Window Coverings Attachment A Pricing (1).xlsx

XLSX spreadsheet 12 KB Posted

Attached to
2016 TAAA 5100 5125 DRC Solar Shade Blinds
Solicitation number
DQ1 TAAA 2016001405 2
Issued by
Denver County, Denver City, Colorado

About this file

This is a pricing attachment for a state or local window coverings procurement. The project involves the installation of Hunter Douglas Designer Screen Empire 1% roller shades with round cassettes in oatmeal color with metal pull chains across multiple windows. The scope includes 37 individual window treatments with varying width measurements ranging from 47 inches to 86 inches, all with a standard length of 77 inches. A voluntary site walk-through was conducted on May 3, 2016, at 10 AM, and vendors were required to guarantee delivery and installation completion by June 30, 2016. The vendor is responsible for all field measurements, as the listed sizes are for estimating purposes only. The specifications indicate the need for metal chain mechanisms rather than plastic alternatives, ensuring durability and quality across all installations.

Pricing for each window treatment unit is to be provided by the vendor in the attached spreadsheet, with costs for removal and disposal of existing vertical blinds and hardware to be quoted separately. Additional pricing components include lead time for material delivery, potential Saturday installation surcharges, and total project cost. Vendors were required to provide specifications and warranty information, demonstrate proper licensing and certifications with appropriate insurance coverage, and submit three business references. The Confirmation of Offer Form submission was mandatory, and vendors needed to confirm their attendance at the site walk-through to validate their bids.

View the file

Other files

File Type Posted
DQ DOR160020-Window Coverings Q&A.pdf PDF
DQ DOR 160020, Window Coverings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Attachment A - Pricing

QuantityDescriptionColorPull ChainWidth*Length*Installed Price
21Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)80"77"$
2Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)79 5/8"77"$
2Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)79 3/4"77"$
3Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)79 1/2"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)79 7/8"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)80 1/8"77"$
2Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)79"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)79 3/8"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)77 3/4"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)78 3/4"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)86"77"$
1Hunter Douglas Designer Screen Empire 1% with round cassette, or equalOatmeal - or equivalentMetal (no plastic)47"77"$
37TOTALTOTAL$
*VENDOR IS RESPONSIBLE FOR ALL FIELD MEASUREMENTS - THESE SIZES ARE LISTED FOR ESTIMATING PURPOSES ONLY
PLEASE PROVIDE RESPONSES BELOW:
Lead time for delivery of materials? ______________
Costs for removal and disposal of all existing vertical blinds and hardware: $_______________________
Surcharge for Saturday installation, if any: $_______________
Vendor has signed and returned Confirmation of Offer Form? _______________
Vendor attended voluntary site walk-through on May 3, 2016 at 10 AM? ___________
Vendor guarantees delivery and installation will be completed by on or before June 30, 2016? ___________
Vendor has attached specifications and warranty information? ___________
Vendor holds the proper licenses, certifications and insurance to meet the requirements of this documented quote? _________
Vendor has provided three references as requested? _____________

Sheet2

Sheet3

File details come from the government source that posted it. Updated .