This document provides details for a federal contract solicitation to upgrade the fire alarm system at the Gallup Federal Building in Gallup, New Mexico. The General Services Administration Public Buildings Service Region 7 intends to issue a request for proposal for a complete replacement of the existing fire alarm system. The scope of work includes upgrading the current system with a new intelligent, addressable, and emergency voice/alarm communication system. It must meet NFPA 72 and P-100 standards for intelligibility, audibility, and ADA compliance. The contractor shall furnish and install all necessary components including manual stations, detectors, notification appliances, network equipment, power supplies, and interfaces to provide a complete voice evacuation system. The solicitation will be issued on December 6, 2022 with proposals due January 10, 2023. Award is anticipated by March 6, 2023 for a 225-day period of performance. The procurement is set aside for small businesses between $500,000 to $1,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to 70159 GSA Fire Alarm Upgrade, newest first.
File Type Posted
Amendment 4 3-6.PDF PDF
Amendment 4 3-1.PDF PDF
Amendment 4 3-2.PDF PDF
47PH0623R0011 - Amendment 4.pdf PDF
Amendment 4 3-3.PDF PDF
Amendment 4 3-5.PDF PDF
Amendment 4 3-4.PDF PDF
47PH0623R0011 - Amendment 3.pdf PDF
47PH0623R0011 - Amendment 2.pdf PDF
SF1442 Gallup Fire Alarm 47PH0623R0011.pdf PDF
Fire Alarm Specifications 11-03-2022.pdf PDF
47PH0623R0011 - Amendment 1.pdf PDF
Vendor Fitness Determination Training Manual.pdf PDF
Wage Determination NM20220024 dated 02-25-2022.pdf PDF
Fire Alarm Drawings 02-14-22.pdf PDF
Past Performance Questionnaire.pdf PDF
Bid Schedule Template.xlsx XLSX spreadsheet
GSA 527.pdf PDF
SOW GSA Fire Alarm Upgrade 11-15-2022.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Plan

: +christopher.clever@gsa.gov +walter.tersch@gsa.gov

(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.

-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.

-Christopher Clever - PCBL That's correct.

-Jake Begnaud - WPIDBBProject Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):Waste Diversion Report (Final) :
The general info in these gray cells replicates onto the Report tabs.
Project Name:ECC (estimated construction cost):Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
Asphalt50%000n/a
Brick, Masonry, and Tile50%000n/a
Cardboard50%000n/a
Carpet, including Padding50%000n/a
Ceiling tile50%000n/a
Concrete50%000n/a
Drywall/ sheetrock (unpainted)50%000n/a
Metals50%000n/a
Painted wood, drywall, or plywood50%000n/a
Reusable items50%000n/a
Roofing50%000n/a
Soil, Rock, Land Clearing Debris50%000n/a
Wood (unpainted)50%000n/a
Other: ____________________50%000n/a
Other: ____________________50%000n/a
Other: ____________________50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.