WCC 260-B4260-040 (L24WC650) Addendum No. 3 2026-05-27.pdf
PDF 5 MB Posted
- Solicitation number
- DBB-118675
- Issued by
- York County, Virginia
About this file
Addendum No. 3 to Bland Hall Renovation Contract Documents
This is Addendum No. 3, dated May 27, 2026, issued by the Virginia Community College System for the Bland Hall renovation project at Wytheville Community College (Project Code 260-B4260-040). The addendum modifies the original contract documents dated July 16, 2025, and introduces significant new requirements for asbestos abatement work. The addendum adds Section 028213 – Asbestos Abatement as a complete 13-page specification section and includes the Asbestos Inspection Report prepared by Jared Crowder of Raymond Global, dated May 26, 2026, as a 23-page appendix. The inspection identified non-friable asbestos-containing materials (ACM) in interior door framing caulk at approximately three locations that must be removed prior to renovation activities. All bidders must acknowledge receipt of this addendum on their bid forms to avoid disqualification. The sealed bid deadline was May 27, 2026, at 3:00 P.M., with public bid opening scheduled for May 28, 2026. A pre-bid conference was held on May 6, 2026, at Wytheville Community College, Bland Hall Room 238.
The asbestos abatement work is a non-friable removal requiring compliance with OSHA regulations (29 CFR 1926.1101), EPA standards (40 CFR Part 61), and Virginia Department of Labor and Industry requirements. The contractor must submit detailed abatement plans, maintain negative pressure containment at minimum 0.02 inches of water column with four air changes per hour, conduct daily air monitoring both inside and outside work areas, establish worker decontamination enclosure systems, and dispose of all asbestos-contaminated materials at authorized disposal sites with documentation provided within 30 days. Personnel protection, including full-body protective clothing, respirators, and medical examinations for all workers, is mandatory. The contractor bears all costs for air sampling, analysis, and disposal. Final air clearance samples will be taken by a Virginia-licensed project monitor using NIOSH 7400 PCM analysis methods, and the contractor is responsible for costs of any subsequent sampling if initial clearance standards are not met. No specific pricing information, set-asides, or incumbent contractor details are disclosed in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WCC MAIN CAMPUS BLAND HALL RENOVATION SFCS – 20301.13
VCCS PROJECT CODE: 260-B4260-040
ADDENDUM NO. 3 1
ADDENDUM NO. 3 – May 27, 2026
This Addendum forms a part of the Contract Documents and modifies the original Contract Documents dated July 16, 2025.
Acknowledge receipt of this Addendum in the space provided on the BID FORM. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 1 narrative page.
The following items clarify, modify, change, delete from or add to the Contract Documents. When any paragraph, subparagraph, or sub-subparagraph thereof is modified or deleted by this Addendum, the unaltered provisions of that paragraph, subparagraph, sub-subparagraph shall remain in effect.
CHANGES TO SPECIFICATIONS:
NOTE: The specification section and Appendix listed below shall be added in their entirety per this Addendum.
1. Table of Contents:
Please remove the current Table of Contents and replace in its entirety, the attached updated Table of Contents.
2. Section 028213 – ASBESTOS ABATEMENT
This 13-page specification section has been added to the project scope.
3. APPENDIX – Asbestos Inspection Report
The Asbestos Inspection Report prepared by Jared Crowder at Raymond and dated May 26, 2026 has been added as an appendix to the Project Manual specifications. The report is 23 pages.
CHANGES TO DRAWINGS:
4. Cover Sheet T1
The Asbestos Disclosure Statement with the associated requirements has been updated from CPSM – 4.12.2.3 to 4.12.2.4.
5. Sheet AD1.0 – GROUND FLOOR DEMOLITION PLANS
References to the Asbestos Inspection Report included with the Addendum have been added to Demolition Plans to determine locations.
END OF ADDENDUM NO. 3
05/27/2026
WCC MAIN CAMPUS - BLAND HALL RENOVATION SFCS - 20301.13
PROJECT CODE: 260-B4260-040
TABLE OF CONTENTS 1
TABLE OF CONTENTS
BIDDING INFORMATION CO FORM NO.
NOTICE OF INVITATION TO BID DGS-30-256
INSTRUCTIONS TO BIDDERS CO-7A/DGS-30-055
PREVAILING WAGE DETERMINATION FROM DOLI
PREBID QUESTION FORM DGS-30-272
BID FORM DGS-30-220
GENERAL CONDITIONS & FORMS
COMMONWEALTH OF VA. GENERAL CONDITIONS OF THE CO-7 / DGS-30-054
CONSTRUCTION CONTRACT
Forms listed below that are preceded with ** may be accessed by Ctrl+Click to follow link or accessed on the DGS Forms Center: https://dgs.virginia.gov/search/documents-and-forms
**CONTRACT BETWEEN OWNER AND CONTRACTOR CO-9/DGS-30-064
**WORKERS COMPENSATION INSURANCE CERTIFICATE CO-9A/DGS-30-076
**STANDARD PERFORMANCE BOND CO-10/DGS-30-084
**STANDARD LABOR AND MATERIAL PAYMENT BOND CO-10.1/DGS-30-088
**STANDARD BID BOND CO-10.2 /DGS-30-090
**CONSTRUCTION CHANGE ORDER CO-11/DGS-30-092
**CHANGE ORDER ESTIMATE (GENERAL CONTRACTOR) GC-1/DGS-30-200
**CHANGE ORDER ESTIMATE (SUBCONTRACTOR) SC-1/DGS-30-204
**CHANGE ORDER ESTIMATE (SUB-SUBCONTRACTOR) SS-1/DGS-30-208
**SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENT CO-12/DGS-30-104
**AFFIDAVIT OF PAYMENT OF CLAIMS CO-13/DGS-30-108
**CERTIFICATE OF COMPLETION BY ARCHITECT/ENGINEER CO-13.1/DGS-30-112
**CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY A/E CO-13.1a/DGS-30-116 **FINAL REPORT OF STRUCTURAL AND SPECIAL INSPECTIONS CO-13.1b/DGS-30-120
**CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY
AGENCY PROJECT MANAGER CO-13.1c/DGS-30-128 **FINAL REPORT OF STRUCTURAL OBSERVATIONS CO-13.1d/DGS-30-121
**CERTIFICATE OF COMPLETION BY CONTRACTOR CO-13.2/DGS-30-136
**CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY CO-13.2A/DGS-30-140
CONTRACTOR
**DOCUMENT CHECKLIST FOR BENEFICIAL OCCUPANCY CO-13.3b/DGS-30-152 **CHECKLIST FOR SUBSTANTIAL COMPLETION INSPECTION CO-13.3s/DGS-30-151 **DOCUMENT CHECKLIST FOR FINAL COMPLETION CO-13.3f/DGS-30-153
**COMMISSIONING COMPLETION FORM DGS-30-229
**SUBMITTAL REGISTER FORMAT (refer to Sample in DGS-30-364)
**VENDOR EVA REGISTRATION REQUIREMENTS DGS-30-384
**VEES VERIFICATION
(if HPBA compliance is required, refer to Section 6.1.3) DGS-30-381 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-054_07-22_co-7.pdf https://dgs.virginia.gov/search/documents-and-forms https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-064_02-22_co-9.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-076_05-02_co-9a.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-084_07-21_co-10.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-088_07-21_co-10_1.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-090_07-21_co-10_2.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-092_07-20_co-11_and_co-11a.xlsm https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-200_03-16_gc-1_.xls https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-204 https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-208 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-104_01-16_co-12---.xls https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-108_12-17_co-13.docx https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-112 https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-116 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-120_08-14_co-13_1b_final_report.xls https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-128_10-24_co-13_1c.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-121_07-22_co-13_1d_final_report.xls https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-136_10-18_co-13_2.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-140_10-18_co-13_2a.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-152-_10_24_co13.3b.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-151_10_24_co13.3s.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-153_10_24_co13_3f.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-229_10-24-cx-completion-form.doc https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-364 https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-384 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-381-vees-verification.xls
TABLE OF CONTENTS 2
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
000107 SEALS PAGE
000115 LIST OF DRAWING SHEETS
2021 VUSBC SPECIAL INSPECTIONS AND STRUCTURAL OBSERVATIONS (CO-6B)
DIVISION 01 - GENERAL REQUIREMENTS
010000 GENERAL REQUIREMENTS
011000 SUMMARY
017300 EXECUTION
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
028213 ASBESTOS ABATEMENT
DIVISION 03 – 04
NOT USED
DIVISION 05 - METALS
051200 STRUCTURAL STEEL FRAMING
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
064219 PLASTIC-LAMINATE-FACED WOOD PANELING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
078413 PENETRATION FIRESTOPPING
078443 JOINT FIRESTOPPING
079200 JOINT SEALANTS
079219 ACOUSTICAL JOINT SEALANTS
DIVISION 08 - OPENINGS
081213 HOLLOW METAL FRAMES
081416 FLUSH WOOD DOORS
083113 ACCESS DOORS AND FRAMES
087100 DOOR HARDWARE
088000 GLAZING
088813 FIRE-RATED GLAZING
TABLE OF CONTENTS 3
DIVISION 09 - FINISHES
092116.23 GYPSUM BOARD SHAFT WALL ASSEMBLIES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
095113 ACOUSTICAL PANEL CEILINGS
095426 SUSPENDED WOOD CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT TILE FLOORING
096813 TILE CARPETING
099124 INTERIOR PAINTING (MPI STANDARDS)
DIVISION 10 – SPECIALTIES
102239 FOLDING PANEL PARTITIONS
104413 FIRE PROTECTION CABINETS
104416 FIRE EXTINGUISHERS
105626 MOBILE STORAGE SHELVING
DIVISIONS 11 – EQUIPMENT
115123 LIBRARY STACK SYSTEMS
DIVISION 12 – FURNISHINGS
122413 ROLLER WINDOW SHADES
123661.16 SOLID SURFACING COUNTERTOPS
DIVISIONS 13 – 21
NOT USED
DIVISION 22 - PLUMBING
220523.12 BALL VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
230500 COMMON WORK RESULTS FOR HVAC
230523 GENERAL-DUTY VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548.13 VIBRATION CONTROLS FOR HVAC
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
230923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC
232113 HYDRONIC PIPING
TABLE OF CONTENTS 4
232116 HYDRONIC PIPING SPECIALTIES
233113 METAL DUCTS
233300 AIR DUCT ACCESSORIES
233346 FLEXIBLE DUCTS
233713.13 AIR DIFFUSERS
233713.23 AIR REGISTERS AND GRILLES
234100 PARTICULATE AIR FILTRATION
238126 SPLIT-SYSTEM AIR CONDITIONERS
238216.14 ELECTRIC-RESISTANCE AIR COILS
238219 FAN COIL UNITS
DIVISION 26 - ELECTRICAL
260010 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533.13 CONDUITS FOR ELECTRICAL SYSTEMS
260533.16 BOXES AND COVERS FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260923 LIGHTING CONTROL DEVICES
260943.23 RELAY-BASED LIGHTING CONTROLS
262726 WIRING DEVICES
262726.11 GENERAL-USE SWITCHES, DIMMER SWITCHES, AND FAN-SPEED
CONTROLLER SWITCHES
262726.31 GENERAL-GRADE SINGLE STRAIGHT-BLADE RECEPTACLES
262726.33 GENERAL-GRADE DUPLEX STRAIGHT-BLADE RECEPTACLES
262726.37 RECEPTACLES WITH ARC-FAULT AND GROUND-FAULT PROTECTIVE DEVICES
262813 FUSES
265000 LIGHTING
DIVISION 27 – COMMUNICATIONS
270000 GENERAL REQUIREMENTS FOR COMMUNICATIONS SYSTEMS
270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS
271013 COMMUNICATIONS COPPER CABLING
271023 COMMUNICATIONS OPTICAL FIBER CABLING
271116 COMMUNICATIONS RACKS, FRAMES, AND ENCLOSURES
274000 AUDIO VISUAL SYSTEMS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
284621.11 ADDRESSABLE FIRE-ALARM SYSTEMS
DIVISIONS 31-33 NOT USED
TABLE OF CONTENTS 5
APPENDIX
-Asbestos and Lead Based Paint Inspection Report, WCC – Bland Hall, 2nd Floor, dated November 22, 2010 -Daily Abatement Monitoring by HDH Technical, Inc. – Bland Hall, dated December 26, 2013 -COMcheck Compliance Certificates – Envelope, Interior Lighting, Exterior Lighting, and Mechanical, dated December 11, 2024 -Asbestos Inspection Report of WCC Bland Hall 1st Floor Renovation by Raymond, dated May 26, 2026
END OF TABLE OF CONTENTS
WCC BLAND HALL RENOVATION
ASBESTOS ABATEMENT
02 82 13 -1
SECTION 02 82 13 - ASBESTOS ABATEMENT
PART 1 – GENERAL
1.01 DESCRIPTION OF WORK:
The work includes the removal and disposal of friable and/or non-friable materials containing asbestos indicated and specified herein and the incidental procedures and equipment required to protect workers from contact with airborne asbestos fibers. The
Contractor shall furnish all labor, materials, services, insurance and equipment required for the removal and disposal of asbestos-containing materials in accordance with the guidelines or regulations of the responsible state agency, the local agency, EPA or OSHA.
The work includes, but is not necessarily limited to the following:
A. All preparation of the work areas and areas outside the work areas prior to beginning asbestos removal work.
B. Removal and disposal of all asbestos materials and waste materials contaminated with asbestos during the process of the work and any other debris generated by this project. Asbestos containing or contaminated material at Wytheville Community
College, Bland Hall includes but may not be limited to the following:
INTERIOR DOOR FRAMING – APPROX. 3 UNITS
(TAN CAULK BETWEEN METAL FRAME AND BLOCK)
LOCATIONS AND AMOUNTS OF ACM ARE APPROXIMATE AND TO
BE FIELD VERIFIED BY CONTRACTOR DURING SITE VIST. SEE
GENERAL CONDITIONS FOR INSTRUCTIONS ON HOW TO
PROCEED IF ADDITIONAL SUSPECT MATERIALS ARE
ENCOUNTERED.
C. Complete cleaning and decontamination of all work areas and contents thereof.
1.02 TERMINOLOGY:
A. Amended Water: Water containing a wetting agent of surfactant.
B. Asbestos Control Area: An area where asbestos removal operations are performed which is isolated by physical boundaries to prevent the release of asbestos dust, fibers, or debris.
C. Authorized Visitor: The Owner's representative, or a representative of any regulatory or other agency having jurisdiction over the project.
02 82 13 -2
D. Friable Asbestos Material: Material when dry, may be crumbled, pulverized or reduced to powder by hand pressure and includes previously non-friable material after such previously non-friable material becomes damaged to the extent that when dry may be crumbled, pulverized, or reduced to powder by hand pressure.
E. HEPA Filter Equipment: High-efficiency particulate air filtered vacuuming equipment with a filter system capable of collecting and retaining asbestos fibers.
Filters shall be of 99.97 percent efficiency for retaining fibers of 0.3 microns or larger.
F. Negative Pressure: A local exhaust system capable of maintaining a minimum pressure differential of minus 0.02 inch of water column relative to adjacent unsealed areas.
G. Non-friable Asbestos Material: Material that contains asbestos in which the fibers have been locked in by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not release fibers during any appropriate use, handling, demolition, storage, transportation, processing or disposal.
H. Owner's Representative: Person designated in the contract as authorized individual
(or his designee) to represent and mediate for the Owner in administration of the
Contract.
I. Project Monitor: One or more individuals employed by the Owner to inspect the
Work and/or to act as clerk of the works to the extent required by the Owner. The
Owner shall notify the Contractor in writing of the appointment of such Project
Monitor(s).
J. Surfactant: A chemical wetting agent added to water to improve penetration, thus reducing the quality of water required for a given operation or area.
K. Wet Cleaning: The process of eliminating asbestos contamination from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with water, and by afterwards disposing of these cleaning tools as asbestos-contaminated waste.
1.03 CONFORMANCE TO REGULATORY REQUIREMENTS:
A. In addition to detailed requirements of this specification, the contractor shall comply with laws, ordinances, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting and disposing of asbestos
02 82 13 -3 waste materials. Comply with the applicable requirements of the current issue of the following regulatory agencies:
1. Title 29, Code of Federal Regulations, Section 1926.1101 (OSHA)
Occupational Safety and Health Administration, U.S. Department of Labor and the Virginia Occupational Safety and Health Standards for Industry, Department of Labor and Industry Construction.
2. Title 40, Part 61, Subparts A and B. Regional National Emissions Standards for Hazardous Air Pollutants. (EPA) U.S. Environmental Protection
Agency.
3. 40 CFR Part 763 Subpart E, Appendix D.
B. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification and referenced documents vary, the most stringent requirement shall apply.
C. When required, written notification shall be made to:
1. Department of Labor and Industry
Attn: Accounting/Finance
Main Street Centre
600 East Main Street, Suite 207
Richmond, Virginia 23219
2. Asbestos Coordinator
USEPA Region III
Mail Code 3LC62
1650 Arch Street
Philadelphia, PA 19103-2029
3. Notification shall be sent not later than 20 days prior to commencement of the work with a copy sent for the Owner's Representative. Notification shall be on a Form provided by the Commonwealth of Virginia, Department of
Labor and Industry.
1.04 BUILDING PROTECTION:
The asbestos control area shall be maintained under negative pressure at all times of a minimum of .02 inches of water column relative to adjacent unsealed area. A minimum of
4 air changes per hour is required.
02 82 13 -4
1.05 SUBMITTALS:
Submittals shall be made in accordance with procedures set forth in Section "Submittals."
A. Notification to Regulatory Agencies: Submit a copy of the notification of the proposed asbestos work as required under paragraph "Conformance to Regulatory
Requirements."
B. Asbestos Plan: Submit a detailed plan of the work procedures to be used in the removal and demolition of materials containing asbestos. Such plan shall include interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent to be used, air monitoring, and a detailed description of the method to be employed in order to control pollution. Plan shall be approved prior to start of the work.
C. Testing Laboratory: Submit the name, address, telephone number, and copy of the
VA Asbestos Laboratory License of the testing laboratory selected for the monitoring of the airborne concentrations of asbestos fibers along with certification that persons counting the samples have been judged proficient by successful participation in the National Institute for Occupational Safety and Health (NIOSH)
Proficiency Analytical Testing (PAT) Program.
D. Disposal: Must comply with 40 CFR Part 763 Subpart E Appendix D
1. Submit evidence that all required permits for transport disposal of asbestos containing or contaminate materials, supplies, and the like have been obtained.
2. Submit certified copies from the operator of the asbestos disposal site that the asbestos has been received, within 30 days of removal, specifying quantities and dates of delivery.
E. Employee Qualification, Virginia Licensure Requirements:
1. Submit documentation indicating that all employees have had instruction on the hazards of asbestos exposure, on use and fitting of respirators, on protective dress, on use of showers, on entry and exit from work areas, and on all aspects of work procedures and protective measures, in accordance with OSHA and the EPA.
2. Submit documentation of each employee's asbestos medical examination.
02 82 13 -5
F. Respirator Program: Submit a copy of the company’s written respirator program in compliance with OSHA regulations. The Contractor shall have a copy of his written respirator program available on the job site at all times. Start job with appropriate respiratory protection based on a Negative Exposure Assessment
(NEA) and ensure that fiber concentration inside mask does not exceed .01 fibers/cc. Use historic or objective data, documenting expected fiber count levels, to prove the proposed respiratory protection is adequate or an OSHA required
Negative Exposure Assessment.
G. Submit a written Assured Equipment Grounding Program and a Lock Out and Tag
Out Program. Provide proof that programs are in effect and being enforced.
H. Equipment: Submit manufacturer's certification that vacuums, ventilation equipment, and other equipment required to contain airborne fibers conform to
ANSI 29.2-79.
I. Submit proof of valid Virginia asbestos licenses for contractor, supervisor and workers.
1.06 PERSONNEL PROTECTION:
A. Provide workers with personally issued and marked respiratory equipment in accordance with Paragraph "Equipment." Where respirators with disposable filters are employed, provide sufficient filters for replacement as required by the worker or applicable regulation.
B. Provide workers with sufficient sets of protective full-body clothing. Such clothing shall consist of full-body overalls and headgear, gloves and foot coverings. Provide hard hats as required by applicable safety regulations. Non-disposable-type protective clothing and footwear shall be left in the contaminated equipment room until the end of the abatement work, at which time such items shall be disposed of as asbestos waste, bagged and removed as asbestos-contaminated or shall be thoroughly cleaned of all asbestos or asbestos-containing material. Disposable-type protective clothing, headgear, gloves and footwear will be provided.
C. Provide authorized visitors with suitable protective clothing, headgear, gloves, eye protection and footwear, as described herein, whenever they are required to enter the work area.
PART 2 – PRODUCTS
2.01 MATERIALS:
02 82 13 -6
A. Sheeting: Polyethylene sheet, minimum 6 mils thick unless otherwise specified, in sizes to minimize the frequency of joints.
B. Tape: Glass fibers or other type capable of sealing joints of adjacent sheets of polyethylene sheets and for attachment of polyethylene sheet to finished or unfinished surfaces of dissimilar materials under both dry and wet conditions, including use of amended water.
C. Surfactant (Wetting Agent): Shall consist of 50-percent polyoxylethylene ether and
50 percent of polyoxylethylene or polyglycol ester, or equivalent and shall be mixed with water to provide a concentration of 1 ounce surfactant to 5 gallons of water.
D. Impermeable Containers: Containers shall be suitable to receive and retain any asbestos-containing or contaminated materials until disposable at an approved site.
They may be in the form of polyethylene bags, sealed cardboard containers, or fiber drums. The containers shall be labeled in accordance with OSHA Regulation 29
CFR 1926.58, NESHAP 40 CFR Part 61, and DOT Regulations. Containers shall be both airtight and watertight.
2.02 EQUIPMENT:
A. Air-Handling Equipment: Equipment shall be a high-efficiency particulate air
(HEPA) filtration system, equipped with filtration equipment in compliance with
ANSI 29.2-79, and a monitoring device, known as a manometer, to continuously gauge and record negative pressure conditions. Manometer tape to be retained by
Contractor for future reference by Owner if necessary. No air-movement system or air equipment shall discharge asbestos fibers outside the work area. Pressure shall be maintained at a minimum of -.02 inches of water column relative to adjacent unsealed areas. A minimum of 1 air change every 15 minutes will be required.
PART 3 – EXECUTION
3.01 PREPARATION OF WORK AREAS:
A. Provide temporary power sources and equipment per applicable electrical code requirements and provide 24-volt safety lighting and ground-fault interrupter circuits as power source for electrical equipment.
B. Seal off all openings, including, but not limited to, corridors, doorways, skylights, ducts, grilles, diffusers, and any other penetrations of the work areas, with plastic
02 82 13 -7 sheeting sealed with tape. Doorways and corridors which will not be used for passage during work must be sealed with barriers as described in Paragraph
"Decontamination Enclosure Systems."
C. Sealing of critical barriers and non-movable objects only will be acceptable during removal of identified Non-Friable ACM. When removing floor tile and mastic only, splash guards will be used for protection of walls from chemical mastic removers.
D. Maintain emergency and fire exits from the work areas, or establish alternative exits satisfactory to the applicable fire officials.
E. Provide 5.0-micron filters on all shower drains. Asbestos-contaminated waste water is to be placed in a sanitary sewer system after filtration through the 5.0 micron filter.
F. After preparation of the work areas and decontamination enclosure systems, remove Asbestos Containing Building Material as required.
3.02 DECONTAMINATION ENCLOSURE SYSTEMS:
A. Worker Decontamination Enclosure System: When removing friable ACM, Construct a worker decontamination enclosure system contiguous to the work area consisting of three totally enclosed chambers and air locks as follows:
1. An equipment room with two curtained doors, one to the work area and one to the air lock.
2. Air lock with two curtained doors, one to equipment room and one to shower room.
3. A shower room with two curtained doorways, one to the air lock on work room side and one to the air lock on the clean room side. The shower room shall contain at least one shower with hot and cold or warm water. Careful attention shall be paid to the shower enclosure to ensure against leaking of any kind. Ensure a supply of liquid soap at all times in the shower room.
4. Air lock with two curtained doors, one to shower room and one to clean room.
5. A clean room with two curtained doors, one to the air lock on the shower side and one to the exterior. Clean room shall be constructed to meet or exceed requirements of OSHA Regulations.
02 82 13 -8
6. Separation of Work Areas from Occupied Areas: Separate parts of the building required to remain in use from parts of the building that will undergo asbestos abatement by means of airtight barriers.
B. Maintenance of Enclosure Systems:
1. Ensure that barriers and plastic linings are effectively sealed and taped.
Repair damaged barriers and remedy defects immediately upon discovery.
2. Visually inspect enclosures at the beginning of each work period.
3. Use smoke methods to test effectiveness of barriers when directed by the
Project Monitor.
3.03 AIR MONITORING:
A. General Requirements:
1. Provide daily air monitoring both in and outside the work area throughout all asbestos stripping, removal and cleaning. Outside monitoring samples may be taken by the Project Monitor, if deemed necessary.
2. Samples shall be collected by calibrated pumps whose flow rates can be determined to an accuracy of plus or minus 5%. Calibrate pumps with a representative filter in line.
3. Personal air monitoring shall be in compliance with 1926.1101 of the
OSHA standards.
4. Analysis of samples shall be done in compliance with OSHA standards
1926.1101 by a competent trained person or laboratory.
5. The sampling schedule shall be posted outside of the containment area showing sample frequency, duration of the sample, and pump flow rates.
6. Results of all samples shall be posted outside of the containment area within
24 hours of collection and maintained there until the job has been concluded. This data shall include the results of 8-hour TWA determinations. Posted results should include a synopsis of work activities of which the results are representative.
02 82 13 -9
B. Air Monitoring by Contractor:
1. Throughout the removal and cleaning operations, personal air monitoring shall be conducted by a Testing Laboratory employed by the Contractor or by the Contractor's personnel. Air monitoring shall be performed to provide the following samples:
a. work area environmental,
b. personal breathing 8-hour TWA and excursion, Samples for air monitoring shall be collected by a competent person in accordance with methods prescribed in the Federal OSHA Industrial
Hygiene Field Operations Manual or by equivalent.
2. The Contractor shall be responsible for personnel and environmental air monitoring samples taken inside the work compartment and all costs in connection with testing and air sampling shall be borne by the Contractor.
3. The Contractor shall determine the release of asbestos from any work or waste storage area is not taking place at concentrations higher than .01 actual fibers/cc.
4. All analytical results shall be presented as signed "Certificates of Analysis."
Form shall state:
a. date and time sampling began
b. flow rate of samples
c. sampling time elapsed
d. concentration in fibers/cc
e. site/individual sampled
f. synopsis of work activities which sample was taken
g. name and signature of analysts
5. Two copies of analytical results shall be delivered in writing to the job site within 24 hours of sample collection (excluding non-working days). A copy of the results shall be submitted to the Project Monitor when received by the Contractor.
6. Analytical results indicating potential for a hazard higher than limits set forth in this section shall be reported immediately, by the most expeditious means possible to the Owner.
02 82 13 -10
7. The Project Monitor shall be informed immediately of any area samples outside of the containment with results in excess of .01 fibers/cc actual.
8. Operations shall be discontinued immediately any time emissions are observed emanating from the work area.
9. Contractor will provide a written plan to the Owner stating steps to be undertaken to assure compliance with all regulations, including but not limited to the following:
a. qualifications of personnel taking and analyzing samples
b. containment procedures
c. respirator program
d. sampling strategy
3.04 ASBESTOS ABATEMENT:
A. Install barrier tape and erect signage minimum 6 feet outside of abatement area.
Cover floor with 6-mil poly sheeting and use a HEPA vac in direct proximity to the
ACM being disturbed.
B. Spray asbestos material with amended water, using spray equipment capable of providing a "mist" application to reduce the release of fibers. Saturate the material sufficiently to wet it to the substrate without causing excess dripping or delamination of the material. Spray the asbestos material repeatedly during work process to maintain wet condition and to minimize asbestos fiber dispersion.
C. Remove the saturated asbestos material in small sections. As it is removed, pack the material in sealable plastic bags of 6-mil minimum thickness and place in labeled containers or a second plastic bag of 6-mil minimum thickness for transport.
If the Contractor chooses plastic bags for transport, the double-bag method of containment will be used. Material shall not be allowed to dry out prior to insertion into the original sealable, plastic bag.
D. Seal filled containers. Place danger labels on containers in accordance with OSHA regulation 29 CFR 1926.58. Additional labeling indicating the name of the waste generator and the location where the waste was generated shall be affixed to each container in accordance with NESHAP regulation 40 CFR Part 61. Clean external surfaces of containers thoroughly by wet sponging in the designated area of the work area which is part of the equipment decontamination enclosure system. Move containers to washroom, wet clean each container thoroughly, and move to holding area pending removal from the holding area by workers who have entered from
02 82 13 -11 uncontaminated areas dressed in clean coveralls. Ensure that workers do not enter from uncontaminated areas into the washroom or the work area; ensure that contaminated workers do not exit the work area through the equipment decontamination enclosure system.
E. After completion of stripping work, all surfaces from which asbestos has been removed or contaminated shall be wire brushed and/or wet sponged or cleaned by an equivalent method to remove all visible material. During this work, the surfaces being cleaned shall be kept wet.
3.5 GLOVE BAG REMOVAL:
A. All glove bag work will be performed within a controlled area. The controlled area is established by installing critical barriers of minimum 6-mil poly over any doors or other openings as needed. Negative air is to be maintained in this controlled area at all times from initial disturbance of material until final clearance is certified. The use of a negative air glove bag will not preclude this requirement.
B. Attach glove bag to pipe with ends and top seam securely taped. Leave enough slack in bag so that bag can be lifted at least 3 inches above pipe at center of attached length.
C. Have all tools needed for removal inside bag, prior to attachment of bag.
D. Insert and seal hoses for HEPA vac and amended water sprayer.
E. One person sprays amended water and control HEPA vac hose while other person removes insulation and cleans pipe.
F. Place tools into glove, pull to outside, and double-tie glove for tool removal. Cut between ties.
G. After all insulation is removed and pipe cleaning is finished, continue to ventilate the bag for 3 minutes. Adjust airflow to allow full bag venting.
H. Remove the HEPA vac and water hoses and seal openings.
I. While vacuuming along the top seal of the bag, remove the bag, twist the top and seal with tape with the top doubled down.
J. Place sealed glove bag into labeled asbestos disposal bag and seal.
02 82 13 -12
K. Plastic floor drop cloth and wall poly may be moved as needed, provided that no visible contamination has accumulated. If any contamination exists or job is completed, this poly is to be properly double-bagged and disposed of as asbestos waste.
3.06 CLEANUP:
A. Remove visible accumulations of asbestos material and debris. Wet clean all surfaces within the work area.
B. The windows and doors shall remain sealed and any HEPA-filtered negative air pressure systems, air filtration, and decontamination enclosure systems shall remain in service until final clearance is certified.
C. Clean all surfaces in the work area and any other contaminated areas with water and/or with HEPA-filtered vacuum equipment all surfaces in the work area. After completion of the second cleaning operation, perform a complete visual inspection of the work area to ensure that the work area is free of visible asbestos debris.
D. Sealed drums and all equipment used in the work area shall be included in the cleanup and shall be removed from work areas, via the equipment decontamination enclosure system, at an appropriate time in the cleaning sequence. The transport vehicle shall be lined with two layers of minimum 6-mil. polyethylene sheeting.
E. If the Project Monitor, within 24 hours, finds visible accumulations of asbestos debris in the work area, the Contractor shall repeat the wet cleaning until the work area is in compliance, at the Contractor's expense.
F. Final air samples will be taken by the Virginia Licensed Project Monitor, using the
NIOSH 7400 PCM method of analysis in accordance will all requirements of
AHERA CFR 40, Part 763. If the final air samples do not meet acceptable standards, the Contractor shall be held responsible for the cost of subsequent air samples. Aggressive air sampling will be required on this project. All exits, vents, and critical barriers shall remain sealed and negative air machines will remain on until final clearance is certified.
G. Contractor shall provide necessary electrical outlets for air clearance equipment.
02 82 13 -13
3.07 DISPOSAL:
Comply with 40 CFR PART 763 SUBPART E APPENDIX D, the Virginia Department of
Environmental Quality and the Virginia Department of Transportation.
A. Disposal of Asbestos-Containing Materials and Asbestos-Contaminated Waste: As the work progresses and to prevent exceeding available storage capacity on site, remove sealed and labeled containers of asbestos waste and dispose of such containers at an authorized disposal site in accordance with the requirements of disposal authority. Submit documentation regarding disposal to Owner within 30 days of removal.
B. Procedure for hauling and disposal shall comply with 40 CFR 61 (Sub-part B), state, regional, and local standards. If drums are chosen as the container for the disposal bags, the bags will be removed by hand from drums into the burial site unless the bags have been broken or damaged. Damaged bags shall remain in the drum and the entire contaminated drum shall be buried. Uncontaminated drums may be recycled. If the double bag method of containment was used, the entire waste package shall be hand placed into the burial site. Workers shall wear appropriate respirators and personal protective equipment when handling asbestos materials at the jobsite and at the disposal site.
C. All procedures are to follow NESHAP regulations, the Virginia Department of
Waste Managements’ Solid Waste Regulations, the Virginia Department of
Transportation and the Virginia Department of Environmental Quality regulations.
END OF SECTION 02 82 13
May 26, 2026
Asbestos Inspection Report
Project Location:
Wytheville Community College
Bland Hall 1st Floor Renovation
Prepared For:
Virginia Community College System
300 Arboretum Place, Suite 200
Richmond, VA 23236
Prepared By:
Jared Crowder
Asbestos Inspector
TABLE OF CONTENTS
SCOPE OF WORK
ASBESTOS INSPECTION
• SAMPLE SUMMARY
• LABORATORY REPORT
• PHOTOS
• APPLICABLE LICENSES
SCOPE OF WORK
Raymond Global was contracted by Virginia Community College System to provide an asbestos inspection at Bland Hall located at Wytheville Community College, Wytheville, Virginia. The inspection was conducted by personnel trained and licensed in accordance with the regulations of the Environmental Protection Agency (EPA) and the Commonwealth of Virginia. This inspection was performed using current EPA AHERA standards. This protocol was used for the determination, sampling and analysis of suspected Asbestos Containing Materials (ACM).
ASBESTOS INSPECTION
An inspection of the Bland Hall was performed May 18 & 22, 2026 by representatives of
Raymond Global. The objective of this inspection was to determine the location of suspect asbestos-containing materials (ACM) currently located on the interior of this structure that may be disturbed by upcoming renovation activities.
As the sample summary indicates, the following suspect materials sampled were reported to be asbestos containing by the laboratory:
• Interior Door Framing Caulk – Tan – Metal Frames to Block
This NON-Friable asbestos containing material should be removed prior to renovation activities at this location. Removal should be performed by licensed, contract personnel using approved methods.
Friable Asbestos Material: Material when dry, may be crumbled, pulverized or reduced to powder by hand pressure and includes previously non-friable material after such previously non-friable material becomes damaged to the extent that when dry may be crumbled, pulverized, or reduced to powder by hand pressure.
Non-friable Asbestos Material: Material that contains asbestos in which the fibers have been locked in by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not release fibers during any appropriate use, handling, demolition, storage, transportation, processing or disposal.
This information should be provided to all contract personnel for their use in meeting current
OSHA requirements. Every attempt was made to gain access to all areas or to assess representative materials entering or leaving the area. Raymond Global-Georgia, Inc. accepts no liability nor makes any claims regarding ACBM which was not accessible during the inspection process if such material was located behind or within walls, concrete decks, subfloors, or was generally inaccessible without destructive sampling. If any additional suspect materials are identified during the course of the project, the contractor is to immediately stop work and contact the Owner for further direction.
Sample Summary
ND -TM 12.1 Tile Mastic - FT 11
ND -
ND -
■ 2%
ND -
ND
26029267 -032 TM 12.2 Tile Mastic - FT 11 ND
ND = = CHRYSOTILE ▲ = AMOSITE ◉ = OTHER
NONE DETECTED NA =
NOT ANALYZED
POSITIVE STOP ■
26029267 -029
26029267 -030
26029267
26029267 -024
26029267 -025
26029267 -026
26029267 -028
26029267 -027
-031
26029267 -023
26029267 -016
26029267 -017
26029267 -018
26029267 -019
26029267 -020 ND -
ND -
ND -
ND
26029267 -021
26029267 -022
ND -
■ 2%
ND -
ND -
ND -
ND -
ND -
ND -
ND -
ND -
ND
ND -
ND -
ND -
ND -
ND -
ND
ND
26029267 -014
26029267 -015
26029267 -009
26029267 -010
26029267 -004
26029267
26029267 -011
26029267
-005
-012
26029267 -013
26029267 -006
26029267 -007
26029267 -008
DF 10.2 Door Framing - 111
FT 11.1 Floor Tile - 12z12 - White
FT 11.2 Floor Tile - 12z12 - White
BM 9.1 Baseboard Mastic
BM 9.2 Baseboard Mastic
DF 10.1 Door Framing - 111
CT 7.3 Ceiling Tile - Squiggles
DM 8.1 Duct Mastic - Tan
DM 8.2 Duct Mastic - Tan
FT 6.2 Floor Tile - 12x12 - Red
CT 7.1 Ceiling Tile - Squiggles
CT 7.2 Ceiling Tile - Squiggles
TM 5.1 Tile Mastic - FT 5
TM 5.2 Tile Mastic - FT 6
FT 6.1 Floor Tile - 12x12 - Red
CT 3.3 Ceiling Tile - 2X2 - Textured
FT 4.1 Floor Tile - 12x12 - Beige
FT 4.2 Floor Tile - 12x12 - Beige
JC 2.5 Joint Compound
CT 3.1 Ceiling Tile - 2X2 - Textured
CT 3.2 Ceiling Tile - 2X2 - Textured
JC 2.2 Joint Compound
JC 2.3 Joint Compound
JC 2.4 Joint Compound
SR 1.5 Sheetrock
JC 2.1 Joint Compound
SR 1.1 Sheetrock
SR 1.2 Sheetrock
SR 1.3 Sheetrock ND -
Bland Hall 1st Floor
LAB # SAMPLE ID SAMPLE DESCRIPTION RESULT %
ND -
ND -
SR 1.4 Sheetrock
26029267 -001
26029267 -002
26029267 -003
▲ = AMOSITE ◉ = OTHERND = NONE DETECTED NA =
NOT ANALYZED
POSITIVE STOP ■ = CHRYSOTILE
26030320 -004 CK 2.2 Caulk ND -
26030320 -003 CK 2.2 Caulk ND -
26030320 -002 DF 1.2 Door Framing - Sheetrock ND -
26030320 -001 DF 1.1 Door Framing - Sheetrock ND -
Bland Hall 1st Floor
LAB # SAMPLE ID SAMPLE DESCRIPTION RESULT %
Laboratory Report
Dear Jared Crowder, We at SanAir would like to thank you for the work you recently submitted. The 32 sample(s) were received on Tuesday, May 19, 2026 via FedEx. The final report(s) is enclosed for the following sample(s): SR 1.1, SR 1.2, SR 1.3, SR 1.4, SR 1.5, JC 2.1, JC 2.2, JC 2.3, JC 2.4, JC 2.5, CT 3.1, CT 3.2, CT 3.3, FT 4.1, FT 4.2, TM 5.1, TM 5.2, FT 6.1, FT 6.2, CT 7.1, CT 7.2, CT 7.3, DM 8.1, DM 8.2, BM 9.1, BM 9.2, DF 10.1, DF 10.2, FT 11.1, FT 11.2, TM 12.1, TM 12.2.
These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.
Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory
Final Report Includes:
- Cover Letter
- Analysis Pages
- Disclaimers and Additional Information
Sample conditions:
- 32 samples in Good condition.
10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com
WCCProject Number:
P.O. Number:
Project Name: Bland 1st Floor
5/18/2026Collected Date:
5/19/2026 10:15:00 AMReceived Date:
5/19/2026 4:57:09 PM
26029267 SanAir ID Number
FINAL REPORT
Raymond Global, Inc.Name:
Address: 1035 Green St. SE, Ste. A
Conyers, GA 30012
770-483-9592Phone:
Analyst: Pisula, Nicholas
Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
SR 1.1 / 26029267-001
Sheetrock
Grey Non-Fibrous
Homogeneous
5% Cellulose 95% Other None Detected
SR 1.2 / 26029267-002
Sheetrock
Grey Non-Fibrous
Homogeneous
5% Cellulose 95% Other None Detected
SR 1.3 / 26029267-003
Sheetrock
Grey Non-Fibrous
Homogeneous
5% Cellulose 95% Other None Detected
SR 1.4 / 26029267-004
Sheetrock
Grey Non-Fibrous
Homogeneous
5% Cellulose 95% Other None Detected
SR 1.5 / 26029267-005
Sheetrock
Grey Non-Fibrous
Homogeneous
5% Cellulose 95% Other None Detected
JC 2.1 / 26029267-006
Joint Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
JC 2.2 / 26029267-007
Joint Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
JC 2.3 / 26029267-008
Joint Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
JC 2.4 / 26029267-009
Joint Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
JC 2.5 / 26029267-010
Joint Compound
White Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 5/19/2026 Date: 5/19/2026
Approved Signatory:
10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com
WCCProject Number:
P.O. Number:
Project Name: Bland 1st Floor
5/18/2026Collected Date:
5/19/2026 10:15:00 AMReceived Date:
5/19/2026 4:57:09 PM
26029267 SanAir ID Number
FINAL REPORT
Raymond Global, Inc.Name:
Address: 1035 Green St. SE, Ste. A
Conyers, GA 30012
770-483-9592Phone:
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
CT 3.1 / 26029267-011
Ceiling Tile 2x2 Textured
White Fibrous
Homogeneous
50% Glass 40% Min. Wool
10% Other None Detected
CT 3.2 / 26029267-012
Ceiling Tile 2x2 Textured
White Fibrous
Homogeneous
50% Glass 40% Min. Wool
10% Other None Detected
CT 3.3 / 26029267-013
Ceiling Tile 2x2 Textured
White Fibrous
Homogeneous
50% Glass 40% Min. Wool
10% Other None Detected
FT 4.1 / 26029267-014
Floor Tile 12x12
Beige Non-Fibrous
Homogeneous
100% Other None Detected
FT 4.2 / 26029267-015
Floor Tile 12x12
Beige Non-Fibrous
Homogeneous
100% Other None Detected
TM 5.1 / 26029267-016
Tile Mastic FT-5
Tan Non-Fibrous
Homogeneous
100% Other None Detected
TM 5.2 / 26029267-017
Tile Mastic FT-6
Tan Non-Fibrous
Homogeneous
100% Other None Detected
FT 6.1 / 26029267-018
Floor Tile 12x12
Red Non-Fibrous
Homogeneous
100% Other None Detected
FT 6.2 / 26029267-019
Floor Tile 12x12
Red Non-Fibrous
Homogeneous
100% Other None Detected
CT 7.1 / 26029267-020
Ceiling Tile Squiggles
White Fibrous
Homogeneous
60% Cellulose 30% Min. Wool
10% Other None Detected
Analyst:
Analysis Date: 5/19/2026 Date: 5/19/2026
Approved Signatory:
10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com
WCCProject Number:
P.O. Number:
Project Name: Bland 1st Floor
5/18/2026Collected Date:
5/19/2026 10:15:00 AMReceived Date:
5/19/2026 4:57:09 PM
26029267 SanAir ID Number
FINAL REPORT
Raymond Global, Inc.Name:
Address: 1035 Green St. SE, Ste. A
Conyers, GA 30012
770-483-9592Phone:
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
CT 7.2 / 26029267-021
Ceiling Tile Squiggles
White Fibrous
Homogeneous
60% Cellulose 30% Min. Wool
10% Other None Detected
CT 7.3 / 26029267-022
Ceiling Tile Squiggles
White Fibrous
Homogeneous
60% Cellulose 30% Min. Wool
10% Other None Detected
DM 8.1 / 26029267-023
Duct Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
DM 8.2 / 26029267-024
Duct Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
BM 9.1 / 26029267-025
Baseboard Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
BM 9.2 / 26029267-026
Baseboard Mastic
Tan Non-Fibrous
Homogeneous
100% Other None Detected
DF 10.1 / 26029267-027
Door Framing-111
Tan Non-Fibrous
Homogeneous
98% Other 2% Chrysotile
DF 10.2 / 26029267-028
Door Framing-111
Tan Non-Fibrous
Homogeneous
98% Other 2% Chrysotile
FT 11.1 / 26029267-029
Floor Tile 12x12
White Non-Fibrous
Homogeneous
100% Other None Detected
FT 11.2 / 26029267-030
Floor Tile 12x12
White Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 5/19/2026 Date: 5/19/2026
Approved Signatory:
10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com
WCCProject Number:
P.O. Number:
Project Name: Bland 1st Floor
5/18/2026Collected Date:
5/19/2026 10:15:00 AMReceived Date:
5/19/2026 4:57:09 PM
26029267 SanAir ID Number
FINAL REPORT
Raymond Global, Inc.Name:
Address: 1035 Green St. SE, Ste. A
Conyers, GA 30012
770-483-9592Phone:
Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
TM 12.1 / 26029267-031
Tile Mastic- FT 11
Tan Non-Fibrous
Homogeneous
100% Other None Detected
TM 12.2 / 26029267-032
Tile Mastic- FT 11
Tan Non-Fibrous
Homogeneous
100% Other None Detected
Analyst:
Analysis Date: 5/19/2026 Date: 5/19/2026
Approved Signatory:
10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com
WCCProject Number:
P.O. Number:
Project Name: Bland 1st Floor
5/18/2026Collected Date:
5/19/2026 10:15:00 AMReceived Date:
5/19/2026 4:57:09 PM
26029267 SanAir ID Number
FINAL REPORT
Raymond Global, Inc.Name:
Address: 1035 Green St. SE, Ste. A
Conyers, GA 30012
770-483-9592Phone:
Disclaimer and Additional Information:
This report is the sole property of the client named on the chain-of-custody (COC) submitted to SanAir Technologies Laboratory, Inc. (SanAir). Results in the report are confidential information intended only for the use by the customer listed on the COC. Neither results nor reports will be discussed with or released to any third party without our client's written permission. The final report shall not be reproduced, except in full, without written approval of the laboratory to assure that parts of the report are not taken out of context.
This report and any information contained within shall not be edited, altered, or modified in any way by any persons or agencies receiving, viewing, distributing, or otherwise possessing a copy of this final report. The laboratory reserves the right to perform amendments to any finalized report, of which shall supersede and make obsolete any previous editions. Such changes, modifications, additions, or deletions shall be effective immediately upon notice thereof, which may be given by means including but not limited to posting on the SanAir client portal website, electronic or conventional mail, or by any other means.
The information provided in this report applies only to the samples submitted and is relevant only for the date, time, and location of sampling. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client on the COC. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample(s) in the condition received at the laboratory and information provided by the client on the COC, such as: project number, project name, collection dates, P.O. number, special instructions, samples collected by, sample numbers, sample identifications, sample type, selected analysis type, flow rate, total volume or area, and start-stop times that may affect the validity of the results in this report. Samples were received in good condition unless otherwise noted on the report. When the client requires samples to be tested that deviates from a specific method or condition, all reported results may be affected by the deviation. SanAir assumes no responsibility or liability for the manner in which the results are used or interpreted.
This report does not constitute nor shall not be used by the client to claim product, process, system, or person certification, approval, or endorsement by NVLAP, NIST, NELAC, AIHA LAP, LLC or any other U.S.
governmental agencies; all or somet tests contained in this report may not be accredited by every local, state, and federal regulatory agencies. Refer to the SanAir website at www.sanair.com for copies of current certificates and scopes of various accreditations, certifications, and licenses or contact the laboratory for inquiries…