Addendum No. 2 to Bland Hall Renovation Contract Documents
This is an addendum to the construction contract documents for the Renovation of Bland Hall at Wytheville Community College (Project Code 260-B4260-040, L24WC650), issued by SFCS Inc. on behalf of the Virginia Community College System. The addendum modifies the original contract documents dated July 16, 2025, and extends the bid submission deadline from May 27, 2026 at 3:00 p.m. to Tuesday, June 9, 2026 at 2:00 p.m., with the public bid opening rescheduled from May 28, 2026 at 3:00 p.m. to Wednesday, June 10, 2026 at 2:00 p.m. The addendum addresses 19 pre-bid requests for information submitted between May 6 and May 15, 2026, providing clarifications on specification discrepancies, preferred vendor selections, material substitutions, shelving configurations, door ratings, flooring products, and fire alarm shutdown responsibilities. Key clarifications include confirmation that existing doors maintain their existing fire ratings; updates to mobile storage shelving specifications and drawings; approval for material substitutions such as switching from discontinued Mohawk "Hit the Mark" LVP to Mannington Products; and allowance for contractors to meet AWI standards through written certification of materials and methods rather than requiring formal AWI certification when alternate materials are proposed.
The addendum modifies Section 105626 (Mobile Storage Shelving) and updates multiple drawing sheets including AD1.0 (Ground Floor Demolition Plans), A1.1 (Ground Floor Plans), A2.1 (Enlarged Plans and Details), A4.1 (Door Schedule and Details), A7.1 (Interior Elevations), I0.0 (Finish Legend), and I1.1 (Finish Floor Plan). Preferred vendors identified include Johnson Controls for fire alarm systems, Epitome for data infrastructure, Verkada with Tight Technologies for access control, and RTW Media for sound masking systems, though the owner reserves the right to change these selections. CAD drawings will be made available to the contractor after bid award subject to a signed CAD release agreement. The owner has initiated an updated lead and asbestos survey, with results to be incorporated into project specifications via a separate addendum if abatement is required. All bidders must acknowledge receipt of Addendum No. 2 on their bid forms to avoid disqualification, and the document includes complete revised specifications for mobile storage shelving systems with detailed performance, materials, and installation requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WCC MAIN CAMPUS BLAND HALL RENOVATION SFCS – 20301.13
VCCS PROJECT CODE: 260-B4260-040
ADDENDUM NO. 2 1
ADDENDUM NO. 2 – May 19, 2026
This Addendum forms a part of the Contract Documents and modifies the original Contract Documents dated July 16, 2025.
Acknowledge receipt of this Addendum in the space provided on the BID FORM. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 6 narrative pages.
The following items clarify, modify, change, delete from or add to the Contract Documents. When any paragraph, subparagraph, or sub-subparagraph thereof is modified or deleted by this Addendum, the unaltered provisions of that paragraph, subparagraph, sub-subparagraph shall remain in effect.
GENERAL:
1. The Bid Due date has been changed from May 27, 2026 at 3:00 pm; the new Bid Due date will be
Tuesday June 09, 2026, at 2:00 pm.
2. The Bid Public Opening date has been changed from May 28, 2026 at 3:00 pm; the new Bid Public
Opening date will be Wednesday June 10, 2026, at 2:00 pm.
PRE-BID RFIs AND RESPONSES:
NOTE: A copy of all pre-bid RFIs received between May 06, 2026 and May 15, 2026 are attached for reference.
3. RFI Question:
Is there a preferred low-voltage contractor for the fire alarm, data, access control and sound masking systems? If so, could you please provide their information?
SFCS Response:
The Meeting Minutes for the Pre-bid meeting on 05/06/2026 issued with Addendum No. 1 identify Johnson Controls as the vendor for the fire alarm.
Currently, WCC's preferred vendor for data is Epitome. For access control, WCC uses a
Verkada system with Tight Technologies managing installation. WCC works with RTW Media.
This is subject to change.
4. RFI Question:
See notes below regarding the sizes not matching what is in the spec. Also, is there a CAD (.dwg) file available for this space that we can use to layout the system? Specification Section 105626 page 4: 2 places on this page indicate that the shelving is 36”W x 12”D, however the drawings seem to reflect
ADDENDUM NO. 2 2
other sizes (there’s a 34”D and 14”D). There is no indication about how many shelves / openings there are per unit. Can we get some clarification on the shelving set up?
SFCS Response: Please refer to Addendum No. 1 for clarification on specification and drawings for mobile storage shelving including an updated specification. Spec Article 2.5 outlines shelving units width and number of shelves.
Spec Article 2.5.B.2 has been updated to indicate single-faced and double-faced sided units and to refer to drawings.
Enlarged Plan 2/A2.1 has been revised to provide additional notes to clarify single/double sided shelving locations.
CAD Drawings can be made available to contractor after bid award and with a signed CAD release agreement.
5. RFI Question:
Sheet A4.1: The door schedule calls for a few doors to have a 20-minute fire rating, but some of the existing doors that are not marked as 20-minute on the schedule are currently rated for 90-minutes or higher. Please clarify if the doors no longer need to be rated if not marked on the door schedule as such.
SFCS Response:
Existing doors to remain shall maintain their existing rating. Door schedule updated to note existing ratings to remain.
6. RFI Question:
Sheet I0.0: Please confirm the intended specification for the Formica Hardstop paneling noted as
“custom graphic”. Formica requires a minimum order quantity of 25 sheets for all “custom graphics” material. Based on the drawings, this will be substantially less. Please confirm that a custom graphic finish is the intended design requirement so that the associated material coverage and cost impact can be accurately included.
Specifications Section 064116, page 160, paragraph 2.1: Is AWI certification required on this project?
SFCS Response:
The PL-2 Formica Hardstop has been updated to a Wilson laminate with a graphic film. Refer to attached Sheet I0.0.
For the AWI certification, per Section 27 of the DGS-30-054, alternate equal materials, products or model numbers may be proposed by the Contractor through the A/E for approval by the Owner through the process set forth in Section 26. Alternately, if the Contractor can certify in writing the following requirements at a minimum will be met, this will be acceptable:
(1) All of the materials used will meet AWI requirements for grade, moisture content, and
ADDENDUM NO. 2 3
performance.
(2) Fabrication and assembly will be completed using AWI-approved methods, including for joinery, hardware and installation.
(3) Installation procedures will be followed for AWI Guidelines for alignment, secure attachment and proper fit.
7. RFI Question:
Sheet A1.1: There are (2) existing windows, (1) to be added in “Pearson Vue Testing” and “Testing
Proctor(s)”, as well as (1) in “Existing Testing Center”. These (4) windows are not showing to receive roller shades like the others. Is this correct or do roller shades need to be added in these locations?
SFCS Response:
Provide roller shades at these windows per updated plan I1.1 – Finish Floor Plan.
8. RFI Question:
Sheet T1: GC shall review & verify where asbestos was abated as marked on as-built drawings to
Architect. Does this mean another asbestos inspection done by GC?
SFCS Response:
Owner has initiated an updated lead and asbestos survey of the project area. If lead and asbestos are present and if abatement is required, that scope will be incorporated into the project specifications and drawings with a separate Addendum.
9. RFI Question:
Sheet M1.1 – Note 12: States see structural drawings for lintels; can you provide drawings.
Typical structural detail has been added: 11/A4.1. New work may coordinate with existing penetrations, to be verified in field. If new penetrations are needed, refer to detail.
10. RFI Question:
A. Sheets I0.0, I1.1: The LVP collection from Mohawk called "Hit The Mark" has been discontinued. Should we switch to the Mannington Products as used in the Smyth Hall renovation? Please advise.
B. The drawings call for Mohawk, Hit the Mark LVT, that product has been dropped. The Resilient spec calls for VCT. What flooring product do you want to use?
Yes, switch to product used at One Stop.
ADDENDUM NO. 2 4
Finish Legend has been updated to reflect current selection recently installed in Smyth Hall.
11. RFI Question:
Specifications Section 2.1A.1/064116 and 1.4b/064219: Spec 2.1A.1/064116 and 1.4b/064219 requires providing certificates from AWI. May we meet the standards without providing the certificates?
SFCS Response:
Per Section 27 of the DGS-30-054, alternate equal materials, products or model numbers may be proposed by the Contractor through the A/E for approval by the Owner through the process set forth in Section 26. Alternately, if the Contractor can certify in writing the following requirements at a minimum will be met, this will be acceptable:
(1) All of the materials used will meet AWI requirements for grade, moisture content, and performance.
(2) Fabrication and assembly will be completed using AWI-approved methods, including for joinery, hardware and installation.
(3) Installation procedures will be followed for AWI Guidelines for alignment, secure attachment and proper fit.
12. RFI Question:
Sheet A1.1: Sheet A1.1 shows relocation/installation of book shelving and lockers. Is this the furniture scope or are we to include within ours?
SFCS Response:
Re-installation of shelving and lockers shall be in contractor's scope. Demolition drawings updated to indicate existing lockers to be removed and stored for re-installation.
13. RFI Question:
Sheet A1.1: What wall types are to be used in the archive areas?
Enlarged Plan 2/A2.1 has been updated to indicated wall types.
14. RFI Question:
Sheet A5.1: Detail 2/A5.1 shows black grid and ACT tile. Please provide spec.
Finish legend has been updated to provide product information.
ADDENDUM NO. 2 5
15. RFI Question:
Sheet I1.1: Sheet I1.1 shoes (sic) the finish floor in Vestibule 120 at ETR. Is the existing carpet to be protected and remain or is the RF1 to take its place? Please advise.
SFCS Response:
Refer to attached updated sheet with RF1 to be included in the Vestibule.
16. RFI Question:
Sheet I0.0: Sheet I0.0 lists RF-5 as Altro 18x18 Dolce Tile, where does this occur?
Please eliminate RF-5, it does not occur.
17. RFI Question:
Sheet I1.1: Sheet I1.1 detail 1 shows new single depth stack shelving. Please confirm these are new and not from the existing owners’ shelving.
SFCS Response:
Provide New shelving where indicated New on the Plans, location is on perimeter wall.
18. RFI Question:
Sheet A7.1: Detail C on sheet A7.1 references PLAM-A and PLAM-B please advise.
Detail should indicate PL- 1 and PL- 2. PLAM A = PL-1 and PLAM B = PL-2. Detail C/A7.1 revised.
19. RFI Question:
Who is responsible for the Fire Alarm Shut down fees, the owner or contractor?
The RFI question doesn't clarify if fees relate specifically to charges from the fire alarm company or for fire watch personnel. For the purpose of the bid assume these costs are the responsibility of the Contractor.
ADDENDUM NO. 2 6
CHANGES TO SPECIFICATIONS:
NOTE: All specification sections listed below shall be deleted and replaced in their entirety per this
Addendum.
20. Section 105626 – MOBILE STORAGE SHELVING
Paragraph 2.5.B.2 has been updated.
CHANGES TO DRAWINGS:
21. Sheet AD1.0 – GROUND FLOOR DEMOLITION PLANS
Refer to Item No. 12 above.
22. Sheet A1.1 – GROUND FLOOR PLANS
Refer to Item No. 7 above.
23. Sheet A2.1 – ENLARGED PLANS AND DETAILS
Refer to Item No. 13 above.
24. Sheet A4.1 – DOOR SCHEDULE AND DETAILS
Refer to Item No. 5 and Item No. 9 above.
25. Sheet A7.1 – INTERIOR ELEVATIONS
Refer to Item No. 18 above.
26. Sheet I0.0 – FINISH LEGEND
Refer to Item No. 6 and Item No. 12 above.
27. Sheet I1.1 – FINISH FLOOR PLAN
Refer to Item No. 10 and Item No. 15 above.
END OF ADDENDUM NO. 2
DGS-30-272
(Rev. 04/15)
PREBID QUESTION FORM
(Use separate Form for each question submitted.)
Date: 5/13/2026
Project Title: Bland Hall Renovations
Project Code No.: 260-B4260-040
The following question concerns Drawing Sheet (number) :
Is there a preferred low-voltage contractor for the fire alarm, data, access control, and sound masking systems? If so, could you please provide their information?
The following question concerns Specifications Section (number) , page , paragraph :
All responses to questions will be made by Addendum.
Question submitted by: Richie Carter Jamison Electric
Name Organization
Bidders shall submit form to: Gary Martin SFCS Inc.
Email address: gmartin@sfcs.com
ITEM 3
FOR REFERENCE
mailto:gmartin@sfcs.com
PREBID QUESTION FORM
(Use separate Form for each question submitted.)
Date:
Project Title: Bland Hall Renovations
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Question submitted by:
5.14.26
105626 4
2 places on this page indicate that the shelving is 36"W x 12"D, however the drawings seem to reflect other sizes (there's a 34"D and 14"D). There is also no indication about how many shelves / openings there are per unit.Can we get some clarification on the shelving set up?
A2.1
See notes below regarding the sizes not matching what is in the spec. Also, is there a CAD
(.dwg) file available for this space that we can use to layout the system?
Datum Storage SolutionsSean McCourt
ITEM 4
ITEM 5
ITEM 6
ITEM 7
Date:
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
05-15-2026
Sheet T1
GC shall review & verify where asbestos was abated as marked on as-built drawings to Architect.
Does this mean another asbestos inspection done by GC?
Chase Crawford Price Buildings Inc.
ITEM 8
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
05-15-2026
Chase Crawford Price Buildings Inc.
Sheet M1.1 – Note 12
States see structural drawings for lintels; can you provide drawings.
ITEM 9
ITEM 10
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Stephanie Hixon MB Contractors
5/15/26
The LVP collection from Mohawk called "Hit The Mark" has been discontinued. Should we switch to the Mannington Products as used in the Smyth Hall renovation? Please advise.
I0.0, I1.1
ITEM 10
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
2.1A.1/064116 and 1.4b/064219
Spec 2.1A.1/064116 and 1.4b/064219 requires providing certificates from AWI. May we meet the standards without the providing the certificates?
ITEM 11
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet A1.1
3.Sheet A1.1 shows relocation/installation of book shelving and lockers. Is this the furniture scope or are we to include within ours?
ITEM 12
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet A1.1
4.What wall types are to be used in the archive areas?
ITEM 13
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet A5.1
5.Detail 2/A5.1 shows black grid and ACT tile. Please provide spec
ITEM 14
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet I1.1
6.Sheet I1.1 shoes the finish floor in Vestibule 120 at ETR. Is the existing carpet to be protected and remain or is the RF1 to take its place? Please advise.
ITEM 15
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet I0.0
7.Sheet I0.0 lists RF-5 as Altro 18x18 Dolce Tile, where does this occur?
ITEM 16
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet I1.1
8.Sheet I1.1 detail 1 shows new single depth stack shelving.
Please confirm these are new and not from the existing owners’ shelving.
ITEM 17
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
Sheet A7.1
9.Detail C on sheet A7.1 references PLAM-A and PLAM-B please advise.
ITEM 18
The following question concerns Specifications Section (number) , page _________, paragraph _______:
Name Organization
10.Who is responsible for the Fire Alarm Shut down fees, the owner or contractor?
ITEM 19
ADDENDUM NO. 2
MAY 19, 2026
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 1
SECTION 105626 - MOBILE STORAGE SHELVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mechanically assisted systems.
2. Steel-bracket shelving.
B. Products Furnished, but Not Installed, under This Section:
1. Inserts in cast-in-place concrete.
1.2 ACTION SUBMITTALS
A. Product Data:
1. Mechanically assisted systems.
2. Steel-bracket shelving.
B. Product Data Submittals: For each product.
1. Include mobile operation, construction details, material descriptions, dimensions of individual components and profiles, and finishes for mobile storage shelving systems and accessories.
C. Shop Drawings:
1. Include plans, elevations, sections, and details.
2. Show shelving layout.
3. Show location and extent of rail system including depth required if recessed.
4. Show clear-aisle widths from face of carriages.
5. Detail fabrication and installation of mobile shelving systems including methods of anchoring shelves to carriages and rails to building structure as required for seismic restraint.
D. Samples: For each exposed product and for each color and texture specified, 6 inches in size.
E. Seismic Design Calculations: For seismic design of mobile storage shelving systems including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1.3 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer and manufacturer.
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 2
B. Sample Warranty: For manufacturer's special warranty.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For mobile shelving systems and operating manuals to include in maintenance manuals.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Shelf Units: provide one of each installed size and type indicated, .
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: A manufacturer capable of fabricating mobile storage shelving that meets or exceeds performance requirements indicated and of documenting this performance by test reports, and calculations.
B. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.
1.7 PROJECT CONDITIONS
A. Field Measurements: Verify actual locations of support rail anchors, depressed slab, embedded conduit, and other construction contiguous with mobile storage shelving by field measurements before fabrication.
1.8 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of mobile shelving systems that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Deterioration of metals, metal finishes, and other materials beyond normal wear.
2. Warranty Period: Five years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 SOURCE LIMITATIONS
A. Obtain mobile storage systems including shelving from single manufacturer.
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 3
2.2 PERFORMANCE REQUIREMENTS
A. Seismic Performance: Mobile shelving systems are to withstand the effects of earthquake motions determined according to ASCE/SEI 7.
B. Structural Performance: Provide mobile shelving systems capable of supporting the following:
1. Load per Linear Foot of Carriage: 1000 lb/ft..
2. Total Load: 16,000 lbs per carriage.
2.3 SYSTEMS AND COMPONENTS
A. General: Provide manufacturer's standard mobile storage shelving systems and components. Where components are not otherwise indicated, provide manufacturer's standard components as required for a complete system.
B. Inserts: Furnish required concrete inserts and similar anchorage devices for installing track system, and furnish other components of work where installation of devices is specified in another Section.
C. Flooring: Underlayment thickness required to bring aisle floor finish flush with rail tops.
1. Plywood Underlayment: DOC PS 1, Interior, Underlayment.
a. Fire-Retardant-Treated Plywood by Pressure Process: Products with a flame-spread index of 25 or less when tested in accordance with ASTM E84.
2. Ramps: Manufacturer's standard metallic-coated, cold-rolled steel ramp not steeper than 1:12.
3. Floor Finish: As scheduled on drawings.
D. Tracks: Steel rails with tops machined to mate with guide wheels and with ends designed to provide smooth, secure continuity between sections without field welding.
Provide mounting brackets, anchorage devices, adjustable leveling devices, and stops at terminations of rails to prevent carriages from running off track ends.
1. Mounting: Surface mounted.
E. Carriages: Rigid frames consisting of C-shaped cold-formed steel beams and cross beams, designed to allow secure anchorage of shelving units.
1. Carriage Width: refer to drawings.
2. Carriage Length: refer to drawings.
3. Wheels: Manufacturer's standard number of bearing-mounted, steel wheels, precision ground to mate with tracks.
4. Bumpers: Provide two rubber bumpers with minimum depth of 1/2 inch each side.
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 4
F. Anti-Tip Brackets: Mount on carriage for engagement with track system to secure units against tipping.
G. Carriage End Panels: Full depth and height of shelving units. Provide at the operating end of each range.
1. Material: Cold-rolled steel sheet, 0.048 inch thick .
2.4 MECHANICALLY ASSISTED SYSTEMS
A. Drive Systems: Geared transmission and chain systems with tensioning device to provide mechanical assistance and uniform movement along entire length of each carriage. Permanently shielded and lubricated.
B. Drive Shaft: Continuous tubular or solid steel shaft, capable of transmitting torque from drive system without distortion.
C. Locking Pins: Located on range end panels to allow locking of individual range carriage when depressed.
2.5 STEEL-BRACKET (CANTILEVER) SHELVING
A. Steel-Bracket Shelving: ANSI Z39.73, shelving consisting of two uprights and two spreaders per section forming a four-sided frame, with adjustable shelves on one or both sides of uprights cantilever-hung by brackets. Configure units for mounting on mobile carriages.
B. Shelving Units :
1. Type: Welded, self-supporting units.
2. Configuration: Double and Single-faced units as indicated on drawings.
3. Width: 36 inches.
4. Height: 90 inches.
5. Shelf Depth: 12 inches nominal, minimum. Refer to drawings.
6. Shelf Styles: Provide the following styles and numbers of adjustable shelves:
a. Flat; six helves.
b. Adjustable divider; shelves. Provide one adjustable partition per shelf with hooks or tabs to fit in slots in divider shelves.
C. Frames:
1. Uprights: Steel channels, 0.060 inch thick, with slots to receive shelf bracket tabs at 1 inch o.c.
2. Spreaders: Tube steel, 0.060 inch thick.
3. Reinforcing Gusset Plates: Triangular steel plates, 0.060 inch thick, with return flange along bottom edge.
D. Adjustable Shelves: 0.048-inch- thick cold-rolled steel sheet. Provide two brackets per shelf; 0.060-inch- thick cold-rolled steel.
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 5
E. Base: Manufacturer's standard for attachment to mobile carriages.
F. End Panels: Provide where indicated.
1. Steel End Panels: Cold-rolled steel sheet, 0.048 inch (1.22 mm) thick, with smooth finish.
G. Shelving Tops: Provide full length of each range with manufacturer's standard attachment brackets for type of top indicated; cold-rolled steel sheet, 0.048 inch thick.
2.6 MATERIALS
A. Steel Sheet: ASTM A29/AISI Type 1035 or Type 1045; manufacturer's standard.
2.7 STEEL FINISHES
A. Appearance of Finished Work: Noticeable variations in same piece are not acceptable.
Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
B. Baked-Enamel or Powder-Coat Finish: Manufacturer's standard two-coat, baked-on finish consisting of prime coat and thermosetting topcoat to achieve a minimum dry film thickness of 2 mils.
1. Color and Gloss: As selected by Architect from manufacturer's full range.
2.8 WOOD FINISHES
2.9 Finishing: Apply manufacturer's standard, baked, clear finish, consisting of a sealer and a conversion varnish or nitrocellulose lacquer topcoat. Sand and wipe clean between applications of sealer and topcoat.
2.10 SYSTEM ACCESSORIES
A. Floor Anchors: Galvanized steel, post-installed expansion anchors, power-actuated fasteners, or threaded concrete screws.
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 6
2.11 Wall Anchors: Manufacturer's standard galvanized-steel anchors.
2.12 GROUT
A. Nonmetallic, Nonshrink Grout: ASTM C1107/C1107M, noncorrosive and nonstaining hydraulic cement compound conforming to the following requirements, based on the performance of the test specimens at room temperature and in laboratory air.
1. Linear Movement: No shrinkage while setting; maximum expansion limited to
0.002 inch per linear inch (0.05 mm per linear mm).
2. Compressive Strength: 4500 psi (31.03 MPa) at one hour and 8000 psi (55.16 MPa) at seven days when tested in accordance with ASTM C109/C109M.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas, with Installer present, for compliance with requirements for installation tolerances, location of framing and reinforcements, and other conditions affecting performance of mobile shelving systems.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Level and plumb tracks to a tolerance of 0.09 inch in 120 inches with no more than 0.06-inch variation between adjacent rails. Use permanent shims or non-shrink grout as indicated by manufacturer.
B. Surface-Mounted Track Systems: Install underlayment, ramps, and finish flooring according to manufacturer's written instructions and flush with track surfaces. Do not extend ramps beyond ends of carriages.
C. Carriage Installation: Mount mobile carriages on track system with anti-tip brackets engaged by rails and adjust for smooth operation. Provide non-moving carriages securely fixed to rails where indicated.
3.3 INSTALLATION OF SHELVING
A. Attach shelving units to carriages according to manufacturer's written instructions and as required to prevent vibration during movement.
1. Level and plumb shelving units to a tolerance of 1/8 inch in 96 inches.
B. Starter/Adder Units: Connect groups together with standard fasteners according to manufacturer's written instructions, using concealed fasteners where possible.
WCC MAIN CAMPUS - BLAND HALL RENOVATION
PROJECT CODE: 260-B4260-040
SFCS - 20301.13
MOBILE STORAGE SHELVING 105626 - 7
C. Install shelves in shelving units at locations indicated on Drawings and according to manufacturer's written instructions.
D. Shelving Enclosure Panels: Install end panels and canopy tops with concealed fasteners.
3.4 CLEANING AND PROTECTING
A. Repair or remove and replace defective work as directed on completion of installation.
B. Clean finished surfaces, touch up as required, and remove or refinish damaged or soiled areas to match original factory finish, as approved by Architect.
C. Protect installed products from damage during remainder of the construction period.
3.5 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain mobile storage shelving.
END OF SECTION
DN
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
PEARSON VUE
TESTING
TESTING
PROCTOR(S)
6 6
6 6
12 12
121212 12
COORDINATE CEILING ACCESS
AND RESTORATION WITH THE
REQUIRED MECHANICAL
DEMOLITION. RE: MECHNICAL
A4.1A2.1
EXISTING TO
REMAIN
EXISTING TO
REMAIN
EXISTING TO
REMAIN
10 10 10
1'
- 8
E
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
BEFORE WORK HAS BEGUN, CONTRACTORS SHALL MAKE A THOROUGH SURVEY OF THE BUILDING AND NOTIFY THE OWNER IN WRITING OF ALL DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THOSE SHOWN ON THE DRAWINGS. FAILURE BY THE CONTRACTOR TO HAVE ACQUAINTED HIMSELF WITH AVAILABLE INFORMATION CONCERNING EXISTING CONDITIONS SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES OF PERFORMANCE
OF WORK IN ACCORDANCE WITH REQUIREMENTS OF THE CONTRACT DOCUMENTS.
THESE DRAWINGS HAVE BEEN DEVELOPED FROM EXISTING DRAWINGS AND MAY NOT REFLECT ACTUAL FIELD CONDITIONS THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND NOTIFY THE ARCHITECT IN WRITING OF ANY WORK DESCRIBED IN THE CONTRACT DOCUMENTS WHICH CANNOT BE PERFORMED DUE TO EXISTING CONDITIONS.
PROTECT FROM DAMAGE ALL MATERIALS TO REMAIN.
CONTRACTOR SHALL USE CAUTION WHEN PERFORMING DEMOLITION AT OR NEAR FIRE-RATED WALLS OR SHAFTS SO AS NOT TO DISRUPT INTEGRITY OF THE FIRE RATING OF THE WALLS OR SHAFTS AND REPAIR DAMAGE TO WALLS OR SHAFTS AS REQUIRED, TO ENSURE CONDITIONS RATINGS REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE
NEW FINISH.
DEMOLITION WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO THOSE ITEMS NOTED. OTHER ITEMS OF A MINOR NATURE WHICH MAY EXIST BUT ARE NOT SPECIFICALLY NOTED ON THE DRAWINGS ARE TO BE REMOVED AS REQUIRED, TO PROVIDE ACCESS AND ALLOW ALTERATION OR NEW WORK TO PROCEED. REPAIR ADJACENT
SURFACES AS REQUIRED TO RECEIVE NEW FINISHES.
NOT ALL MECHANICAL, ELECTRICAL AND PLUMBING, EQUIPMENT WHICH IS REQUIRED TO BE REMOVED IS SHOWN.
CONTRACTOR SHALL REMOVE ALL SUCH EQUIPMENT WHICH WILL INTERFERE WITH NEW CONSTRUCTION. EQUIPMENT WHICH WILL NO LONGER BE USED (EG. PIPES, CONDUITS AND DUCTS) SHALL BE REMOVED COMPLETELY BACK TO THE POINT OF SERVICE AND CAPPED OR PLUGGED. ALSO SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS
FOR ADDITIONAL DEMOLITION NOTES.
IF ANY HAZARDOUS MATERIALS ARE ENCOUNTERED BY THE GENERAL CONTRACTOR, INCLUDING BUT NOT LIMITED TO MATERIALS CONTAINING ASBESTOS, LEAD PAINT, ETC., WORK IS TO BE STOPPED AND THE ARCHITECT IMMEDIATELY
NOTIFIED.
WHERE PLUMBING FIXTURES ARE NOTED TO BE REMOVED, ALL ASSOCIATED TOILET ACCESSORIES SHALL ALSO BE
REMOVED.
REMOVE OR MODIFY EXISTING CONSTRUCTION AS SHOWN. TYPICAL WALL AND CEILING REMOVAL INCLUDES FINISHES, TRIM, BASES, DOORS AND FRAMES, MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS CONTAINED THERIN UNLESS NOTED OTHERWISE. REMOVE ALL EXISTING DEVICES (SWITCHES, RECEPTACLES, TELEPHONE, CONDUIT, WIRE, ETC.)
IN EXISTING WALLS TO BE REMOVED. REMOVE EXISTING LIGHT FIXTURES, DIFFUSERS, SPEAKERS, CONDUIT, WIRE, ETC. WHERE EXISTING CEILING IS TO BE REMOVED. SAW CUT SLAB ON GRADE AS REQ'D TO ACCOMODATE NEW UNDERGROUND UTILITY LINES AND PATCH SLABS FLUSH W/ EXIST. DOWEL NEW/ EXIST AS REQ'D TO PREVENT
SETTLEMENT.
AREAS OF EXISTING SURFACES NOT SCHEDULED FOR DEMOLITION WHICH BECOME DAMAGED, SHALL BE PATCHED OR REPAIRED TO MATCH ADJACENT SURFACE THICKNESS, FINISH AND TEXTURE.NEW WORK SHALL BE PRIMED PRIOR TO
RECEIVING FINISH COATS.
ALL EXISTING WALLS AND PARTITIONS THAT ARE SCHEDULED TO REMAIN AND RECEIVE NEW FINISHES SHALL BE PATCHED, REPAIRED, OR RESURFACED AS REQUIRED TO PROVIDE A SMOOTH SURFACE FOR THE NEW FINISHES.
REPAIR ADJACENT SURFACES AS REQUIRED TO RECEIVE NEW FINISH.
ALL EXISTING FLOOR AND WALL SURFACES THAT HAVE BEEN DAMAGED BY THIS RENOVATION SHALL BE REPAIRED OR
PATCHED TO MATCH THEIR FINISH PRIOR TO THE START OF CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF DEMOLITION OF EXISTING CONCRETE SLAB FOR THE
INSTALLATION OF PLUMBING WORK. REFER TO PLUMBING DRAWINGS FOR EXTENT OF WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL SHORING AND BRACING NECESSARY TO PROTECT EXISTING CONSTRUCTION TO REMAIN. CONTRACTOR SHALL PROVIDE SUITABLE SHORING AND BRACING AS REQUIRED TO SUPPORT LOADS IMPOSED OR RESULTING FROM DEMOLITION WORK. REFER TO SPECIFACTION SECTION 02150 AND
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
RENOVATION OR EXTENTSIONS OF EXISTING SYSTEMS MAY REQUIRE WORK IN AREAS NOT NOTED WITHIN THE SCOPE.
FLOORS, CEILINGS, AND WALLS AFFECTED BY ADJACENT CONSTRUCTION SHALL BE REPAIRED AS STATED ABOVE.
GENERAL DEMOLITION NOTES
DEMOLITION KEY NOTES
2 REMOVE PARTITION AS INDICATED TO ACCOMMODATE NEW DOOR AND FRAME
3 REMOVE EXISTING DOOR AND FRAME IN ITS ENTIRETY. PREP OPENING FOR NEW DOOR AND
FRAME.
4 REMOVE EXISTING DOOR OR WINDOW IN ITS ENTIRETY, INCLUDING ANY SIDE LIGHTS OR
TRANSOMS. INFILL WITH SIMILAR CONSTRUCTION AS ADJACENT WALL.
5 REMOVE FLOOR FINISH IN ITS ENTIRETY AND PREPARE SUBSTRATE TO ACCEPT NEW FINISH.
6 REMOVE CEILING IN ITS ENTIRETY INCLUDING ALL LIGHT FIXTURES, HVAC ELEMENTS, HANGERS, SUPPORTS, ETC. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR EXTENT OF ABOVE
CEILING DEMOLITION AND/OR RETENTION.
1 REMOVE PARTITION IN ITS ENTIRETY, INCLUDING ALL FIXTURES AND DEVICES.
9 REMOVE CASEWORK IT ITS ENTIRETY.
8 REMOVE GWB AND METAL STUD COLUMN SURROUND IN ITS ENTIRETY. RETAIN MASONRY
COLUMN SURROUND INTACT.
10 REMOVE ALL EXISTING WALL FINISH AND FURRING TO MASONRY SUBSTRATE. PREPARE
SUBSTRATE TO ACCEPT NEW FINISH.
11 CAP, FILL, AND REPAIR FLOOR AS REQUIRED TO BE SMOOTH AND LEVEL ACROSS DEMOLISHED
PARTITIONS SUCH THAT SUBSTRATE IS CONSISTENT AND LEVEL TO ACCEPT NEW FINISH
FLOORING.
7 REMOVE PARTITION AS INDICATED TO ACCOMMODATE NEW WINDOW
12 DEMOLISH BULKHEAD BETWEEN COLUMNS. RETAIN AND REPAIR FINISH AT ADJACENT WALL AS
REQUIRED TO COORDINATE WITH NEW BULKHEAD.
13 EXISTING LOCKERS - SALVAGE AND STORE FOR RE-INSTALLATION. RE: A1.1 FOR NEW
LOCATION.
OFFICE
OFFICE
OFFICE
OFFICE
STOR
OFFICE
OFFICE
OFFICE
CUBICLE
101c
CUBICLE
101b
OFFICE
SMALL TESTING
OFFICE
WAITING
MULTIPURPOSE
STORAGE
112a
BUSINESS
SUPPLY
112b
OFFICE
102a
OFFICE
102b
OFFICE
103A
CUBICLE
101a
VESTIBULE
119a
N
N
2'
1'
SC
AL
E:
'-0
1'
2' 3'
SC
AL
E:
/4
'-0
1/
2' 1'
SC
AL
E:
'-0
1'
2'
1' 2'
SC
AL
E:
/2
'-0
4'
8'
SC
AL
E:
/8
'-0
2'
4' 8'
SC
AL
E:
/4
'-0
1'
2' 4'
SC
AL
E:
/2
'-0
2'
4' 6'
SC
AL
E:
/8
'-0
N
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
N
:PROJECT ENGINEER
DRAWING
COMM. NO. DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
JULY 16, 2025
WCC MAIN CAMPUS -
BLAND HALL RENOVATION
WYTHEVILLE, VA
BID SET
BLB/CYW
PLAN NOTES
GENERAL NOTES
KEYPLAN
BLB
PLAN NORTH
PLAN NORTHTRUE NORTH
TRUE NORTH
PROJECT CODE: #260-B4260-040
N.I.C.
WORK
AREA
N.I.C.
Autodesk Docs://20301.13 - Wytheville CC - Student Success Renovation/20301.13 - WCC Bland Hall LRC Renovation - ARCH Central.rvt
DDP
BLB
20301.13
GROUND FLOOR
DEMOLITION PLANS
AD1.0
CIW/AJM
1/8" = 1'-0"AD1.0
DEMO RCP - GROUND FLOOR1
1/8" = 1'-0"AD1.0
GROUND FLOOR - DEMO PLAN2
1. REFER TO COVER SHEET FOR REQUIRED ASBESTOS AND LEAD
STATMENTS.
1 ADD. NO. 2 5/19/26
UP
DN
UP
DN
OS
OS
OS
OS
S
S
S
SS
S
S
S
S
S SS
OS
S
S
S
S
S
S
S
WAP
S S S
S S S
S
SSS
S
S S
SSS S S
S
S S
S
S
S
S
S
S S
S S
S
S
S S
S S
S S
S S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S S S
WAP
WAP
C
OS
OS OS
OS
S
OS OS
OS
OS
OS
OSOS
OS OS
OS
OS OS
OS OS
PAINTED GYPSUM BOARD
SUSPENDED ACOUSTIC CEILING
SYSTEM
REFLECTED CEILING PLAN LEGEND
RECESSED TROFFER
RECESSED DOWNLIGHT
SURFACE FIXTURE LIGHT
CEILING DIFFUSER
CEILING OUTLET
CEILING DATA
SMOKE DETECTOR
EXIT SIGN
SUSPENDED LINEAR LIGHT FIXTURE
S
FIRE ALARM SPEAKER -
CEILING MOUNTED
S
SPEAKERS
WIRELESS ACCESS POINTWAP
CEILING RETURN
OCCUPANCY SENSORSO
FIXED SECURITY CAMERAC
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
Existing Classroom, N.I.C.
Exist Testing Center, N.I.C.
TESTING
PROCTOR(S)
PEARSON VUE
TESTING
Existing Mech Room N.I.C.
x110
Exist Women's N.I.C.
x106
Exist Jan. N.I.C.
x107
Existing Corridor, N.I.C.
120x
TESTING ENTRY
104A
STACKS
VESTIBULE
VEST.
119a
EXISTING TO REMAIN
EXISTING TO REMAIN
EXISTING
TO REMAIN
VENDING
MACHINES,
BY OWNER
Exist Men's Toilet N.I.C.
x108
WORK ROOM
COLLAB ROOM 3
COLLAB ROOM 2
DATA CLOSET
CORR.
102B
COLLAB ROOM 1
DIGITAL
RESOURCES
OFFICE
OFFICE
A7.1A1.1K
A7.1A1.1
J
A7.1A1.1
A7.1A1.1
C
101X
105X
106X
X117
X109aB
X108eX107eX106e
X109aA
X119
X119A
X109aCX101A
X2
X3
X1
X105A
X4
X121
X110a
X110M
X122
LRC
CORRIDOR
114B
2 110
108B 10107
114A
108A
COFFEE
COUNTER
104A
A
A7.1A1.1
D
B
A7.1A1.1G
H
F
A5.1A1.1
S D1
J
C
C
C
C
CC
C S
D S
DS
D
S D
D C
C
2"
ALIGN CENTERLINE OF PARTITIONS WITH
CENTERLINE OF EXIST STEEL MULLIONS
2"
3" V
.I.F
4' - 0" 7' - 2" 4' - 1 1/8" 35' - 10 3/8"
ALIGN
7 1 /8"
V.
I.F
2"
5 3 /8"
5 5 /8"
4'
- 0
7/ 8"
6'
- 0
4 7
/8"
9 1 /2"
5'
- 7
2'
- 9
1/ 4"
8'
- 5
/16
4 1
1/1 6"
3'
- 7
1/ 2"
14' - 10" 8' - 7 13/16" ± 3' - 3 1/2"
B
D
A
A
A
BA
C
A
5' - 2"
4' - 3 1/8" 9' - 3 1/8" 1' - 10 1/4" 10' - 2 5/8" 3' - 10" 2' - 0" 14' - 2 3/4" 6"
A7.1A1.1 B
SIM OPP
1' - 0 1/8"
KEGLEY
ARCHIVE
STORAGE
ARCHIVE
SEMINAR ROOM
115ARCHIVE FILES
ARCHIVIST
RELOCATED AND
REINSTALLED
BOOKSHELVES
MOBILE SHELVING SYSTEM
21' - 6" V.I.F. 15' - 6" +/- 19' - 10 1/16"
116A
A2.1
A1.1
RELOCATED &
REINSTALLED
EXISTING
LOCKERS
COPY
BY OWNER
FEC
FEC
FILING
CABINETS,
N.I.C.
S D1
N1
J
S L
KK
K
OPERABLE
PARTITION
8 1 /16
KK
A2.1
A1.1
A7.2A1.1
A
1EXISTING
FEC, V.I.F.
ALIGN
AL
IG
N
L
S N1
179' - 4"
0"
J
J
L
L
9'
- 1
5/
L
L
5' - 4" ± 7' - 1 7/8" ± 8' - 9 5/16"5' - 4"
S D1
S D1
N1
TEMPORARY FLOOR
TO CEILING
CONSTRUCTION
BARRIER
A4.1
A1.1
S D1
119A
S D
6 1 /4"
2'
- 6
1' - 10 1/4"
0"
8'
- 3
1/ 2"
V .I.F
6' - 6"
EXISTING
TO REMAIN
EQ
EQ
4' - 9 7/8"
B
E
7'
- 1
3/ 8"
5' - 7" 6' - 0 3/4"
8' - 3 11/16"7' - 10 1/16" 6' - 2 5/8"
1'
- 5
1/ 4" 2' - 7" 2' - 7"
COORDINATE
WITH OPERABLE
PARTITION
K
K
6' - 5 1/4"
S L
EQUIP.
BY OWNER
EQUIP.
BY OWNER
A1.1
A1.1
L
K
0 3 /8"
EXISTING
TO REMAIN
Existing Classroom, N.I.C.
Exist Testing Center, N.I.C.
TESTING
PROCTOR(S)
PEARSON VUE
TESTING
106 Existing Mech Room N.I.C.
x110
Exist Women's N.I.C.
x106
Exist Jan. N.I.C.
x107
Exist Men's Toilet N.I.C.
x108
Existing Corridor, N.I.C.
120x
TESTING ENTRY
104A
STACKS
VESTIBULE
VEST.
119a
WORK ROOM
COLLAB ROOM 3
110 COLLAB ROOM 2
DATA CLOSET
CORR.
102B
COLLAB ROOM 1
DIGITAL
RESOURCES
OFFICE
OFFICE
1 1
7 7
A4.1A1.1
A5.1A1.1
CENTER LIGHT FIXTURE
BETWEEN ADJACENT
BAFFLES, TYP. ALL
SUSPENDED LIGHT
FIXTURES
A1.1A1.1
A5.1A1.1
1010 11
KEGLEY
ARCHIVE
STORAGE
ARCHIVIST
ARCHIVE FILES
ARCHIVE
SEMINAR ROOM
C
TEMPORARY FLOOR
TO CEILING
CONSTRUCTION
BARRIER
COORDINATE CEILING ACCESS
AND RESTORATION WITH THE
REQUIRED MECHANICAL
DEMOLITION. RE: MECHNICAL
1'
- 1
1/ 2"
1'
- 1
1/ 2" 7
ALIGN
ALIGN
ALIGN
2' - 6"
S
10 11'-8" A.F.F.
1 EXISTING TO REMAIN
8 10'-6" A.F.F.
4 9'-6" A.F.F.
3 9'-0" A.F.F.
REFLECTED CEILING PLAN NOTES
2 8' - 6" A.F.F.
6 10' - 1" A.F.F.
7 10' - 4" A.F.F.
9 11' - 0" A.F.F.
5 11' - 0" A.F.F. 11 10'-0" A.F.F.
12 8'-10" A.F.F.
