LEVELING COMPOUND AS REQUIRED. WALL & FLOOR SURFACE TO RECEIVE NEW FINISH
MATERIAL & PATCH TO MATCH EXISTING.
14 REMOVE EXISTING MEZZANINE INCLUDING ALL SUPPORT FRAMING, FLOOR DECK, HANGERS AND ALL ADDITIONAL RELATED MATERIALS. REPAIR WALL TO MATCH ADJACENT WALL MATERIALS AND FINISH.
15 REMOVE EXISTING TERRAZZO FLOORING, CONCRETE SLAB AND COVED BASE. REFER TO ROOM FINISH
SCHEDULE FOR NEW FLOORING.
DEMOLITION CONTRACTOR IS TO STOP WORK IMMEDIATELY IN AREA IF ASBESTOS IS ENCOUNTERED.
NOTIFY CONSTRUCTION MANAGER OF SUSPECTED AREA SO PROPER ABATEMENT CAN BE DONE.
(UNDER A SEPARATE ASBESTOS ABATEMENT CONTRACT AS NEGOTIATED BY OWNER.)
ALL MASONRY BLOCK AND BRICK WALLS TO BE REMOVED MUST BE TOOTHED TO RECEIVE NEW
MASONRY, UNLESS NOTED OTHERWISE ON DRAWINGS.
DEMOLITION CONTRACTOR IS TO PROVIDE TEMPORARY SHORING AND BRACING FOR EXISTING
ROOF/FLOOR STRUCTURE AS REQUIRED UNTIL PERMANENT WALLS & LINTELS ARE INSTALLED.
REFER TO STRUCTURAL & ARCHITECTURAL DRAWINGS FOR BEARING CONDITIONS.
ALL TRADES ARE TO COORDINATE ANY DEMOLITION, CAPPING OR ABANDONMENT OF EXISTING
MECHANICAL, ELECTRICAL, PLUMBING OR ARCHITECTURAL ITEMS.
ALL ITEMS TO BE SAVED AND/OR RELOCATED ARE TO BE STORED IN A PROPER MANNER SO NO
DAMAGE WILL OCCUR TO THESE ITEMS DURING THEIR STORAGE PERIOD.
ALL DEMOLITION WHICH DAMAGES ADJACENT SURFACES IS TO BE REPAIRED TO MATCH THE
EXISTING SURFACE DAMAGED (MATERIALS & FINISHES) AND ALL REPAIR WORK IS TO BE
COORDINATED WITH NEW CONSTRUCTION. FOR NEW OPENINGS IN EXISTING WALLS, COORDINATE
NEW LINTELS W/ MASONRY CONTRACTOR.
PATCH WALLS & ROOF TO MATCH EXISTING CONSTRUCTION BEHIND REMOVAL OF WALL LOUVERS, EXHAUST FANS, INTAKE HOODS & CABINET HEATERS. VERIFY SEQUENCE OF REMOVAL W/
CONSTRUCTION MANAGER. SEE MECHANICAL AND ELECTRICAL DEMOLITION SHEETS FOR WALL,
ROOF & FLOOR OPENINGS TO BE PATCHED.
ALL TRADES ARE TO COORDINATE THE REMOVAL OF EXISTING LOOSE EQUIPMENT WITH ARCHITECT AND/OR OWNER. ADDITIONAL EQUIPMENT FOUND THAT IS NOT NOTED ON DEMOLITION PLAN SHALL BE REMOVED AS PART OF GENERAL DEMOLITION AFTER VERIFICATION WITH ARCHITECT/OWNER.
17 ALTERNATE A-1: REMOVE EXISTING METAL WALL PANELS BELOW THE WINDOWS AT VESTIBULE B101, VESTIBULE C127, MULTI-PURPOSE C130, AND CLASSROOMS AS NOTED ON PLAN. REPLACE WITH 1" METAL
FACED INSULATED PANEL.
18 REMOVE EXISTING PA SYSTEM OR PROJECTION SCREEN AND RETURN TO OWNER. PATCH AND REPAIR WALL
AND PREP FOR NEW FINISHES.
19 REMOVE EXISTING DOOR HARDWARE (DOOR AND FRAME TO REMAIN UNLESS OTHERWISE NOTED ON PLAN OR DOOR HARDWARE SCHEDULE). WHERE DOORS AND FRAMES ARE TO REMAIN, PROTECT FROM DAMAGE.
SAND AND PREP FRAME FOR NEW PAINT FINISH UNDER SECTION 09 90 00. SEE DOOR HARDWARE
REPLACEMENT SCHEDULES FOR NEW DOOR HARDWARE.
CORRIDOR
ACT
CUSTODIAL
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
STORAGE
MUSIC ROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
STORAGET.
CORRIDOR
ACT
VEST
TILE
ACT
VEST
TILE
ACT
CLASSROOM
ACT
T.
TILE
ACT
T.
TILE
ACT
BOYS T.
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CORRIDOR
ACT
VEST
TILE
ACT
OFFICE
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
LOUNGE
ACT
WORK ROOM
ACT
TELE.
ACT
T.
GIRLS T.
PROJECT NO.
DRAWN
REVIEWED
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATA BASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
ALL RIGHTS RESERVED
c
KEYPLAN
ISSUANCES
GMB COPYRIGHT
Au to de sk
D oc s:
//5
-6
W es t O tta w a W oo ds id e
El em en ta ry Im pr ov em en ts /5
-6
0A
5.
rv t
8/
/2
7:
:1
PM
A1.1A
5-6250
UNIT 'A' FIRST FLOOR
DEMOLITION PLAN
RAM
AMS
W O
O D
S
ID
E E
LE
M
E N
T A
R Y
S C
H O
O L
IM
P
R O
V E
M E
N T
S
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
H O
LL
A
N D
M
IC
H
IG
A
N
2025UNIT A
UNIT B
UNIT C
1/8" = 1'-0"
UNIT 'A' FIRST FLOOR DEMOLITION PLAN
08.28.2025 BIDS &
CONSTRUCTION
https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12
ACSACS
BFBF BF
BF BF BF
BF
BF BF
BFBF
BF
BF
05 10
05 10
050505
05 05 05
05 05 05
050505
05 05
05 05
05 0505
13 13
04 04
040404
040406 04 06 04 04 04 06
04 04 06
04 04 04
06 06
17 17
04 0404
04 0404
010101
01 01 01
19 19 19
19 19 19
191919
19 19
19 19 19
19 19 19 19
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
REMOVE EXISTING CUBBIES
AND COUNTERTOP ONLY,
SURROUNDING CASEWORK
TO REMAIN
ALT A-1
REMOVE FACE BRICK AND INSULATION ABOVE EL.
102'-8" AS REQUIRED FOR NEW MCM PANEL SYSTEM
REMOVE 'WOODSIDE PRIDE' MURAL AND FRAME.
FLOOR AND WALL SURFACE TO BE PATCHED AS
REQUIRED TO RECIEVE NEW FINISHES
10 10
09 09 09
09 09
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
REMOVE TALL CASEWORK
UNIT AND STORE FOR
REUSE IN ROOM
09 09
REMOVE FLOOR
SLAB AS NEEDED
FOR ELECTRICAL
WORK. PATCH
AND REPLACE
FLOOR FINISHED
AS REQUIRED.
REMOVE FLOOR
SLAB AS NEEDED
FOR ELECTRICAL
WORK. PATCH
AND REPLACE
FLOOR FINISHED
AS REQUIRED.
DEMOLITION NOTES
01 REMOVE EXISTING WALL INCLUDING DOORS, WINDOWS, BORROWED LITES, AND ANY EQUIPMENT OR FURNISHINGS ATTACHED TO WALL OR PORTION OF EXISTING WALL AS SHOWN ON FLOOR PLAN (MIN. 4" BELOW FLOOR SLAB) AND AS REQUIRED FOR NEW CONSTRUCTION. FLOOR SURFACE TO BE PATCHED AS REQUIRED TO RECEIVE NEW FLOOR MATERIAL. WALL SURFACE TO BE PATCHED AS REQUIRED TO RECEIVE NEW WALL FINISH. SEE MECHANICAL & ELECTRICAL DEMOLITION NOTES FOR RELATED ITEMS. SUPPORT
UNBRACED SECTIONS OF WALL OR ROOF AS REQUIRED.
02 REMOVE EXISTING BORROWED LITE OR DOOR & DOOR FRAME. (DOOR LINTEL TO REMAIN UNLESS OTHERWISE NOTED ON PLAN - SEE STRUCTURAL FOR ADDITIONAL INFORMATION). WHERE DOOR FRAMES ARE TO REMAIN, PROTECT FRAMES FROM DAMAGE. SAND AND PREP FOR NEW PAINT FINISH UNDER SECTION 09 90 00 SEE DOOR SCHEDULE FOR REQUIRED NEW DOORS AND FRAMES OR ONLY NEW DOORS.
03 SAW CUT AND REMOVE FLOOR OR PORTION OF EXISTING FLOOR SLAB AS SHOWN OR DIMENSIONED ON FLOOR PLAN. FLOOR CUTS SHOWN REPRESENT APPROXIMATE SIZE, LOCATION AND INTENT OF FLOOR
CUTTING, FLOOR CUTTING MAY VARY FROM SHOWN, COORDINATE WITH ARCHITECT/ENGINEER.
EXCAVATE, FILL & COMPACT SOIL AS REQUIRED FOR NEW SLAB- COORDINATE WITH MECHANICAL/ ELECTRICAL DEMOLITION NOTES FOR RELATED ITEMS & LOCATIONS. INSTALL NEW SLAB TO MATCH EXISTING
ELEVATION. SEE STRUCTURAL FOR ADDITIONAL INFORMATION REGARDING SLAB REMOVAL.
04 REMOVE EXISTING CASEWORK/MILLWORK, COUNTER TOPS & BACK SPLASH. SAVE ITEMS AT OWNER'S
REQUEST.
05 REMOVE EXISTING SUSPENDED/PLASTER CEILING - EXISTING GRID TO REMAIN UNLESS NOTED OTHERWISE.
REPLACE PER REFL. CEILING PLANS.
06 SEE MECHANICAL DEMOLITION NOTES FOR REMOVAL OF EXIST. PLUMBING/MECHANICAL (i.e. LAVATORIES, SINKS, WATER CLOSETS, URINALS, FIN TUBE, MECH. DUCTWORK, UNIT VENTS, ETC.)
07 REMOVE EXISTING WINDOW, WINDOW WALL WITH ALUMINUM FRAMING WITH METAL PANELS BELOW WINDOW, FRAME, SILL & GLAZING INCLUDING ALL EXISTING WOOD BLOCKING AND FRAMING ABOVE
WINDOWS TO ROOF AND/OR MASONRY TIES AT BRICK PIERS AND SIDE WALLS.
08 REMOVE EXISTING EQUIPMENT OR FURNISHINGS SECURED TO FLOOR, WALL OR CEILING AND STORE FOR
REUSE BY OWNER.
09 REMOVE EXISTING CHALK, TACK OR WHITE BOARD. REMOVE ALL GLUE RESIDUE, ETC. FROM BLOCK BEHIND
BOARD AND PREPARE SURFACE FOR NEW FINISH MATERIALS WHERE REQUIRED.
16 REMOVE EXISTING BASKETBALL BACKBOARD AND ALL RELATED HANGERS, FASTENERS AND FRAMING TO
STRUCTURE ABOVE.
11 REMOVE PORTION OF EXISTING ROOF & STRUCTURE (AS SHOWN ON DEMOLITION PLAN). PROVIDE TEMPORARY WEATHER PROTECTION AS NEEDED AROUND PERIMETER OF ROOF REMOVAL AS REQUIRED.
PROVIDE TEMPORARY SHORING & BRACING AS REQUIRED.
12 REMOVE EXISTING TOILET PARTITION, DISPENSERS AND/OR TOILET ACCESSORIES AND REPAIR ADJACENT
SURFACES TO RECEIVE NEW FINISHES.
13 REMOVE EXISTING LOCKERS AND LOCKER BASE. CUT SLOPED LOCKER TOP & BASE AS NECESSARY.
RE-USE/RELOCATE EXISTING END PANEL(S) AS REQUIRED. REVISE & PREPARE FOR NEW FINISHES.
10 REMOVE EXISTING FLOOR COVERING AND BASE, INCLUDING ALL GLUE RESIDUE, MUDBEDS, ETC. FROM FLOORS & WALLS AND PREPARE SURFACE FOR NEW FINISH MATERIALS, INCLUDING GRINDING, PATCHING AND/OR SELF-LEVELING COMPOUND AS REQUIRED. WALL & FLOOR SURFACE TO RECEIVE NEW FINISH
MATERIAL & PATCH TO MATCH EXISTING.
14 REMOVE EXISTING MEZZANINE INCLUDING ALL SUPPORT FRAMING, FLOOR DECK, HANGERS AND ALL ADDITIONAL RELATED MATERIALS. REPAIR WALL TO MATCH ADJACENT WALL MATERIALS AND FINISH.
15 REMOVE EXISTING TERRAZZO FLOORING, CONCRETE SLAB AND COVED BASE. REFER TO ROOM FINISH
SCHEDULE FOR NEW FLOORING.
DEMOLITION CONTRACTOR IS TO STOP WORK IMMEDIATELY IN AREA IF ASBESTOS IS ENCOUNTERED.
NOTIFY CONSTRUCTION MANAGER OF SUSPECTED AREA SO PROPER ABATEMENT CAN BE DONE.
(UNDER A SEPARATE ASBESTOS ABATEMENT CONTRACT AS NEGOTIATED BY OWNER.)
ALL MASONRY BLOCK AND BRICK WALLS TO BE REMOVED MUST BE TOOTHED TO RECEIVE NEW
MASONRY, UNLESS NOTED OTHERWISE ON DRAWINGS.
DEMOLITION CONTRACTOR IS TO PROVIDE TEMPORARY SHORING AND BRACING FOR EXISTING
ROOF/FLOOR STRUCTURE AS REQUIRED UNTIL PERMANENT WALLS & LINTELS ARE INSTALLED.
REFER TO STRUCTURAL & ARCHITECTURAL DRAWINGS FOR BEARING CONDITIONS.
ALL TRADES ARE TO COORDINATE ANY DEMOLITION, CAPPING OR ABANDONMENT OF EXISTING
MECHANICAL, ELECTRICAL, PLUMBING OR ARCHITECTURAL ITEMS.
ALL ITEMS TO BE SAVED AND/OR RELOCATED ARE TO BE STORED IN A PROPER MANNER SO NO
DAMAGE WILL OCCUR TO THESE ITEMS DURING THEIR STORAGE PERIOD.
ALL DEMOLITION WHICH DAMAGES ADJACENT SURFACES IS TO BE REPAIRED TO MATCH THE
EXISTING SURFACE DAMAGED (MATERIALS & FINISHES) AND ALL REPAIR WORK IS TO BE
COORDINATED WITH NEW CONSTRUCTION. FOR NEW OPENINGS IN EXISTING WALLS, COORDINATE
NEW LINTELS W/ MASONRY CONTRACTOR.
PATCH WALLS & ROOF TO MATCH EXISTING CONSTRUCTION BEHIND REMOVAL OF WALL LOUVERS, EXHAUST FANS, INTAKE HOODS & CABINET HEATERS. VERIFY SEQUENCE OF REMOVAL W/
CONSTRUCTION MANAGER. SEE MECHANICAL AND ELECTRICAL DEMOLITION SHEETS FOR WALL,
ROOF & FLOOR OPENINGS TO BE PATCHED.
ALL TRADES ARE TO COORDINATE THE REMOVAL OF EXISTING LOOSE EQUIPMENT WITH ARCHITECT AND/OR OWNER. ADDITIONAL EQUIPMENT FOUND THAT IS NOT NOTED ON DEMOLITION PLAN SHALL BE REMOVED AS PART OF GENERAL DEMOLITION AFTER VERIFICATION WITH ARCHITECT/OWNER.
17 ALTERNATE A-1: REMOVE EXISTING METAL WALL PANELS BELOW THE WINDOWS AT VESTIBULE B101, VESTIBULE C127, MULTI-PURPOSE C130, AND CLASSROOMS AS NOTED ON PLAN. REPLACE WITH 1" METAL
FACED INSULATED PANEL.
18 REMOVE EXISTING PA SYSTEM OR PROJECTION SCREEN AND RETURN TO OWNER. PATCH AND REPAIR WALL
AND PREP FOR NEW FINISHES.
19 REMOVE EXISTING DOOR HARDWARE (DOOR AND FRAME TO REMAIN UNLESS OTHERWISE NOTED ON PLAN OR DOOR HARDWARE SCHEDULE). WHERE DOORS AND FRAMES ARE TO REMAIN, PROTECT FROM DAMAGE.
SAND AND PREP FRAME FOR NEW PAINT FINISH UNDER SECTION 09 90 00. SEE DOOR HARDWARE
REPLACEMENT SCHEDULES FOR NEW DOOR HARDWARE.
DEMOLITION LEGEND
EXISTING WALL TO BE DEMOLISHED
PORTION OF EXISTING WALL TO BE DEMOLISHED
EXISTING OBJECT TO BE DEMOLISHED
EXISTING WALLS TO REMAIN
EXISTING OBJECTS TO REMAIN
XX DEMOLITION TAG: SEE DEMOLITION NOTES
AREA OF FLOOR CUTTING
ROOM NAME
CEILING FINISH
FLOOR FINISH
EXISTING ROOM FINISH INFORMATION:
ROOM NAME, FLOORING TYPE, CEILING TYPE
AREA OF CEILING REMOVAL AND REINSTALL
COUNSELOR
ACT
CONF.
