About this file
This document is an Addendum to the original solicitation for the Winterville Blacksmith Shop rehabilitation project, which is being undertaken by the City of Winterville, Georgia. The addendum provides revised drawings and clarifications to contractor questions, including updates to the roofing, site drainage, millwork, materials, and structural design. Key changes include confirming the base bid for the roof, removing the "Corten finish" specification, providing an updated roof assembly drawing, allowing for the existing sill beams to be removed, and specifying the use of cedar for the new board and batten siding. The bid deadline has been extended to November 1st at 10:30 AM, and the lowest responsible bidder will be selected for the contract.
The project is funded in part by a Community Development Block Grant, and applicable portions of the work must conform to Davis Bacon Wage Rates. Bidders must also provide E-Verify and Section 3 compliance information. The solicitation is for construction services to rehabilitate the 19th century Blacksmith Shop located on Inez Edwards Plaza in Winterville, Georgia, which is within Clayton County.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Winterville Blacksmith Shop
Addendum 1
October 16, 2024
Brandied History, LLC
Please find attached revised drawings including clarifications to contractor questions.
Updates include revisions to roofing, site drainage, millwork, and clarifications on materials and structural design.
RESPONSES TO CONTRACTOR QUESTIONS BELOW IN CAPS
• Can you please confirm that the base bid for the roof is now the original “ALT BID”, this includes “INSTALL NEW 5V ROOFING PANELS PER MANUFACTURER’S
INSTRUCTIONS”? CONFIRMED
• Can you please confirm that we are removing the specification for “CORTEN FINISH” from the roofing selection? CONFIRMED
• Can we get an updated drawing of the new roof assembly? PLEASE FIND
ATTACHED REVISIONS.
• Are we pricing to keep the existing sill beams? THESE HAVE BEEN REMOVED PER
STRUCTURAL. PLEASE FIND ATTACHED UPDATED DRAWINGS.
• Is there an opportunity to dismantle the building and label all pieces that will be reinstalled? THE EXISTING STRUCTURAL FRAMING IS TO REMAIN AS NOTED IN
THE DRAWINGS.
• If we are sistering the entire length of the ceiling beam near the forge location, is it necessary to keep the post located in the proposed office room? NO, IT IS NOT AS
LONG AS THE EXISTING CEILING BEAM THAT IS CURRENTLY DEFLECTING
OVER AN INCH WILL BE JACKED UP TO CORRECT DEFLECTION, DEFLECTION
NO MORE THAN 1/4", SISTERED AND THEN JACKS RELEASED.
• Can you please specify that the called out “beams” that are being sistered on sheet S1.0 are the drop beams below the ceiling assembly and not the ceiling rafters themselves? EVERYTHING THAT IS CALLED "SISTERD" SHOULD
BE IN THE SAME ELEVATION AS THE BEAM THAT IS BEING SISTERED,
SO THE BOTTOM FLUSH, NOT DROPPED. GC CAN USE DETAIL C/SS2.0,
OR ALTERNATIVELY 1/2" DIA. THRU BOLTS AT 16" O.C. STAGGERED, 4
INCHES MAX FROM EACH END, BOLTS CANNOT BE PLUGGED IN. I
PREFER THE OPTION WITH THRU BOLTS, BUT IF HISTORIC WON'T
ALLOW FOR THE BOLTS TO BE SEEN, THEN OPTION WITH THE NAILS
FROM THE DETAIL C/S2.0.
• Is it possible to specify what material should be priced for the new board and batten?
PRICE CEDAR
• Is it required to use the called out “JULIUS BLOOM” handrail and lamb’s tongue for the ADA ramp railing? A DEDUCTIVE ALTERNATE CAN BE PROVIDED FOR A 1-1/2”
DIAMETER STEEL PIPE HANDRAIL.
• Is the chimney and forge to remain? YES. CONTRACTOR TO PROTECT AND
STABILIZE THROUGHOUT CONSTRUCTION. SEE UPDATED DRAWINGS.
Winterville Blacksmith Shop
Addendum 1
October 16, 2024
Brandied History, LLC
• Will the low bid be selected? THE LOWEST RESPONSIBLE BIDDER WILL BE
SELECTED.
• Is it possible for an extension on pricing due date to be included in the addendum? THE
BID DEADLINE HAS BEEN EXTENDED TO NOVEMBER 1ST AT 10:30 AM.