Water Tanks - 1 - SOW.doc

DOC document 81 KB Posted

Attached to
Z2NE--CON Project 667-22-118, Replacement Underground Water Tanks
Solicitation number
36C25626R0064
Issued by

About this file

This is a Statement of Work (SOW) for the replacement of underground water storage tanks at Overton Brooks Veterans Affairs Medical Center (VAMC) in Shreveport, Louisiana. The contractor is required to construct two new 300,000-gallon pre-stressed concrete tanks with domed roofs, build a gravity retaining wall across a depression in the northeast corner of the site, remove trees and brush on a City of Shreveport easement to create a haul route, and construct an analyzer building with electrical services connected to Building 42. All work must comply with VA Design Manuals and applicable codes. The contractor assumes full responsibility for labor, materials, tools, equipment, licenses, permits, and services; all damages to persons or property; and material accountability until project completion and acceptance. The period of performance is 365 days from the Notice to Proceed.

The SOW establishes critical operational and safety requirements due to the facility's active medical environment and public use of adjacent city land. The contractor must attend a mandatory Pre-Bid Site Visit to verify existing conditions, comply with Infection Control Risk Assessment protocols, and implement dust control measures during demolition and hauling. Work involving extensive noise or odor must be performed after hours or on weekends, with utility outages scheduled at hospital convenience. The contractor must maintain a minimum of two flaggers to manage site access and traffic flow, ensure stable post-driven chain-link fencing, provide secondary stormwater pollution prevention methods, and maintain jobsite security at all times. Final deliverables include site cleanup and completion of Pre-Final and Final Inspections scheduled at the hospital's convenience, with submittals required as specified in project specifications.

View the file

Other files

File Type Posted
36C25626R0064 0006.docx DOCX document
36C25626R0064 0005.docx DOCX document
Water Tanks RFIs_Response.docx DOCX document
36C25626R0064 A0004.pdf PDF
36C25626R0064 0003.docx DOCX document
Attch 1 36C25626R0064 RFIs and Answers.docx DOCX document
36C25626R0064 0002.docx DOCX document
Attch 2 667-22-118 Replacement Undergound Water Tank Geo Report.pdf PDF
36C25626R0064 0001.docx DOCX document
Water Tanks - 11 - Specs.pdf PDF
36C25626R0064 EXHIBIT C.docx DOCX document
36C25626R0064 EXHIBIT A.docx DOCX document
36C25626R0064 EXHIBIT F.docx DOCX document
Water Tanks - 13 - First Draft Servitude Pending resubmission.pdf PDF
36C25626R0064_1.docx DOCX document
Wage Determination LA20250002 dated 01.30.2026.pdf PDF
Water Tanks - 10 - Drawings.pdf PDF
36C25626R0064 EXHIBIT E.docx DOCX document
36C25626R0064 EXHIBIT D.docx DOCX document
36C25626R0064 EXHIBIT B.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Replace Underground Water Storage Tanks 667-22-118 Statement of Work Overton Brooks VAMC has a requirement to replace the existing underground water storage tanks. Contractor is required to construct two new 300,000-gallon pre-stressed concrete tanks with domed roofs. The location of the tanks requires the construction of a gravity retaining wall across the depression in the northeast corner of the site. Contractor will construct the retaining walls as described in the drawings. VA is securing an easement on the City of Shreveport land behind the VAMC. Contractor will remove trees and brush on the easement site to create a haul route for vehicles to access the retaining wall. An analyzer building will be constructed to support the operations of the water system with electrical services pulled from Building 42.

All work must be performed as specified herein and shall be in accordance with all applicable codes indicated in the Department of Veterans Affairs (VA) Design Manuals and any other applicable codes. The Contractor must provide all necessary labor, materials, tools, equipment, licenses, permits, and services for completion of this project. The Contractor must be responsible for all damages to persons or property occurring as a result of the Contractor’s fault or negligence. The Contractor must be responsible for all materials delivered and work performed until completion and acceptance of the entire work.

PERIOD OF PERFORMANCE:

The Contractor shall complete the work 365 Days from the issuance of the Notice to Proceed.

CONTRACTOR SITE VISIT AND FIELD VERIFICATION PRIOR TO BIDDING:

Contractor shall be responsible for attending the Pre-Bid Site Visit prior to bidding to verify all existing conditions and take any necessary measurements required to adequately bid the project. If the Contractor chooses not to attend the Pre-Bid Site Visit, the Contractor may submit their bid at their own risk.

INFECTION CONTROL DURING CONSTRUCTION:

Contractor shall follow and comply with the established Infection Control Risk Assessment (ICRA) specific for the project. Contractor is responsible for dust control during demolition and during hauling operations.

DEMOLITION:

Contractor must confirm the location of all utilities (water, gas, electrical, etc.) prior to any demolition activities. Contractor must protect all adjacent structures of the hospital during all operations. Repairing any damage shall be the sole responsibility of the Contractor. If any damage is noticed prior to starting work which may be misconstrued as damage caused by the contractor, immediately notify the COR, and the damage shall be documented as existing conditions.

PHASING, NOISE, SMELLS, AND AFTER-HOURS WORK:

Work resulting in extensive noise or odor, shall be performed after hours or on weekends. Any required utility outages shall be scheduled at the convenience of the hospital, and potentially require after-hours work or on weekends.

DELIVERIES:

Contractor shall coordinate material and equipment deliveries, storage, and handling requirements with COR.

SAFETY REQUIREMENTS:

The facility drive near the jobsite is the only exit for emergency department and long radius turns for semi-truck deliveries. VA is also securing an easement on the City of Shreveport land which is normally open to the public for use such as frisbee golf course, bike trails, jogging paths and picnic areas.

In addition to safety requirements defined in project specifications and drawings, contractor must always provide a minimum of two flaggers to assist with site access and construction activities outside of the construction site and nearby easement area. Flaggers must assist with traffic flow. Contractor must provide all necessary safety precautions to ensure hospital normal operations and pedestrians using City of Shreveport Land are not impacted by construction activities and traffic.

Also, all chain-link construction fencing must be post driven installed rather using sandbags or some other means to secure fencing. This will ensure the construction fence is stable enough to resist be blown over and knocked down easily. Jobsite must be secured at all times to include all entrances to construction site.

SWPPP is shown in project drawings. Contractor must use the plan and provide additional secondary methods to prevent runoff and unnecessary discharge onto the City of Shreveport land. This construction site will easily be visible from Clyde Fant Parkway which can be visible from several others outside of the medical center.

FINAL CLEAN, PRE-FINAL & FINAL INSPECTIONS:

Once all work has been completed, the Contractor shall adequately clean the project site and request a Pre-Final Inspection. Upon completion of the Pre-Final punch list items, the Contractor shall request a Final Inspection. Each of these inspections will be scheduled at the convenience of the hospital.

SUBMITTALS:

Contractor shall provide submittals as detailed in the specifications and samples of all finishes showing the full range of available colors and options to be selected by the VA-ID and COR.