Addendum No. 3 to Bland Hall Renovation Contract Documents

This is Addendum No. 3, dated May 27, 2026, issued by the Virginia Community College System for the Bland Hall renovation project at Wytheville Community College (Project Code 260-B4260-040). The addendum modifies the original contract documents dated July 16, 2025, and introduces significant new requirements for asbestos abatement work. The addendum adds Section 028213 – Asbestos Abatement as a complete 13-page specification section and includes the Asbestos Inspection Report prepared by Jared Crowder of Raymond Global, dated May 26, 2026, as a 23-page appendix. The inspection identified non-friable asbestos-containing materials (ACM) in interior door framing caulk at approximately three locations that must be removed prior to renovation activities. All bidders must acknowledge receipt of this addendum on their bid forms to avoid disqualification. The sealed bid deadline was May 27, 2026, at 3:00 P.M., with public bid opening scheduled for May 28, 2026. A pre-bid conference was held on May 6, 2026, at Wytheville Community College, Bland Hall Room 238.

The asbestos abatement work is a non-friable removal requiring compliance with OSHA regulations (29 CFR 1926.1101), EPA standards (40 CFR Part 61), and Virginia Department of Labor and Industry requirements. The contractor must submit detailed abatement plans, maintain negative pressure containment at minimum 0.02 inches of water column with four air changes per hour, conduct daily air monitoring both inside and outside work areas, establish worker decontamination enclosure systems, and dispose of all asbestos-contaminated materials at authorized disposal sites with documentation provided within 30 days. Personnel protection, including full-body protective clothing, respirators, and medical examinations for all workers, is mandatory. The contractor bears all costs for air sampling, analysis, and disposal. Final air clearance samples will be taken by a Virginia-licensed project monitor using NIOSH 7400 PCM analysis methods, and the contractor is responsible for costs of any subsequent sampling if initial clearance standards are not met. No specific pricing information, set-asides, or incumbent contractor details are disclosed in the addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WCC MAIN CAMPUS BLAND HALL RENOVATION SFCS – 20301.13

VCCS PROJECT CODE: 260-B4260-040

ADDENDUM NO. 3 1

ADDENDUM NO. 3 – May 27, 2026

This Addendum forms a part of the Contract Documents and modifies the original Contract Documents dated July 16, 2025.

Acknowledge receipt of this Addendum in the space provided on the BID FORM. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of 1 narrative page.

The following items clarify, modify, change, delete from or add to the Contract Documents. When any paragraph, subparagraph, or sub-subparagraph thereof is modified or deleted by this Addendum, the unaltered provisions of that paragraph, subparagraph, sub-subparagraph shall remain in effect.

CHANGES TO SPECIFICATIONS:

NOTE: The specification section and Appendix listed below shall be added in their entirety per this Addendum.

1. Table of Contents:

Please remove the current Table of Contents and replace in its entirety, the attached updated Table of Contents.

2. Section 028213 – ASBESTOS ABATEMENT

This 13-page specification section has been added to the project scope.

3. APPENDIX – Asbestos Inspection Report

The Asbestos Inspection Report prepared by Jared Crowder at Raymond and dated May 26, 2026 has been added as an appendix to the Project Manual specifications. The report is 23 pages.

CHANGES TO DRAWINGS:

4. Cover Sheet T1

The Asbestos Disclosure Statement with the associated requirements has been updated from CPSM – 4.12.2.3 to 4.12.2.4.

5. Sheet AD1.0 – GROUND FLOOR DEMOLITION PLANS

References to the Asbestos Inspection Report included with the Addendum have been added to Demolition Plans to determine locations.

END OF ADDENDUM NO. 3

05/27/2026

WCC MAIN CAMPUS - BLAND HALL RENOVATION SFCS - 20301.13

PROJECT CODE: 260-B4260-040

TABLE OF CONTENTS 1

TABLE OF CONTENTS

BIDDING INFORMATION CO FORM NO.

NOTICE OF INVITATION TO BID DGS-30-256

INSTRUCTIONS TO BIDDERS CO-7A/DGS-30-055

PREVAILING WAGE DETERMINATION FROM DOLI

PREBID QUESTION FORM DGS-30-272

BID FORM DGS-30-220

GENERAL CONDITIONS & FORMS

COMMONWEALTH OF VA. GENERAL CONDITIONS OF THE CO-7 / DGS-30-054

CONSTRUCTION CONTRACT

Forms listed below that are preceded with ** may be accessed by Ctrl+Click to follow link or accessed on the DGS Forms Center: https://dgs.virginia.gov/search/documents-and-forms

**CONTRACT BETWEEN OWNER AND CONTRACTOR CO-9/DGS-30-064

**WORKERS COMPENSATION INSURANCE CERTIFICATE CO-9A/DGS-30-076

**STANDARD PERFORMANCE BOND CO-10/DGS-30-084

**STANDARD LABOR AND MATERIAL PAYMENT BOND CO-10.1/DGS-30-088

**STANDARD BID BOND CO-10.2 /DGS-30-090

**CONSTRUCTION CHANGE ORDER CO-11/DGS-30-092

**CHANGE ORDER ESTIMATE (GENERAL CONTRACTOR) GC-1/DGS-30-200

**CHANGE ORDER ESTIMATE (SUBCONTRACTOR) SC-1/DGS-30-204

**CHANGE ORDER ESTIMATE (SUB-SUBCONTRACTOR) SS-1/DGS-30-208

**SCHEDULE OF VALUES AND CERTIFICATE FOR PAYMENT CO-12/DGS-30-104

**AFFIDAVIT OF PAYMENT OF CLAIMS CO-13/DGS-30-108

**CERTIFICATE OF COMPLETION BY ARCHITECT/ENGINEER CO-13.1/DGS-30-112

**CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY A/E CO-13.1a/DGS-30-116 **FINAL REPORT OF STRUCTURAL AND SPECIAL INSPECTIONS CO-13.1b/DGS-30-120

**CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY

AGENCY PROJECT MANAGER CO-13.1c/DGS-30-128 **FINAL REPORT OF STRUCTURAL OBSERVATIONS CO-13.1d/DGS-30-121

**CERTIFICATE OF COMPLETION BY CONTRACTOR CO-13.2/DGS-30-136

**CERTIFICATE OF PARTIAL OR SUBSTANTIAL COMPLETION BY CO-13.2A/DGS-30-140

CONTRACTOR

**DOCUMENT CHECKLIST FOR BENEFICIAL OCCUPANCY CO-13.3b/DGS-30-152 **CHECKLIST FOR SUBSTANTIAL COMPLETION INSPECTION CO-13.3s/DGS-30-151 **DOCUMENT CHECKLIST FOR FINAL COMPLETION CO-13.3f/DGS-30-153

**COMMISSIONING COMPLETION FORM DGS-30-229

**SUBMITTAL REGISTER FORMAT (refer to Sample in DGS-30-364)

**VENDOR EVA REGISTRATION REQUIREMENTS DGS-30-384

**VEES VERIFICATION

(if HPBA compliance is required, refer to Section 6.1.3) DGS-30-381 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-054_07-22_co-7.pdf https://dgs.virginia.gov/search/documents-and-forms https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-064_02-22_co-9.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-076_05-02_co-9a.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-084_07-21_co-10.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-088_07-21_co-10_1.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-090_07-21_co-10_2.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-092_07-20_co-11_and_co-11a.xlsm https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-200_03-16_gc-1_.xls https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-204 https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-208 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-104_01-16_co-12---.xls https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-108_12-17_co-13.docx https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-112 https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-116 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-120_08-14_co-13_1b_final_report.xls https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-128_10-24_co-13_1c.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-121_07-22_co-13_1d_final_report.xls https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-136_10-18_co-13_2.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-140_10-18_co-13_2a.doc https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-152-_10_24_co13.3b.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-151_10_24_co13.3s.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-153_10_24_co13_3f.docx https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-229_10-24-cx-completion-form.doc https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-364 https://dgs.virginia.gov/search/documents-and-forms/?filter=DGS-30-384 https://dgs.virginia.gov/globalassets/business-units/bcom/documents/forms/dgs-30-381-vees-verification.xls

TABLE OF CONTENTS 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

000107 SEALS PAGE

000115 LIST OF DRAWING SHEETS

2021 VUSBC SPECIAL INSPECTIONS AND STRUCTURAL OBSERVATIONS (CO-6B)

DIVISION 01 - GENERAL REQUIREMENTS

010000 GENERAL REQUIREMENTS

011000 SUMMARY

017300 EXECUTION

DIVISION 02 - EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION

028213 ASBESTOS ABATEMENT

DIVISION 03 – 04

NOT USED

DIVISION 05 - METALS

051200 STRUCTURAL STEEL FRAMING

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 ROUGH CARPENTRY

064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

064219 PLASTIC-LAMINATE-FACED WOOD PANELING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

078413 PENETRATION FIRESTOPPING

078443 JOINT FIRESTOPPING

079200 JOINT SEALANTS

079219 ACOUSTICAL JOINT SEALANTS

DIVISION 08 - OPENINGS

081213 HOLLOW METAL FRAMES

081416 FLUSH WOOD DOORS

083113 ACCESS DOORS AND FRAMES

087100 DOOR HARDWARE

088000 GLAZING

088813 FIRE-RATED GLAZING

TABLE OF CONTENTS 3

DIVISION 09 - FINISHES

092116.23 GYPSUM BOARD SHAFT WALL ASSEMBLIES

092216 NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

095113 ACOUSTICAL PANEL CEILINGS

095426 SUSPENDED WOOD CEILINGS

096513 RESILIENT BASE AND ACCESSORIES

096519 RESILIENT TILE FLOORING

096813 TILE CARPETING

099124 INTERIOR PAINTING (MPI STANDARDS)

DIVISION 10 – SPECIALTIES

102239 FOLDING PANEL PARTITIONS

104413 FIRE PROTECTION CABINETS

104416 FIRE EXTINGUISHERS

105626 MOBILE STORAGE SHELVING

DIVISIONS 11 – EQUIPMENT

115123 LIBRARY STACK SYSTEMS

DIVISION 12 – FURNISHINGS

122413 ROLLER WINDOW SHADES

123661.16 SOLID SURFACING COUNTERTOPS

DIVISIONS 13 – 21

NOT USED

DIVISION 22 - PLUMBING

220523.12 BALL VALVES FOR PLUMBING PIPING

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

220719 PLUMBING PIPING INSULATION

221116 DOMESTIC WATER PIPING

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

230500 COMMON WORK RESULTS FOR HVAC

230523 GENERAL-DUTY VALVES FOR HVAC PIPING

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230548.13 VIBRATION CONTROLS FOR HVAC

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230719 HVAC PIPING INSULATION

230923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC

232113 HYDRONIC PIPING

TABLE OF CONTENTS 4

232116 HYDRONIC PIPING SPECIALTIES

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233346 FLEXIBLE DUCTS

233713.13 AIR DIFFUSERS

233713.23 AIR REGISTERS AND GRILLES

234100 PARTICULATE AIR FILTRATION

238126 SPLIT-SYSTEM AIR CONDITIONERS

238216.14 ELECTRIC-RESISTANCE AIR COILS

238219 FAN COIL UNITS

DIVISION 26 - ELECTRICAL

260010 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533.13 CONDUITS FOR ELECTRICAL SYSTEMS

260533.16 BOXES AND COVERS FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 LIGHTING CONTROL DEVICES

260943.23 RELAY-BASED LIGHTING CONTROLS

262726 WIRING DEVICES

262726.11 GENERAL-USE SWITCHES, DIMMER SWITCHES, AND FAN-SPEED

CONTROLLER SWITCHES

262726.31 GENERAL-GRADE SINGLE STRAIGHT-BLADE RECEPTACLES

262726.33 GENERAL-GRADE DUPLEX STRAIGHT-BLADE RECEPTACLES

262726.37 RECEPTACLES WITH ARC-FAULT AND GROUND-FAULT PROTECTIVE DEVICES

262813 FUSES

265000 LIGHTING

DIVISION 27 – COMMUNICATIONS

270000 GENERAL REQUIREMENTS FOR COMMUNICATIONS SYSTEMS

270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS

271013 COMMUNICATIONS COPPER CABLING

271023 COMMUNICATIONS OPTICAL FIBER CABLING

271116 COMMUNICATIONS RACKS, FRAMES, AND ENCLOSURES

274000 AUDIO VISUAL SYSTEMS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

284621.11 ADDRESSABLE FIRE-ALARM SYSTEMS

DIVISIONS 31-33 NOT USED

TABLE OF CONTENTS 5

APPENDIX

-Asbestos and Lead Based Paint Inspection Report, WCC – Bland Hall, 2nd Floor, dated November 22, 2010 -Daily Abatement Monitoring by HDH Technical, Inc. – Bland Hall, dated December 26, 2013 -COMcheck Compliance Certificates – Envelope, Interior Lighting, Exterior Lighting, and Mechanical, dated December 11, 2024 -Asbestos Inspection Report of WCC Bland Hall 1st Floor Renovation by Raymond, dated May 26, 2026

END OF TABLE OF CONTENTS

WCC BLAND HALL RENOVATION

ASBESTOS ABATEMENT

02 82 13 -1

SECTION 02 82 13 - ASBESTOS ABATEMENT

PART 1 – GENERAL

1.01 DESCRIPTION OF WORK:

The work includes the removal and disposal of friable and/or non-friable materials containing asbestos indicated and specified herein and the incidental procedures and equipment required to protect workers from contact with airborne asbestos fibers. The

Contractor shall furnish all labor, materials, services, insurance and equipment required for the removal and disposal of asbestos-containing materials in accordance with the guidelines or regulations of the responsible state agency, the local agency, EPA or OSHA.

The work includes, but is not necessarily limited to the following:

A. All preparation of the work areas and areas outside the work areas prior to beginning asbestos removal work.

B. Removal and disposal of all asbestos materials and waste materials contaminated with asbestos during the process of the work and any other debris generated by this project. Asbestos containing or contaminated material at Wytheville Community

College, Bland Hall includes but may not be limited to the following:

INTERIOR DOOR FRAMING – APPROX. 3 UNITS

(TAN CAULK BETWEEN METAL FRAME AND BLOCK)

LOCATIONS AND AMOUNTS OF ACM ARE APPROXIMATE AND TO

BE FIELD VERIFIED BY CONTRACTOR DURING SITE VIST. SEE

GENERAL CONDITIONS FOR INSTRUCTIONS ON HOW TO

PROCEED IF ADDITIONAL SUSPECT MATERIALS ARE

ENCOUNTERED.

C. Complete cleaning and decontamination of all work areas and contents thereof.

1.02 TERMINOLOGY:

A. Amended Water: Water containing a wetting agent of surfactant.

B. Asbestos Control Area: An area where asbestos removal operations are performed which is isolated by physical boundaries to prevent the release of asbestos dust, fibers, or debris.

C. Authorized Visitor: The Owner's representative, or a representative of any regulatory or other agency having jurisdiction over the project.

02 82 13 -2

D. Friable Asbestos Material: Material when dry, may be crumbled, pulverized or reduced to powder by hand pressure and includes previously non-friable material after such previously non-friable material becomes damaged to the extent that when dry may be crumbled, pulverized, or reduced to powder by hand pressure.

E. HEPA Filter Equipment: High-efficiency particulate air filtered vacuuming equipment with a filter system capable of collecting and retaining asbestos fibers.

Filters shall be of 99.97 percent efficiency for retaining fibers of 0.3 microns or larger.

F. Negative Pressure: A local exhaust system capable of maintaining a minimum pressure differential of minus 0.02 inch of water column relative to adjacent unsealed areas.

G. Non-friable Asbestos Material: Material that contains asbestos in which the fibers have been locked in by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not release fibers during any appropriate use, handling, demolition, storage, transportation, processing or disposal.

H. Owner's Representative: Person designated in the contract as authorized individual

(or his designee) to represent and mediate for the Owner in administration of the

Contract.

I. Project Monitor: One or more individuals employed by the Owner to inspect the

Work and/or to act as clerk of the works to the extent required by the Owner. The

Owner shall notify the Contractor in writing of the appointment of such Project

Monitor(s).

J. Surfactant: A chemical wetting agent added to water to improve penetration, thus reducing the quality of water required for a given operation or area.

K. Wet Cleaning: The process of eliminating asbestos contamination from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with water, and by afterwards disposing of these cleaning tools as asbestos-contaminated waste.

1.03 CONFORMANCE TO REGULATORY REQUIREMENTS:

A. In addition to detailed requirements of this specification, the contractor shall comply with laws, ordinances, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting and disposing of asbestos

02 82 13 -3 waste materials. Comply with the applicable requirements of the current issue of the following regulatory agencies:

1. Title 29, Code of Federal Regulations, Section 1926.1101 (OSHA)

Occupational Safety and Health Administration, U.S. Department of Labor and the Virginia Occupational Safety and Health Standards for Industry, Department of Labor and Industry Construction.

2. Title 40, Part 61, Subparts A and B. Regional National Emissions Standards for Hazardous Air Pollutants. (EPA) U.S. Environmental Protection

Agency.

3. 40 CFR Part 763 Subpart E, Appendix D.

B. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification and referenced documents vary, the most stringent requirement shall apply.

C. When required, written notification shall be made to:

1. Department of Labor and Industry

Attn: Accounting/Finance

Main Street Centre

600 East Main Street, Suite 207

Richmond, Virginia 23219

2. Asbestos Coordinator

USEPA Region III

Mail Code 3LC62

1650 Arch Street

Philadelphia, PA 19103-2029

3. Notification shall be sent not later than 20 days prior to commencement of the work with a copy sent for the Owner's Representative. Notification shall be on a Form provided by the Commonwealth of Virginia, Department of

Labor and Industry.

1.04 BUILDING PROTECTION:

The asbestos control area shall be maintained under negative pressure at all times of a minimum of .02 inches of water column relative to adjacent unsealed area. A minimum of

4 air changes per hour is required.

02 82 13 -4

1.05 SUBMITTALS:

Submittals shall be made in accordance with procedures set forth in Section "Submittals."

A. Notification to Regulatory Agencies: Submit a copy of the notification of the proposed asbestos work as required under paragraph "Conformance to Regulatory

Requirements."

B. Asbestos Plan: Submit a detailed plan of the work procedures to be used in the removal and demolition of materials containing asbestos. Such plan shall include interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent to be used, air monitoring, and a detailed description of the method to be employed in order to control pollution. Plan shall be approved prior to start of the work.

C. Testing Laboratory: Submit the name, address, telephone number, and copy of the

VA Asbestos Laboratory License of the testing laboratory selected for the monitoring of the airborne concentrations of asbestos fibers along with certification that persons counting the samples have been judged proficient by successful participation in the National Institute for Occupational Safety and Health (NIOSH)

Proficiency Analytical Testing (PAT) Program.

D. Disposal: Must comply with 40 CFR Part 763 Subpart E Appendix D

1. Submit evidence that all required permits for transport disposal of asbestos containing or contaminate materials, supplies, and the like have been obtained.

2. Submit certified copies from the operator of the asbestos disposal site that the asbestos has been received, within 30 days of removal, specifying quantities and dates of delivery.

E. Employee Qualification, Virginia Licensure Requirements:

1. Submit documentation indicating that all employees have had instruction on the hazards of asbestos exposure, on use and fitting of respirators, on protective dress, on use of showers, on entry and exit from work areas, and on all aspects of work procedures and protective measures, in accordance with OSHA and the EPA.

2. Submit documentation of each employee's asbestos medical examination.

02 82 13 -5

F. Respirator Program: Submit a copy of the company’s written respirator program in compliance with OSHA regulations. The Contractor shall have a copy of his written respirator program available on the job site at all times. Start job with appropriate respiratory protection based on a Negative Exposure Assessment

(NEA) and ensure that fiber concentration inside mask does not exceed .01 fibers/cc. Use historic or objective data, documenting expected fiber count levels, to prove the proposed respiratory protection is adequate or an OSHA required

Negative Exposure Assessment.

G. Submit a written Assured Equipment Grounding Program and a Lock Out and Tag

Out Program. Provide proof that programs are in effect and being enforced.

H. Equipment: Submit manufacturer's certification that vacuums, ventilation equipment, and other equipment required to contain airborne fibers conform to

ANSI 29.2-79.

I. Submit proof of valid Virginia asbestos licenses for contractor, supervisor and workers.

1.06 PERSONNEL PROTECTION:

A. Provide workers with personally issued and marked respiratory equipment in accordance with Paragraph "Equipment." Where respirators with disposable filters are employed, provide sufficient filters for replacement as required by the worker or applicable regulation.

B. Provide workers with sufficient sets of protective full-body clothing. Such clothing shall consist of full-body overalls and headgear, gloves and foot coverings. Provide hard hats as required by applicable safety regulations. Non-disposable-type protective clothing and footwear shall be left in the contaminated equipment room until the end of the abatement work, at which time such items shall be disposed of as asbestos waste, bagged and removed as asbestos-contaminated or shall be thoroughly cleaned of all asbestos or asbestos-containing material. Disposable-type protective clothing, headgear, gloves and footwear will be provided.

C. Provide authorized visitors with suitable protective clothing, headgear, gloves, eye protection and footwear, as described herein, whenever they are required to enter the work area.

PART 2 – PRODUCTS

2.01 MATERIALS:

02 82 13 -6

A. Sheeting: Polyethylene sheet, minimum 6 mils thick unless otherwise specified, in sizes to minimize the frequency of joints.

B. Tape: Glass fibers or other type capable of sealing joints of adjacent sheets of polyethylene sheets and for attachment of polyethylene sheet to finished or unfinished surfaces of dissimilar materials under both dry and wet conditions, including use of amended water.

C. Surfactant (Wetting Agent): Shall consist of 50-percent polyoxylethylene ether and

50 percent of polyoxylethylene or polyglycol ester, or equivalent and shall be mixed with water to provide a concentration of 1 ounce surfactant to 5 gallons of water.

D. Impermeable Containers: Containers shall be suitable to receive and retain any asbestos-containing or contaminated materials until disposable at an approved site.

They may be in the form of polyethylene bags, sealed cardboard containers, or fiber drums. The containers shall be labeled in accordance with OSHA Regulation 29

CFR 1926.58, NESHAP 40 CFR Part 61, and DOT Regulations. Containers shall be both airtight and watertight.

2.02 EQUIPMENT:

A. Air-Handling Equipment: Equipment shall be a high-efficiency particulate air

(HEPA) filtration system, equipped with filtration equipment in compliance with

ANSI 29.2-79, and a monitoring device, known as a manometer, to continuously gauge and record negative pressure conditions. Manometer tape to be retained by

Contractor for future reference by Owner if necessary. No air-movement system or air equipment shall discharge asbestos fibers outside the work area. Pressure shall be maintained at a minimum of -.02 inches of water column relative to adjacent unsealed areas. A minimum of 1 air change every 15 minutes will be required.

PART 3 – EXECUTION

3.01 PREPARATION OF WORK AREAS:

A. Provide temporary power sources and equipment per applicable electrical code requirements and provide 24-volt safety lighting and ground-fault interrupter circuits as power source for electrical equipment.

B. Seal off all openings, including, but not limited to, corridors, doorways, skylights, ducts, grilles, diffusers, and any other penetrations of the work areas, with plastic

02 82 13 -7 sheeting sealed with tape. Doorways and corridors which will not be used for passage during work must be sealed with barriers as described in Paragraph

"Decontamination Enclosure Systems."

C. Sealing of critical barriers and non-movable objects only will be acceptable during removal of identified Non-Friable ACM. When removing floor tile and mastic only, splash guards will be used for protection of walls from chemical mastic removers.

D. Maintain emergency and fire exits from the work areas, or establish alternative exits satisfactory to the applicable fire officials.

E. Provide 5.0-micron filters on all shower drains. Asbestos-contaminated waste water is to be placed in a sanitary sewer system after filtration through the 5.0 micron filter.

F. After preparation of the work areas and decontamination enclosure systems, remove Asbestos Containing Building Material as required.

3.02 DECONTAMINATION ENCLOSURE SYSTEMS:

A. Worker Decontamination Enclosure System: When removing friable ACM, Construct a worker decontamination enclosure system contiguous to the work area consisting of three totally enclosed chambers and air locks as follows:

1. An equipment room with two curtained doors, one to the work area and one to the air lock.

2. Air lock with two curtained doors, one to equipment room and one to shower room.

3. A shower room with two curtained doorways, one to the air lock on work room side and one to the air lock on the clean room side. The shower room shall contain at least one shower with hot and cold or warm water. Careful attention shall be paid to the shower enclosure to ensure against leaking of any kind. Ensure a supply of liquid soap at all times in the shower room.

4. Air lock with two curtained doors, one to shower room and one to clean room.

5. A clean room with two curtained doors, one to the air lock on the shower side and one to the exterior. Clean room shall be constructed to meet or exceed requirements of OSHA Regulations.

02 82 13 -8

6. Separation of Work Areas from Occupied Areas: Separate parts of the building required to remain in use from parts of the building that will undergo asbestos abatement by means of airtight barriers.

B. Maintenance of Enclosure Systems:

1. Ensure that barriers and plastic linings are effectively sealed and taped.

Repair damaged barriers and remedy defects immediately upon discovery.

2. Visually inspect enclosures at the beginning of each work period.

3. Use smoke methods to test effectiveness of barriers when directed by the

Project Monitor.

3.03 AIR MONITORING:

A. General Requirements:

1. Provide daily air monitoring both in and outside the work area throughout all asbestos stripping, removal and cleaning. Outside monitoring samples may be taken by the Project Monitor, if deemed necessary.

2. Samples shall be collected by calibrated pumps whose flow rates can be determined to an accuracy of plus or minus 5%. Calibrate pumps with a representative filter in line.

3. Personal air monitoring shall be in compliance with 1926.1101 of the

OSHA standards.

4. Analysis of samples shall be done in compliance with OSHA standards

1926.1101 by a competent trained person or laboratory.

5. The sampling schedule shall be posted outside of the containment area showing sample frequency, duration of the sample, and pump flow rates.

6. Results of all samples shall be posted outside of the containment area within

24 hours of collection and maintained there until the job has been concluded. This data shall include the results of 8-hour TWA determinations. Posted results should include a synopsis of work activities of which the results are representative.

02 82 13 -9

B. Air Monitoring by Contractor:

1. Throughout the removal and cleaning operations, personal air monitoring shall be conducted by a Testing Laboratory employed by the Contractor or by the Contractor's personnel. Air monitoring shall be performed to provide the following samples:

a. work area environmental,

b. personal breathing 8-hour TWA and excursion, Samples for air monitoring shall be collected by a competent person in accordance with methods prescribed in the Federal OSHA Industrial

Hygiene Field Operations Manual or by equivalent.

2. The Contractor shall be responsible for personnel and environmental air monitoring samples taken inside the work compartment and all costs in connection with testing and air sampling shall be borne by the Contractor.

3. The Contractor shall determine the release of asbestos from any work or waste storage area is not taking place at concentrations higher than .01 actual fibers/cc.

4. All analytical results shall be presented as signed "Certificates of Analysis."

Form shall state:

a. date and time sampling began

b. flow rate of samples

c. sampling time elapsed

d. concentration in fibers/cc

e. site/individual sampled

f. synopsis of work activities which sample was taken

g. name and signature of analysts

5. Two copies of analytical results shall be delivered in writing to the job site within 24 hours of sample collection (excluding non-working days). A copy of the results shall be submitted to the Project Monitor when received by the Contractor.

6. Analytical results indicating potential for a hazard higher than limits set forth in this section shall be reported immediately, by the most expeditious means possible to the Owner.

02 82 13 -10

7. The Project Monitor shall be informed immediately of any area samples outside of the containment with results in excess of .01 fibers/cc actual.

8. Operations shall be discontinued immediately any time emissions are observed emanating from the work area.

9. Contractor will provide a written plan to the Owner stating steps to be undertaken to assure compliance with all regulations, including but not limited to the following:

a. qualifications of personnel taking and analyzing samples

b. containment procedures

c. respirator program

d. sampling strategy

3.04 ASBESTOS ABATEMENT:

A. Install barrier tape and erect signage minimum 6 feet outside of abatement area.

Cover floor with 6-mil poly sheeting and use a HEPA vac in direct proximity to the

ACM being disturbed.

B. Spray asbestos material with amended water, using spray equipment capable of providing a "mist" application to reduce the release of fibers. Saturate the material sufficiently to wet it to the substrate without causing excess dripping or delamination of the material. Spray the asbestos material repeatedly during work process to maintain wet condition and to minimize asbestos fiber dispersion.

C. Remove the saturated asbestos material in small sections. As it is removed, pack the material in sealable plastic bags of 6-mil minimum thickness and place in labeled containers or a second plastic bag of 6-mil minimum thickness for transport.

If the Contractor chooses plastic bags for transport, the double-bag method of containment will be used. Material shall not be allowed to dry out prior to insertion into the original sealable, plastic bag.

D. Seal filled containers. Place danger labels on containers in accordance with OSHA regulation 29 CFR 1926.58. Additional labeling indicating the name of the waste generator and the location where the waste was generated shall be affixed to each container in accordance with NESHAP regulation 40 CFR Part 61. Clean external surfaces of containers thoroughly by wet sponging in the designated area of the work area which is part of the equipment decontamination enclosure system. Move containers to washroom, wet clean each container thoroughly, and move to holding area pending removal from the holding area by workers who have entered from

02 82 13 -11 uncontaminated areas dressed in clean coveralls. Ensure that workers do not enter from uncontaminated areas into the washroom or the work area; ensure that contaminated workers do not exit the work area through the equipment decontamination enclosure system.

E. After completion of stripping work, all surfaces from which asbestos has been removed or contaminated shall be wire brushed and/or wet sponged or cleaned by an equivalent method to remove all visible material. During this work, the surfaces being cleaned shall be kept wet.

3.5 GLOVE BAG REMOVAL:

A. All glove bag work will be performed within a controlled area. The controlled area is established by installing critical barriers of minimum 6-mil poly over any doors or other openings as needed. Negative air is to be maintained in this controlled area at all times from initial disturbance of material until final clearance is certified. The use of a negative air glove bag will not preclude this requirement.

B. Attach glove bag to pipe with ends and top seam securely taped. Leave enough slack in bag so that bag can be lifted at least 3 inches above pipe at center of attached length.

C. Have all tools needed for removal inside bag, prior to attachment of bag.

D. Insert and seal hoses for HEPA vac and amended water sprayer.

E. One person sprays amended water and control HEPA vac hose while other person removes insulation and cleans pipe.

F. Place tools into glove, pull to outside, and double-tie glove for tool removal. Cut between ties.

G. After all insulation is removed and pipe cleaning is finished, continue to ventilate the bag for 3 minutes. Adjust airflow to allow full bag venting.

H. Remove the HEPA vac and water hoses and seal openings.

I. While vacuuming along the top seal of the bag, remove the bag, twist the top and seal with tape with the top doubled down.

J. Place sealed glove bag into labeled asbestos disposal bag and seal.

02 82 13 -12

K. Plastic floor drop cloth and wall poly may be moved as needed, provided that no visible contamination has accumulated. If any contamination exists or job is completed, this poly is to be properly double-bagged and disposed of as asbestos waste.

3.06 CLEANUP:

A. Remove visible accumulations of asbestos material and debris. Wet clean all surfaces within the work area.

B. The windows and doors shall remain sealed and any HEPA-filtered negative air pressure systems, air filtration, and decontamination enclosure systems shall remain in service until final clearance is certified.

C. Clean all surfaces in the work area and any other contaminated areas with water and/or with HEPA-filtered vacuum equipment all surfaces in the work area. After completion of the second cleaning operation, perform a complete visual inspection of the work area to ensure that the work area is free of visible asbestos debris.

D. Sealed drums and all equipment used in the work area shall be included in the cleanup and shall be removed from work areas, via the equipment decontamination enclosure system, at an appropriate time in the cleaning sequence. The transport vehicle shall be lined with two layers of minimum 6-mil. polyethylene sheeting.

E. If the Project Monitor, within 24 hours, finds visible accumulations of asbestos debris in the work area, the Contractor shall repeat the wet cleaning until the work area is in compliance, at the Contractor's expense.

F. Final air samples will be taken by the Virginia Licensed Project Monitor, using the

NIOSH 7400 PCM method of analysis in accordance will all requirements of

AHERA CFR 40, Part 763. If the final air samples do not meet acceptable standards, the Contractor shall be held responsible for the cost of subsequent air samples. Aggressive air sampling will be required on this project. All exits, vents, and critical barriers shall remain sealed and negative air machines will remain on until final clearance is certified.

G. Contractor shall provide necessary electrical outlets for air clearance equipment.

02 82 13 -13

3.07 DISPOSAL:

Comply with 40 CFR PART 763 SUBPART E APPENDIX D, the Virginia Department of

Environmental Quality and the Virginia Department of Transportation.

A. Disposal of Asbestos-Containing Materials and Asbestos-Contaminated Waste: As the work progresses and to prevent exceeding available storage capacity on site, remove sealed and labeled containers of asbestos waste and dispose of such containers at an authorized disposal site in accordance with the requirements of disposal authority. Submit documentation regarding disposal to Owner within 30 days of removal.

B. Procedure for hauling and disposal shall comply with 40 CFR 61 (Sub-part B), state, regional, and local standards. If drums are chosen as the container for the disposal bags, the bags will be removed by hand from drums into the burial site unless the bags have been broken or damaged. Damaged bags shall remain in the drum and the entire contaminated drum shall be buried. Uncontaminated drums may be recycled. If the double bag method of containment was used, the entire waste package shall be hand placed into the burial site. Workers shall wear appropriate respirators and personal protective equipment when handling asbestos materials at the jobsite and at the disposal site.

C. All procedures are to follow NESHAP regulations, the Virginia Department of

Waste Managements’ Solid Waste Regulations, the Virginia Department of

Transportation and the Virginia Department of Environmental Quality regulations.

END OF SECTION 02 82 13

May 26, 2026

Asbestos Inspection Report

Project Location:

Wytheville Community College

Bland Hall 1st Floor Renovation

Prepared For:

Virginia Community College System

300 Arboretum Place, Suite 200

Richmond, VA 23236

Prepared By:

Jared Crowder

Asbestos Inspector

TABLE OF CONTENTS

SCOPE OF WORK

ASBESTOS INSPECTION

• SAMPLE SUMMARY

• LABORATORY REPORT

• PHOTOS

• APPLICABLE LICENSES

SCOPE OF WORK

Raymond Global was contracted by Virginia Community College System to provide an asbestos inspection at Bland Hall located at Wytheville Community College, Wytheville, Virginia. The inspection was conducted by personnel trained and licensed in accordance with the regulations of the Environmental Protection Agency (EPA) and the Commonwealth of Virginia. This inspection was performed using current EPA AHERA standards. This protocol was used for the determination, sampling and analysis of suspected Asbestos Containing Materials (ACM).

ASBESTOS INSPECTION

An inspection of the Bland Hall was performed May 18 & 22, 2026 by representatives of

Raymond Global. The objective of this inspection was to determine the location of suspect asbestos-containing materials (ACM) currently located on the interior of this structure that may be disturbed by upcoming renovation activities.

As the sample summary indicates, the following suspect materials sampled were reported to be asbestos containing by the laboratory:

• Interior Door Framing Caulk – Tan – Metal Frames to Block

This NON-Friable asbestos containing material should be removed prior to renovation activities at this location. Removal should be performed by licensed, contract personnel using approved methods.

Friable Asbestos Material: Material when dry, may be crumbled, pulverized or reduced to powder by hand pressure and includes previously non-friable material after such previously non-friable material becomes damaged to the extent that when dry may be crumbled, pulverized, or reduced to powder by hand pressure.

Non-friable Asbestos Material: Material that contains asbestos in which the fibers have been locked in by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not release fibers during any appropriate use, handling, demolition, storage, transportation, processing or disposal.

This information should be provided to all contract personnel for their use in meeting current

OSHA requirements. Every attempt was made to gain access to all areas or to assess representative materials entering or leaving the area. Raymond Global-Georgia, Inc. accepts no liability nor makes any claims regarding ACBM which was not accessible during the inspection process if such material was located behind or within walls, concrete decks, subfloors, or was generally inaccessible without destructive sampling. If any additional suspect materials are identified during the course of the project, the contractor is to immediately stop work and contact the Owner for further direction.

Sample Summary

ND -TM 12.1 Tile Mastic - FT 11

ND -

ND -

■ 2%

ND -

ND

26029267 -032 TM 12.2 Tile Mastic - FT 11 ND

ND = = CHRYSOTILE ▲ = AMOSITE ◉ = OTHER

NONE DETECTED NA =

NOT ANALYZED

POSITIVE STOP ■

26029267 -029

26029267 -030

26029267

26029267 -024

26029267 -025

26029267 -026

26029267 -028

26029267 -027

-031

26029267 -023

26029267 -016

26029267 -017

26029267 -018

26029267 -019

26029267 -020 ND -

ND -

ND -

ND

26029267 -021

26029267 -022

ND -

■ 2%

ND -

ND -

ND -

ND -

ND -

ND -

ND -

ND -

ND

ND -

ND -

ND -

ND -

ND -

ND

ND

26029267 -014

26029267 -015

26029267 -009

26029267 -010

26029267 -004

26029267

26029267 -011

26029267

-005

-012

26029267 -013

26029267 -006

26029267 -007

26029267 -008

DF 10.2 Door Framing - 111

FT 11.1 Floor Tile - 12z12 - White

FT 11.2 Floor Tile - 12z12 - White

BM 9.1 Baseboard Mastic

BM 9.2 Baseboard Mastic

DF 10.1 Door Framing - 111

CT 7.3 Ceiling Tile - Squiggles

DM 8.1 Duct Mastic - Tan

DM 8.2 Duct Mastic - Tan

FT 6.2 Floor Tile - 12x12 - Red

CT 7.1 Ceiling Tile - Squiggles

CT 7.2 Ceiling Tile - Squiggles

TM 5.1 Tile Mastic - FT 5

TM 5.2 Tile Mastic - FT 6

FT 6.1 Floor Tile - 12x12 - Red

CT 3.3 Ceiling Tile - 2X2 - Textured

FT 4.1 Floor Tile - 12x12 - Beige

FT 4.2 Floor Tile - 12x12 - Beige

JC 2.5 Joint Compound

CT 3.1 Ceiling Tile - 2X2 - Textured

CT 3.2 Ceiling Tile - 2X2 - Textured

JC 2.2 Joint Compound

JC 2.3 Joint Compound

JC 2.4 Joint Compound

SR 1.5 Sheetrock

JC 2.1 Joint Compound

SR 1.1 Sheetrock

SR 1.2 Sheetrock

SR 1.3 Sheetrock ND -

Bland Hall 1st Floor

LAB # SAMPLE ID SAMPLE DESCRIPTION RESULT %

ND -

ND -

SR 1.4 Sheetrock

26029267 -001

26029267 -002

26029267 -003

▲ = AMOSITE ◉ = OTHERND = NONE DETECTED NA =

NOT ANALYZED

POSITIVE STOP ■ = CHRYSOTILE

26030320 -004 CK 2.2 Caulk ND -

26030320 -003 CK 2.2 Caulk ND -

26030320 -002 DF 1.2 Door Framing - Sheetrock ND -

26030320 -001 DF 1.1 Door Framing - Sheetrock ND -

Bland Hall 1st Floor

LAB # SAMPLE ID SAMPLE DESCRIPTION RESULT %

Laboratory Report

Dear Jared Crowder, We at SanAir would like to thank you for the work you recently submitted. The 32 sample(s) were received on Tuesday, May 19, 2026 via FedEx. The final report(s) is enclosed for the following sample(s): SR 1.1, SR 1.2, SR 1.3, SR 1.4, SR 1.5, JC 2.1, JC 2.2, JC 2.3, JC 2.4, JC 2.5, CT 3.1, CT 3.2, CT 3.3, FT 4.1, FT 4.2, TM 5.1, TM 5.2, FT 6.1, FT 6.2, CT 7.1, CT 7.2, CT 7.3, DM 8.1, DM 8.2, BM 9.1, BM 9.2, DF 10.1, DF 10.2, FT 11.1, FT 11.2, TM 12.1, TM 12.2.

These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information

Sample conditions:

- 32 samples in Good condition.

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

WCCProject Number:

P.O. Number:

Project Name: Bland 1st Floor

5/18/2026Collected Date:

5/19/2026 10:15:00 AMReceived Date:

5/19/2026 4:57:09 PM

26029267 SanAir ID Number

FINAL REPORT

Raymond Global, Inc.Name:

Address: 1035 Green St. SE, Ste. A

Conyers, GA 30012

770-483-9592Phone:

Analyst: Pisula, Nicholas

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

SR 1.1 / 26029267-001

Sheetrock

Grey Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

SR 1.2 / 26029267-002

Sheetrock

Grey Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

SR 1.3 / 26029267-003

Sheetrock

Grey Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

SR 1.4 / 26029267-004

Sheetrock

Grey Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

SR 1.5 / 26029267-005

Sheetrock

Grey Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

JC 2.1 / 26029267-006

Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

JC 2.2 / 26029267-007

Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

JC 2.3 / 26029267-008

Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

JC 2.4 / 26029267-009

Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

JC 2.5 / 26029267-010

Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 5/19/2026 Date: 5/19/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

WCCProject Number:

P.O. Number:

Project Name: Bland 1st Floor

5/18/2026Collected Date:

5/19/2026 10:15:00 AMReceived Date:

5/19/2026 4:57:09 PM

26029267 SanAir ID Number

FINAL REPORT

Raymond Global, Inc.Name:

Address: 1035 Green St. SE, Ste. A

Conyers, GA 30012

770-483-9592Phone:

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

CT 3.1 / 26029267-011

Ceiling Tile 2x2 Textured

White Fibrous

Homogeneous

50% Glass 40% Min. Wool

10% Other None Detected

CT 3.2 / 26029267-012

Ceiling Tile 2x2 Textured

White Fibrous

Homogeneous

50% Glass 40% Min. Wool

10% Other None Detected

CT 3.3 / 26029267-013

Ceiling Tile 2x2 Textured

White Fibrous

Homogeneous

50% Glass 40% Min. Wool

10% Other None Detected

FT 4.1 / 26029267-014

Floor Tile 12x12

Beige Non-Fibrous

Homogeneous

100% Other None Detected

FT 4.2 / 26029267-015

Floor Tile 12x12

Beige Non-Fibrous

Homogeneous

100% Other None Detected

TM 5.1 / 26029267-016

Tile Mastic FT-5

Tan Non-Fibrous

Homogeneous

100% Other None Detected

TM 5.2 / 26029267-017

Tile Mastic FT-6

Tan Non-Fibrous

Homogeneous

100% Other None Detected

FT 6.1 / 26029267-018

Floor Tile 12x12

Red Non-Fibrous

Homogeneous

100% Other None Detected

FT 6.2 / 26029267-019

Floor Tile 12x12

Red Non-Fibrous

Homogeneous

100% Other None Detected

CT 7.1 / 26029267-020

Ceiling Tile Squiggles

White Fibrous

Homogeneous

60% Cellulose 30% Min. Wool

10% Other None Detected

Analyst:

Analysis Date: 5/19/2026 Date: 5/19/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

WCCProject Number:

P.O. Number:

Project Name: Bland 1st Floor

5/18/2026Collected Date:

5/19/2026 10:15:00 AMReceived Date:

5/19/2026 4:57:09 PM

26029267 SanAir ID Number

FINAL REPORT

Raymond Global, Inc.Name:

Address: 1035 Green St. SE, Ste. A

Conyers, GA 30012

770-483-9592Phone:

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

CT 7.2 / 26029267-021

Ceiling Tile Squiggles

White Fibrous

Homogeneous

60% Cellulose 30% Min. Wool

10% Other None Detected

CT 7.3 / 26029267-022

Ceiling Tile Squiggles

White Fibrous

Homogeneous

60% Cellulose 30% Min. Wool

10% Other None Detected

DM 8.1 / 26029267-023

Duct Mastic

Tan Non-Fibrous

Homogeneous

100% Other None Detected

DM 8.2 / 26029267-024

Duct Mastic

Tan Non-Fibrous

Homogeneous

100% Other None Detected

BM 9.1 / 26029267-025

Baseboard Mastic

Tan Non-Fibrous

Homogeneous

100% Other None Detected

BM 9.2 / 26029267-026

Baseboard Mastic

Tan Non-Fibrous

Homogeneous

100% Other None Detected

DF 10.1 / 26029267-027

Door Framing-111

Tan Non-Fibrous

Homogeneous

98% Other 2% Chrysotile

DF 10.2 / 26029267-028

Door Framing-111

Tan Non-Fibrous

Homogeneous

98% Other 2% Chrysotile

FT 11.1 / 26029267-029

Floor Tile 12x12

White Non-Fibrous

Homogeneous

100% Other None Detected

FT 11.2 / 26029267-030

Floor Tile 12x12

White Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 5/19/2026 Date: 5/19/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

WCCProject Number:

P.O. Number:

Project Name: Bland 1st Floor

5/18/2026Collected Date:

5/19/2026 10:15:00 AMReceived Date:

5/19/2026 4:57:09 PM

26029267 SanAir ID Number

FINAL REPORT

Raymond Global, Inc.Name:

Address: 1035 Green St. SE, Ste. A

Conyers, GA 30012

770-483-9592Phone:

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

TM 12.1 / 26029267-031

Tile Mastic- FT 11

Tan Non-Fibrous

Homogeneous

100% Other None Detected

TM 12.2 / 26029267-032

Tile Mastic- FT 11

Tan Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 5/19/2026 Date: 5/19/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

WCCProject Number:

P.O. Number:

Project Name: Bland 1st Floor

5/18/2026Collected Date:

5/19/2026 10:15:00 AMReceived Date:

5/19/2026 4:57:09 PM

26029267 SanAir ID Number

FINAL REPORT

Raymond Global, Inc.Name:

Address: 1035 Green St. SE, Ste. A

Conyers, GA 30012

770-483-9592Phone:

Disclaimer and Additional Information:

This report is the sole property of the client named on the chain-of-custody (COC) submitted to SanAir Technologies Laboratory, Inc. (SanAir). Results in the report are confidential information intended only for the use by the customer listed on the COC. Neither results nor reports will be discussed with or released to any third party without our client's written permission. The final report shall not be reproduced, except in full, without written approval of the laboratory to assure that parts of the report are not taken out of context.

This report and any information contained within shall not be edited, altered, or modified in any way by any persons or agencies receiving, viewing, distributing, or otherwise possessing a copy of this final report. The laboratory reserves the right to perform amendments to any finalized report, of which shall supersede and make obsolete any previous editions. Such changes, modifications, additions, or deletions shall be effective immediately upon notice thereof, which may be given by means including but not limited to posting on the SanAir client portal website, electronic or conventional mail, or by any other means.

The information provided in this report applies only to the samples submitted and is relevant only for the date, time, and location of sampling. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client on the COC. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample(s) in the condition received at the laboratory and information provided by the client on the COC, such as: project number, project name, collection dates, P.O. number, special instructions, samples collected by, sample numbers, sample identifications, sample type, selected analysis type, flow rate, total volume or area, and start-stop times that may affect the validity of the results in this report. Samples were received in good condition unless otherwise noted on the report. When the client requires samples to be tested that deviates from a specific method or condition, all reported results may be affected by the deviation. SanAir assumes no responsibility or liability for the manner in which the results are used or interpreted.

This report does not constitute nor shall not be used by the client to claim product, process, system, or person certification, approval, or endorsement by NVLAP, NIST, NELAC, AIHA LAP, LLC or any other U.S.

governmental agencies; all or somet tests contained in this report may not be accredited by every local, state, and federal regulatory agencies. Refer to the SanAir website at www.sanair.com for copies of current certificates and scopes of various accreditations, certifications, and licenses or contact the laboratory for inquiries…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .