WASTEWATER SITE PLANS.pdf
PDF 2 MB Posted
- Attached to
- WASTEWATER IMPROVEMENTS SES & ORES
- Solicitation number
- IFB-119581
- Issued by
- Bedford County, Virginia
About this file
This is a wastewater site plan document prepared by Blue Ridge Engineering & Construction Services, LLC for Bedford County Public Schools, detailing comprehensive system improvements at two elementary schools in Bedford County, Virginia: Otter River Elementary School and Stewartsville Elementary School. The project encompasses detailed engineering specifications and general scopes of work for both facilities, including dewatering and cleaning of existing dosing tanks, nitrification tanks, and chlorine contact tanks; installation of duplex pumps with SJE Rhombus control panels; removal and replacement of distribution piping systems with new pressure piping featuring orifice diffusers; addition of 9-12 inches of sand per filter bed (approximately 30 tons per bed); installation of new electrical service and conduit with specific amperage requirements; installation of chlorine and dechlorination tablet feeders (Bio-Dynamic XT 2000S models); installation of recirculation tanks and pump systems; and site work including fencing, grading, and retaining wall installation where applicable. The project requires contractor compliance with Virginia Department of Environmental Quality sewage collection and treatment regulations, mandatory site visits scheduled for May 7, 2026, electronic bid submission by 2:00 pm on May 21, 2026, project commencement on June 1, 2026, and operational readiness by August 1, 2026. The contractor must provide five days' notice prior to equipment startup, submit daily progress photography weekly to the engineer and owner, and complete all temporary and permanent seeding of disturbed areas.
The contractor must carry substantial insurance coverage including Commercial General Liability of $1,000,000, Automobile Liability of $1,000,000, Workers' Compensation at Virginia statutory limits, Employers' Liability of $100,000, Umbrella/Excess Liability of $5,000,000, and Professional Liability of $1,000,000 per occurrence and $2,000,000 aggregate, with certification of no violent felony or child abuse convictions required. Separate pricing is required for each school location plus a total bid price. No performance or payment bonds are required, and no set-aside designations or restrictions limiting participation to specific business categories are identified. Payment will be made within 30 days of invoice receipt, with subcontractors required to be paid within seven days of the contractor receiving payment. Questions should be directed to Chris Fewster, PE at 540-392-4144 or Taylor Bell at 540-875-9776.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM 2 WASTEWATER IMPROVEMENTS.pdf | ||
| ADDENDUM 1 SES ORES WASTEWATER.pdf | ||
| WASTEWATER IMPROVEMENTS.pdf | ||
| WASTEWATER SITE PLANS.pdf | ||
| WASTEWATER IMPROVEMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GNI's written c
NO. COMMENTS DATE
SHEET NUMBER
JOB NO. ISSUE DATE
PROJECT TEAM
REVISIONS
cf ew st er bl ue rid ge ec s.
co m (5
) 3
-4
W ild
C he rr y
RD
Pi lo t V A, Bl ue
R id ge E ng in ee rin g
Co ns tr uc tio n
Se rv ic es
, L
LC
BASE DRAWING FROM PLANS PREPARED BY BERKLEY HOWELL & ASSOCIATES, DATED 4-2-98
W A
S T
E W
A T
E R
S Y
S T
E M
IM
P
R O
V E
M E
N T
S S
IT
E
P
LA
N
O T
T E
R R
IV
E
R E
LE
M
E N
T A
R Y
S C
H O
O L
B E
D F
O R
D C
O U
N T
Y , V
A
1130 5-3-26
SITE PLAN
(NOT TO SCALE)
SAND FILTER 1SAND FILTER 2
SAND FILTER 3
SAND FILTER 4
PUMP CONTROL PANEL
MOUNTED ON METAL
STRUT FRAME
1-1/2" PVC CONDUIT FOR
ELECTRICAL SERVICE
APPROX 75 LF - 6'
CHAIN LINK FENCE
RECIRCULATION PUMP
WITH SIMPLEX CONTROL
PANEL SJE RHOMBUS IFS
SERIES
1" PVC CONDUIT TO
RECIRCULATION PUMP
CONTROL PANEL
1-1/4" SCH 80 PVC
FORCE MAIN
2" SCH 80 PVC FORCE MAIN
REMOVE EXISTING BOX AND
PIPING
1-1/2" SCH 80 PVC DISTIBUTION
PIPE WITH 1/2" DIA HOLE AT 4'
OC WITH POLYLOK ORIFICE
DIFFUSER (5 TOTAL)
PRECAST PIPE SUPPORT AT 8'
MAX OC
THREADED END CAP (TYP)
1-1/2" SCH 80 PVC BALL VALVE
W/ UNION AFTER VALVE (TYP)
2 DISTRIBUTION PIPES PER
FILTER, EQUALLY SPACED
5-3-26
EXISTING CHLORINE CONTACT TANK
INSTALL NEW EXISTING TABLET
FEEDER (2 TOTAL)
BIO-DYNAMIC XT 2000S
GENERAL SCOPE OF WORK
A. SITEWORK
1. ADD FILL MATERIAL AT DOSING TANK
2. MODIFY EXISTING SITE FENCE
B. DOSING TANK
1. DEWATER AND CLEAN EXISTING DOSING TANK
2. REMOVE DOSING SIPHONS AND SEAL PIPE OUTLETS
3. INSTALL DUPLEX PUMPS, VALVE VAULT AND CONTROL
PANEL
4. INSTALL CONDUIT AND ELECTRICAL SERVICE TO
CONTROL PANEL
5. INSTALL HOIST
6. INSTALL ALUMINIUM OR FRP COVER OVER OPENING IN
DOSING TANK
C. SAND FILTERS
1. REMOVE EXISTING SPLITTER BOX AND DISTRIBUTION
PIPING
2. LEVEL SAND BEDS, ADD 9-12” SAND PER BED, APPROX 30
TONS PER BED OR 25’X25’X1’ = 625 CF/BED
3. INSTALL NEW PRESSURE PIPING AND DISTRIBUTION
LINES WITH ORIFICES AND DIFFUSERS.
4. PROVIDE PIPE SUPPORTS NOT TO EXCEED 8’ ON CENTER
D. NITRIFICATION TANK
1. DEWATER AND CLEAN EXISTING NITRIFICATION TANK
2. INSTALL RECIRCULATION PUMP AND CONTROL PANEL
3. INSTALL CONDUIT AND ELECTRICALSERVICE TO
CONTROL PANEL
4. INSTALL FORCE MAIN TO DOSING TANK
E. CHLORINE CONTACT TANK
1. DEWATER AND CLEAN EXISTING CONTACT TANK
2. INSTALL NEW CHLORINE AND DECHLORINATION TABLET
FEEDERS
GNI's written consent is prohibited.
REVISIONS
cf ew st er bl ue rid ge ec s.
co m (5
) 3
-4
W ild
C he rr y
RD
Pi lo t V A, Bl ue
R id ge E ng in ee rin g
Co ns tr uc tio n
Se rv ic es
, L
LC
W A
S T
E W
A T
E R
S Y
S T
E M
IM
P
R O
V E
M E
N T
S S
IT
E
P
LA
N
S T
E W
A R
T S
V
IL
LE
E
LE
M
E N
T A
R Y
S C
H O
O L
B E
D F
O R
D C
O U
N T
Y , V
A
1139 5-3-26
BASE DRAWING FROM PLANS PREPARED BY COX & ASSOCIATES, DATED 6-27-90
(3 TOTAL)
PROPOSED 2,000 GAL PRECAST
CONCRETE RECIRCULATION TANK
EXISTING CHLORINE CONTACT TANK
INSTALL NEW EXISTING TABLET
FEEDER (2 TOTAL)
BIO-DYNAMIC XT 2000S
INSTALL APPROX. 20 LF PRECAST
BLOCK RETAINING WALL
GRADE TO DRAIN AWAY FOR CONTACT
TANK
24" DIA PE VALVE VAULT
WITH COVER (2 TOTAL)
APPROX 150 LF - 6' CHAIN
LINK FENCE W/ 8' ACCESS
GATE
PROVIDE 4' FROM ALL
STRUCTURES
1-1/2" PVC CONDUIT FOR
ELECTRICAL SERVICE
FROM BREAKER PANEL
IN BASEMENT
50 AMP 120/240V SERVICE PANEL &
PUMP CONTROL PANEL ON 2 - 4X4"
TREATED POST W/ METAL STRUT
FOR CONTROL PANEL
5-3-26
FROM SAND FILTERS
RECIRCULATION TANK
(NOT TO SCALE)
SITE PLAN
(NOT TO SCALE)
PRESSURE TRANSDUCER
FRANKLIN ELECTRIC
SUBMERSIBLE EFFLUENT
PUMP
MODEL 20JE05P4-2W230
230V, 1 PHASE
SIMPLEX PUMP CONTROL PANEL
SJE RHOMBUS IFAS SERIES
PANEL MOUNTED ON 2 - 4X4 WITH
METAL STRUTS
PROVIDE 20 AMP 120V GFI
RECEPTACLE
24" DIA PE RISER WITH
COVER (IF REQUIRED)
NOTE: CONTRACTOR SHALL CONFIRM DEPTH OF
EXISTING PIPING FROM FILTERS TO CONTACT TANK
PRIOR TO PLACING THE RECIRCULATION TANK
1-1/4" SCH 80 PVC
FORCE MAIN TO
DOSING TANK
1-1/2" PVC CONDUIT TO RECIRCULATION
PUMP CONTROL PANEL
1-1/4" SCH 80 PVC FORCE
MAIN FOR RECIRCULATION
1-1/2" SCH 80 PVC DISTIBUTION
PIPE WITH 1/2" DIA HOLE AT 4'
OC WITH POLYLOK ORIFICE
DIFFUSER (5 TOTAL)
PRECAST PIPE SUPPORT AT 8'
MAX OC
PROVIDE THREAED END CAP
PIPES TO BE EQUALLY SPACED
PUMP CONTROL PANEL MOUNTED
ON METAL STRUT FRAME
2,500 GAL PRECAST CONCRETE TANK
GENERAL SCOPE OF WORK
A. SITEWORK
1. INSTALL FENCE AND GATE AROUND SEPTIC TANK AND DOSING TANK
B. DOSING TANK
1. DEWATER AND CLEAN EXISTING DOSING TANK
2. REMOVE DOSING SIPHONS AND SEAL PIPE OUTLETS
3. INSTALL DUPLEX PUMPS, VALVE VAULT, AND CONTROL PANEL
4. INSTALL CONDUIT AND ELECTRICAL SERVICE TO CONTROL PANEL
5. INSTALL HOIST
C. SAND FILTERS
1. REMOVE EXISTING SPLITTER BOX AND DISTRIBIUTION PIPING
2. LEVEL SAND BEDS, ADD 9-12” SAND PER BED, APPROX 30 TONS PER BED OR
25’X25’X1’ = 625 CF/BED
3. INSTALL NEW PRESSURE PIPING AND DISTRIBUTION LINES WITH ORIFICES
AND DIFFUSERS
4. PROVIDE PIPE SUPPORTS NOT TO EXCEED 8’ ON CENTER
D. RECIRCULATION TANK
1. TEST HOLE AREA FOR RECIRCULATION TANK TO DETERMINE DEPTH OF
INSTALLATION
2. INSTALL 2,500 GAL RECIRCULATION TANK WITH PUMP AND CONTROL PANEL
3. INSTALL CONDUIT AND ELECTRICAL SERVICE TO CONTROL PANEL. PROVIDE
20 AMP 120V GFI RECEPTACLE
4. INSTALL FORCE MAIN TO DOSING TANK
E. CHLORINE CONTACT TANK
1. DEWATER AND CLEAN CONTACT TANK
2. INSTALL PRECAST BLOCK RETAINING WALL AND GRADE TO DRAIN AWAY FROM
CONTACT TANK
3. INSTALL NEW CHLORINE AND DECHLORINATION TABLET FEEDERS
GNI's written c
REVISIONS
cf ew st er bl ue rid ge ec s.
co m (5
) 3
-4
W ild
C he rr y
RD
Pi lo t V A, Bl ue
R id ge E ng in ee rin g
Co ns tr uc tio n
Se rv ic es
, L
LC
BASE DRAWING FROM PLANS PREPARED BY BERKLEY HOWELL & ASSOCIATES, DATED 4-2-98
1130 5-3-26
DEMOLITION WORK PROPOSED WORK
REMOVE EXISTING
SIPHON EQUIPMENT
NO EXISTING OVERFLOW
SEAL EXISTING PIPE OUTLETS
19"
2" NPT
5¾"
PUMP OFF @ 19"
PUMP ON @ 32"
ALARM @ 36"
2" SCH 80 PVC
PUMP DISCHARGE
(TYP)
EZ PULL QUICK
DISCONNECT
DOSING PUMP
GOULDS 3886 WS0512B
1/2 HP, 230 V, 1 PHASE
KICK-BACK
ROTATION
12"
6¼"
8¼"
KICK-BACK
ROTATION
12"
6¼"
8¼"
TO SAND
FILTERS
DOSING PUMP 1
DOSING PUMP 2
TRANSDUCER IN SCH 40
PVC STILLING PIPE
DUPLEX CONTROL PANEL
SJE RHOMBUS IFS SERIES
NOTE: DOSING TANK HAS AN APPROXIMATE
WORKING VOLUME OF 30 GALLONS PER INCH
UP TO THE OVERFLOW LEVEL
W A
S T
E W
A T
E R
S Y
S T
E M
IM
P
R O
V E
M E
N T
S D
O S
IN
G
T A
N K
S T
E W
A R
T S
V
IL
LE
O T
T E
R R
IV
E
R E
LE
M
E N
T A
R Y
S C
H O
O
LS
B E
D F
O R
D C
O U
N T
Y , V
A
HOIST & SOCKET
24" PE RISER WITH
COVER (TYP)
PROVIDE 1/4"
WEEP HOLE
TRANSDUCER IN SCH 40
PVC STILLING PIPE
SET 12" OFF BOTTOM
5-3-26
GNI's written consent is prohibited.
REVISIONS
cf ew st er bl ue rid ge ec s.
co m (5
) 3
-4
W ild
C he rr y
RD
Pi lo t V A, Bl ue
R id ge E ng in ee rin g
Co ns tr uc tio n
Se rv ic es
, L
LC
W A
S T
E W
A T
E R
S Y
S T
E M
IM
P
R O
V E
M E
N T
S D
E T
A
IL
S
N O
T E
S
S T
E W
A R
T S
V
IL
LE
O T
T E
R R
IV
E
R E
LE
M
E N
T A
R Y
S C
H O
O Ls
B E
D F
O R
D C
O U
N T
Y , V
A
1139 5-3-26
5-3-26
THIS DETAIL APPLICABLE
FOR DEPTHS LESS THAN 14 FEET
SEE PLANS FOR MODIFICATIONS
IN DEEPER TRENCHES.
PRESSURE PIPE
TRENCH BEDDING
GENERAL NOTES:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE
PROJECT DOCUMENTS. ANY DEVIATIONS MUST BE
APPROVED BY THE ENGINEER.
2. CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER
PRIOR TO COMMENCING WORK TO SCHEDULE A
PRECONSTRUCTION CONFERENCE.
3. AREAS DISTURBED DURING CONSTRUCTION SHALL BE
TEMPRORILY AND PERMANENTLY SEEDED. CONTRACTOR IS
RESPONSIBLE FOR MAINTENANCE DURING CONSTRUCTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING
MISS UTILITY PRIOR TO COMMENCING AND EXCAVATION
WORK ON THE SITE.
5. PLANS HAVE BEEN PREPARED WITHOUT THE BENEFIT OF A
FIELD SURVEY. CONTRACTOR SHALL CHECK CRITICAL
ELEVATIONS AND NOTIFY THE ENGINEER OF ANY POTENTIAL
CONFLICTS.
6. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE
CURRENT SEWAGE COLLECTION AND TREATMENT
REGULATIONS ADMINISTERED BY THE DEPARTMENT OF
ENVIRONMENTAL QUALITY.
CONSTRUCTION NOTES:
1. ALL PENETRATIONS TO CONCRETE TANKS, EXISTING AND
NEW, SHALL BE WATERTIGHT.
2. ALL PIPING, BURIED AND EXPOSED, SHALL BE PROPERLY
SECURED TO PREVENT MOVEMENT.
3. PIPE SHALL BE LAID TO AVOID ANY UNNECESSARY HIGH OR
LOW POINTS.
4. WATER AND SEWER LINES SHALL HAVE A MINIMUM
HORIZONTAL SEPERATION OF 10 FEET, AND ANY CROSSINGS
SHALL HAVE VERTICAL SEPERATION OF 18 INCHES BETWEEN
THE BOTTOM OF THE WATER LINE AND TOP OF THE SEWER
LINE. ANY DEVIATIONS MUST BE APPROVED BY THE
ENGINEER.
5. CONTRACTOR SHALL PROVIDE 5 DAYS NOTICE TO THE
ENGINEER PRIOR TO STARTUP OF EQUIPMENT. ENGINEER
MUST BE PRESENT AT STARTUP TO CONFIRM ALL PUMP
SETTINGS.
6. DISTURBED AREAS AROUND TANKS SHALL BE PROVIDED
WITH A GRAVEL SURFACE.
7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER’S RECOMMENDATIONS.
8. CONTROL PANELS SHALL BE LOCATED WITHIN THE LINE OF
SITEOF THEIR RESPECTIVE EQUIPMENT AND NOT TO EXCEED
10 FEET FROM THE EQUIPMENT LOCATION.
9. CONTRACTOR SHALL TAKE DAILY PROGRESS PHOTOGRAPHS
AND PROVIDE THEM TO THE ENGINEER FOR
DOCUMENTATION OF ALL WORK. PICTURES SHALL BE
SUBMITTED TO THE ENGINEER AND OWNER WEEKLY.