ACT
OFFICE
ACT
CONF.
ACT
WORK ROOM
ACT
T.
ACT
GENERAL OFFICE
ACT
HEALTH
ACT
SUPPLY
ACT
WORK
ACT
WORK ROOM
ACT
VESTIBULE
CORRIDOR
ACT
HALL
ACT
CORRIDOR
ACT
VEST
ACT
CLASSROOM
ACT
STUDY ROOM
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
STUDY
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
CUSTODIAL
T.
TILE
ACT
T.
TILE
ACT
SPECIAL
ACT
BOYS T.
CORRIDOR
ACT
VEST
ACT CORRIDOR
ACT
STORAGE / IT
CPT
OFFICE
ACT
STORAGE
SPECIAL
ACT
BOILER
CLASSROOM
SPECIAL
ACT
SPECIAL
ACT
SPECIAL
ACT
SPECIAL
ACT
SPECIAL
ACT
SPECIAL
ACT
T.
T.SHOWER
CORRIDOR
ACT
MEDIA CENTER
ACT ONLY
COMPUTER
ACT
STORAGE ELECT.
T.
T.SHOWER
GIRLS T.
TILE
ACT
BOYS T.
TILE
ACT
T.
ACT
MEDIA BREAKOUT
ACT
GIRLS T.
VEST
ACT
PROJECT NO.
DRAWN
REVIEWED
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATA BASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
ALL RIGHTS RESERVED
c
KEYPLAN
ISSUANCES
GMB COPYRIGHT
Au to de sk
D oc s:
//5
-6
W es t O tta w a W oo ds id e
El em en ta ry Im pr ov em en ts /5
-6
0A
5.
rv t
8/
/2
7:
:1
PM
A1.1B
5-6250
UNIT 'B' FIRST FLOOR
DEMOLITION PLAN
RAM
AMS
W O
O D
S
ID
E E
LE
M
E N
T A
R Y
S C
H O
O L
IM
P
R O
V E
M E
N T
S
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
H O
LL
A
N D
M
IC
H
IG
A
N
2025UNIT A
UNIT B
UNIT C
1/8" = 1'-0"
UNIT 'B' FIRST FLOOR DEMOLITION PLAN
ALTERNATE A-1
08.28.2025 BIDS &
CONSTRUCTION
https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12
05 10
05 10 0505
05 10
ACT
17 17
06 06
17 17 17 17
191919
19 19
ALTERNATE A-1
INCLUDE
REMOVAL OF
SOFFIT PANEL
ABOVE
WINDOWS
ALTERNATE A-1
INCLUDE
REMOVAL OF
SOFFIT PANEL
ABOVE
WINDOWS
ALTERNATE A-1
INCLUDE
REMOVAL OF
SOFFIT PANEL
ABOVE
WINDOWS
ALTERNATE A-1
INCLUDE
REMOVAL OF
SOFFIT PANEL
ABOVE
WINDOWS
ALTERNATE A-1
INCLUDE
REMOVAL OF
SOFFIT PANEL
ABOVE
WINDOWS
DEMOLITION NOTES
01 REMOVE EXISTING WALL INCLUDING DOORS, WINDOWS, BORROWED LITES, AND ANY EQUIPMENT OR FURNISHINGS ATTACHED TO WALL OR PORTION OF EXISTING WALL AS SHOWN ON FLOOR PLAN (MIN. 4" BELOW FLOOR SLAB) AND AS REQUIRED FOR NEW CONSTRUCTION. FLOOR SURFACE TO BE PATCHED AS REQUIRED TO RECEIVE NEW FLOOR MATERIAL. WALL SURFACE TO BE PATCHED AS REQUIRED TO RECEIVE NEW WALL FINISH. SEE MECHANICAL & ELECTRICAL DEMOLITION NOTES FOR RELATED ITEMS. SUPPORT
UNBRACED SECTIONS OF WALL OR ROOF AS REQUIRED.
02 REMOVE EXISTING BORROWED LITE OR DOOR & DOOR FRAME. (DOOR LINTEL TO REMAIN UNLESS OTHERWISE NOTED ON PLAN - SEE STRUCTURAL FOR ADDITIONAL INFORMATION). WHERE DOOR FRAMES ARE TO REMAIN, PROTECT FRAMES FROM DAMAGE. SAND AND PREP FOR NEW PAINT FINISH UNDER SECTION 09 90 00 SEE DOOR SCHEDULE FOR REQUIRED NEW DOORS AND FRAMES OR ONLY NEW DOORS.
03 SAW CUT AND REMOVE FLOOR OR PORTION OF EXISTING FLOOR SLAB AS SHOWN OR DIMENSIONED ON FLOOR PLAN. FLOOR CUTS SHOWN REPRESENT APPROXIMATE SIZE, LOCATION AND INTENT OF FLOOR
CUTTING, FLOOR CUTTING MAY VARY FROM SHOWN, COORDINATE WITH ARCHITECT/ENGINEER.
EXCAVATE, FILL & COMPACT SOIL AS REQUIRED FOR NEW SLAB- COORDINATE WITH MECHANICAL/ ELECTRICAL DEMOLITION NOTES FOR RELATED ITEMS & LOCATIONS. INSTALL NEW SLAB TO MATCH EXISTING
ELEVATION. SEE STRUCTURAL FOR ADDITIONAL INFORMATION REGARDING SLAB REMOVAL.
04 REMOVE EXISTING CASEWORK/MILLWORK, COUNTER TOPS & BACK SPLASH. SAVE ITEMS AT OWNER'S
REQUEST.
05 REMOVE EXISTING SUSPENDED/PLASTER CEILING - EXISTING GRID TO REMAIN UNLESS NOTED OTHERWISE.
REPLACE PER REFL. CEILING PLANS.
06 SEE MECHANICAL DEMOLITION NOTES FOR REMOVAL OF EXIST. PLUMBING/MECHANICAL (i.e. LAVATORIES, SINKS, WATER CLOSETS, URINALS, FIN TUBE, MECH. DUCTWORK, UNIT VENTS, ETC.)
07 REMOVE EXISTING WINDOW, WINDOW WALL WITH ALUMINUM FRAMING WITH METAL PANELS BELOW WINDOW, FRAME, SILL & GLAZING INCLUDING ALL EXISTING WOOD BLOCKING AND FRAMING ABOVE
WINDOWS TO ROOF AND/OR MASONRY TIES AT BRICK PIERS AND SIDE WALLS.
08 REMOVE EXISTING EQUIPMENT OR FURNISHINGS SECURED TO FLOOR, WALL OR CEILING AND STORE FOR
REUSE BY OWNER.
09 REMOVE EXISTING CHALK, TACK OR WHITE BOARD. REMOVE ALL GLUE RESIDUE, ETC. FROM BLOCK BEHIND
BOARD AND PREPARE SURFACE FOR NEW FINISH MATERIALS WHERE REQUIRED.
16 REMOVE EXISTING BASKETBALL BACKBOARD AND ALL RELATED HANGERS, FASTENERS AND FRAMING TO
STRUCTURE ABOVE.
11 REMOVE PORTION OF EXISTING ROOF & STRUCTURE (AS SHOWN ON DEMOLITION PLAN). PROVIDE TEMPORARY WEATHER PROTECTION AS NEEDED AROUND PERIMETER OF ROOF REMOVAL AS REQUIRED.
PROVIDE TEMPORARY SHORING & BRACING AS REQUIRED.
12 REMOVE EXISTING TOILET PARTITION, DISPENSERS AND/OR TOILET ACCESSORIES AND REPAIR ADJACENT
SURFACES TO RECEIVE NEW FINISHES.
13 REMOVE EXISTING LOCKERS AND LOCKER BASE. CUT SLOPED LOCKER TOP & BASE AS NECESSARY.
RE-USE/RELOCATE EXISTING END PANEL(S) AS REQUIRED. REVISE & PREPARE FOR NEW FINISHES.
10 REMOVE EXISTING FLOOR COVERING AND BASE, INCLUDING ALL GLUE RESIDUE, MUDBEDS, ETC. FROM FLOORS & WALLS AND PREPARE SURFACE FOR NEW FINISH MATERIALS, INCLUDING GRINDING, PATCHING AND/OR SELF-LEVELING COMPOUND AS REQUIRED. WALL & FLOOR SURFACE TO RECEIVE NEW FINISH
MATERIAL & PATCH TO MATCH EXISTING.
14 REMOVE EXISTING MEZZANINE INCLUDING ALL SUPPORT FRAMING, FLOOR DECK, HANGERS AND ALL ADDITIONAL RELATED MATERIALS. REPAIR WALL TO MATCH ADJACENT WALL MATERIALS AND FINISH.
15 REMOVE EXISTING TERRAZZO FLOORING, CONCRETE SLAB AND COVED BASE. REFER TO ROOM FINISH
SCHEDULE FOR NEW FLOORING.
DEMOLITION CONTRACTOR IS TO STOP WORK IMMEDIATELY IN AREA IF ASBESTOS IS ENCOUNTERED.
NOTIFY CONSTRUCTION MANAGER OF SUSPECTED AREA SO PROPER ABATEMENT CAN BE DONE.
(UNDER A SEPARATE ASBESTOS ABATEMENT CONTRACT AS NEGOTIATED BY OWNER.)
ALL MASONRY BLOCK AND BRICK WALLS TO BE REMOVED MUST BE TOOTHED TO RECEIVE NEW
MASONRY, UNLESS NOTED OTHERWISE ON DRAWINGS.
DEMOLITION CONTRACTOR IS TO PROVIDE TEMPORARY SHORING AND BRACING FOR EXISTING
ROOF/FLOOR STRUCTURE AS REQUIRED UNTIL PERMANENT WALLS & LINTELS ARE INSTALLED.
REFER TO STRUCTURAL & ARCHITECTURAL DRAWINGS FOR BEARING CONDITIONS.
ALL TRADES ARE TO COORDINATE ANY DEMOLITION, CAPPING OR ABANDONMENT OF EXISTING
MECHANICAL, ELECTRICAL, PLUMBING OR ARCHITECTURAL ITEMS.
ALL ITEMS TO BE SAVED AND/OR RELOCATED ARE TO BE STORED IN A PROPER MANNER SO NO
DAMAGE WILL OCCUR TO THESE ITEMS DURING THEIR STORAGE PERIOD.
ALL DEMOLITION WHICH DAMAGES ADJACENT SURFACES IS TO BE REPAIRED TO MATCH THE
EXISTING SURFACE DAMAGED (MATERIALS & FINISHES) AND ALL REPAIR WORK IS TO BE
COORDINATED WITH NEW CONSTRUCTION. FOR NEW OPENINGS IN EXISTING WALLS, COORDINATE
NEW LINTELS W/ MASONRY CONTRACTOR.
PATCH WALLS & ROOF TO MATCH EXISTING CONSTRUCTION BEHIND REMOVAL OF WALL LOUVERS, EXHAUST FANS, INTAKE HOODS & CABINET HEATERS. VERIFY SEQUENCE OF REMOVAL W/
CONSTRUCTION MANAGER. SEE MECHANICAL AND ELECTRICAL DEMOLITION SHEETS FOR WALL,
ROOF & FLOOR OPENINGS TO BE PATCHED.
ALL TRADES ARE TO COORDINATE THE REMOVAL OF EXISTING LOOSE EQUIPMENT WITH ARCHITECT AND/OR OWNER. ADDITIONAL EQUIPMENT FOUND THAT IS NOT NOTED ON DEMOLITION PLAN SHALL BE REMOVED AS PART OF GENERAL DEMOLITION AFTER VERIFICATION WITH ARCHITECT/OWNER.
17 ALTERNATE A-1: REMOVE EXISTING METAL WALL PANELS BELOW THE WINDOWS AT VESTIBULE B101, VESTIBULE C127, MULTI-PURPOSE C130, AND CLASSROOMS AS NOTED ON PLAN. REPLACE WITH 1" METAL
FACED INSULATED PANEL.
18 REMOVE EXISTING PA SYSTEM OR PROJECTION SCREEN AND RETURN TO OWNER. PATCH AND REPAIR WALL
AND PREP FOR NEW FINISHES.
19 REMOVE EXISTING DOOR HARDWARE (DOOR AND FRAME TO REMAIN UNLESS OTHERWISE NOTED ON PLAN OR DOOR HARDWARE SCHEDULE). WHERE DOORS AND FRAMES ARE TO REMAIN, PROTECT FROM DAMAGE.
SAND AND PREP FRAME FOR NEW PAINT FINISH UNDER SECTION 09 90 00. SEE DOOR HARDWARE
REPLACEMENT SCHEDULES FOR NEW DOOR HARDWARE.
DEMOLITION LEGEND
EXISTING WALL TO BE DEMOLISHED
PORTION OF EXISTING WALL TO BE DEMOLISHED
EXISTING OBJECT TO BE DEMOLISHED
EXISTING WALLS TO REMAIN
EXISTING OBJECTS TO REMAIN
XX DEMOLITION TAG: SEE DEMOLITION NOTES
AREA OF FLOOR CUTTING
ROOM NAME
CEILING FINISH
FLOOR FINISH
EXISTING ROOM FINISH INFORMATION:
ROOM NAME, FLOORING TYPE, CEILING TYPE
AREA OF CEILING REMOVAL AND REINSTALL
CORRIDOR
ACT
VEST
ACT
ART
LVT
ACT
STORAGE
CT
ACT
KILN
TILE
ACT
T.
TILE
ACT
OFFICE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
ACT
SMALL GROUP
ACT
T.
TILE
ACT
CLASSROOM
CORRIDOR
ACT
RECEIVING
MULTI-PURPOSE
KITCHEN
ACT
STOR
GYMNASIUM
OFFICE
CT
ACT
STORAGE
STORAGE
CLASSROOM
CLASSROOM
CORRIDOR
VESTIBULE
STORAGE
LVT
ACT
FAN
FAN
VEST
ACT
06 06
8" 2'
- 4
MECHANICAL MECHANICAL
PROJECT NO.
DRAWN
REVIEWED
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATA BASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
ALL RIGHTS RESERVED
c
KEYPLAN
ISSUANCES
GMB COPYRIGHT
Au to de sk
D oc s:
//5
-6
W es t O tta w a W oo ds id e
El em en ta ry Im pr ov em en ts /5
-6
0A
5.
rv t
8/
/2
7:
:2
PM
A1.1C
5-6250
UNIT 'C' FIRST FLOOR
DEMOLITION PLAN
RAM
AMS
W O
O D
S
ID
E E
LE
M
E N
T A
R Y
S C
H O
O L
IM
P
R O
V E
M E
N T
S
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
H O
LL
A
N D
M
IC
H
IG
A
N
2025UNIT A
UNIT B
UNIT C
1/8" = 1'-0"
UNIT 'C' FIRST FLOOR DEMOLITION PLAN
ALTERNATE A-1
ALTERNATE A-1
1/8" = 1'-0"
UNIT 'C' MEZZANINE DEMOLITION PLAN
08.28.2025 BIDS &
CONSTRUCTION
https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12
BF
BFBF
BF BF BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF
BF BF
BF
GENERAL FLOOR PLAN NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
A.
B.
C.
DIMENSIONS GIVEN ARE TO THE FACE OF MASONRY UNITS OR TO THE FINISHED FACE OF METAL STUD PARTITION WALLS.
REFERENCE STRUCTURAL DRAWINGS FOR CONCRETE SLAB SIZES AND SLAB RELATED INFORMATION.
INTERIOR STUD WALLS ARE TO USE 3 5/8" METAL STUD FRAMING UNLESS OTHERWISE NOTED.
TURN UP VAPOR RETARDER MATERIAL AT JOINTS BETWEEN FLOOR SLAB AND FOUNDATION WALL UNLESS NOTED
OTHERWISE.
SEE FOUNDATION PLANS FOR FLOOR SLAB RECESSES FOR TILE, WOOD FLOOR, ETC. (VERIFY RECESS REQUIRED BY MFR.)
EXTEND ALL INTERIOR WALL PARTITIONS (MASONRY OR STUDS) TO BOTTOM OF DECK ABOVE UNLESS NOTED OTHERWISE.
REFERENCE STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL FOR ITEMS NOT SHOWN. COORDINATE AS REQUIRED
INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OF ANY CABINETRY, FRAMES, STRUCTURAL ITEMS, ETC.
PROVIDE PAINTED ACCESS PANELS IN WALLS AND CEILINGS TO PROVIDE ACCESS TO CONCEALED ITEMS INCLUDING BUT NOT LIMITED TO VALVES, CONTROLS, MECH. EQUIPMENT, ETC. ACCESS PANELS MAY NOT ALWAYS BE SHOWN ON PLANS. IT IS THE SUB CONTRACTOR RESPONSIBILITY TO DETERMINE LOCATIONS. COORDINATE LOCATIONS WITH OTHER GENERAL
CONTRACTOR / SITE SUPERVISOR.
COORDINATE WALLS WITH COLUMNS AND OTHER ENCASED ITEMS. COLUMNS ARE TO BE CONTAINED WITHIN WALLS. THE FRAMING CONTRACTOR SHALL INCREASE FRAMING SIZE TO ACCOMMODATE COLUMNS, DRAIN LEADERS, PIPING, ELECTRICAL PANELS, ETC. WHERE WALLS REQUIRE EXTRA WIDTH THE ENTIRE WALL SHALL BE WIDENED UNLESS
APPROVED BY ARCHITECT.
ALL GUARDRAILS AND HANDRAILS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH ALL REQUIREMENTS OF THE 2015 M.B.C., ANSI ICC A117.1-2017 & AMERICANS WITH DISABILITIES ACT GUIDELINES. THE MOST STRINGENT SHALL
PREVAIL.
PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER DETAILS. SEE G0.01 FOR REQUIREMENTS.
FOR ALL CABINETRY, SEE INTERIOR ELEVATIONS FOR LAYOUTS. FIELD VERIFY CLEAR WIDTHS PRIOR TO FABRICATION.
ALL EXTERIOR BLOCK CORNERS ARE TO BE BULLNOSE BLOCK EXCEPT CONCRETE BLOCK COLUMNS, PIERS AND WALLS TO
RECEIVE TILE - UNLESS NOTED OTHERWISE.
CONTRACTOR TO MAINTAIN / REPAIR RATING OF EXISTING PARTITIONS AS AFFECTED BY DEMOLITION / NEW
CONSTRUCTION. TYPICAL THROUGHOUT.
SEAL ALL PENETRATIONS IN FIRE RATED FLOORS AND WALLS WITH APPROVED FIRESTOPPING.
WHERE SPECIALTY BLOCK IS REQUIRED AT THE SAME HEIGHT ON BOTH SIDES OF A WALL USE (2) SPECIALTY BLOCKS BACK TO BACK TO MAINTAIN THE FINISHED WALL APPEARANCE BOTH SIDES OF THE WALL. COORDINATE WITH STRUCTURAL FOR
LINTELS CONDITIONS PER SPECIFICATIONS.
WALLS TO BE PATCHED WITH LIKE MATERIALS WHERE EXISTING WALLS HAVE BEEN COMPROMISED FROM DEMOLITION. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO REMOVAL AND REINSTALLATION OF CASEWORK AND WALL MOUNTED EQUIPMENT IN ORDER TO ACHIEVE SAID PATCH. IN AREAS WHERE BLOCK OR BRICK HAVE BEEN USED, NEW MASONRY TO BE TOOTHED IN AND MATCH EXISTING. AREAS AND FINISHES IN QUESTION SHALL BE COORDINATED WITH
ARCHITECT.
SEE STRUCTURAL FRAMING PLANS FOR ADDITIONAL WALL REINFORCING REQUIREMENTS. MINIMUM REINFORCING (FOR ALL
WALLS NOT OTHERWISE NOTED ON STRUCTURAL PLANS):
ALL BEARING WALLS SHALL RECEIVE A MINIMUM REINFORCING OF R1-5-48.
ALL EXTERIOR WALLS SHALL RECEIVE A MINIMUM REINFORCING OF R1-5-48.
ALL INTERIOR NON-BEARING WALLS OVER 16'-0" HIGH SHALL RECEIVE A MINIMUM REINFORCING OF R1-5-48.
CORRIDOR
A135
CUSTODIAL
A151
CLASSROOM
A153
SMALL GROUP
A154
CLASSROOM
A149
SMALL GROUP
A150
CLASSROOM
A147
SMALL GROUP
A148
CLASSROOM
A142
SMALL GROUP
A143
CLASSROOM
A144
STORAGE
A146
MUSIC ROOM
A138
SMALL GROUP
A137
CLASSROOM
A139
STORAGE
A141T.
A140
CORRIDOR
A102
VEST.
A136
VEST.
A101
CLASSROOM
A132
T.
A134
T.
A133
BOYS T.
A127
CLASSROOM
A130
SMALL GROUP
A131
T.
A129
CORRIDOR
A119
VEST.
A121
OFFICE
A120
CLASSROOM
A124
SMALL GROUP
A125
T.
A123
CLASSROOM
A113
SMALL GROUP
A114
T.
A112
CLASSROOM
A117
SMALL GROUP
A118
T.
A116
CLASSROOM
A105
SMALL GROUP
A106
T.
A104
CLASSROOM
A109
SMALL GROUP
A110
T.
A108
WORK ROOM
A152
WORK ROOM
A155
TELE.
A156
T.
A145
GIRLS T.
A126
A105A A109A
A113A A117A
A124A
A130A
A132A
A137AA138AA142AA149A
A139AA144AA147A
A151A
A153A
A152A
A155A
A136A
A8.01
A8.01
A8.01
A8.01
A8.01
A8.01 6
A8.017
A8.01
A8.01
A8.01
A8.01
A8.01
A8.01
3 SIM
A8.01 1
SI
M
A8.01
8 SIM
A8.011
SI
M
A8.01 7
SI
M
A8.017
SI
M
A8.01
8 SIM
A8.01 6
SI
M
A8.01
8 SIM
A8.01 1
SI
M
A8.01 1
SI
M
A8.01 14 A8.0116
A8.0118
SI
M
A8.01 16
SI
M
A8.01 19
A8.01 18
A8.011
A8.01
9 SIM
SI
M
SI
M
4 SIM
9 SIM
9 SIM
4'W X
6' H
TB
4'W X
6' H
TB
4'W X
6' H
TB
4'W X
6' H
TB
4'W
X 6'
H
TB
4'W X
6' H
TB
A2.80
2' - 0"
2' - 0"
" W x
" D
LO
CK
ER
S
" W x
" D
LO
CK
ER
S
" W x
" D 8 L
OC
KE
RS
" W x
" D
LO
CK
ER
S
" W x
" D
6 L
OC
KE
RS
MIN
1' - 4"
15" W x 12" D 3 L.
15" W x 12" D
8 LOCKERS
15" W x 12" D
24 LOCKERS
15" W x 12" D
24 LOCKERS
A150A A143A
A154A A148A
A104A
A106A
A114A
A112A
A108A
A110A
A118A
A125A
A131A
A129A
A133A
A134A
A132B
2' - 0"1' - 11 1/2"
A116A
A123A
A156A
A120A
A4.01
A4.0115
A4.01 14
A4.01
SOLID SURFACE WINDOW SILL
WITH MAPLE FACED PLYWOOD
BUILT IN READING BENCH
A7.01
A7.01
A7.01
4'MB
8'W X
4' H
TB
8'W
X 4'
H
TB
6'W X 4'H TB
4'M B
4'M B
4'M B
6'W X 4'H TB
6'W X 4'H TB6'W X 4'H TB
AS A STANDARD, WHERE 30" DEEP C-
TOPS ARE SHOWN TO ACCOMODATE
30" DEEP POSTER UNITS, INSTALL ALL
CABS FLUSH WITH FRONT FACE OF
POSTER CAB; TYP. ENTIRE BUILDING,
ALL AREAS OF NEW CASEWORK
4'MB
4"
INFILL OPENING WHERE LOUVER
IS REMOVED WITH FACE BRICK
OVER AN AIR SPACE & 2" RIGID
INSULATION ON BLOCK
2' - 0"
NEW LOUVER IN
EXISTING OPENING.
ADJUST SILL AS
NEEDED, TYP.
A7.01
TYP
NEW LOUVER IN
EXISTING OPENING.
ADJUST SILL AS
NEEDED, TYP.
A7.01
TYP
NEW LOUVER IN EXISTING
OPENING. ADJUST SILL
AS NEEDED, TYP.
A7.01
TYP
NEW LOUVER IN EXISTING
WALL. SEE ELEVATIONS
FOR TYPICAL DETAILS
NEW LOUVER IN EXISTING
OPENING. ADJUST SILL
AS NEEDED, TYP.
A7.01
TYP
1'
- 4
3'
- 4
8"
4"
1'
- 0
1' - 0" 4"
RELOCATED EXISTING
TALL CASEWORK UNIT
'W
M B
/ 4 'W
T B
X 5'H
4'MB
16'W X 4'H TB
RELOCATED EXISTING
TALL CASEWORK UNIT
RELOCATED EXISTING
TALL CASEWORK UNIT
A8.01
RELOCATED EXISTING
TALL CASEWORK UNIT
RELOCATED EXISTING
TALL CASEWORK UNIT
1'
- 4
1'
- 4
4" 2' - 3"
4"
4"2' - 3"
4" 1'
- 0
A8.0135
A8.0136
A8.01 36
SI
M
A8.01 35
SI
M
A8.0135
SI
M
A8.0136
SI
M
A8.01
35 SIM
A8.01
36 SIM
A8.01
36 SIM
A8.01
35 SIM
WALL LEGEND
5/8" GYP. BOARD BOTH SIDES 3 5/8" LIGHT GA.
METAL FRAMING AT 16" O.C. SOUND BATT
FULL HEIGHT OF WALL. WALLS TO BOTTOM
OF DECK UNLESS NOTED OTHERWISE
CMU WALL SEE FLOOR PLANS FOR REQUIRED
WALL REINFORCING. NOMINAL DIMENSIONS
GIVEN
(8" TYPICAL U.N.O.)
5/8" GYP. BOARD BOTH SIDES 6" LIGHT GA.
METAL FRAMING AT 16" O.C. SOUND BATT
FULL HEIGHT OF WALL. WALLS TO BOTTOM
OF DECK UNLESS NOTED OTHERWISE
-FIRE RATINGS AS CALLED FOR ON CODE COMPLIANCE PLAN
-DIMENSIONS GIVEN ARE TO THE FINISHED FACE OF CMU OR
GYPSUM WALL BOARD UNLESS NOTED OTHERWISE
BRICK AND CMU WALL W/ 2" SPRAY APPLIED
INSULATION SEE FLOOR PLANS FOR REQUIRED
WALL REINFORCING. NOMINAL DIMENSIONS
GIVEN. SEE WALL SECTIONS FOR ADDITIONAL
DETAILS, BANDING, ETC.
(3 5/8" BRICK & 8" CMU TYPICAL U.N.O.)
CONCRETE WALL SEE STRUCTURAL
PLANS FOR REQUIRED REINFORCING.
4 7 /8"
7 1 /4"
SE
E
PL
AN
SE
E
PL
AN
SE
E
PL
AN
PROJECT NO.
DRAWN
REVIEWED
NO PART OF THIS DRAWING MAY BE
USED OR REPRODUCED IN ANY FORM
OR BY ANY MEANS, OR STORED IN A
DATA BASE OR RETRIEVAL SYSTEM,
WITHOUT PRIOR WRITTEN
PERMISSION OF
ALL RIGHTS RESERVED
c
KEYPLAN
ISSUANCES
GMB COPYRIGHT
Au to de sk
D oc s:
//5
-6
W es t O tta w a W oo ds id e
El em en ta ry Im pr ov em en ts /5
-6
0A
5.
rv t
8/
/2
1:
:3
PM
A2.1A
5-6250
UNIT 'A' FIRST FLOOR PLAN
ERE
AMS
W O
O D
S
ID
E E
LE
M
E N
T A
R Y
S C
H O
O L
IM
P
R O
V E
M E
N T
S
W E
S T
O
TT
A W
A P
U B
LI
C
S C
H O
O
LS
H O
LL
A
N D
M
IC
H
IG
A
N
2025UNIT A
UNIT B
UNIT C
1/8" = 1'-0"
UNIT 'A' FIRST FLOOR PLAN
ALT A-1
08.28.2025 BIDS &
CONSTRUCTION
https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=4642355f-0392-4913-a481-78b7b53c3f64 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=cb37b593-2670-425f-9f5b-15605acd3c3f https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=bf59fe3e-d7c4-4c8e-9404-f846e2c26a12 https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=14567a1e-235b-4b13-a3d8-e4398af0620b https://acc.autodesk.com/build/sheets/projects/1bf640f6-e498-4e0c-a38d-f5252eb23e2e?moduleId=2d&historyId=acb29d29-6494-423d-9bbc-1c64276e391c…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .