(Addendum 2) 356-025 WOPS Woodside Elementary Improvements.pdf
PDF 7 MB Posted
- Attached to
- ELEMENTARY IMPROVEMENTS
- Solicitation number
- RFP-WOP-250000003178-4
- Issued by
- Saginaw County, Michigan
About this file
The document is a comprehensive bid package for the Woodside Elementary Improvements project by West Ottawa Public Schools, located at 2591 N. Division Ave. in Holland, Michigan. The project involves renovations and improvements to the elementary school, with bids due on October 21, 2025, and a pre-bid walk-through scheduled for October 8, 2025. The construction is set to begin on December 20, 2025 (during Christmas break) with substantial completion targeted for August 7, 2026. The bid package is divided into 13 bid categories, including sitework, concrete, masonry, metals, general trades, metal roofing, membrane roofing, aluminum storefronts & glazing, LPDA, flooring, painting, mechanical, and electrical work.
The project includes a concrete allowance of $150,000 for removing and replacing existing concrete paving, and an alternate (Alternate No. A-1) that involves removing existing metal wall panels at various locations and replacing them with 1" metal face insulated panels. The bid documents provide detailed scope of work for each category, including specific requirements for demolition, installation, materials, coordination, and compliance with local regulations and MIOSHA standards. Contractors are required to submit proof of insurance, performance bonds, and various submittals. The project emphasizes thorough documentation, including as-built drawings, warranties, and close-out documents, with final payment contingent upon review of these materials by the Construction Manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 - Woodside Elementary Improvements.pdf | ||
| Invite_Front_Ends.pdf | ||
| Woodside Project Schedule Gantt Chart.pdf | ||
| Waukazoo Drawings.pdf | ||
| Woodside Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 10/16/2025
Owner: West Ottawa Public Schools
Project Name: Woodside Elementary Improvements
Location: 2591 N. Division Ave., Holland, MI 49424
CM No.: 356-025
A/E No.: 5-6250
ADDENDUM NO. 02
SPECIAL NOTE:
The Notice to Bidders, Instruction to Bidders, General Conditions of the Contract Construction, Supplementary
Conditions of the Contract for Construction, and all modifications and previously issued Contract Documentation are a part of the Addendum.
SCOPE OF WORK:
The following items are changes, additions, deletions, clarifications and/or errors and omissions in the plans and specifications and shall be considered by each Bidder regarding their proposal submitted. This document and all its entirety shall be considered part of the Contract Documents.
NOTICE TO ALL BIDDERS:
It is the responsibility of the Bidder to take note of all items covered in this Addendum. It is the responsibility of the
Bidder to review all documentations in total regarding their scope of work and any work that will interface with their scope of work.
ATTACHMENTS:
Specifications: GMB Addendum 002
Drawings: GMB Addendum 002
Other: Front Ends Response to Pre-Bid Walk-Thru LVT question Pre-Bid RFI #’s 1-7
WEST OTTAWA PUBLIC SCHOOLS
Woodside Elementary Improvements
SPECIFICATIONS CLARIFICATIONS / REVISIONS:
(Refer to A/E Remarks)
SHEET CLARIFICATIONS / REVISIONS:
(Refer to A/E Remarks)
OTHER:
ITEM NO. 1: FRONT ENDS (ALL CHANGES NOTED IN RED/YELLOW)
Refer to scope of work changes noted in this Addendum which includes clarifications to the alternates, an added allowance for Concrete, and other clarifying items to the following Bid
Category’s scope of work: Concrete, General Trades, Aluminum Storefronts & Glazing
ITEM NO. 2: RESPONSE TO PRE-BID WALK-THRU LVT QUESTION
Please refer to the Pre-Bid Walk-Thru Minutes issued in Addendum 001.
Response is as follows: The drawings call for demo of the tile in the classroom toilet rooms and it was asked if the LVT could be installed over it instead. This should not be done because the grout lines could translate through the LVT unless a leveler like Ardex is used.
Please bid to remove the tile as shown in the drawings.
ITEM NO. 3: PRE-BID RFI #’S 1-7
Refer to the Pre-Bid RFI questions and answers included in this Addendum.
*Note: The Deadline has passed for submitting RFI’s
WEST OTTAWA PUBLIC SCHOOLS
Woodside Elementary Improvements
ADDENDUM
WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 002
5-6250 WOODSIDE ELEMENTARY IMPROVEMENTS OCTOBER 16 2025
A/E PROJECT 5-6250 PAGE 1 OF2
SECTION 00 91 11.02 - ADDENDUM 002
OWNER WEST OTTAWA PUBLIC SCHOOLS
PROJECT 5-6250 WOODSIDE ELEMENTARY
IMPROVEMENTS
A/E PROJECT 5-6250
PURPOSE THIS ADDENDUM SHALL FORM PART OF THE
BIDDING DOCUMENTS. CHANGES, ADDITIONS,
CLARIFICATION OR DELETIONS HEREIN
SUPERSEDE THE DRAWINGS AND
SPECIFICATIONS. BIDDERS SHALL INCLUDE
ON THE PROPOSAL FORM
ACKNOWLEDGEMENT OF THE RECEIPT OF
THIS ADDENDUM.
ATTACHMENTS
REISSUED SPECIFICATIONS: 07 41 13
REISSUED SHEETS: A1.1A, A1.1B, A1.1C,
A7.02, E5.10
SHEETS TO ISSUE TO THE BCC: NONE
SHEETS TO ISSUE TO THE BFS: NONE
ARCHITECT-ENGINEER GMB
616.796.0200
WWW.GMB.COM
CONSTRUCTION MANAGER FRITZ WAHLFIELD CONSTRUCTION
616.784.5833
WWW.WAHLFIELDCONSTRUCTION.COM
ADDENDUM
WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 002
5-6250 WOODSIDE ELEMENTARY IMPROVEMENTS OCTOBER 16 2025
A/E PROJECT 5-6250 PAGE 2 OF2
SPECIFICATION CLARIFICATIONS / REVISIONS
1.1 SECTION 07 41 13 METAL ROOF PANELS (REISSUED)
A. Standing seam metal roof panels revised to have snap-lock seams. See section 3.1 for updated manufacturer specific product types.
B. See section 3.3 for metal roof panel revised profile height and type.
C. Joint type description removed from specification, see section 3.3.
SHEET CLARIFICATIONS / REVISIONS
2.1 SHEET A1.1A - UNIT 'A' FIRST FLOOR DEMOLITION PLAN (REISSUED)
A. Note to patch and prepare surfact where projector is removed added to Demolition Note #18.
B. See plan for demolition tags noting the removal or projector screens in classrooms.
2.2 SHEET A1.1B - UNIT 'B' FIRST FLOOR DEMOLITION PLAN (REISSUED)
A. Note to patch and prepare surfact where projector is removed added to Demolition Note #18.
B. See plan for demolition tags noting the removal or projector screens in classrooms.
2.3 SHEET A1.1C - UNIT 'C' FIRST FLOOR DEMOLITION PLAN (REISSUED)
A. Note to patch and prepare surfact where projector is removed added to Demolition Note #18.
B. See plan for demolition tags noting the removal or projector screens in classrooms.
2.4 SHEET A7.02 - ROOFING DETAILS (REISSUED)
A. See detail 16/A7.02 for revised standing seam termination direction.
2.5 SHEET E5.10 - LIGHTING FIXTURE SCHEDULE (REISSUED)
A. Revised lighting fixture schedule for fixture equivalents.
END OF SECTION
BID CATEGORIES INDEX
1. Sitework
2. Concrete
3. Masonry
4. Metals
5. General Trades
6. Metal Roofing/Metal Panel Systems
7. Membrane Roofing
8. Aluminum Storefronts/Glazing
9. LPDA
10. Flooring
11. Painting
12. Mechanical
13. Electrical
BID CATEGORY NO. 01 - SITEWORK
INCLUDE:
1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
32.9219 SEEDING
2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL
CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. All Excavating as shown on pages C0.01, C2.0.
4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material.
5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work.
6. The CM will provide a one time staking of grades, building footprint, and misc. locations.
a. Additional staking will be at the cost of the contractor.
7. Furnish and Install as shown:
a. Site demolition and site clearing as shown on C2.01
b. Excavate and regrade areas as shown on C2.01
c. Seed as shown.
8. Concrete or asphalt cutting to complete work in this scope.
9. Any dewatering necessary to complete this scope of work.
10. Dust control measures for all work in this Bid Category.
11. Daily clean-up at work areas.
12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
13. All work must be done in accordance with MIOSHA Regulations.
14. Warranties as specified.
15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
BID CATEGORY NO. 02 - CONCRETE
1. Complete Concrete and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
03.3511 CONCRETE FLOOR FINISHES
07.2100 THERMAL INSULATION
07.9200 JOINT SEALANTS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all reinforcement as shown.
4. Provide Sealer and Vapor Barrier as specified.
5. Furnish and install all interior & exterior concrete MEP pads as shown.
6. Furnish and Install Exterior Concrete Paving as shown.
7. Furnish and Install Interior Slab on Grade infill as shown on A1.1B and A1.1C.
8. Furnish and install joint sealants at all new exterior concrete paving as shown and specified.
9. Dust control measures for all work in this Bid Category.
10. Daily clean-up at work areas.
11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
12. All work must be done in accordance with MIOSHA Regulations.
13. Warranties as specified.
14. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
15. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
16. Alternate No. A-1: Woodside Elementary
a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.
i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.
ii. If alternate is not accepted, install metal closure panel and infill insulation where louvers are removed from the soffit.
17. Concrete Allowance
a. To remove and replace existing concrete paving with new pour-in-place concrete paving.
This allowance NEEDS to be included in the base bid of this scope.
i. Amount: $150,000.00
BID CATEGORY NO. 03 - MASONRY
1. Complete Masonry and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
04.0511 MASONRY MORTARING AND GROUTING
04.2000 UNIT MASONRY
07.2100 THERMAL INSULATION
07.2119 FOAMED-IN-PLACE INSULATION
07.2500 WEATHER BARRIERS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc., as shown and/or specified.
4. Grouting solid of new hollow metal frames in masonry.
5. Clean all new masonry.
6. Furnish and Install complete Masonry as shown and specified.
7. Furnish and Install all reinforcement as shown.
8. Demo and tooth in openings called out on Note 1 on pages A1.1A, A1.1B, A1.1C.
a. Furnish and Install CMU and Brick at new openings as shown.
b. Install Lintel as shown. Furnished by others.
9. Cut in Joist Pockets as needed for new joist as shown on pages S3.1A and S3.1B.
10. Furnish and Install Masonry chases as shown on Pages A2.1A, A2.1B, and A2.1C.
11. Furnish and Install new Masonry wall in Rm B100.
12. Masonry Infill in Room A124 as shown.
13. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.
14. Furnish and Install all necessary flashing as shown.
a. Masonry membrane flashing as shown.
15. Flashing and weep holes concealed in masonry work. Includes pre-finished flashings.
16. Cavity wall insulation, this includes all spray insulation at all new exterior walls.
17. Joint Sealants at all CMU wall CJs.
18. Fire safe-ing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the all system, where shown. Include fire safe-ing at existing masonry walls where shown. See code compliance plans for locations.
19. Install lintels as provided for new openings.
20. Provided rebar caps for all exposed rebar ends installed by this contractor.
21. This contractor is responsible for the disposal of excess masonry and masonry related items. I.e., rubble, cut blocks, mortar, etc., into concrete dumpster. Coordinate this with Construction Manager. It is the responsibility of this contractor to provide its own dumpsters as necessary.
22. All work must be done in accordance to the new Silica Regulations.
23. Furnish and install masonry toothing as required for all new openings as shown. Openings may include, but not limited to: doors, windows, louvers, chases and masonry openings for new MEP work.
24. Installation of anchor bolts at top of wall for wood blocking.
25. Dust control measures for all work in this Bid Category.
26. Daily clean-up at work areas.
27. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
28. All work must be done in accordance with MIOSHA Regulations.
29. Warranties as specified.
30. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
31. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
32. Alternate No. A-1: Woodside Elementary
a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.
i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.
ii. If alternate is not accepted, install metal closure panel and infill insulation where louvers are removed from the soffit.
BID CATEGORY NO. 04 - METALS
1. Complete Metals and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
05.1200 STRUCTURAL STEEL FRAMING
05.2100 STEEL JOIST FRAMING
05.3100 STEEL DECKING
05.5133 METAL LADDERS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Erect new structural steel as shown on S0.01, S0.03, S3.1A, S3.1B, S3.1C and S7.01.
4. Furnish and Erect structural reinforcing as shown on S0.01, S0.03, S3.1A, S3.1B, S3.1C and S7.01.
5. Furnish and Erect metal deck patching as shown.
6. Furnish New lintels as shown for new mechanical openings.
7. Furnish and Install any shoring needing to complete the work in this scope.
8. Furnish and Install any Fire protection and weld protection needed to complete the work in this scope.
9. All onsite welding must be done by certified welders.
10. Provide Fire Watch for work completed above.
11. Dust control measures for all work in this Bid Category.
12. Daily clean-up at work areas.
13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
14. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
15. Warranties as specified.
16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 05 - GENERAL TRADES
1. Complete General Trades work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
06.1000 ROUGH CARPENTRY
06.2000 FINISH CARPENTRY
06.6100 CAST POLYMER FABRICATIONS
07.9200 JOINT SEALANTS
08.1113 HOLLOW METAL DOORS AND FRAMES
08.1416 FLUSH WOOD DOORS
08.7100 DOOR HARDWARE
10.1100 VISUAL DISPLAY UNITS
10.1419 DIMENSIONAL LETTER SIGNAGE
10.2113.17 PHENOLIC TOILET COMPARTMENTS
10.2800 TOILET, BATH, AND LAUNDRY ACCESSORIES
10.5113 METAL LOCKERS
12.3200 MANUFACTURED WOOD CASEWORK
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Schedule, take delivery, inventory, and store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not noted are to be furnished and installed.
4. Furnish and Install Floor Protection in Areas; Corridors A101, A127, & C101. Vestibules A100, A128, C102, C109, & C112.
a. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44 mil.
i. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
5. Furnish and Install Floor Protection in the following Areas;
a. Unit A (All Rooms and Corridors), Unit B (All Rooms and Corridors), Unit C (All Rooms and
Corridors)
i. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44mil.
ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
b. Gymnasium C133
i. Floor Protection to be one layer of ½” O.S.B over 6 mil clear poly plastic in area of coverage.
ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
6. Demo as shown on pages A1.1A, A1.1B, A1.1C
a. Notes 1-5, 7-9, 12 -17 and 19.
b. Furnish and Install temporary enclosures at all new exterior openings for doors, windows, and MEP openings. Make enclosures secure from outside and shed water.
c. Include Dumpster services for Demo specified under this scope of work.
i. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
7. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work. Roof Blocking by others.
i. Casework and furnishings blocking as required.
ii. Any doors or window bucks as needed/shown.
8. All lumber to be treated as specified.
9. Joint Sealants at all new door frames, casework, and countertops and any application where drywall meets
CMU walls.
10. Furnish and Install all Hollow Metal Door Frames and Window Frames as shown.
11. Furnish and Install all Hollow Metal and Wood Doors Leafs as shown.
12. Furnish and Install all new Door Hardware as shown.
13. Furnish and Install all new Casework, Millwork, and Countertops as shown.
14. Furnish and Install new marker boards and tack boards as shown.
15. Furnish and Install all new Bath Accessories as specified and shown.
16. Furnish and Install all new Toilet Partitions as specified and shown.
17. Furnish and Install new metal lockers as shown.
a. Includes wood bases as shown.
18. Dust control measures for all work in this Bid Category.
19. Daily clean-up at work areas.
20. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
21. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
22. Warranties as specified.
23. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
24. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
25. Alternate No. A-1: Woodside Elementary
a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.
i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.
ii. If alternate is not accepted, install metal closure panel and infill insulation where
BID CATEGORY NO. 06 - METAL ROOFING/METAL PANEL SYSTEMS
1. Complete Metal Roofing/Metal Panel Systems as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.2100 THERMAL INSULATION
07.2500 WEATHER BARRIERS
07.4113 METAL ROOF PANELS
07.4213 METAL WALL PANELS
07.4213.19 INSULATED METAL WALL PANELS
07.4213.23 METAL COMPOSITE MATERIAL WALL PANELS
07.6200 SHEET METAL FLASHING AND TRIM
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demolition of Existing Standing Seam roof as shown on pages A2.3B, and A2.3D.
a. Make area water sealed prior to installation of new standing seam roof system.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and Install all joint sealants for related work in this scope.
6. Furnish and Install complete roofing system as shown.
a. Standing Seam Metal Roofing System.
i. This includes all metal flashing and copings.
7. Furnish and Install ½” Coverboard with (2) layers of 2.6” Rigid Insulation underneath the Metal Roof System.
a. This includes Ice and Shield as shown.
8. Furnish and Install MCM panels as shown on A2.1B
9. Furnish and Install wood blocking as needed for this scope of work.
10. Daily clean-up at work areas.
11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
12. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
13. Warranties as specified.
14. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
15. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
16. Alternate No. A-1: Woodside Elementary
a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.
i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.
ii. If alternate is not accepted, install metal closure panel and infill insulation where
BID CATEGORY NO. 07 - MEMBRANE ROOFING
1. Complete Membrane Roofing as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.2100 THERMAL INSULATION
07.5300 ELASTOMERIC MEMBRANE ROOFING
07.6200 SHEET METAL FLASHING & TRIM
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demolition of existing Membrane roof and insulation as shown on page A2.3A, A2.3B, and A2.3C.
a. Demolition shall be performed so that there is no water damage to existing and new finishes inside the building. All work must remain water tight at the end of the day.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and install new membrane roof system as shown on page A2.3A, A2.3B, and A2.3C.
a. This includes all metal flashings and copings related to this work.
b. This includes flashing in all existing penetrations along with all new penetrations.
6. Furnish and Install ½” coverboard with (2) layers of 2.6” Insulation fastened to the metal deck.
a. This includes the tapered insulation as shown on the drawings.
7. Furnish and Install new wood blocking as shown.
8. Furnish and Install all joint sealants for related work in this scope.
9. Daily clean-up at work areas.
10. Contractor to Meet Project Schedule, this includes weekend work or Daily overtime.
11. Furnish and install complete roofing system as shown.
12. Tie into the existing roofing system as necessary.
13. Provide all warranties as specified.
BID CATEGORY NO. 08 - ALUMINUM STOREFRONTS & GLAZING
1. Complete Aluminum Storefronts & Glazing as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.9200 JOINT SEALANTS
08.7100 DOOR HARDWARE
08.8000 GLAZING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all Aluminum Frames and Doors as shown.
a. Including all Door Hardware related to this scope of work.
4. Furnish and Install all Glass and Glazing as shown.
5. Furnish and Install Mirrors as shown.
6. Furnish and Install all joint sealants for related work in this scope.
7. Glass cleaning at substantial completion of the entire project.
8. Furnish and install all storefront systems as shown and specified.
9. Contractor responsible for all field measurements for this scope of work.
10. Provide all hardware specified under this scope.
11. Furnish and install any break metal necessary to complete this scope.
12. Furnish and install egress stickers at all new egress openings.
13. Furnish and install all glazing films as shown.
14. Daily clean-up at work areas.
15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
16. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
17. Warranties as specified.
18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
20. Alternate No. A-1: Woodside Elementary
a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.
i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.
ii. If alternate is not accepted, install metal closure panel and infill insulation where louvers are removed from the soffit.
BID CATEGORY NO. 09 - LPDA
1. Complete LPDA work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
05.4000 COLD-FORMED METAL FRAMING
07.8400 FIRESTOPPING
07.9200 JOINT SEALANTS
09.2116 GYPSUM BOARD ASSEMBLIES
09.2216 NON-STRUCTURAL METAL FRAMING
09.5100 ACOUSTICAL CEILINGS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all new metal studs as shown.
a. This includes cold form metal framing and non structural metal framing.
4. Engineered drawings required to be provided for cold form metal framing.
5. Furnish and Install all Gypsum boards as shown.
a. All Gypsum board must be finished as specified for painting.
6. Furnish and Install new Ceilings and Grid as shown on the drawings.
7. Furnish and Install new drywall bulkheads as shown.
8. Furnish and Install all batt insulation as shown on interior partitions as well as any exterior metal stud walls as shown.
9. Furnish and Install firestopping at all rated assemblies as shown on the drawing.
10. Coordinate layout and elevations with the Construction Manager prior to install.
11. Dust control measures for all work in this Bid Category.
12. Daily clean-up at work areas.
13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
14. All work must be done in accordance with MIOSHA Regulations.
15. Warranties as specified.
16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 10 - FLOORING
1. Complete Flooring work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
09.3000 TILING
07.9200 JOINT SEALANTS
09.6500 RESILIENT FLOORING
09.6813 TILE CARPETING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demo of Existing flooring and base as shown in note 10 on pages A1.1A, A1.1B, and A1.1C.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and Install new flooring as shown on the drawings.
a. This includes All Resilient Flooring (including base), Tile Carpeting, and Ceramic Tiling.
b. Responsible for monitoring and procuring methods for humidity control during the installation of the new flooring system.
6. Minor floor prep as needed.
7. Furnish and Install Entrance Floor Mats and Frames as shown.
8. Coordinate layout and elevations with the Construction Manager prior to install.
9. Dust control measures for all work in this Bid Category.
10. Daily clean-up at work areas.
11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
12. All work must be done in accordance with MIOSHA Regulations.
13. Warranties as specified.
14. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
15. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 11 - PAINTING
1. Complete Painting work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.9200 JOINT SEALANTS
09.9000 PAINTING AND COATING
09.9113 EXTERIOR PAINTING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all painting as shown and specified in the Construction Documents for this project.
a. Includes but not limited to, Walls, Ceilings, Structural Steel, Misc. Steel, Door Frames, Doors.
4. Sand Blast and Paint exterior trellis as shown.
5. Contractor responsible for final touch-up.
6. Fire barrier signage/ stenciling on fire walls within concealed space above ceiling per Barrier Free
Dimensions.
7. Dust control measures for all work in this Bid Category.
8. Daily clean-up at work areas.
9. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
10. All work must be done in accordance with MIOSHA Regulations.
11. Warranties as specified.
12. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
13. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 12 - MECHANICAL
1. Complete Mechanical work as shown on the drawings and as specified in the following categories:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.8400 FIRESTOPPING
07.9200 JOINT SEALANTS
22.0500 PLUMBING SUMMARY OF WORK
22.0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
22.0517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22.0519 METERS AND GAUGES FOR PLUMBING PIPING
22.0523 GENERAL DUTY VALVES FOR PLUMBING PIPING
22.0529 HANGERS AND SUPPORTS PLUMBING PIPING AND EQUIPMENT
22.0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22.0719 PLUMBING PIPING INSULATION
22.1005 PLUMBING PIPING
22.1006 PLUMBING PIPING SPECIALTIES
22.1123 DOMESTIC WATER PUMPS
22.3000 PLUMBING EQUIPMENT
22.4000 PLUMBING FIXTURES
23.0500 HVAC SUMMARY OF WORK
23.0513 COMMON MOTOR REQUIREMENTS FOR HVAC PIPING
23.0517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
23.0519 METERS AND GAGES FOR HVAC PIPING
23.0523 GENERAL-DUTY VALVES FOR HVAC PIPING
23.0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23.0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23.0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23.0713 DUCT INSULATION
23.0719 HVAC PIPING INSULATION
23.0800 COMMISSIONING OF HVAC
23.0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23.0913.16 REFRIGERANT DETECTION AND ALARM
23.0923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
23.0934 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC
23.0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
23.1123 FACILITY NATURAL-GAS PIPING
23.2113 HYDRONIC PIPING
23.2114 HYDRONIC SPECIALTIES
23.2123 HYDRONIC PUMPS
23.2300 REFRIGERANT PIPING
23.2500 HVAC WATER TREATMENT
23.3100 HVAC DUCTS AND CASINGS
23.3300 AIR DUCT ACCESSORIES
23.3423 HVAC POWER VENTILATORS
23.3700 AIR OUTLETS AND INLETS
23.4000 HVAC AIR CLEANING DEVICES
23.5100 BREECHINGS, CHIMNEYS, AND STACKS
23.6213 PACKAGED AIR-COOLED REFRIGERANT COMPRESSOR AND
CONDENSER UNITS
23.7313 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23.7416 PACKAGED ROOFTOP AIR-CONDITIONING UNITS
23.8126.13 SMALL-CAPACITY SPLIT-SYSTEM AIR-CONDITIONERS
23.8200 TERMINAL HEATING AND COOLING UNITS
23.8216 AIR COILS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Plumbing and Mechanical Demo as shown on pages P1.1A, P1.1B, P1.1C, M1.1A, M1.1B, M1.1C.
4. Include Dumpster services for Demo specified under this scope of work.
a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.
5. Furnish and Install exterior louvers as shown.
6. Furnish and Install all plumbing and HVAC as specified and shown.
a. All equipment as specified.
b. Testing and Balancing as required.
c. Includes caulking/ joint sealants for the work completed in this bid category.
7. Applicable fees, permits, inspections, etc., as required for the completion of the work in this bid category.
8. Fire caulk any penetrations at rated assemblies.
9. Any coring through masonry or concrete to complete work in this scope must be included.
10. All DDC and Controls must be included as specified and shown.
11. Floor protection for any welding or soldering.
12. Dust control measures for all work in this Bid Category.
13. Daily clean-up at work areas.
14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
15. All work must be done in accordance with MIOSHA Regulations.
16. Warranties as specified.
17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 13 - ELECTRICAL
1. Complete Electrical work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0101 PROJECT TITLE PAGE
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS
01.7329 CUTTING AND PATCHING
01.7700 CLOSEOUT SUBMITTALS
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES
02.4119 DEMOLITION
07.8400 FIRESTOPPING
07.9200 JOINT SEALANTS
26.0500 COMMON RESULTS FOR ELECTRICAL
26.0505 SELECTIVE DEMOLITION FOR ELECTRICAL
26.0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26.0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26.0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26.0533.13 CONDUIT FOR ELECTRICAL SYSTEMS
26.0533.16 BOXES FOR ELECTRICAL SYSTEMS
26.0533.23 SURFACE RACEWAYS FOR ELECTRICAL SYSTEMS
26.0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26.0573 POWER SYSTEM STUDIES
26.0583 WIRING CONNECTIONS
26.0943 NETWORK LIGHTING CONTROLS
26.2200 LOW-VOLTAGE TRANSFORMERS
26.2416 PANELBOARDS
26.2713 POWER AND ENERGY METERS
26.2726 WIRING DEVICES
26.2813 FUSES
26.2816.16 ENCLOSED SWITCHES
26.2913 ENCLOSED CONTROLLERS
26.3213 ENGINE GENERATORS
26.3600 TRANSFER SWITCHES
26.4300 SURGE PROTECTIVE DEVICES
26.5100 INTERIOR LIGHTING
26.5600 EXTERIOR LIGHTING
27.0505 SELECTIVE DEMOLITION FOR COMMUNICATION
27.0526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27.0529 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
27.0533.13 CONDUIT FOR COMMUNICATIONS SYSTEMS
27.1000 STRUCTURED CABLING
27.5116 PUBLIC ADDRESS SYSTEMS
27.5313 CLOCK SYSTEMS
28.0505 SELECTIVE ELECTRONIC SAFETY AND SECURITY DEMOLITION
28.1300 INTEGRADED ACCESS CONTROLS, VIDEO SURVEILLANCE, INSTRUSION
AND THREAT LEVEL MANAGEMENT SYSTEM
28.4600 FIRE DETECTION AND ALARM
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Electrical Demo as shown on pages E1.1A, E.1.1B, and E1.1C.
4. Furnish and Install complete Electrical & Low Voltage system as specified and shown.
a. This includes the electrical work shown on the Civil drawings.
b. This includes the installation of pre-purchased equipment by the owner.
5. Include all fire alarm systems.
6. Fire caulk any penetrations at rated assemblies.
7. Temporary electrical (Power and Lighting) system(s). Remove upon the direction of the Construction
Manager.
8. Technology and communications related (voice, data, video, etc.) boxes, raceways and pull wires as required by the documents. Coordinate with appropriate contractor(s).
9. Fire resistant joint sealers as specified in Section 07.8443 for all electrical associated penetrations.
10. Applicable fees, permits, inspections, etc., as required for the completion of the work in this bid category.
11. Furnish and install electrical sleeves.
12. Final hook-up of mechanical equipment.
13. Receive power supplies, mount and energize with 120V.
14. Demolition of and removal of electrical systems required to facilitate new construction and/or remodeling.