WD_OR20260003_2026_01_02_HEAVY.pdf

PDF 3 MB Posted

Attached to
Two gate replacement, Lewis and Clark NHP Federal contract opportunity
Solicitation number
140P8326Q0029
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This is a General Decision wage determination for heavy construction projects in Clatsop County, Oregon, issued January 2, 2026 (OR20260063), superseding the previous determination OR20250063.

The determination establishes prevailing wage rates and fringe benefits for multiple skilled trade classifications required on heavy construction projects in the specified geographic area. Rates vary by classification and include: Millwright ($59.35/hour with $22.38 fringe), Carpenter ($53.94/hour with $16.81 fringe), Electrician ($63.50/hour with $29.73 fringe), Line Construction Lineman ($64.17/hour with $1.5% + $23.58 fringe), and Power Equipment Operators across eight groups ranging from $45.81 to $60.98/hour with $16.90 fringe. Additional classifications include Ironworker ($48.31/hour with $34.52 fringe), Laborers in two groups ($39.11–$40.41/hour with $17.30 fringe), Painters ($39.94/hour with $16.68 fringe), Cement Mason/Concrete Finisher ($46.13/hour with $20.31 fringe), Truck Drivers in four groups ($35.41–$36.08/hour with $18.30 fringe), and various operators and laborers from an earlier survey. Zone differentials apply: Zone 2 adds $3.00 and Zone 3 adds $6.00 to base rates for specific metropolitan counties and cities. The determination includes detailed classifications for Power Equipment Operators by equipment type and capacity. Executive Order 13706 paid sick leave requirements and Executive Order 13658 minimum wage provisions ($13.30/hour for 2025) apply to covered contracts. Unlisted classifications may be added post-award through labor standards contract clauses. Appeals may be directed to the Wage and Hour Division or Administrative Review Board at the U.S. Department of Labor.

View the file

Other files for this federal contract opportunity

Other files attached to Two gate replacement, Lewis and Clark NHP, newest first.
File Type Posted
Sol_140P8326Q0029_Amd_0001.pdf PDF
B08_Relevant_Project_Experience_Questionnaire.docx DOCX document
Sol_140P8326Q0029.pdf PDF
B08_Attachment_07_Price_Schedule_and_Forms_to_Submit_with_Quote.docx DOCX document
A04_SOW_PMIS_328717.pdf PDF
Simplified_Construction_Attachment_2_Terms_Provisions_Clauses.docx DOCX document
B08_Attachment_01_READ_ME_FIRST_-_FAQs.docx DOCX document
WD_OR20260001_2026_01_23.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .