WAN_RFP_Appendix_B_-_Service_Availability_Questionnaire.pdf
PDF 243 KB Posted
- Attached to
- Wide Area Network (WAN) Communication Services
- Solicitation number
- RFP-21435
- Issued by
- Cuyahoga County, Ohio
About this file
This is a Service Availability Questionnaire appendix for the Cleveland Metropolitan School District (CMSD) Wide Area Network (WAN) Communication Services RFP in Ohio. The questionnaire must be completed by vendors for each site listed in Appendix A during the pre-implementation planning phase. The document establishes the framework for vendors to assess service delivery capabilities at specific locations, document available technologies, and confirm their ability to meet minimum performance requirements.
Section 1 of the questionnaire requires vendors to provide site identification information, including site ID, site name, address, and completion details. Section 2 addresses service availability and technical specifications, requiring vendors to confirm whether they can provide service to each site address and identify available technologies including fiber optic dark fiber, lit fiber, MPLS, or other options. Vendors must also recommend the appropriate technology for each site and confirm whether the recommended technology can meet minimum requirements of 1 Gbps download and 10 Gbps burst capacity. This questionnaire serves as a critical assessment tool to evaluate vendor capabilities and network feasibility across the district's multiple sites before contract implementation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX B: SERVICE AVAILABILITY QUESTIONNAIRE
Vendors must complete this questionnaire for each site listed in Appendix A during the Pre- Implementation Planning phase.
SECTION 1: SITE INFORMATION
Site ID: _________________ (from Appendix A)
Site Name: _________________________________________________
Site Address: ______________________________________________
Vendor Completing Form: ____________________________________
Date Completed: ____________________
Completed By (Name/Title): __________________________________
SECTION 2: SERVICE AVAILABILITY
2.1 Can you provide service to this site address?
Yes No (if No, explain why and skip to Section 5)
2.2 Available Technologies at this site (check all that apply):
Fiber Optic (Dark Fiber) Fiber Optic (Lit Fiber)
MPLS
Other (describe): _________________________________________
2.3 Recommended Technology for this site: _____________________
2.4 Can the recommended technology meet all minimum requirements?
Yes (1Gbps download, 10Gbps burst, <=20ms latency, <=0.1% packet loss, <=5ms jitter) No (if No, explain limitations): ____________________________
2.5 Estimated bandwidth capability at this site:
Sustained Download Speed: _________ Gbps Burst Download Speed: _________ Gbps Expected Latency: _________ ms Expected Packet Loss: _________% Expected Jitter: _________ ms
SECTION 3: NETWORK TOPOLOGY & ARCHITECTURE
3.1 Proposed Network Topology:
Hub-and-Spoke MPLS Mesh Dual Ring Other: _________________________________________
3.2 Describe how this site connects in the overall
topology: _____________________________________________________________
3.3 Resiliency Options Available:
Single circuit Dual diverse circuits (same entrance) Dual diverse circuits (different entrances) Other: _________________________________________
3.4 If Resiliency is available, can both circuits terminate at same utility pole while taking diverse paths?
Yes No Unknown
SECTION 4: EQUIPMENT AND INSTALLATION
4.1 Customer Premises Equipment (CPE):
Proposed Equipment Model: _____________________________________ Proposed Equipment Make: _____________________________________ If rack-mountable, specify rack units: _____ U
4.2 Does proposed equipment include Wi-Fi capability?
Yes - No - No Wi-Fi radios present
4.3 Installation Requirements:
4.4 Building Demarcation Point:
Proposed location for service entry: ___________________________ Distance from service entry to proposed equipment location: _________ feet
4.5 Power Requirements:
Power draw: _________ watts Voltage: _________ V (single-phase/three-phase)
If yes, UPS capacity: _________ VA
SECTION 5: TIMELINE AND DEPENDENCIES
5.1 Estimated installation timeline for this site:
Service availability verification: _________ business days Permitting (if required): _________ business days Construction/outside plant work: _________ business days Inside installation: _________ business days Testing and cutover: _________ business days Total estimated timeline: _________ business days from approval
5.2 Dependencies or constraints:
Utility pole access required (owned by: _______________) City/county permits required Easement or right-of-way needed Third-party coordination required (specify): _________________ Environmental/historic building restrictions Other (describe): __________________________________________
5.3 Are there any seasonal or weather-related constraints?
Yes (describe): ___________________________________________ No
5.4 Capacity for future bandwidth increases:
What is the maximum sustainable bandwidth at this location? _________ Gbps
SECTION 6: SITE-SPECIFIC CONSIDERATIONS
6.1 Building Access:
6.2 Site Challenges or Considerations:
Limited accessibility Historic building restrictions Asbestos or environmental concerns Conduit or pathway limitations Power availability concerns Roof access required Existing infrastructure congestion Other (describe): __________________________________________
6.3 High Availability & Resiliency Capabilities:
6.4 Static Public IP Address:
Cost per additional static IP: $ _________ per month IP provisioning timeframe: _________ business days after activation
SECTION 7: CYBERSECURITY & OPERATIONAL REQUIREMENTS
7.1 SIEM and Monitoring Integration:
Can vendor provide real-
7.2 Security Patch Management:
Can vendor provide zero-
7.3 Maintenance Windows:
Preferred maintenance window for this site: _____________________
7.4 Compliance & Monitoring:
SECTION 8: ALTERNATIVE SOLUTIONS (Complete only if service cannot be provided as specified)
8.1 Reason service cannot be provided:
Site address not in service territory Fiber infrastructure not available Cannot meet bandwidth requirements Cannot meet latency requirements (exceeds _________ ms) Cost-prohibitive construction required Environmental/permitting obstacles Other (describe): __________________________________________
8.2 Proposed Alternative Solution (if any):
Description: _________________________________________________ Technology: __________________________________________________ Bandwidth capability: _________________________________________ Latency: _________ ms Limitations compared to standard solution: _____________________ Additional cost (if any): $ _________ Timeline (if different from standard): ________________________
SECTION 9: COST ESTIMATE
9.1 One-Time Costs:
Installation/activation: $ _________ Construction (if required): $ _________ Site survey/engineering: $ _________ Equipment (vendor-owned, no charge to CMSD): N/A Rack-mounting hardware/installation: $ _________ Other NRC: $ _________ Total One-Time: $ _________
9.2 Monthly Recurring Costs:
Internet service (per-site rate): $ _________ Management/monitoring services: $ _________ Optional services: $ _________
Total Monthly: $ _________
9.3 Year 1 Total Cost:
One-time costs: $ _________ Monthly costs × 12 months: $ _________ Year 1 Total: $ _________
SECTION 10: VENDOR CERTIFICATIONS
By signing below, vendor certifies that:
Service availability has been verified through internal systems/surveys Timeline estimates are realistic and achievable Any site-specific concerns or limitations have been fully disclosed Vendor commits to meeting all technical requirements specified in RFP Section 2 Cybersecurity controls described in RFP Section 2.5 can be implemented Vendor can meet or exceed all SLA commitments in RFP Section 4
Vendor Signature: _____________________________ Date: __________
Printed Name/Title: _______________________________________________
Company: _______________________________________________
FOR CMSD USE ONLY
Reviewed By: ___________________________ Date: __________
Status
Notes/Clarifications Required:
File details come from the government source that posted it. Updated .