WCC Booster Pump and Master Meter Plans.pdf

PDF 18 MB Posted

Attached to
Wayne Community College - MASTER METER AND BOOSTER PUMP ADDITION
Solicitation number
131-70141
Issued by
Warren County, North Carolina

About this file

Summary

This is a preliminary design document for a Master Meter and Booster Pump Addition project at Wayne Community College in Wayne County, North Carolina, prepared by Timmons Group engineering firm. The project involves the installation of water infrastructure to serve the entire WCC campus, designed to handle an average daily flow of approximately 120 GPM with a maximum daily demand of 300 GPM and required fire flows of 1,500 GPM per hydrant. The system includes three Cornell Model 2YH low-service booster pumps capable of 150 GPM at 65 feet of lift, two Cornell Model 5RB high-service booster pumps capable of 1,500 GPM at 116 feet of lift, one 8-inch turbine master meter, one 8-inch RPZA (Reduced Pressure Zone Assembly), 275 linear feet of 10-inch DIP water main, nine 10-inch isolation valves, one 10-inch check valve with vault, and a pump building structure. The design includes provisions for a bypass vault approximately 24 linear feet in front of the booster pump house to maintain water flow during maintenance operations.

The project documentation consists of site plans, erosion and sediment control plans, mechanical plans with sections and isometric views, and detailed specifications for the booster pump station components, including the meter vault, check valve vault, reduced pressure zone assembly, concrete foundation pads, and generator concrete pad. All piping is specified as ductile iron with mechanical joints for buried applications and flanged Class 53 for above-grade or exposed pipe. The design incorporates a low-pressure cutoff on all booster pumps to prevent vacuum conditions, restrained joint piping throughout, and electrical infrastructure including a 300-ampere breaker in an existing switchboard with 4/0 copper conductors to the pump house. Construction sequencing requires installation of primary erosion and sedimentation control measures prior to land-disturbing activities, with stabilization of graded slopes required within 21 calendar days and permanent seeding using Bermudagrass or fall/winter rye grass depending on season.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

SCALE: 1" = 500'

PROJECT DATA

AUGUST 20, 2025

OWNER/OPERATOR

WAYNE COMMUNITY COLLEGE

3000 WAYNE MEMORIAL DRIVE

GOLDSBORO, NC 27534

CONTACT: DEREK HUNTER, VP OF OPERATIONS

PHONE: (919) 739-7020

EMAIL: MDHUNTER@WAYNECC.EDU

ENGINEERS

TIMMONS GROUP

5410 TRINITY ROAD SUITE 102

RALEIGH, NC 27607

CONTACT: CHRIS PETREE, PE, DBIA

PHONE: (919) 532-3234

EMAIL: CHRIS.PETREE@TIMMONS.COM

MASTER METER AND BOOSTER PUMP ADDITION

WAYNE COMMUNITY COLLEGE

WAYNE COUNTY, NORTH CAROLINA

SHEET INDEX

SHEET TITLE SHEET

COVER SHEET C1.0

BOOSTER STATION SITE PLAN C1.1

EROSION AND SEDIMENT CONTROL PLAN C1.2

MECHANICAL PLAN, SECTION, AND ISOMETRIC VIEW C1.3

BOOSTER PUMP STATION DETAILS U1.0

BOOSTER PUMP STATION DETAILS U1.1

BOOSTER PUMP STATION DETAILS U1.2

C1.0

1-

2C -C

O V R

G -1

V. DALTON

J. HOPPER

C. PETREE

PROJECT SITE

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m en t

R es id en ti al

I nf ra st ru ct ur e

T ec hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

A

70141

AS SHOWN

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

N A

D

CEDAR BUILDING

WALNUT BUILDING

N O

R

TH

H O

SPITAL R

O

AD

WAYNE MEMORIAL DRIVE COX BOULEVARD

APPROXIMATE MATERIAL QUANTITIES

WATER MAIN

10" DIP WATER MAIN 275 L.F.

10" ISOLATION VALVE 9 EA.

10" CHECK VALVE AND VAULT 1 EA.

8" WATER METER AND VAULT 1 EA.

8" RPZA 1 EA.

LOW SERVICE BOOSTER PUMP 3 EA.

HIGH SERVICE BOOSTER PUMP 2 EA.

PUMP BUILDING 1 EA.

PRELIMINARY

DESIGN

NOT FOR

CONSTRUCTION

09/03/25

W

W

W

W

W W

WW

W

W W

W W

W

W W

W W

W W

W

W

WW

''W10

''W

10'' W 10'' W 10'' W 10'' W 10'' W 10'' W

6'

22.67'

11.33'

E

AC

UGP

UGP

UGP

UGP UGP UGP

UG

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP UGP UGP

UGP

W W

W W

W W

W W

W

W

W W

UGTUGTUGT

W W

U G

P U

G P

NEW 8" TURBINE

MASTER METER

NEW 8" RPZA

NEW 10" DIP SUCTION LINE

NEW PUMP

BUILDING

NEW 10" TEE

NEW 10" GATE VALVE

(NORMALLY OPEN)

NEW 10" TAPPING

SLEEVE AND VALVE

NEW 10" TAPPING

SLEEVE AND VALVE

NEW 10" 90° BEND

NEW 10" 45° BEND

48"X48" DOUBLE

DOOR HATCH

NEW 10" GATE VALVE

(NORMALLY CLOSED)

OPEN CUT AND REPAIR ASPHALT

NEW 10" GATE VALVE

(NORMALLY OPEN)

NEW 10" GATE VALVE

(NORMALLY OPEN)

MDS

EXISTING CEDAR

BUILDING WEST WALL

80.42'

24.13'

NEW 10" 45° BEND

APPROXIMATE LOCATION OF

CEDAR BUILDING FUTURE

EXPANSION (BY OTHERS)

NEW 10" TEE

EXISTING HYDRANT TO BE

REMOVED AND RELOCATED

APPROXIMATELY 72' EAST

8'X4' IN-GROUND

CHECK VALVE VAULT

EXISTING TREE TO BE REMOVED

115.32'

64.98'

NEW 10" GATE VALVE

(NORMALLY OPEN)

RELOCATED HYDRANT

OPEN CUT AND REPAIR

GUTTER PAN AND CURB

NEW 10" DIP DISCHARGE LINE

WW

W W

WW

UGP

UGP

U G

P

UGP

WW

U G

P U

G P

W W

W W

W W

UGP

UTL UTL

W

W W

W

W W

W

W W

W W

UGP

UTL

UGP UGP UGP

W

UGP

U G

P

W W UGP

UGP

DOGWOOD

WALNUT

6' ' S

A N

W6'' SANS

S

S

WW

S

S

10'' W 10'' W 10'' W 10'' W

E

AC

UGP

UGP

UGP

UGP

UGP

UGP

UGT

PROJECT BOUNDARY

'' W

'' W

'' W

'' W

'' W

'' W

'' W

'' W

'' W

APPROXIMATE LOCATION OF

CEDAR BUILDING FUTURE

EXPANSION (BY OTHERS)

C1.1

B O

O S

TE

R S

TA

TI

O N

S

IT

E

PL

A N

V. DALTON

J. HOPPER

C. PETREE

SCALE 1"=60'

120'60' 0

SCALE 1"=20'

40'20'

W A

Y N

E M

E M

O R

IA

L

D R

IV

E

SITE LOCATION ON WCC CAMPUS WCC BOOSTER STATION SITE PLAN

EXISTING 24" RCP STORM PIPE

CEDAR BUILDING

WALNUT

BUILDING

DOGWOOD

BUILDING

WAYNE COMMUNITY COLLEGE ENTRANCE DRIVE

BOOSTER STATION NOTES:

DESIGN CRITERIA:

THE WAYNE COMMUNITY COLLEGE (WCC) BOOSTER STATION HAS BEEN DESIGNED TO SERVE THE ENTIRE WCC CAMPUS. THE TOTAL AVERAGE DAILY FLOW FOR THE WCC CAMPUS IS APPROXIMATELY 120 GPD. USING A PEAKING FACTOR OF 2.5 THE MAXIMUM DAILY DEMAND IS 300 GPM. THE REQUIRED FIRE FLOW ON EACH CAMPUS HYDRANT (RUNNING NON-SIMULTANEOUSLY) IS 1,500 GPM. THE STATION SHALL HAVE (3) CORNELL LOW SERVICE BOOSTER PUMPS AND (2) CORNELL HIGH SERVICE BOOSTER PUMPS, WHICH WILL BOOST FIRE FLOWS. ALL PUMPS SHALL BE CONNECTED IN PARALLEL TO THE NEW 10-INCH DIP WATERLINE THAT IS DOWNSTREAM OF THE NEW 8-INCH MASTER METER AND 8-INCH MASTER BACKFLOW PREVENTER. A BYPASS VAULT SHALL BE INSTALLED APPROXIMATELY 24 LF IN FRONT OF THE BOOSTER PUMP HOUSE ON THE NEW 10-INCH WATER MAIN TO MAINTAIN WATER FLOW TO THE COLLEGE IN CASE OF REQUIRED MAINTENANCE

ON THE BOOSTER PUMP STATION.

DESIGN SUMMARY:

THE WCC BOOSTER STATION LOW SERVICE FLOWS ARE HANDLED BY (3) CORNELL MODEL 2YH PUMPS, EACH CAPABLE OF OPERATING AT 150 GPM @ 65 FT OF LIFT. TWO PUMPS WILL OPERATE AT ONCE TO MEET MAXIMUM DAILY DOMESTIC DEMANDS AND THE THIRD PUMP WILL CYCLE IN AS A BACK UP. THE WCC BOOSTER STATION HIGH SERVICE FLOWS ARE HANDLED BY (2) CORNELL MODEL

5RB PUMPS, EACH CAPABLE OF OPERATING AT 1,500 GPM @ 116 FT OF LIFT.

GENERAL NOTES:

1. CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND CONNECTIONS REQUIREMENTS WITH THE MANUFACTURERS PRIOR TO ORDERING AND INSTALLING EQUIPMENT.

2. A LOW-PRESSURE CUTOFF SHALL BE INSTALLED ON ALL BOOSTER PUMPS TO PREVENT THE CREATION OF A VACUUM OR NEGATIVE PRESSURE ON THE SUCTION SIDE OF THE PUMP WHEN

THE SUCTION PRESSURE IS 10 PSI OR LESS. THIS IS IN ACCORDANCE WITH NCPC 606.5.5.

3. ALL PIPING SHALL BE RESTRAINED JOINT.

4. ALL BURIED PIPE SHALL BE DUCTILE IRON MECHANICAL JOINT CLASS 52 AND ALL ABOVE GRADE OR EXPOSED PIPE SHALL BE DUCTILE IRON FLANGED CLASS 53 UNLESS OTHERWISE NOTED.

5. ALL WIRING SHALL BE COPPER THHN-2 OR THWN-2.

KEY NOTES:

1. PROVIDE (4) #350KCM, (1) #4 GND, IN 4" SCHEDULE 80 PVC CONDUIT FROM SWITCHBOARD "MDS" TO DISCONNECT AT PUMP HOUSE. MINIMUM BURY DEPTH SHALL BE 24". PROVIDE RGS ELBOWS FOR TRANSITION FROM BELOW TO ABOVE GRADE. PROVIDE RGS CONDUIT FOR ALL ABOVE GROUND PORTIONS OF THE FEEDER.

2. PROVIDE 300A/3P 65KAIC BREAKER IN EXISTING SQUARE D QED-2 SWITCHBOARD TO SERVE PUMP HOUSE.

3. PROVIDE (1) 400A, SE RATED, 65AIC, NEMA 3R, 600V, 3-PHASE, FUSED DISCONNECT WITH 300A FUSES TO SERVE AS THE DISCONNECTING MEANS FOR THE PUMP HOUSE. PROVIDE 3/4" X 10 FT GROUND RODS IN TRIAD PATTERN ADJACENT TO PUMP HOUSE AND CONNECT TO GROUND BUS OF DISCONNECT. UTILIZE #3/0 BARE COPPER GND FOR ALL GROUNDING WITHIN THE TRIAD AND TO DISCONNECT. INSTALL GROUNDING WIRE IN SCHEDULE 80 PVC CONDUIT WHEN ABOVE GROUND. PROVIDE CONNECTION FROM DISCONNECT TO PUMP HOUSE PANEL USING (4) #350KCM, (1) #4 GND, IN 4" RGS CONDUIT. NEUTRAL AND GROUND BUS SHALL REMAIN INDEPENDENT FOR THE PUMP HOUSE.

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m id en ti al

I nf ra st ru ct hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

SCALE: 1" = 20'SCALE: 1" = 60'

PRELIMINARY

DESIGN

NOT FOR

''W

''W

''W

''W

''W

10'' W 10'' W 10'' W 10'' W 10'' W 10'' W 10'' W 10'' W 10'' W 10'' W

AC

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP UGP UGP UGP UGP

UG

P

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP

UGP UGP UGP UGP UGP UGP

W W

W W

10''W 10''W

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLODLODLODLODLODLOD

PS

LOD LOD LOD LOD LOD LOD LOD

25'

SF

CE

PS

PS

TP

TP

TP

IP

10''W

TP

CONSTRUCTION ENTRANCE

SILT FENCE

PERMANENT SEEDING

SYMBOLLABEL STANDARD NAME

EROSION CONTROL LEGEND

CE

SF

PS PS

TREE PROTECTION SILT FENCETP

IP INLET PROTECTION

C1.2

ER

O

S

IO

N A

N D

S

ED

IM

EN

T C O

N

TR

O L

PL

A N

V. DALTON

J. HOPPER

C. PETREE

SCALE 1"=10'

20'10'

2"-3" COURSE

AGGREGATE

EROSION AND SEDIMENT CONTROL SITE PLAN

EXISTING 24" RCP STORM PIPE

SEQUENCE OF CONSTRUCTION

1. THE CONTRACTOR SHALL CONSTRUCT AND PLACE INTO OPERATION ALL PRIMARY EROSION AND SEDIMENTATION CONTROL PRACTICES FOR THE SITE (SILT FENCE, SEDIMENT BASINS AN TRAPS, AND WATER CONVEYANCE MEASURES)

PRIOR TO UNDERTAKING MAJOR LAND-DISTURBING ACTIVITIES.

2. STABILIZE ALL CONSTRUCTION ACCESS ROUTES, CONSTRUCTION ENTRANCES/EXISTS, AND ASSOCIATED DRAINAGE

SYSTEM. INSTALL INLET PROTECTION DEVICES.

3. INSTALL DIVERSIONS ABOVE AREAS TO BE DISTURBED AND LOCATE DIVERSION DIKES ALONG GRADING BOUNDARIES

PRIOR TO GRADING ACTIVITIES.

4. PERFORM LAND CLEARING, ROUGH GRADING, AND PIPELINE INSTALLATION. CLEAR AREAS ONLY NEEDED.

5. BACKFILL PIPELINE AND COMPLETE FINAL GRADING AND SURFACE STABILIZATION TO MINIMIZE THE TIME OF EXPOSURE AND SELECT TEMPORARY GROUND COVER ACCORDING TO LOCATION AND SEASON. TEMPORARY SURFACES SHOULD BE STABILIZED AS SOON AS ACTIVE GRADING IS SUSPENDED OR BACKFILL IS COMPLETE. GRADED SLOPES AND FILLS MUST

BE STABILIZED WITHIN 21 CALENDAR DAYS, REGARDLESS OF TIME OF YEAR.

6. INSPECT EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF-PRODUCING RAINFALL. FREQUENTLY INSPECT PROPERTY BOUNDARY FOR EVIDENCE OF SEDIMENTATION. MAINTAIN EROSION CONTROL MEASURES AS NECESSARY AND ADDRESS ANY SEDIMENTATION AT EROSION CONTROL MEASURES, PROPERTY BOUNDARY, OR OFF-SITE SEDIMENTATION DUE TO UNDER-PERFORMING SEDIMENT CONTROL MEASURES UNTIL FINAL APPROVAL IS RECEIVED AND

ALL AREAS ARE STABILIZED..

7. REMOVE TEMPORARY EROSION CONTROL MEASURES.

SEEDING AND MULCHING (EAST):

THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE DETERMINED. ALL

RATES

ARE IN POUNDS PER ACRE.

ALL ROADWAY AREAS

MARCH 1 - AUGUST 31: 25# BERMUDAGRASS (HULLED), 500# FERTILIZER

SEPTEMBER 1 - FEBRUARY 28: FALL/WINTER RYE GRASS

WASTE AND BURROW LOCATIONS

MARCH 1 - AUGUST 31: 25# BERMUDAGRASS (HULLED), 500# FERTILIZER

SEPTEMBER 1 - FEBRUARY 28: FALL/WINTER RYE GRASS

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m id en ti al

I nf ra st ru ct hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

SCALE: 1" = 10'

EXISTING TREE TO BE REMOVED

70'

PRELIMINARY

DESIGN

NOT FOR

C1.3

M

EC

H A N

IC

A L

PL

A N

S

EC

TI

O

N

A N

D I

S O

M

ET

R

IC

V

IE

W S

V. DALTON

J. HOPPER

C. PETREE

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m id en ti al

I nf ra st ru ct hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

PRELIMINARY

DESIGN

NOT FOR

U1.0

B O

O S

TE

R P

U M

P S

TA

TI

O

N D

ET

A

IL

S

V. DALTON

J. HOPPER

C. PETREE

AS SHOWN

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m id en ti al

I nf ra st ru ct hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

PRELIMINARY

DESIGN

NOT FOR

U1.1

B O

O S

TE

R P

U M

P S

TA

TI

O

N D

ET

A

IL

S

V. DALTON

J. HOPPER

C. PETREE

AS SHOWN

LOW SERVICE PUMP CURVE HIGH SERVICE PUMP CURVE

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m id en ti al

I nf ra st ru ct hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

PRELIMINARY

DESIGN

NOT FOR

U1.2 U1.2

SCALE:

CHECK VALVE VAULT SECTION

N.T.S.

A

U1.2 U1.2

5'-0"

MIN

(2) S.S. PIPE

SUPPORTS

10" OS&Y GATE

VALVE

(NORMALLY OPEN)

48"X48" DOUBLE DOOR HATCH

ALUMINUM

LADDER

8" MIN #57 STONE

NOTE:.

1. THE PRECAST SUPPLIER SHALL SIZE THE STRUCTURE

WALLS, TOP, AND BASE TO ACCOUNT FOR THE

ANTICIPATED LOADS, DEPTH OF SERVICE, AND

FLOATATION AND PROVIDE CALCULATIONS SIGNED BY

A LICENSED PROFESSIONAL ENGINEER IN THE STATE

OF NORTH CAROLINA.

2. CONTRACTOR SHALL CONFIRM PENETRATION SIZES

AND LOCATIONS PRIOR TO ORDERING PRECAST

STRUCTURE.

PRECAST CONCRETE VAULT

(3,000 PSI MIN)

LINK SEAL (TYP)

GROUT FLOOR TO DRAIN AT

4" PER FOOT MIN SLOPE

SCALE:

CHECK VALVE VAULT

N.T.S.

10" OS&Y GATE VALVE

(NORMALLY OPEN)

10" SWING

CHECK

VALVE

GRADE ELEV. = 123'

10" DI

PIPE10" DI

PIPE

10" DIP WATERLINE

10" DIP WATERLINE

10" FLANGE

ADAPTER 10" FLANGE

ADAPTER

1 CUBIC YARD OF

#57 STONE SET

BELOW STRUCTURE

ELEVATION

3" SCH 80 PVC EXTRA

FILTRATION DRAIN,

SLOPE TO #57 STONE

1 CUBIC YARD OF

#57 STONE SET

BELOW STRUCTURE

ELEVATION

3" SCH 80 PVC EXTRA

FILTRATION DRAIN,

SLOPE TO #57 STONE

10" DIP WATERLINE

10" DIP WATERLINE

10" OS&Y

GATE VALVE

(NORMALLY

OPEN)

10" OS&Y

GATE VALVE

(NORMALLY

OPEN)

ALUMINUM

LADDER

48"X48" DOUBLE

DOOR HATCH

10" SWING

CHECK

VALVE

PRECAST 8' X 4' IN-GROUND

CONCRETE BYPASS VAULT

(3,000 PSI MIN)

MIN. 1'

MIN. 1'

MIN. 1'

MIN. 1'

MIN. 1'

6" Ø OPENING FOR DRAINAGE

SCALE:

METER VAULT PLAN VIEW

N.T.S.

SCALE:

METER VAULT CROSS-SECTION

N.T.S.

1 10" DIP WATERLINE

EQUIPMENT LEGEND

8" FLANGED TEE CLASS 50 DIP

8" 90° BEND (TYP.)

MIN. 6" LEVEL OF COMPACTED STONE

ALUMINUM HATCH (HALLIDAY MODEL H2W7260) (OR APPROVED

EQUIVALENT)

72" X 114" PRECAST CONCRETE METER VAULT

GATE VALVE (TYP.) (SEE NOTE)

ADJUSTABLE ALUMINUM PIPE CRADLE W/ STAINLESS STEEL STANDPIPE13

UNDISTURBED SUBGRADE

8" SUNSUS OMNI+ TURBO (T2) METER WITH STRAINER

ALUMINUM ACCESS LADDER

8" FLANGED ADAPTER (TYP. OF 2)

LINK-SEAL (OR APPROVED EQUIVALENT)8" X 10" REDUCER

8" DIP SPOOL PIECE

8" DIP WATERLINE

5 5

1 CY #57 STONE FOR EXFILTRATION

STRAINER

STRAINER

NOTES:

1. COORDINATE OVERALL TANK PAD DIMENSIONS WITH GENERATOR

MANUFACTURER.

2. SLAB SUBGRADE SHALL BE PREPARED IN ACCORDANCE WITH EXISTING

SOIL CONDITIONS. MINIMUM COMPACTION SHALL BE 95% OF THE SOIL'S

STANDARD PROCTOR MAXIMUM DRY DENSITY.

3. REINFORCING; GRADE 60 PER ASTM A-615.

FINISHED

GRADE

2" CHAMFER

STEEL TROWEL FINISH

#5 @ 8" O.C. EACH WAY

TOP AND BOTTOM; 2" CLEAR

2 - #5 CONTINOUS

SUBGRADE COMPACTED TO

95% MODIFIED PROCTOR;

ASTM D-698

6" #57 STONE

SCALE:

GENERATOR

CONCRETE PAD DETAILS

NOT TO SCALE

18"

#6 BARS AT 12"

O.C. MAX. (B)

#4 BARS AT 12"

O.C. MAX. (T)

0.17' 0.25'

1'

0.5'

1'

0.5'

#7 or #8 STONE (PEA GRAVEL)

COMPACTED STRUCTURAL FILL

OR NATURAL EARTH (SEE

GEOTECHNICAL REPORT FOR

ADDITIONAL REQUIREMENTS)

SCALE:

CONCRETE FOUNDATION PAD

NOT TO SCALE

WATER MAIN

WATER VALVE

RODDING (TYP)

RPZ

O.S.& Y. RISING STEM

OR INDICATING

BUTTERFLY VALVE

DIP

D

IP D

IPVALVE BOX

(TYP) REFER TO

W-19

12" MIN

ALL

SIDES

12" MIN

ALL SIDES

60" MAX

1. ALL ABOVE GROUND ENCLOSURES MUST HAVE ADEQUATE DRAINAGE (TWICE THE

DIAMETER OF THE SUPPLY PIPE) TO DAYLIGHT ABOVE GRADE.

2. REDUCED PRESSURE BACKFLOW PREVENTERS MAY BE LOCATED IN A BUILDING PROVIDED

THERE ARE NO OTHER UNPROTECTED TAPS BETWEEN THE MAIN AND THE BUILDING.

DRAINAGE IN A BUILDING MUST BE TWICE THE DIAMETER OF THE SUPPLY PIPE.

3. ABOVE GROUND INSULATED VAULTS MUST BE ASSE 1060 APPROVED. SEE CROSS

CONNECTION MANUAL FOR ENCLOSURE FREEZE PROTECTION AND CERTIFICATION

REQUIREMENTS.

4. RESIDENTIAL LAWN IRRIGATION R.P. ASSEMBLIES THAT ARE REMOVED TO PREVENT

FREEZING IN THE WINTER MONTHS MUST BE CAPPED OFF. ALL ABOVE GROUND ASSEMBLIES,

EXCEPT RESIDENTIAL LAWN IRRIGATION ASSEMBLIES, MUST BE PROTECTED FROM FROST.

5. ENCLOSURE SHALL BE HEATED.

6. FOR ENCLOSURE DIMENSIONS SEE DETAIL W-34.

7. STEEL RODS AND BOLTS SHALL BE 3/4" HOT DIPPED GALVANIZED.

8. ALL ASSEMBLIES MUST BE ON THE CURRENT APPROVAL LIST.

9. ALL BELOW-GRADE JOINTS SHALL BE RESTRAINED.

4" THICK

CONCRETE PAD

INSULATED AND HEATED

ENCLOSURE

SCALE:

REDUCED PRESSURE ZONE ASSEMBLY

NOT TO SCALE

U1.2

B O

O S

TE

R P

U M

P S

TA

TI

O

N D

ET

A

IL

S

V. DALTON

J. HOPPER

C. PETREE

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

D A

TE

DRAWN BY

DATE

R

EV

IS

IO

N D

ES

C R

IP

TI

O

N

YO

UR

V

IS

IO

N

AC

HI

EV

ED

T

HR

O

UG

H O

UR

S.

Si te

D ev el op m id en ti al

I nf ra st ru ct hn ol og y

08/20/2025

M A S

TE

R M

ET

ER

A N

D B

O O

S

TE

R P

U M

P A D

D

IT

IO

N

W A

YN

E C O

M M

U N

IT

Y

C O

LL

EG

E

W A

YN

E C O

U N

TY

N O

R

TH

C A R O

LI

N

T rin ity R oa d, S ui te

R al ei gh

, N C

TE

L

9.

6.

F

AX

.8

.8 w w w .t im m on s.

co m

TH

IS

D

RA

W

IN

G P

RE

PA

RE

D

A T

TH

E

R A

LE

IG

H O

FF

IC

E

PRELIMINARY

DESIGN

NOT FOR

Sheets and Views
70141-212C-COVR - G-1
70141-BOOSTER_LAYOUT_4_11_25 - C1.1
70141-BOOSTER_LAYOUT_4_11_25 - C1.2
70141-BOOSTER_LAYOUT_4_11_25 - C1.3
99999-212C-1-UTND - U1.0
99999-212C-1-UTND - U1.1
99999-212C-1-UTND - U1.2
70141-BOOSTER_LAYOUT_4_11_25 - C1.4

File details come from the government source that posted it. Updated .