Summary

This is an Addendum #1 Revision to Request for Proposal (RFP 2026-RFP-006) issued by Greenwood Metropolitan District (GMD) in South Carolina for Wastewater SCADA System HMI Replacement services. The project encompasses the design, procurement, installation, testing, and commissioning of a new Human-Machine Interface (HMI) system to replace the existing SCADA system at two wastewater treatment facilities: Wilson Creek WWTF and West Alexander WWTF, which currently operate 21 mixed-model Rockwell PLCs (ControlLogix, CompactLogix, MicroLogix, PLC5, and SLC 5/05). The scope includes system assessment, HMI design and installation, integration with existing SCADA hardware and software, comprehensive testing and validation, security compliance implementation following NIST guidelines, documentation development, training for operators and IT personnel, and a minimum one-year warranty with quarterly security and application updates. Site visits with GMD IT staff are mandatory by September 9, 2026, at 4:00 PM; questions must be submitted by September 17, 2026, at 4:00 PM; and proposals are due September 23, 2026, at 4:00 PM via the electronic procurement portal at https://procurement.opengov.com/portal/gmdsc. Commission approval is anticipated October 14, 2026.

Pricing proposals must be submitted using the provided cost proposal tables and include separate itemized supporting schedules detailing equipment costs, labor hours and rates by role, parts and materials, software and licensing (initial versus recurring costs), travel and mobilization, and line-item costs for SCADA cabinet removal and replacement if required. Bidders must include a bid bond of not less than 5% of the total bid amount and provide proof of current Certificate of Insurance with GMD named as additional insured, including Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000 combined single limit), Workers' Compensation (South Carolina statutory limits plus $100,000 employers' liability), and Professional Liability or Errors and Omissions ($1,000,000). The successful bidder will be required within ten days of award to provide Performance and Payment Bonds each equal to 100% of the total contract price. Evaluation criteria are weighted as: Minimum Qualifications (100 points, pass/fail); Contractor Qualifications and Experience (30 points); Technical Specifications and System Functionality (30 points); Cost Competitiveness (20 points); Implementation Approach and Timeline (10 points); and Warranty Terms (10 points). No specific budget amount is identified, and GMD reserves the right to reject any or all proposals.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/gmdsc

Greenwood Metropolitan District, SC

RFP: 2026-RFP-006

WASTEWATER SCADA SYSTEM HMI REPLACEMENT

RELEASE DATE: August 17, 2026

RESPONSE DEADLINE: September 23, 2026, 4:00 pm

Please refer to the project timeline in this document for all important deadlines.

#2026-RFP-006

Title: Wastewater SCADA System HMI Replacement

Table Of Contents

1. SOLICITATION INFORMATION

2. GENERAL TERMS & INSURANCE

3. BACKGROUND

4. SCOPE OF WORK

5. QUALIFICATIONS & REQUIREMENTS

6. EVALUATION CRITERIA

7. VENDOR QUESTIONNAIRE

8. COST PROPOSAL

9. ATTACHMENTS

Attachments:

A - Payment Bond

B - Performance Bond

C - Bid Bond

SOLICITATION INFORMATION

REQUEST FOR PROPOSALS

Wastewater SCADA System HMI Replacement

Owner: Greenwood Metropolitan District (GMD)

Greenwood Metropolitan District (GMD) invites qualified contractors to submit proposals in response to this

Request for Proposal (RFP). This RFP outlines the general project scope, proposal requirements and evaluation criteria for Wastewater SCADA System HMI Replacement, with the goal of identifying a contractor who can deliver the most advantageous solution aligned with GMD’s operational needs.

Receipt of Proposals: Separate sealed proposals for Wastewater SCADA System HMI Replacement will be received electronically by GMD at https://procurement.opengov.com/portal/gmdsc before 4:00 pm on

Wednesday, September 23, 2026, and opened at the time and place designated in the RFP.

Timeline:

Release Project Date: August 17, 2026

Site Visits Deadline w/GMD IT Staff: September 9, 2026, 4:00pm

Question Submission Deadline: September 17, 2026, 4:00pm

Proposals Due: September 23, 2026, 4:00pm

Anticipated Commission Approval: October 14, 2026

Electronic Proposals: Proposals shall be submitted electronically via https://procurement.opengov.com/portal/gmdsc. Electronic proposals must be received no later than 4:00 pm on

Wednesday, September 23, 2026. Electronic proposals received after this time will not be accepted. The vendor is responsible for confirming receipt of proposal. GMD will not be responsible for electronic proposals that are delayed.

Description: Wastewater SCADA System HMI Replacement

Questions and Answers: Questions will be received via https://procurement.opengov.com/portal/gmdsc until

4:00 pm on Thursday, September 17, 2026. See Section 2.1 for additional information regarding the Q&A process.

GENERAL TERMS & INSURANCE

1. RFP QUESTIONS & ANSWERS

GMD is not bound by, and proposers may not request or rely on any oral interpretation or clarification of this

RFP. Any questions regarding this RFP are encouraged, and should be submitted electronically using the

Question and Answer tab of this RFP on GMD's online e-procurement portal, which can be accessed at https://procurement.opengov.com/portal/gmdsc

Questions received on or before the Deadline to Submit Questions in the Schedule of Events will be posted on the Question and Answer tab of this RFP in the e-procurement portal, per the Schedule of Events. Answers to questions from any proposer will be available to all proposers.

Exceptions will only be made for questions or details whereby if disclosed, would present a potential security vulnerability regarding the subject matter of the project. In such cases, GMD at its sole discretion reserves the right to withhold from public disclosure, redact or rephrase any such question or portion thereof.

In the event it becomes necessary to revise, change, modify or cancel this RFP or to provide additional information, addenda will be issued in the e-procurement portal.

2. SUBMITTAL FORMAT

Submittals must be submitted electronically via https://procurement.opengov.com/portal/gmdsc. Any submittals not in this format at the proper time and method indicated will be considered “irregular” and cause for rejection.

3. CORRECTION OR WITHDRAWAL OF SUBMITTAL

A respondent may correct or withdraw a submittal at any time before the submission deadline. After solicitation opening, any clarification, correction of an erroneous submittal, withdrawal, or cancellation of an award shall be permitted only at the discretion of the GMD Commission.

4. BIDDER RESPONSIBILITY

It shall be the bidder's responsibility to carefully examine each item of the specification. Failure to offer a complete submittal or failure to respond to each section of the technical specification will cause the submittal to be rejected without review as “non-responsive”. All variances, exceptions and/or deviations shall be fully described with your submittal. Deceit in responding to the specification will be cause for automatic rejection.

Respondent must provide all of their standard goods/services whether specified or not, unless otherwise specified within this document. All necessary items needed, even though not mentioned in the specifications, must be supplied.

5. IRREGULAR SUBMITTALS

The specification herein states the minimum requirements of the District. All submittals must be regular in every respect. Unauthorized conditions, limitations or provisions shall be cause for rejection. The Greenwood

Metropolitan District will consider as “irregular” or “non-responsive” and reject any submittal not prepared and submitted in accordance with the submittal documents and specification, or any submittal lacking sufficient information to enable the District to make a reasonable determination of compliance to the specification.

6. AWARD CRITERIA

In comparing submittals, consideration will not be confined to price only. The successful contractor will be one whose solution is judged to best serve the interests of the District when price, service, safety, quality and dependability are considered. The District reserves the right to reject any or all submittals or any part thereof, and to waive any minor technicalities. Submittals will be accepted for consideration from vendors for services equal or superior to those specified.

Decisions of equivalency will be at the sole interpretation of the District. In awarding, the GMD Commissioners reserve the right to give reasonable consideration to bidders who are customers of Greenwood Metropolitan

District. Respondents should not submit a response for pre-owned, used or discontinued products or parts, as such submittals will not be considered.

7. AWARD AND COMMISSION APPROVAL

For contracts requiring GMD Commission approval, an award recommendation shall be presented to the GMD

Commission at its next public meeting for approval, after which written notice will be provided to the recommended respondent. In the event two or more respondents are tied in price while otherwise meeting all required conditions, GMD will make the selection it deems to be in the best interest of the District.

8. RIGHT OF REJECTION & RE-SOLICITATION

Prior to award, the GMD Commission reserves the right to reject any and all submittals, to decline to award the contract to any respondent, or to re-solicit the project based on modified specifications or terms and conditions.

9. NO BID RESPONSE

If your firm chooses not to submit a response, please indicate the reason why via https://procurement.opengov.com/portal/gmdsc/projects/281983.

10. BID BOND and PAYMENT & PERFORMANCE BONDS

Bid Bond Bidder shall provide a Bid Proposal Bond in an amount not less than 5% of the total main bid amount as specified with their bid proposal. Proposals that do not include the required bid bond will be marked as non-responsive and disqualified.

The successful bidder will be required, within ten days following receipt of award and prior to the execution of contract, provide GMD two separate bonds:

Performance Bond: In the amount equal to 100% of the total contract price, guaranteeing faithful, timely and complete performance of all terms, conditions and agreements of the contract documents.

Payment Bond: In the amount equal to 100% of the total contract price, a labor and material payment bond, guaranteeing the prompt payment of all sub-contractors, laborers, materialmen who provide labor, equipment or materials for the execution of the work.

The contractor shall pay all premiums, fees and costs associated with securing and maintaining the required

Performance & Payment bonds. The Performance Bond shall remain in full force for the duration of the project period, plus the entirety of the designated correction/warranty period. The Payment Bond shall remain in full effect until all liabilities to sub-contractors and suppliers are fully discharged.

https://procurement.opengov.com/portal/gmdsc/projects/281983

11. INSURANCE REQUIREMENTS

Vendor shall procure, provide and maintain a current Certificate of Insurance (COI) to GMD evidencing all required coverage. Insurance coverage shall not lapse or be canceled at any time. Failure to maintain continuous coverage or to provide a current COI may be deemed a material breach and may result in immediate termination of any contract at GMD’s sole discretion. Specific contract or bid documents may require additional coverage.

Construction Contractor shall provide GMD with a Certificate of Insurance for the following coverage prior to commencement of work.

Commercial General Liability: Minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate.

Automobile Liability: Minimum limit of $1,000,000 combined single limit for any owned, hired or non-owned vehicles used in contract.

Workers’ Compensation: Coverage A - State of South Carolina Statutory Worker’s Compensation. Coverage B

- Employers Liability $100,000/$500,000. Statutory limits as required by South Carolina law.

Professional Liability: Minimum of $1,000,000 per claim and aggregate.

GMD shall be named as Additional Insured on General Liability and Automobile Liability policies. COI must be current and reflect coverage for the full duration of the contract. All policies shall provide 30 days’ notice of cancellation.

Professional Services Consultant/vendor shall provide Certificate of Insurance with the following coverage prior to commencement of work.

Errors and Omission Liability to include Cyber Liability and Data Breach insurance in the minimum amount of: $1,000,000.00 each claim, or (2) the maximum amount of such insurance available to Vendor under

Vendor’s combined insurance policies (including any excess or “umbrella” policies), whichever is greater.

Further, if Vendor maintains a claims-made policy, Vendor shall provide written evidence of such insurance to

GMD for at least five (5) years after the completion of work performed under the Agreement.

General Liability: Minimum of $1,000,000 per occurrence and $2,000,000 aggregate.

Automobile Liability: Minimum of $1,000,000 combined single limit.

Workers’ Compensation: Coverage A - State of South Carolina Statutory Worker’s Compensation. Coverage B

- Employers Liability $100,000/$500,000. Statutory limits as required by South Carolina law.

GMD shall be listed as Additional Insured on applicable policies. COI must be current and reflect coverage for the full duration of the contract. All policies shall provide 30 days’ notice of cancellation.

Goods & Services Vendor shall provide a Certificate of Insurance with the following prior to delivery or service.

Commercial General Liability: Minimum limits of $1,000,000 per occurrence and $2,000,000 aggregate.

Automobile Liability: Minimum limit of $1,000,000 combined single limit for any owned, hired or non-owned vehicles used in contract.

Workers’ Compensation: Coverage A - State of South Carolina Statutory Worker’s Compensation. Coverage B

- Employers Liability $100,000/$500,000. Statutory limits as required by South Carolina law.

GMD shall be listed as Additional Insured on applicable policies. COI must be current and reflect coverage for the full duration of the contract. All policies shall provide 30 days’ notice of cancellation.

BACKGROUND

1. Background Existing Systems

Access to critical infrastructure supplemental attachments titled Section 3 Background Existing Systems, including detailed system specifications, SCADA HMI screens and photographs are available by secure access from GMD’s IT team.

To receive the supplemental attachments, interested respondents must contact GMD IT Manager Jeff

Auman at jauman@gmdsc.gov

Unauthorized distribution, copying or dissemination of confidential supplemental documents is strictly prohibited without written permission from authorized GMD personnel.

mailto:jauman@gmdsc.gov

SCOPE OF WORK

1. Project Phases

The following shall be completed and expected as a part of the awarded project. The project is expected to be completed in several phases.

Project Management Lifecycle: SCADA Integrator is expected to be prepared to present project schedules before each project phase begins and should include the following or similar project management lifecycle.

• Kick-Off meeting

• Discovery & Initiation

• Planning

• Execution & Implementation

• Cleanup & Closing

• Monthly (at a minimum) coordination meetings - discussing project status, accomplishments, challenges, schedule, and invoice status.

• Project Phase Review - successes, failures, recommendations for revision

2. Technical Specifications & System Functionality

Analyze and conduct evaluation of the current HMI setup within the wastewater SCADA system architecture including hardware and software components.

3. HMI Replacement

Design, install, test and commission a new HMI system that meets the needs of the two wastewater treatment facilities. Provide clear rationale of solution, emphasizing benefits such as system simplification and license reduction. Incorporate advanced visualization, intuitive dashboards and efficient alarm management.

4. System Assessment

Analyze and conduct evaluation of the current HMI setup within the wastewater SCADA system architecture including hardware and software components.

5. Integration and Compatibility

Ensure seamless integration of the new HMI system with existing SCADA hardware, software, and network infrastructure.

6. Testing and Validation

Perform comprehensive testing phases of the replacement system to verify functionality and performance including unit testing, integration testing, system testing, and user acceptance testing (UAT) with GMD staff.

Demonstrate system performance under real-world operational loads. Set testing environment, station(s) for staff to develop, test, modify and launch HMI applications in the future.

7. Security Compliance

Implement security protocols following NIST guidelines or equivalent frameworks.

Ensure secure authentication, authorization, and encryption for system access and data transmission.

8. Parameters

• The scope of this project includes the WWTFs that serve GMD customers. The wastewater treatment system includes two wastewater treatment facilities.

• GMD staff are not SCADA experts. The description included in this RFP is to be used as a general descriptive guide only. Potential contractors will be required to make onsite visits for both facilities and verify and collect any additional information needed to submit a proposal for the project.

• Because all locations and facilities are in use and fully operational, all upgrades shall be completed in a systematic and timely fashion to minimize interruptions to daily operations. The contractor shall allow for and include all costs to ensure that the systems always remain functional. GMD recognizes during the upgrade sites will be down for limited times during transitions. Any outages must be communicated and coordinated well ahead of time and systems shall be fully operational prior to the conclusion of each workday, unless agreed upon beforehand in writing. The SCADA system integrator shall coordinate with GMD’s project manager to ensure system functionality during upgrades.

• All work is to be coordinated with each of the two plant superintendents and scheduled to be completed no later than 2:30 PM each workday.

9. SCADA Software Upgrades Physical and/or Cloud Responsibilities

• For physical servers and/or VMs that are required for SCADA software, it will be the responsibility of the SCADA integrator to provide and deploy the physical servers and/or VMs after GMD approval of the equipment brand and specifications.

• SCADA software installations, configurations, migrations, will be the responsibility of the SCADA integrator.

• Access to servers, workstations and networks will be planned out in coordination with the GMD’s project manager as required and/or needed.

• A documented backup plan for SCADA systems will be required from the SCADA integrator in coordination with GMD. Server backups will be joint responsibility of the integrator and GMD staff.

• SCADA integrator shall include any server and workstation requirements for the chosen SCADA solution. If a Cloud solution SCADA system is chosen, it will completely be the SCADA integrator’s responsibility to complete the requirements listed. On-premise systems will be set up for redundancy.

• GMD will work with SCADA integrator to complete networking requirements for communication to and from the cloud provider.

• Security of cloud and/or on-premise SCADA solutions will need to demonstrate a proven security track record. Cloud or on-premise SCADA solution must have all basic levels of security e.g., MFA, encryption in transit, encryption at rest, geo IP blocking, etc. based on current industry-based practices and standards and be as secure and isolated as possible.

• Cloud or on-premise SCADA solution must have Incident Response Plan in the event of catastrophic event detailing manual operation of the plants.

• A documented backup plan and contingency measures in case of downtime or disruption is required and must be tested before the completion of the project.

• Physical workstations will be the responsibility of SCADA integrator with support of GMD.

• Internal business networking will be the responsibility of GMD.

• SCADA device networking will be shared responsibility.

10. Documentation

Include the development of the following items:

• Operation and Maintenance (O&M) Manuals for key components

• System schematics

• Communication schematics

• Wiring diagrams of each Remote Terminal Unit (RTU) and control panels (only applies to devices that may be replaced or changed in the scope of this project).

• HMI development data to include tag-name database with corresponding Input/Output (I/O) list

• Electronic back-up and printed copies of all programs

• Operational instructions in electronic and printed format

• Client and server administrative instructions and installation instructions for GMD support staff

11. Hardware/Software/Programming

Provide design and integration services including procurement to replace any required existing SCADA hardware and software as described below.

• Services include procurement, installation and configuration of SCADA server hardware and software, SCADA Client hardware and software, SCADA HMI software, SCADA historian, alarm notification through telephone call and text, dynamic trending tool that is user changeable and one daily automated print report of 24-hour plant flow totals.

• Conduct an in-depth analysis of the existing SCADA equipment, software and programming scheme, and evaluate the information gained to recommend any needed replacement of existing PLCs, servers, workstations and any other equipment. There are a few existing HMI screens that will no longer be needed.

• If determined to be required, replace any existing PLCs and related equipment needed to perform the specified functions of the SCADA system.

• Provide one (1) additional pre-programmed PLC spare of each type, if any current equipment is replaced.

• Sites include Wilson Creek WWTF, and West Alexander WWTF for a total of 21 PLCs.

• Current PLCs are a mix of Rockwell ControlLogix, CompactLogix, MicroLogix, PLC5, and SLC 5/05.

• Include and allow for all programming as required for a complete and functioning system on existing

PLCs and any new equipment provided during upgrade. Current PLC programming is functional from a process control perspective. The only expected changes would be for interface to the proposed HMI replacement. Programming shall address all items for functionality and performance including but not limited to:

o Data integrity o Performance of system within operational parameters o Versatility of parameter and operator selectable adjustments

12. Training

Provide comprehensive training for GMD staff on the operation and maintenance of the upgraded SCADA system.

Training at a minimum should cover the use of and basic diagnostic of:

• Any new hardware

• New SCADA software

• New features

• Alarms

Conduct training sessions for Operators, Administrators, and IT personnel on the operation and maintenance of the new HMI. Training shall take place between the business hours of 7:00 AM to 2:30 PM, Monday through

Thursday unless otherwise agreed upon with GMD staff.

13. Warranty & Maintenance

• Minimum one-year warranty on all hardware and software components.

• Provide options for extended maintenance contracts.

• Ensure availability of spare parts and components for a minimum of five years.

• Perform quarterly (4 times per year) security operating system (OS) updates on HMIs and server(s)

• Perform quarterly (4 times per year) SCADA application updates. This includes updating to the latest minor version of the application (i.e., update from version 1.0 to 1.1).

• Perform application upgrades to the latest major version of the application, when available (i.e., upgrade from version 1.0 to 2.0), up to once per year.

• Perform updates/upgrades to the latest supported firmware version for PLCs, once per year.

• Perform updates/upgrades to the latest supported firmware/OS version for network switches, once per year.

14. Acceptance

• Delivered components will be inspected by GMD staff upon arrival.

• Any damaged or non-compliant items must be replaced by the contractor at no additional cost.

• Final acceptance of the system will be based on successful completion of testing and validation procedures.

QUALIFICATIONS & REQUIREMENTS

1. Minimum Qualifications

Contractor must meet the following minimum qualifications:

A. PLC & Controls Expertise

Demonstrated experience with:

• PLC programming (e.g., Rockwell/Allen-Bradley, Siemens, Schneider, Emerson)

• Control system migration or modernization projects

• Instrumentation, control panels, and system testing

B. SCADA Software Experience

Hands-on experience with:

• SCADA platform development and upgrades (e.g. Ignition, Wonderware, VTScada)

• Alarm management, historian integration, and HMI design

• Migration from legacy systems

C. Cybersecurity & Networking Knowledge Working knowledge of:

• Industrial Ethernet and network segmentation

• Firewalls, VLANs, and secure remote access

• Basic industrial cybersecurity standards (e.g., NIST, ISA/IEC 62443)

D. Licensing & Vendor Authorization

Contractors must:

• Be a certified or approved system integrator for the SCADA vendor

• Understand software licensing, activation, and upgrade paths

E. Documentation & Commissioning Skills

Ability to produce:

• Control narratives

• Network architecture diagrams

• PLC and SCADA documentation

• FAT/SAT procedures and commissioning reports

2. Proposal Requirements

• Company profile, qualifications and relevant experience with similar SCADA system upgrades and integrations.

• Detailed project approach and proposed schedule with clear milestones and deliverables, including estimated tasks and man-hours to accomplish.

• Technical specifications of the proposed SCADA system and any change in components for complete installation, including but not limited to servers, software, alarming, documentation, training, software maintenance, any recommended PLC hardware replacements if required and all custom programming source code for any changes provided.

• Warranty information, including requirement for programming and onsite installation.

• References from at least three similar projects completed within the last five years.

o Include agency name, agency address, contact name, contact phone number and contact email address.

• Itemized supporting cost schedule including:

o Equipment: Itemized model, quantity and cost o Labor: Estimated hours and rates by role (e.g. Project Manager, Engineers, PLC Programmer, Developer) and task o Parts & Materials: Hardware, wiring o Software & Licensing: Initial software costs vs. recurring costs o Other Associated Costs: Travel, mobilization o A separate line-item cost per SCADA cabinet for any recommended removal and replacement of existing equipment shall be included o Cost of all necessary items including but not limited to disposal of removed equipment, installation of new equipment and any necessary programming and configuration is to be included.

3. Site Visits - Mandatory

Proposals will not be considered by respondents that have not been verified as having conducted in-person site visits with a member of GMD's IT staff. Please review the project timeline for the deadline for site visit requests.

o Jeff Auman jauman@gmdsc.gov o Jimmy Pinson jpinson@gmdsc.gov mailto:jauman@gmdsc.gov mailto:jpinson@gmdsc.gov

EVALUATION CRITERIA

Proposals will be evaluated based on the following:

1. Phase 1

No. Evaluation Criteria Scoring Method Weight (Points)

1. Minimum Qualifications

Provide evidence that your firm meets the Minimum Qualifications.

• PLC & Controls Expertise

• SCADA Software

Experience

• Cybersecurity &

Networking Working

Knowledge

• Licensing & Vendor

Authorization

• Documentation &

Commissioning Skills

Pass / Fail 100 (100% of Total)

2. Phase 2

No. Evaluation Criteria Scoring Method Weight (Points)

1. Contractor Qualifications, Experience and

Response Time

• Number of years in business providing these services.

• Experience of proposed project manager completing similar implementations.

• References and reference feedback including how the system continues to operate.

• Contractor approach and availability during hours, after hours, weekends.

• Reference feedback on contractor response time.

• Similar clients/industry with similar functional requirements.

0-100 Points 30 (30% of Total)

2. Technical Specifications & System

Functionality

• Degree to which proposed system meets requirements of RFP

• Ease of use for end users

• Proposed ongoing support and maintenance

• Report capabilities

• Unique features

• Physical and digital data protection and security of proposed system

• System monitoring

• Accessibility to training

0-100 Points 30 (30% of Total)

3. Cost Competitiveness

• GMD resources for implementation and system support.

• On-going support costs

(including support, maintenance, and additional training).

• Total purchase costs which also include pricing requested in Pricing

Proposal tables.

0-100 Points 20 (20% of Total)

4. Approach to Project, Implementation Plan

& Timeline

• Overall process for implementation.

• Proposed implementation timeline.

0-100 Points 10 (10% of Total)

5. Warranty Terms

• Warranty duration

• Warranty response time

• Inclusions and exclusions

(parts, labor)

0-100 Points 10 (10% of Total)

VENDOR QUESTIONNAIRE

1. Authorized Representative*

Please include the full name, title, telephone and email address of the fully authorized representative submitting this response:

*Response required

2. Minimum Qualifications*

Provide evidence that your firm meets the Minimum Qualifications described in Section 3:19.

• PLC & Controls Expertise

• SCADA Software Experience

• Cybersecurity & Networking Working Knowledge

• Licensing & Vendor Authorization

• Documentation & Commissioning Skills

*Response required

3. Qualifications, Experience & Response Time*

Discuss Contractor’s qualifications and previous experience and describe the contractor's firm; how it is organized, the resources and expertise it has available and summarize the ability to provide the products and services outlined in this RFP. Discuss relevant experience with similar implementations, including details regarding the scope of work and the types of services provided by your firm.

Provide a description of at least three similar implementations that your firm has provided within the last five

(5) years.

Include a description of the services provided, the organization’s name, contact name, title, phone number, and email address. Specifically include any wastewater entities that are using the proposed solution. Proposer’s references must be able to currently corroborate performance and capability. GMD WILL CONTACT THE

REFERENCES PROVIDED AND WILL REJECT ANY AND ALL REFERENCES FOR SIMILAR PROJECTS

THAT IT IS UNABLE TO INDEPENDENTLY VERIFY.

Include your firms approach to response times when needed, during standard business hours, after hours and on weekends.

*Response required

4. Technical Specifications & System Functionality*

Provide the degree to which your proposed system meets the requirements of the RFP including the ease of use for end users, unique features, system monitoring, report capabilities, proposed ongoing maintenance and support, accessibility to training and the physical and the digital data protection and security of your proposed system.

*Response required

5. Approach to Project, Implementation Plan & Timeline*

Provide a detailed approach to meeting the requirements identified in this RFP. Demonstrate a thorough understanding of the process including how your team intends to coordinate the work internally and with GMD staff.

Provide a detailed implementation plan to meet the requirements of the RFP, including proposed schedule with key dates. This plan should identify the necessary GMD personnel and include a detailed estimate of GMD staff hours necessary to complete according to the proposed schedule.

*Response required

6. Warranty Terms*

Provide detailed warranty information including duration, response time for warranty items or service, warranty inclusions and notable exclusions.

*Response required

7. Supporting Cost Schedule*

Use the Cost Proposal pricing tables as your primary high-level Bid Form.

Upload a separate itemized cost schedule here to support your total cost Bid Form. The supporting cost schedule should include but not be limited to:

Equipment: Itemized model, quantity and cost

Labor: Estimated hours and rates by role (e.g. Project Manager, Engineers, PLC Programmer, Developer) and task

Parts & Materials: Hardware, wiring

Software & Licensing: Initial software costs vs. recurring costs

Other Associated Costs: Travel, mobilization

In the event of a conflict between the uploaded supporting cost schedule and the Cost Proposal table, the platform's electronic Cost Proposal tables will prevail as the respondent's official total.

*Response required

8. Bid Bond*

Please download the bid bond, complete and upload. Bidder shall provide bid bond in an amount not less than

5% of the total main bid amount as specified with your proposal.

• Bid_Bond.docx

*Response required

9. Upload your Certificate of Insurance here*

Please ensure the Greenwood Metropolitan District, SC is listed as an additional insured

*Response required

10. Do you have a completed W9?* https://government-project.s3.us-west-2.amazonaws.com/281983/05e15abc-cb00-47d7-a3da-479fdf88a584_Bid_Bond.docx

☐ Yes

☐ No

*Response required

When equals "Yes"

10.1 Please upload your W9 here*

*Response required

When equals "No"

10.2 Please download, complete and upload*

Download blank W9 form, complete, and upload.

• W9_Blank.pdf

*Response required

11. Upload any relevant licenses or certifications (if applicable)

12. Conflict of Interest Statement*

The authorized representative submitting this response hereby affirms that neither he/she, nor the principals or employees of his/her organization (whether corporate, partnership, association or otherwise), are related by blood or marriage to any employee or Commissioner of the Greenwood Metropolitan District. If such a relationship exists, please select no and disclose the nature of the relationship.

☐ Yes

☐ No

*Response required

When equals "No"

12.1 Please explain the nature of the relationship below:*

*Response required

13. Destruction of Confidential Data Disclosure*

Should I be notified that my firm has not been awarded a contract for this project, or in the event of termination of the RFP, I will immediately destroy and/or erase all confidential documentation associated with this RFP, both electronic and hard copy.

☐ Please confirm

*Response required https://government-project.s3.us-west-2.amazonaws.com/281983/abde39cd-7a8f-4da4-b99a-6a3621261be5_W9_Blank.pdf

COST PROPOSAL

GMD is eligible for Cooperative Purchasing group pricing associated with but not limited to GSA (where applicable), South Carolina State Contract, OMNIA, TIPS, 1GPA, Sourcewell, NCPA and NASPO

Cooperative Purchasing

COST PROPOSAL WILSON CREEK WWTF

The figures submitted in these Cost Proposal pricing tables represent your official, final bid. In the event of a conflict between the uploaded supporting cost schedule and the Cost Proposal tables, the platform's electronic

Cost Proposal tables will prevail as the respondent's official total. GMD is not tax exempt and tax and freight is to be included in your proposal where applicable.

Line Item Description Quantity Unit of

Measure Unit Cost Total Expected

Start Date Days To

Complete

1 Wilson Creek WWTF SCADA System

HMI Replacement to include Design, Hardware and Software Installation

Each

2 Wilson Creek Software Updates & License

Fee Year 1 Year

3 Wilson Creek Software Updates & License

Fee Year 2 Year

4 Wilson Creek Software Updates & License

Fee Year 3 Year

5 Wilson Creek Software Updates & License

Fee Year 4 Year

6 Wilson Creek Software Updates & License

Fee Year 5 Year

[*] Denotes item is taxable

Sales Tax (@ 7%)

TOTAL

COST PROPOSAL WEST ALEXANDER WWTF

The figures submitted in these Cost Proposal pricing tables represent your official, final bid. In the event of a conflict between the uploaded supporting cost schedule and the Cost Proposal tables, the platform's electronic

Cost Proposal tables will prevail as the respondent's official total. GMD is not tax exempt and tax and freight is to be included in your proposal where applicable.

Line Item Description Quantity Unit of

Measure Unit Cost Total Expected

Start Date Days To

Complete

7 West Alexander WWTF SCADA System

HMI Replacement to include Design, Hardware and Software Installation

Each

8 West Alexander Software Updates &

License Fee Year 1 Year

9 West Alexander Software Updates &

License Fee Year 2 Year

10 West Alexander Software Updates &

License Fee Year 3 Year

11 West Alexander Software Updates &

License Fee Year 4 Year

12 West Alexander Software Updates &

License Fee Year 5 Year

[*] Denotes item is taxable

ADDITIONAL SERVICES, AS REQUIRED

Please select NO BID if not applicable for your proposed solution. The figures submitted in these Cost Proposal pricing tables represent your official, final bid. In the event of a conflict between the uploaded supporting cost schedule and the Cost Proposal tables, the platform's electronic Cost Proposal tables will prevail as the respondent's official total. GMD is not tax exempt and tax and freight is to be included in your proposal where applicable.

Line Item Description Quantity Unit of

Measure Unit Cost Total No Bid

13 Wilson Creek WWTF

SCADA cabinet removal and replacement of any existing equipment

Each

14 West Alexander

WWTF SCADA

cabinet removal and replacement of any existing equipment

Each

Line Item Description Quantity Unit of

Measure Unit Cost Total No Bid

[*] Denotes item is taxable

ELECTIVE PROJECT SCOPE ENHANCEMENTS

The following items are optional project scope enhancements. They are not required to complete the core scope outlined in the RFP. You may elect to include or NO BID any of the Elective Enhancement Line Items 15 - 18, prior to your proposal submittal. The figures submitted in these Cost Proposal pricing tables represent your official, final bid. In the event of a conflict between the uploaded supporting cost schedule and the Cost

Proposal tables, the platform's electronic Cost Proposal tables will prevail as the respondent's official total.

GMD is not tax exempt and tax and freight is to be included in your proposal where applicable.

Line Item Description Quantity Unit of

Measure Unit Cost Total No Bid

15 Wilson Creek Optional

Software

Enhancements

Each

16 West Alexander

Optional Software

Enhancements

Each

17 Wilson Creek

Enhanced Security and/or Additional

Firewall

Each

18 West Alexander

Enhanced Security and/or Additional

Firewall

Each

[*] Denotes item is taxable

SOLICITATION INFORMATION
GENERAL TERMS & INSURANCE
1. RFP QUESTIONS & ANSWERS
2. SUBMITTAL FORMAT
3. CORRECTION OR WITHDRAWAL OF SUBMITTAL
4. BIDDER RESPONSIBILITY
5. IRREGULAR SUBMITTALS
6. AWARD CRITERIA
7. AWARD AND COMMISSION APPROVAL
8. RIGHT OF REJECTION & RE-SOLICITATION
9. NO BID RESPONSE
10. BID BOND and PAYMENT & PERFORMANCE BONDS
11. INSURANCE REQUIREMENTS
BACKGROUND
1. Background Existing Systems
SCOPE OF WORK
1. Project Phases
2. Technical Specifications & System Functionality
3. HMI Replacement
4. System Assessment
5. Integration and Compatibility
6. Testing and Validation
7. Security Compliance
8. Parameters
9. SCADA Software Upgrades Physical and/or Cloud Responsibilities
10. Documentation
11. Hardware/Software/Programming
12. Training
13. Warranty & Maintenance
14. Acceptance
QUALIFICATIONS & REQUIREMENTS
1. Minimum Qualifications
2. Proposal Requirements
3. Site Visits - Mandatory
EVALUATION CRITERIA
1. Phase 1
2. Phase 2
VENDOR QUESTIONNAIRE
1. Authorized Representative*
2. Minimum Qualifications*
3. Qualifications, Experience & Response Time*
4. Technical Specifications & System Functionality*
5. Approach to Project, Implementation Plan & Timeline*
6. Warranty Terms*
7. Supporting Cost Schedule*
8. Bid Bond*
9. Upload your Certificate of Insurance here*
10. Do you have a completed W9?*
10.1 Please upload your W9 here*
10.2 Please download, complete and upload*
11. Upload any relevant licenses or certifications (if applicable)
12. Conflict of Interest Statement*
12.1 Please explain the nature of the relationship below:*

13. Destruction of Confidential Data Disclosure*

COST PROPOSAL