13 SUSPENDED CEILING BAFFLE
FINISHED CEILING, RE: RCP
PARTITION TRACK
COORDINATE WITH CEILING FINISH
EXISTING FLOOR JOISTS
VERIFY IN FIELD
RE: STRUCTURAL DETAIL 6/A4.1
VE
RI
FY
IN
FI
EL
D
PROVIDE 3.5" SOUND BATT
FULL LENGTH ON EACH
SIDE OF OPERATBLE
PARTITION, MIN. 2'-0" WIDE
J
J
J
PROVIDE SOLID FRT WOOD
BLOCKING FOR FULL HEIGHT
OF OPERABLE PARTITION
OPERABLE PARTITION W/
MANUFACTURER'S
STANDARD JAMB SEAL
EXISTING MASONRY COLUMN
SURROUND
5 1/2"
N
N
2'
1'
SC
AL
E:
'-0
1'
2' 3'
SC
AL
E:
/4
'-0
1/
2' 1'
SC
AL
E:
'-0
1'
2'
1' 2'
SC
AL
E:
/2
'-0
4'
8'
SC
AL
E:
/8
'-0
2'
4' 8'
SC
AL
E:
/4
'-0
1'
2' 4'
SC
AL
E:
/2
'-0
2'
4' 6'
SC
AL
E:
/8
'-0
N
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
N
:PROJECT ENGINEER
DRAWING
COMM. NO. DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
JULY 16, 2025
WCC MAIN CAMPUS -
BLAND HALL RENOVATION
WYTHEVILLE, VA
BID SET
BLB/CYW
PLAN NOTES
KEYPLAN
BLB
PLAN NORTH
PLAN NORTHTRUE NORTH
TRUE NORTH
PROJECT CODE: #260-B4260-040
N.I.C.
WORK
AREA
N.I.C.
Autodesk Docs://20301.13 - Wytheville CC - Student Success Renovation/20301.13 - WCC Bland Hall LRC Renovation - ARCH Central.rvt
DDP
BLB
20301.13
GROUND FLOOR
PLANS
A1.1
AJM/CIW
1 INFILL TO MATCH ADJACENT EXISTING CONSTRUCTION. PROVIDE
PER UL D902.
2 67" CLEAR TURNING RADIUS
1/8" = 1'-0"A1.1
GROUND FLOOR PLAN1
1/8" = 1'-0"A1.1
GROUND FLOOR REFLECTED
CEILING PLAN2
1 1/2" = 1'-0"A1.1 A1.1
4 CEILING AT OPERABLE PARTITION
1 1/2" = 1'-0"A1.1 A1.1
3 OPERABLE PARTITION JAMB
A7.2A2.1
2"
42' - 0"
2"
EXISTING TO REMAIN
2" 2'
- 1 0"
6'
- 4
4"
3'
- 3
4"
ALIGN
ALIGN
21' - 4"
21' - 4"
J
ALIGN
1' - 0 3/8" 11 5/8"
KK2'
- 6
1' - 10 1/4" V.I.F.
J
L
K 1'
- 1
3/
1'
- 8
/16
3' - 0"3' - 0" 3' - 2 3/4"3' - 10"
1/2
3'
- 1
1 3 /8"
2'
- 0
1' - 9 5/8" 1' - 10 1/4"
1'
- 0
1/ 2"
J
6" S
L
H
S L
END CAP, TYP.
L
RELOCATED 42" TALL SHELVES
OWNER PROVIDED CONTRACTOR INSTALLED
84" TALL SHELVES, TYP.
OWNER PROVIDED CONTRACTOR INSTALLED
1'
- 0
1/ 2"
1/2
S L
S D
PROVIDE CONTINUOUS HORIZONTAL FRAMING
AT 2'-0" VERTICAL SPACING AS REQUIRED PER
MANUFACTURERS RECOMMENDATIONS FOR
SECURE ATTACHMENT OF SHELVING,
COORDINATE WITH SHELVING MANUFACTURER
84" TALL SHELVES, TYP.
84" TALL SHELVES
OWNER PROVIDED
CONTRACTOR
INSTALLED
L
L
END CAP, SIM. END CAP, SIM.
END CAP,
TYP.
END CAP,
SIM.
EA. END
3' - 0"
2'
- 6
0"
A4.1A2.1
1'
- 1
2'
- 0
1'
- 1
2'
- 0
KNEE WALL BELOW,
TYP. RE: ELEVATION
AL
IG
N
AL
IG
N
A4.1A2.1
MOBILE SHELVING SYSTEM
2' - 0"
2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 10" 5' - 1 1/8" 1' - 2"
0"
4"
SLOPED FLOOR
TRANSITION
FURRING AND GWB
TO MATCH ADJACENT
CONSTRUCTION
BRICK AND MASONRY INFILL
TO MATCH ADJACENT
CONSTRUCTION
PROVIDE END UNIT SHELVING
AS STATIONARY COMPONENTS
2'
- 2
MOBILE SHELVING TRACK SYSTEM
PER MANUFACTURER'S
REQUIREMENTS
KEGLEY
ARCHIVE
STORAGE
EQ EQ
A2.1A2.1 ARCHIVIST
ARCHIVE FILES
ARCHIVE
SEMINAR ROOM
7/
8" V
.I.F
C
C C
H
H
H
HH
DF
DF: DOUBLE-FACED SHELVING
SF: SINGLE-FACED SHELVING
CL-21: PROVIDE MIN CLEAR WIDTH OF 21"
CL-34: PROVIDE MIN CLEAR WIDTH OF 34"
DF DF DF DF
SF
CL-21 CL-34
GUIDE WHEEL OF
MOBILE SHELVING
STEEL RAIL SIZED BY
MANUFACTURER
GROUT, LEVEL RAIL
AS REQUIRED PER
MANUFACTURER'S
RECOMMENDATIONS
FIRE-RETARDANT-
PLYWOOD
FINISH FLOOR,
RE: INTERIORS
LEVELING COMPOUND
AS REQUIRED
ADA COMPLIANT FLOOR
TRANSITION BY SHELVING
MANUFACTURER
REINFORCING GUSSET, NEW
SECURED BETWEEN EACH
WELDED FRAME AND AT EACH
END WITH MANUFACTURER'S
STANDARD 1/4"-20 X 1" HEX-HEAD
MACHINE BOLTS
END PANEL BEYOND, NEW
SECURE TO SHELVING
PER SHELVING
MANUFACTURER'S
INSTALLATION
INSTRUCTIONS
SHELF CANOPY AND
BRACKET, EXISTING
TO BE RELOCATED
TOP TIE STRUT, CONTINUOUS
ACROSS ALL STACKS, EXISTING TO
BE RELOCATED, SPACED AND
SECURED PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS
WELDED FRAME, EXISTING
TO BE RELOCATED
BASE SUPPORT, EXISTING
TO BE RELOCATED
REINFORCING GUSSET, NEW
SECURED TO SLAB ON GRADE FLOOR
WITH 1/2" DIA. EXPANSION ANCHORS
WITH 2-1/4" EMBEDMENT DEPTH
SHIM AS REQUIRED TO PROVIDE
PLUMB AND LEVEL SHELVES
2 5/16" 2 5/16"
NOTE: FOLLOW MANUFACTURER'S
INSTALLATION INSTRUCTIONS. NOTIFY
ARCHITECT IMMEDIATELY OF ANY
DISCREPANCY BETWEEN DRAWINGS AND
MANUFACTURER'S INSTRUCTIONS.
REINFORCING SWAY BRACES, NEW
SECURED WITHIN EACH WELDED
FRAME WITH MANUFACTURER'S
STANDARD 1/4"-20 X 1" HEX-HEAD
MACHINE BOLTS
PER MANUFACTURER'S
INSTALALTION INSTRUCTIONS
PROVIDE 3/16"-8 X 1" TECH-SCREWS
TO SECURE BASE BRACKETS TO
FRAME, TYP ALL BASE BRACKETS
N
2'
1'
SC
AL
E:
'-0
1'
2' 3'
SC
AL
E:
/4
'-0
1/
2' 1'
SC
AL
E:
'-0
1'
2'
1' 2'
SC
AL
E:
/2
'-0
4'
8'
SC
AL
E:
/8
'-0
2'
4' 8'
SC
AL
E:
/4
'-0
1'
2' 4'
SC
AL
E:
/2
'-0
2'
4' 6'
SC
AL
E:
/8
'-0
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
N
:PROJECT ENGINEER
DRAWING
COMM. NO. DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
JULY 16, 2025
WCC MAIN CAMPUS -
BLAND HALL RENOVATION
WYTHEVILLE, VA
BID SET
BLB/CYW
GENERAL NOTES
BLB
PLAN NORTHTRUE NORTH
PROJECT CODE: #260-B4260-040
Autodesk Docs://20301.13 - Wytheville CC - Student Success Renovation/20301.13 - WCC Bland Hall LRC Renovation - ARCH Central.rvt
DDP
BLB
20301.13
ENLARGED PLANS AND
DETAILS
A2.1
CIW/AJM
1/4" = 1'-0"A1.1 A2.1
1 ENLARGED PLAN - STACKS 103
1/4" = 1'-0"A1.1 A2.1
2 ENLARGED PLAN - KEGLEY ARCHIVE
1 1/2" = 1'-0"A2.1 A2.1
3 MOBILE SHELVING TRACK DETAIL
1/2" = 1'-0"A2.1
SEISMIC DETAILS - STACK SHELVING4
DOOR TYPE ABBREVIATIONS
DOOR NOTES
NOTE 1: 3/4" DOOR UNDERCUT.
GLASS TYPES
1/4" THICK CLEAR FULLY TEMPERED SAFETY GLASS.1
AL - ALUMINUM
FBG - FIBERGLASS
FD - FOLDING DOOR
FG - FULL GLASS
FL - FULL LOUVER
HC - HOLLOW CORE
HG - HALF GLASS
HGP - HALF GLASS PANEL
HM - HOLLOW METAL
G - GLASS
MDF - MEDIUM DENSITY FIBERBOARD
NV - NARROW VISION
OCD - OVERHEAD COILING DOOR
OSD - OVERHEAD SECTIONAL DOOR
PL - PLASTIC LAMINATE
SR - SOUND RATED
SS - STAINLESS STEEL
STL - STEEL
TR - THERMAL RATED
WD - WOOD
WSR - WOOD STILE & RAIL
V - VISION
1/4" THICK CLEAR FIRE GLASS.
1.
A.
B.
C.
a.
NOTES:
RATED GLAZING IN 1-HOUR FIRE PARTITIONS-
CORRIDOR WALLS PER TABLE 716.1(2)
MIN ASSEMBLY RATING: 1/3 HOUR ASSEMBLY
DOOR VISION PANEL SIZE: MAXIMUM SIZE
TESTED
FIRE-RATED GLAZING MARKING DOOR VISION
PANEL: D-20
PER TABLE 716.1(1)
"D" REFERS TO NFPA 252 -OR- UL
10B -OR- UL 10C
FIN
FLOOR
7'
- 0
2"
2" VARIES 2"
7'
- 0
4"
2" VARIES 2"
FIN
FLOOR
F
(FLUSH)
NV
(NARROW VISION)
HG
(HALF GLASS)
FG
(FULL GLASS)
AT RATED
DOORS
AT RATED
DOORS
AT RATED
DOORS
1'
- 0
5'
- 6
6" 7'
- 0
3' - 0"
6" 2' - 0" 6"
7'
- 0
3'
- 6
3'
- 0
6"
6" 2' - 0" 6"
3' - 0"
3'
- 6
3'
- 0
6" 7'
- 0
6" 6" 2' - 0"
3' - 0"
HM FRAME
METAL STUD
RUNNER
SEALANT
STRUT STUD
BEYOND
H1
HM FRAME
SEALANT
SEALANT
1/2
RE
: P
LA
N
1/2
J1
2"
2" SEALANT
HM FRAME
H2
J2
7 5 /8"
- V .I.F
2 1 /8"
- V .I.F
HM FRAME
4"
SEALANT
EXISTING CMU WALL
TO REMAIN
EXISTING CORRIDOR
CEILING TO REMAIN
EXISTING MASONRY
LINTEL(S) TO REMAIN
EXISTING METAL
FURRING & GWB
TO REMAIN
EXISTING METAL
FURRING & GWB
TO REMAIN
EX
IS
T
MA
TC
H
EXISTING BRICK & CMU
WALL TO REMAIN
2"
FIN
FLOOR
A
6' - 4"
3'
- 1
0" 3'
- 4
7'
- 2
B
2' - 4"
3'
- 1
0" 3'
- 4
7'
- 2
1 1
2" 1' - 4" 2" 3' - 0" 2" 1' - 4" 2"
REFER TO DETAILS 1, 2, & 3 ON A4.1 FOR
TYPICAL DETAILS AT HEAD, JAMB, AND SILL
6' - 4"
3'
- 1
0" 3'
- 4
7'
- 2
2" 6' - 0" 2"
C D
5' - 4"
3'
- 4
2" 1' - 0" 2" 2' - 8" 2" 1' - 0" 2"
2"
1/2" RE: PLAN 1/2"
HM FRAME
SEALANT
GLASS STOP
GLAZING
ROOM SIDE
HM FRAME
METAL STUD
RUNNER
SEALANT
STRUT STUD
BEYOND
2"
1/2" RE: PLAN 1/2"
GLASS STOP
GLAZING
ROOM SIDE
GLASS STOP
GLAZING
ROOM SIDE
2"
1/2
RE
: P
LA
N
1/2
HM FRAME
SEALANT
SEALANT
EXIST EXTERIOR
METAL WINDOWS
CONT 16 GAUGE
GALV BRAKE METAL
CLOSURE, STUFF W/
MINERAL WOOL INSUL,
PAINT
EQ EXIST MET MULLION
2" ± MATCH WIDTH OF
EQ
4" 1 1
/2"
RE: PLAN
SEALANT
EXST 12H5 STEEL
JOIST (TYP)
EXST SLAB ON NON-
COMPOSITE DECK
L3-1/2X3-1/2X1/4 @
48" OC MAX (NOTE 1)
3/16
3/16
EA END
CONT C6X8.2
3/16 2 1/2
3/16 2 1/2
FOLDING PARTITION, BY OTHERS
HANGER BRACKET &
LOCKING FLANGE NUTS
BY MANUFACTURER
1.
NOTES:
PLACE HORIZONTAL L3-1 /2X3- 1/2X1/4 WITHIN 6" OF THE
JOIST BOTTOM CHORD PANEL POINT.
L4X4X1/4 HANGER @ 48" OC
V.I.F.
2' - 0"
3/16
3/16
HEIGHT TO SUIT
PARTITION
MANUFACTURER
EXISTING ROOF AND
INSULATION OVER 1-1/2"
METAL DECK
EXISTING STEEL
JOIST (TYP)
PARTITION WALL, SEE
PLAN AND SCHED
CEILING LINE
362S162-33 BRACE
@ 4' OC MAX
M
AX
60.00°
4-#10 SCREWS AT EA
BRACE, EA END (TYP)
ALTERNATE
BRACES ON EA
SIDE OF PARTITION
3 5/8" METAL
STUDS @ 16" O.C.
5/8" GWB
2 1/2" SOUND
INSULATION,
PER NOTE 1
C
STRUCTURE
CLG
ACTUAL DIMENSION
TYPE
FIRE RATING
SOUND RATING
4 7/8"
2 1/2" METAL
STUDS
@ 16" O.C.
5/8" GWB
K
3 1/8"
PARTITION NOTES:
NOTE 1: SOUND RATING WHERE NOTED ON PLANS.
NOTE 2: BRACE TOP OF PARTITIONS PER 6/A4.1.
NOTE 3: INSULATION IN SOUND RATED PARTITIONS SHALL EXTEND FULL
HEIGHT TO TOP OF PARTITIONS.
NOTE 4: GWB SHALL BE ACOUSTICALLY SEALED AT PERIMETER OF
SOUND RATED PARTITIONS. APPLY SEALANT AROUND ALL CUT
OUTS IN GWB WALL. CAULK SIDES AND BACK OF ELECTRICAL
BOXES.
NOTE 5: DESIGNATED STC RATINGS APPLY TO SOUND RATED PARTITIONS.
NOTE 6: WHERE INSTALLED ADJACENT TO EXISTING CONSTRUCTION,
PROVIDE ADEQUATE FURRING TO ENSURE FACE OF GWB IS
FLUSH TO EXISTING ADJACENT CONSTRUCTION.
NOTE 7: WHERE PARTITION IS INDICATED FOR SOUND, PROVIDE SOUND
BATT INSULATION 2'-0" WIDE ON EACH SIDE OF AND ABOVE
PARTITION AS SHOWN IN PARTITION SCHEDULE.
STC-40
3 5/8" METAL
STUDS @ 16" O.C.
5/8" GWB
L
4 1/4"
5/8" GWB
STC-44
6" METAL STUDS
@ 16" O.C.
6" SOUND
INSULATION,
PER NOTE 1
G
7 1/4"
1 5/8" METAL
STUDS
@ 16" O.C.
5/8" GWB
J
2 1/4"
4"
4" 4"
4"NOTE 2NOTE 2
STRUCTURE
CLG
ACTUAL DIMENSION
TYPE
FIRE RATING
SOUND RATING
1 1/2" METAL
FURRING CHANNELS
@ 16" O.C., NOTE 6
5/8" GWB
H
2 1/4"
4"
UL HW-D-0654
3 5/8" METAL
STUDS @ 16" O.C.
5/8" TYPE "X" GWB
INSULATION
NOTE 1
1/2" RESILIENT
CHANNEL
D1
5 3/8"
1 HR - UL U465
UL HW-D-0342
2 1/2" C-H METAL
STUDS @ 16" O.C.
1" TYPE "X" GYPSUM
LINER PANEL
1 1/2" ACOUSTICAL
INSULATION
NOTE 1
5/8" TYPE "X" GWB
3 1/8"
N1
1 HR - UL U469
STC-47
UL BW-S-0001UL BW-S-0023
3 5/8" METAL
STUDS @ 16" O.C.
5/8" GWB
INSULATION
NOTE 1
1/2" RESILIENT
CHANNEL
D
5 3/8"
4"NOTE 24"
INSULATION
NOTE 1
INSULATION
NOTE 7INSULATION
NOTE 7
INSULATION
NOTE 7
INSULATION
NOTE 7
MIN. 2'-0"
MIN. 2'-0"
NOTE 2
J
PROVIDE CONTINUOUS SOLID BLOCKING
SPACED PER SHELVING MANUFACTURER'S
INSTALLATION INSTRUCTIONS. SECURE
BLOCKING TO MASONRY WALL, WITH
MASONRY SCREW ANCHOR (MIN 100#
TENSILE CAPACITY) @ 16" OC
SINGLE DEPTH CANTILEVER LIBRARY
SHELVING. OWNER PROVIDED,
CONTRACTOR INSTALLED
FINISHED CEILING
SCHEDULED FINISHED FLOORING
EXISTING CONCRETE
SLAB OVER METAL DECK
EXISTING STEEL JOIST (TYP)
PARTITION WALL, SEE
PLAN AND SCHED
CEILING LINE
DEFLECTION TRACK W/
2-0.138" P.A.F. @ 24" OC
1"
PROVIDE CONTINUOUS SOLID BLOCKING
SPACED PER SHELVING MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
SECURE BLOCKING TO METAL STUD
PARTITION PER SPECIFICATIONS
SINGLE DEPTH CANTILEVER LIBRARY
SHELVING. OWNER PROVIDED,
CONTRACTOR INSTALLED
FINISHED CEILING
SCHEDULED FINISHED FLOORING
L
PROVIDE PARTITION BRACING PER 6/A4.1
EXISTING CONSTRUCTION
WALL INFILL,
RE: PLAN
EXISTING SLAB ON GRADE
STANDARD
PUNCHOUT
WALL
FRAMING
1 1/2" CRC - COLD
ROLLED CHANNEL
BRIDGE CLIP WITH
SCREW OR WELD
ATTACHMENT
BRIDGING OPTION STRAP OPTION
2-#8 SCREWS @
STRAP TO BLOCKING
1-#8 SCREW EACH FLANGE,
EACH SIDE 1 1/2" X 33 MIL FLAT STRAP (MIN)
WALL FRAMING
BLOCKING SAME GAUGE AS STUD AT EACH STRAP
ADJACENT TO OPENINGS, EACH END OF WALL AND AT
10'-0" OC HORIZONTAL MAX - BEND SECTION OR CLIP
FLANGE TO FORM VERTICAL
NOTE: REQUIRED WHERE RIGID WALL FINISH
DOES NOT CONTINUE FULL HEIGHT OF WALL
OF EITHER OR BOTH SIDES OF STUD
PA
RT
ITI
ON
H
EI
GH
T
1'-0" MAX
4'-0" OC MAX
WALL SECTION
EXISTING CMU WALL
GROUT 1 COURSE
SOLID ABOVE
OPENING
2-L4X3 1/2X1/4 LLV
LINTEL W/ 8" BEARING
EA END, NOTE 1
1/2"Ø ADHESIVE
ANCHORS @ 24" OC1"
NOTES:
1. TO AVOID SHORING EXISTING CMU WALL, CUT MORTAR
JOINT AND INTALL ANGLE ON ONE SIDE BEFORE CUTTING
THE MORTAR JOINT ON THE OTHER SIDE.
2. ALL LINTELS IN EXTERIOR WALLS SHALL BE HOT-DIPPED
GALVANIZED.
DOOR SCHEDULE
ROOM
DOOR
FIRE
RATING
FRAME
Frame
Material
HARDWARE
CommentsELEV TYPE WIDTH HEIGHT ELEV HEAD JAMB HDWR SET CLOS
ACCESS
CNTRL
101X FG AL 3' - 0" 7' - 2" EXIST EXIST N/A EXIST EGRESS DOOR REMAINS - NO WORK - NOTE 1
104 FG WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
104A FG WD 3' - 0" 7' - 0" 20 MIN 1 H1 J1 HM OFFICE YES
105X F WD 3' - 0" 7' - 0" EXIST EXIST OFFICE EXIST DOOR AND FRAME REMAINS, NEW LOCKSET ONLY -
NOTE 1
106X F WD 3' - 0" 7' - 0" EXIST EXIST STOR EXIST DOOR AND FRAME REMAINS, NEW LOCKSET ONLY -
NOTE 1
107 FG WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
108A F WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
108B F WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
109 FG WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
110 FG WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
111 FG WD 3' - 0" 7' - 0" 1 H1 J1 HM OFFICE
112 F WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
113 FG WD 3' - 0" 7' - 0" 1 H1 J1 HM OFFICE
114A FG WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
114B FG WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
115 NV WD 3' - 0" 7' - 0" 20 MIN 2 H2 J2 HM STOR YES EXIST OPENING W/ NEW FRAME & DOOR
116A NV WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
117 NV WD 3' - 0" 7' - 0" 1 H1 J1 HM OFFICE
118 NV WD 3' - 0" 7' - 0" 1 H1 J1 HM STOR
119A NV WD 3' - 0" 7' - 0" 20 MIN 1 H1 J1 HM STOR YES
121 HG WD (2) 3' - 0" 7' - 0" 20 MIN 1 H1 J1 HM YES YES
2'
1'
SC
AL
E:
'-0
1'
2' 3'
SC
AL
E:
/4
'-0
1/
2' 1'
SC
AL
E:
'-0
1'
2'
1' 2'
SC
AL
E:
/2
'-0
4'
8'
SC
AL
E:
/8
'-0
2'
4' 8'
SC
AL
E:
/4
'-0
1'
2' 4'
SC
AL
E:
/2
'-0
2'
4' 6'
SC
AL
E:
/8
'-0
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
DRAWING
COMM. NO. DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
JULY 16, 2025
WCC MAIN CAMPUS -
BLAND HALL RENOVATION
WYTHEVILLE, VA
BID SET
BLB/CYW
GENERAL NOTES
BLB
PROJECT CODE: #260-B4260-040
Autodesk Docs://20301.13 - Wytheville CC - Student Success Renovation/20301.13 - WCC Bland Hall LRC Renovation - ARCH Central.rvt
DDP
BLB/DLG
20301.13
DOOR SCHEDULE AND
DETAILS
A4.1
CIW/AJMHOLLOW METAL WINDOW FRAME ELEVATIONS HEAD AND JAMB DETAILS
PARTITION SCHEDULE
1 1/2" = 1' - 0"
3/4" = 1' - 0"
1/4" = 1' - 0" DOOR ELEVATIONS 1/4" = 1' - 0"1/4" = 1' - 0"HM DOOR FRAME ELEV
1 1/2" = 1'-0"A4.1
TYP HM WIN SILL DET3
1 1/2" = 1'-0"A4.1
TYP HM WIN HEAD DET1
1 1/2" = 1'-0"A4.1
TYP HM WIN JAMB DET2
1. DOORS ARE TO BE INSTALLED SO THE BACK OF THE FRAME IS 4", TYP.
TO FACE OF WALL AT INSIDE CORNER, UNLESS NOTED OTHERWISE.
2. ALL INTERIOR GLAZING SHALL BE GLASS TYPE 1 - 1/4" THICK CLEAR
FULLY TEMPERED SAFETY GLASS, U.N.O.
1 1/2" = 1'-0"A1.1 A4.1
4 PARTITION TO MULLION
1" = 1'-0"A1.1 A4.1
9 FOLDING PARTITION BRACING DETAIL
1" = 1'-0"A4.1
TYP PARTITION BRACING DETAIL6
1/2" =…