This document is a Questions and Answers summary issued by Hermiston School District (HSD) in Oregon regarding the Weber Field Concession and Bathroom Building Invitation to Bid (ITB) process. The project involves the construction of a new concessions and bathroom building at Weber Field, with an estimated cost range of $225,000 to $275,000. The district clarified that revised plans addressing missing sheets C1-C3 and S5.2 from Exhibit 1 would be distributed via addendum on August 29, 2025. Key project scope details include that HSD will retain responsibility for landscaping and irrigation work, with the contractor required to leave the site graded and sloped for drainage and notify the owner of any irrigation lines requiring repair. The contractor is responsible for obtaining all permits except the building permit, which HSD has already secured. The district confirmed that it will carry Builder's Risk Insurance for the project.
Insurance requirements specify a minimum of $1 million per occurrence and $2 million aggregate coverage. The Q&A document addresses technical specifications including HVAC controls (not required), casework details (undercounter cabinets with plastic laminate boxes and adjustable shelving), and clarifications on design notes such as "A.P.O." (As Per Owner) for exterior siding options. Civil work on the project is described as basic with no parking lot or stormwater management required, though a grease interceptor is specified on plumbing drawings and marked on-site with a white 4x4. Contractors are encouraged to conduct site visits to confirm the exact sewer location. No engineer's estimate was provided, though the district established the preliminary budget range to guide bidders in their proposals.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Superintendent Tricia Mooney, Ed.D. Address Office 541-667-6000
Assistant Superintendent Jake Bacon 305 SW 11th St Fax 541-667-6050 Hermiston, OR 97838 Website hermiston.k12.or.us/
Below is a summary of the questions the district received and answered regarding the Weber Concessions and Bathroom Building ITB Process.
1. Exhibit 1 is missing sheets C1-C3 and S5.2
a. Revised plans will be sent out with addendum 8/29/2025.
2. Is there an engineer’s estimate?
a. We do not have an engineer's estimate, but our estimated cost range is $225,000 - $275,000.
3. Do you have civil/site utility drawings available?
a. No
4. What is the basis of design for the toilet specialties?
a. Attached Specifications
5. The Exterior Elevations call for Board and Batt siding or A.P.O – what does A.P.O stand for?
a. As Per Owner
6. Will landscape restoration be part of the contractor’s scope? If so, to what extent?
a. HSD will handle the landscaping and irrigation. Site to be left graded and slopped to drain. Contractor to notify owner of any irrigation lines to repairs.
7. Do you have the permits?
a. HSD has Building permit, but all other permits (MEP) are by contractor
8. Are you able to let me know what the budget is for the project?
a. We do not have an engineer's estimate, but our estimated cost range is $225,000 - $275,000.
9. Are you carrying Builder’s Risk Insurance?
a. Yes, the district will carry Builder's Risk
10. What are the required insurance limits?
a. No less than $1 million per occurrence and $2 million aggregate
11. Can you please clarify what the notes A.P.O. and mean on Equipment Key Notes on S1 and detail on S3?
a. The new plans should answer this question(s).
12. Are HVAC controls required? There is a note relating to the Hot Water heater, but nothing for the HVAC system.
a. HVAC controls are not required.
13. Can you provide casework details? There is not enough information for casework folks to bid this one.
a. The undercounter cabinet casework should consist of plastic laminate boxes, open face with adjustable shelving.
14. Can you provide civil work details? The cover sheet refers to C1, C2, and C3.
a. The revised drawings that will be sent out with the addendum correct the “index of sheets” on page G1.
The civil on this project is very basic and shouldn’t be too difficult to quote, as there is no parking lot or stormwater to speak of. The grease interceptor is called out on the plumbing drawings. Contractors are welcome to do a site visit to confirm the exact sewer location, but it is marked with a white 4x4 coming out of the ground.