WD_AZ20240022_10-04-2024.pdf

PDF 2 MB Posted

Attached to
NEW REQ ROOF REPLACEMENT COTTONWOOD DS
Solicitation number
140A2325R0001
Issued by

About this file

This is a Department of Labor wage determination (General Decision Number AZ20240022) for building construction projects in Apache County, Arizona, effective October 4, 2024. The determination covers building construction on treatment plants and industrial sites including chemical/processing/manufacturing plants, power plants, refineries, and nuclear plants, but excludes single family homes and apartments up to 4 stories.

The wage determination establishes minimum wage rates and fringe benefits for various construction trades, with key rates including Asbestos Worker/Heat & Frost Insulator ($51.06/hr + $16.30 fringe), Electrician ($34.50-$38.30/hr + fringe depending on location relative to Highway 66), Power Equipment Operators ($33.41-$35.52/hr + $12.57 fringe based on crane tonnage), and Ironworkers ($33.00/hr + $18.91 fringe with zone differentials). The document includes Executive Order requirements for minimum wages ($17.20/hr for contracts after January 30, 2022, or $12.90/hr for earlier contracts) and provides detailed information about zone pay differentials based on distance from reference points like Gallup, NM and Phoenix City Hall.

View the file

Other files

File Type Posted
Sol_140A2325R0001_Amd_0001.pdf PDF
B08_Questions_and_Answers_Log_(1)_0001.xlsx XLSX spreadsheet
SF25A_Payment_Bond.pdf PDF
B08_Questions_and_Answers_Log.xlsx XLSX spreadsheet
Sol_140A2325R0001.pdf PDF
SF_24_Bid_Bond.pdf PDF
A04_SOW.pdf PDF
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
Map.docx DOCX document
SF25_Performance_Bond.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .