This is a prevailing wage schedule document issued by the Massachusetts Department of Labor Standards for the Department of Corrections project DRM 2018-46 #10, involving the installation of conduit, junction boxes, and electrical systems at NCCI Gardner located at 500 Colony Road in Gardner, Massachusetts. The wage schedule establishes prevailing wage rates for various construction classifications effective from June 2025 through 2028 and applies to all contractors, subcontractors, and workers performing construction work on this project. The document specifies that wage rates remain in effect for the duration of the project, with annual updates required for multi-year projects no later than two weeks before contract anniversaries. The schedule must be incorporated into all bidding advertisements and project contracts, posted at the work site throughout the project duration, and referenced in weekly payroll reports submitted directly to the awarding authority. A mandatory pre-bid meeting is scheduled for November 13, 2025, at 9:00 AM at the project site, with the bid deadline set for November 25, 2025, at 2:00 PM. The project has a substantial completion timeline of 350 days with an additional 45 days for final acceptance.
The prevailing wage rates encompass over 100 construction classifications including electricians, laborers, operating engineers, carpenters, plumbers, and specialty trades, with hourly rates ranging from approximately $34 to $151 depending on classification and effective date. All registered apprentices must be paid according to the apprentice wage rates specified in the schedule, calculated as a percentage of journeyworker rates based on their step and trade. Employees not registered with the Division of Apprentice Standards must be paid the full journeyworker rate regardless of experience level. Contractors and subcontractors are required to submit weekly payroll reports containing employee names, addresses, occupational classifications, hours worked, and wages paid, which must be retained for three years. Non-compliance with prevailing wage requirements is subject to civil and criminal penalties, and employees may file complaints regarding wage violations with the Fair Labor Division of the Massachusetts Attorney General's office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plan Holders List DRM 2018 46 10 Conduit Install NCCI.docx | DOCX document | |
| Bid Intent Form~39.doc | DOC document | |
| DRM 2018-46 10 Conduit Installation at NCCI - Addendum 1.pdf | ||
| Where to get plans and specs~64.docx | DOCX document | |
| Prevailing Wage Statement of Compliance~92.pdf | ||
| DRM 2018 46 10 Conduit Installation Pre Bid Site Walkthrough Sign in Sheet.pdf | ||
| Bidder Checklist~81.doc | DOC document | |
| Prevailing Wage Payroll Report Form~94.pdf | ||
| Bid Package~45.doc | DOC document | |
| Bid Results~5.pdf | ||
| schedule-for-participation-by-mwbe-construction~8.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R ep rin t
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Department of Corrections City/Town: GARDNER
Contract Number: DRM 2018-46 #10
Description of Work: Install conduit, junction boxes and electrical systems
Job Location: 500 Colony Rd., Gardner, MA 01440
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.
Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.
Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617)
626-6953.
Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney
General at (617) 727-3465.
Page 1 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $40.95 $15.57 $20.17 $0.00 $0.00 $76.69
12/1/2025 $40.95 $15.57 $21.78 $0.00 $0.00 $78.30
1/1/2026 $40.95 $16.17 $21.78 $0.00 $0.00 $78.90
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2025 $41.02 $15.57 $20.17 $0.00 $0.00 $76.76
12/1/2025 $41.02 $15.57 $21.78 $0.00 $0.00 $78.37
1/1/2026 $41.02 $16.17 $21.78 $0.00 $0.00 $78.97
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2025 $41.14 $15.57 $20.17 $0.00 $0.00 $76.88
12/1/2025 $41.14 $15.57 $21.78 $0.00 $0.00 $78.49
1/1/2026 $41.14 $16.17 $21.78 $0.00 $0.00 $79.09
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2025 $40.59 $10.15 $9.50 $9.11 $0.00 $69.35
12/1/2025 $41.97 $10.15 $9.50 $9.11 $0.00 $70.73
6/1/2026 $43.41 $10.15 $9.50 $9.11 $0.00 $72.17
12/1/2026 $44.85 $10.15 $9.50 $9.11 $0.00 $73.61
6/1/2027 $46.30 $10.15 $9.50 $9.11 $0.00 $75.06
12/1/2027 $47.75 $10.15 $9.50 $9.11 $0.00 $76.51
6/1/2028 $49.25 $10.15 $9.50 $9.11 $0.00 $78.01
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $10.15 $9.50 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $10.15 $9.50 $9.21 $0.00 $69.45
12/1/2025 $41.97 $10.15 $9.50 $9.21 $0.00 $70.83
6/1/2026 $43.41 $10.15 $9.50 $9.21 $0.00 $72.27
AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $10.15 $9.50 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $43.80 $14.50 $4.30 $6.75 $0.00 $69.35ASBESTOS WORKER (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (WORCESTER)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
ASPHALT RAKER
LABORERS
LABORERS - ZONE 2
Page 2 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.09 $10.15 $9.50 $9.21 $0.00 $68.95
12/1/2025 $41.47 $10.15 $9.50 $9.21 $0.00 $70.33
6/1/2026 $42.91 $10.15 $9.50 $9.21 $0.00 $71.77
ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.35 $10.15 $9.50 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $10.15 $9.50 $9.11 $0.00 $69.35
12/1/2025 $41.97 $10.15 $9.50 $9.11 $0.00 $70.73
6/1/2026 $43.41 $10.15 $9.50 $9.11 $0.00 $72.17
12/1/2026 $44.85 $10.15 $9.50 $9.11 $0.00 $73.61
6/1/2027 $46.30 $10.15 $9.50 $9.11 $0.00 $75.06
12/1/2027 $47.75 $10.15 $9.50 $9.11 $0.00 $76.51
6/1/2028 $49.25 $10.15 $9.50 $9.11 $0.00 $78.01
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $10.15 $9.50 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $10.15 $9.50 $9.21 $0.00 $69.45
12/1/2025 $41.97 $10.15 $9.50 $9.21 $0.00 $70.83
6/1/2026 $43.41 $10.15 $9.50 $9.21 $0.00 $72.27
BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $10.15 $9.50 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
Page 3 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
8/1/2025 $65.81 $11.49 $15.57 $7.33 $0.00 $100.20
2/1/2026 $67.16 $11.49 $15.57 $7.33 $0.00 $101.55
8/1/2026 $69.36 $11.49 $15.57 $7.33 $0.00 $103.75
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (LOWELL)
2/1/2027 $70.76 $11.49 $15.57 $7.33 $0.00 $105.15
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $32.91 $11.49 $15.57 $7.33 $0.00 $67.30
2 60.00 $39.49 $11.49 $15.57 $7.33 $0.00 $73.88
3 70.00 $46.07 $11.49 $15.57 $7.33 $0.00 $80.46
4 80.00 $52.65 $11.49 $15.57 $7.33 $0.00 $87.04
5 90.00 $59.23 $11.49 $15.57 $7.33 $0.00 $93.62
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $33.58 $11.49 $15.57 $7.33 $0.00 $67.97
2 60.00 $40.30 $11.49 $15.57 $7.33 $0.00 $74.69
3 70.00 $47.01 $11.49 $15.57 $7.33 $0.00 $81.40
4 80.00 $53.73 $11.49 $15.57 $7.33 $0.00 $88.12
5 90.00 $60.44 $11.49 $15.57 $7.33 $0.00 $94.83
Apprentice to Journeyworker Ratio: 1:5
Page 4 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $48.35 $10.15 $9.50 $9.80 $0.00 $77.80
12/1/2025 $49.85 $10.15 $9.50 $9.80 $0.00 $79.30
6/1/2026 $51.40 $10.15 $9.50 $9.80 $0.00 $80.85
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.90 $10.15 $9.50 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $47.20 $10.15 $9.50 $9.80 $0.00 $76.65
12/1/2025 $48.70 $10.15 $9.50 $9.80 $0.00 $78.15
6/1/2026 $50.25 $10.15 $9.50 $9.80 $0.00 $79.70
CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.75 $10.15 $9.50 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $47.53 $10.15 $9.50 $9.80 $0.00 $76.98
12/1/2025 $49.03 $10.15 $9.50 $9.80 $0.00 $78.48
6/1/2026 $50.58 $10.15 $9.50 $9.80 $0.00 $80.03
CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.08 $10.15 $9.50 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
9/1/2025 $50.35 $10.33 $11.47 $8.50 $0.00 $80.65
3/1/2026 $51.60 $10.33 $11.47 $8.50 $0.00 $81.90
9/1/2026 $52.85 $10.33 $11.47 $8.50 $0.00 $83.15
CARPENTER
CARPENTERS
CARPENTERS -ZONE 2 (Eastern Massachusetts)
3/1/2027 $54.10 $10.33 $11.47 $8.50 $0.00 $84.40
Apprentice: CARPENTER
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.66 $10.33 $0.00 $1.73 $0.00 $34.72
2 45.00 $22.66 $10.33 $0.00 $1.73 $0.00 $34.72
3 55.00 $27.69 $10.33 $0.00 $3.40 $0.00 $41.42
4 55.00 $27.69 $10.33 $0.00 $3.40 $0.00 $41.42
5 70.00 $35.25 $10.33 $11.41 $5.10 $0.00 $62.09
6 70.00 $35.25 $10.33 $11.41 $5.10 $0.00 $62.09
7 80.00 $40.28 $10.33 $11.44 $6.80 $0.00 $68.85
8 80.00 $40.28 $10.33 $11.44 $6.80 $0.00 $68.85
Page 5 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
10/1/2025 $27.75 $7.02 $3.80 $1.00 $0.00 $39.57CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.85 $7.02 $3.80 $1.00 $0.00 $40.67
All Aspects of New Wood Frame Work
Apprentice: CARPENTER
Effective Date: 3/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $23.22 $10.33 $0.00 $1.73 $0.00 $35.28
2 45.00 $23.22 $10.33 $0.00 $1.73 $0.00 $35.28
3 55.00 $28.38 $10.33 $0.00 $3.40 $0.00 $42.11
4 55.00 $28.38 $10.33 $0.00 $3.40 $0.00 $42.11
5 70.00 $36.12 $10.33 $11.41 $5.10 $0.00 $62.96
6 70.00 $36.12 $10.33 $11.41 $5.10 $0.00 $62.96
7 80.00 $41.28 $10.33 $11.44 $6.80 $0.00 $69.85
8 80.00 $41.28 $10.33 $11.44 $6.80 $0.00 $69.85
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
2 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
3 65.00 $18.04 $7.02 $0.00 $1.00 $0.00 $26.06
4 70.00 $19.43 $7.02 $0.00 $1.00 $0.00 $27.45
5 75.00 $20.81 $7.02 $3.80 $1.00 $0.00 $32.63
6 80.00 $22.20 $7.02 $3.80 $1.00 $0.00 $34.02
7 85.00 $23.59 $7.02 $3.80 $1.00 $0.00 $35.41
8 90.00 $24.98 $7.02 $3.80 $1.00 $0.00 $36.80
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $17.31 $7.02 $0.00 $0.00 $0.00 $24.33
2 60.00 $17.31 $7.02 $0.00 $0.00 $0.00 $24.33
3 65.00 $18.75 $7.02 $0.00 $1.00 $0.00 $26.77
4 70.00 $20.20 $7.02 $0.00 $1.00 $0.00 $28.22
5 75.00 $21.64 $7.02 $3.80 $1.00 $0.00 $33.46
6 80.00 $23.08 $7.02 $3.80 $1.00 $0.00 $34.90
7 85.00 $24.52 $7.02 $3.80 $1.00 $0.00 $36.34
8 90.00 $25.97 $7.02 $3.80 $1.00 $0.00 $37.79
Page 6 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
CEMENT MASONRY/PLASTERING
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (LOWELL)
7/1/2024 $49.19 $13.35 $16.43 $7.78 $1.80 $88.55
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $59.51 $15.55 $13.25 $3.25 $0.00 $91.56
12/1/2025 $60.98 $15.55 $13.25 $3.25 $0.00 $93.03
6/1/2026 $62.31 $15.55 $13.25 $3.25 $0.00 $94.36
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $63.79 $15.55 $13.25 $3.25 $0.00 $95.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $37.52 $15.55 $13.25 $3.25 $0.00 $69.57
12/1/2025 $38.47 $15.55 $13.25 $3.25 $0.00 $70.52
6/1/2026 $39.33 $15.55 $13.25 $3.25 $0.00 $71.38
COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $40.28 $15.55 $13.25 $3.25 $0.00 $72.33
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
7/1/2025 $58.51 $10.30 $11.95 $12.50 $0.00 $93.26DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 2
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.60 $13.35 $16.43 $0.00 $0.00 $54.38
2 60.00 $29.51 $13.35 $16.43 $2.78 $1.80 $63.87
3 65.00 $31.97 $13.35 $16.43 $3.78 $1.80 $67.33
4 70.00 $34.43 $13.35 $16.43 $4.78 $1.80 $70.79
5 75.00 $36.89 $13.35 $16.43 $5.78 $1.80 $74.25
6 80.00 $39.35 $13.35 $16.43 $6.78 $1.80 $77.71
7 90.00 $44.27 $13.35 $16.43 $7.78 $1.80 $83.63
Apprentice to Journeyworker Ratio: 1:3
Apprentice: DELEADER (BRIDGE)
Effective Date: 7/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.26 $10.30 $0.00 $0.00 $0.00 $39.56
Page 7 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/2/2025 $47.25 $10.15 $9.50 $9.65 $0.00 $76.55
12/1/2025 $48.75 $10.15 $9.50 $9.65 $0.00 $78.05
6/1/2026 $50.30 $10.15 $9.50 $9.65 $0.00 $79.60
12/7/2026 $51.80 $10.15 $9.50 $9.65 $0.00 $81.10
6/7/2027 $53.40 $10.15 $9.50 $9.65 $0.00 $82.70
12/6/2027 $55.00 $10.15 $9.50 $9.65 $0.00 $84.30
6/5/2028 $56.68 $10.15 $9.50 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.35 $10.15 $9.50 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.25 $10.15 $9.50 $9.65 $0.00 $77.55
12/1/2025 $49.75 $10.15 $9.50 $9.65 $0.00 $79.05
6/1/2026 $51.30 $10.15 $9.50 $9.65 $0.00 $80.60
12/7/2026 $52.80 $10.15 $9.50 $9.65 $0.00 $82.10
6/7/2027 $54.40 $10.15 $9.50 $9.65 $0.00 $83.70
12/6/2027 $56.00 $10.15 $9.50 $9.65 $0.00 $85.30
6/5/2028 $57.68 $10.15 $9.50 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.35 $10.15 $9.50 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.00 $10.15 $9.50 $9.65 $0.00 $77.30DEMO: BURNERS
Apprentice: DELEADER (BRIDGE)
Effective Date: 7/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
2 55.00 $32.18 $10.30 $0.00 $6.88 $0.00 $49.36
3 60.00 $35.11 $10.30 $0.00 $7.50 $0.00 $52.91
4 65.00 $38.03 $10.30 $0.00 $8.13 $0.00 $56.46
5 70.00 $40.96 $10.30 $11.95 $8.75 $0.00 $71.96
6 75.00 $43.88 $10.30 $11.95 $9.38 $0.00 $75.51
7 80.00 $46.81 $10.30 $11.95 $10.00 $0.00 $79.06
8 90.00 $52.66 $10.30 $11.95 $11.25 $0.00 $86.16
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 8 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
12/1/2025 $49.50 $10.15 $9.50 $9.65 $0.00 $78.80
6/1/2026 $51.05 $10.15 $9.50 $9.65 $0.00 $80.35
12/7/2026 $52.55 $10.15 $9.50 $9.65 $0.00 $81.85
6/7/2027 $54.15 $10.15 $9.50 $9.65 $0.00 $83.45
12/6/2027 $55.75 $10.15 $9.50 $9.65 $0.00 $85.05
6/5/2028 $57.43 $10.15 $9.50 $9.65 $0.00 $86.73
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.10 $10.15 $9.50 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.25 $10.15 $9.50 $9.65 $0.00 $77.55
12/1/2025 $49.75 $10.15 $9.50 $9.65 $0.00 $79.05
6/1/2026 $51.30 $10.15 $9.50 $9.65 $0.00 $80.60
12/7/2026 $52.80 $10.15 $9.50 $9.65 $0.00 $82.10
6/7/2027 $54.40 $10.15 $9.50 $9.65 $0.00 $83.70
12/6/2027 $56.00 $10.15 $9.50 $9.65 $0.00 $85.30
6/5/2028 $57.68 $10.15 $9.50 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.35 $10.15 $9.50 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.00 $10.15 $9.50 $9.65 $0.00 $77.30
12/1/2025 $49.50 $10.15 $9.50 $9.65 $0.00 $78.80
6/1/2026 $51.05 $10.15 $9.50 $9.65 $0.00 $80.35
12/7/2026 $52.55 $10.15 $9.50 $9.65 $0.00 $81.85
6/7/2027 $54.15 $10.15 $9.50 $9.65 $0.00 $83.45
12/6/2027 $55.75 $10.15 $9.50 $9.65 $0.00 $85.05
6/5/2028 $57.43 $10.15 $9.50 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.10 $10.15 $9.50 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $47.25 $10.15 $9.50 $9.65 $0.00 $76.55
12/1/2025 $48.75 $10.15 $9.50 $9.65 $0.00 $78.05
6/1/2026 $50.30 $10.15 $9.50 $9.65 $0.00 $79.60
12/7/2026 $51.80 $10.15 $9.50 $9.65 $0.00 $81.10
6/7/2027 $53.40 $10.15 $9.50 $9.65 $0.00 $82.70
12/6/2027 $55.00 $10.15 $9.50 $9.65 $0.00 $84.30
6/5/2028 $56.68 $10.15 $9.50 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.35 $10.15 $9.50 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
DIRECTIONAL DRILL MACHINE OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $78.11 $10.08 $11.62 $12.67 $0.00 $112.48 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER 8/1/2024 $51.97 $10.08 $11.62 $12.67 $0.00 $86.34
Page 9 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74ELECTRICIAN
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
1/1/2025 $66.41 $16.28 $10.96 $10.40 $0.00 $104.05
1/1/2026 $69.23 $16.38 $11.06 $10.70 $0.00 $107.37
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $72.23 $16.48 $11.16 $11.00 $0.00 $110.87
Apprentice: ELECTRICIAN
Effective Date: 9/7/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $19.26 $14.98 $0.58 $0.00 $0.00 $34.82
2 45.00 $21.67 $14.98 $0.65 $0.00 $0.00 $37.30
3 48.00 $23.12 $14.98 $13.55 $2.54 $0.00 $54.19
4 55.00 $26.49 $14.98 $13.65 $2.92 $0.00 $58.04
5 65.00 $31.30 $14.98 $13.80 $3.45 $0.00 $63.53
6 80.00 $38.53 $14.98 $14.02 $4.24 $0.00 $71.77
Apprentice: ELECTRICIAN
Effective Date: 9/6/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $19.75 $15.96 $0.59 $0.00 $0.00 $36.30
2 45.00 $22.22 $15.96 $0.67 $0.00 $0.00 $38.85
3 48.00 $23.70 $15.96 $13.80 $2.61 $0.00 $56.07
4 55.00 $27.16 $15.96 $13.90 $2.99 $0.00 $60.01
5 65.00 $32.10 $15.96 $14.05 $3.53 $0.00 $65.64
6 80.00 $39.50 $15.96 $14.28 $4.35 $0.00 $74.09
Apprentice to Journeyworker Ratio: 2:3
Page 10 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
1/1/2025 $46.49 $16.28 $10.96 $10.40 $0.00 $84.13
1/1/2026 $48.46 $16.38 $11.06 $10.70 $0.00 $86.60
ELEVATOR CONSTRUCTOR HELPER
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $50.56 $16.48 $11.16 $11.00 $0.00 $89.20
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
6/1/2025 $40.09 $10.15 $9.50 $9.21 $0.00 $68.95
12/1/2025 $41.47 $10.15 $9.50 $9.21 $0.00 $70.33
6/1/2026 $42.91 $10.15 $9.50 $9.21 $0.00 $71.77
FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.35 $10.15 $9.50 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
5/1/2025 $52.47 $15.85 $13.15 $3.25 $0.00 $84.72
11/1/2025 $53.76 $15.85 $13.15 $3.25 $0.00 $86.01
5/1/2026 $55.20 $15.85 $13.15 $3.25 $0.00 $87.45
11/1/2026 $56.49 $15.85 $13.15 $3.25 $0.00 $88.74
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $57.92 $15.85 $13.15 $3.25 $0.00 $90.17
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2025 $54.07 $15.85 $13.15 $3.25 $0.00 $86.32
11/1/2025 $55.37 $15.85 $13.15 $3.25 $0.00 $87.62
5/1/2026 $56.82 $15.85 $13.15 $3.25 $0.00 $89.07
11/1/2026 $58.12 $15.85 $13.15 $3.25 $0.00 $90.37
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $59.57 $15.85 $13.15 $3.25 $0.00 $91.82
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $33.21 $16.28 $0.00 $0.00 $0.00 $49.49
2 55.00 $36.53 $16.28 $10.96 $10.40 $0.00 $74.17
3 65.00 $43.17 $16.28 $10.96 $10.40 $0.00 $80.81
4 70.00 $46.49 $16.28 $10.96 $10.40 $0.00 $84.13
5 80.00 $53.13 $16.28 $10.96 $10.40 $0.00 $90.77
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $34.62 $16.38 $0.00 $0.00 $0.00 $51.00
2 55.00 $38.08 $16.38 $11.06 $10.70 $0.00 $76.22
3 65.00 $45.00 $16.38 $11.06 $10.70 $0.00 $83.14
4 70.00 $48.46 $16.38 $11.06 $10.70 $0.00 $86.60
5 80.00 $55.38 $16.38 $11.06 $10.70 $0.00 $93.52
Page 11 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
5/1/2025 $25.47 $15.85 $13.15 $3.25 $0.00 $57.72
11/1/2025 $26.23 $15.85 $13.15 $3.25 $0.00 $58.48
5/1/2026 $27.08 $15.85 $13.15 $3.25 $0.00 $59.33
11/1/2026 $27.84 $15.85 $13.15 $3.25 $0.00 $60.09
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $28.69 $15.85 $13.15 $3.25 $0.00 $60.94
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
For apprentice rates see "Apprentice- ELECTRICIAN"
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74FIRE ALARM REPAIR / MAINT/COMMISSIONING
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
For apprentice rates see "Apprentice- ELECTRICIAN"
6/1/2025 $47.02 $15.55 $13.25 $3.25 $0.00 $79.07
12/1/2025 $48.19 $15.55 $13.25 $3.25 $0.00 $80.24
6/1/2026 $49.25 $15.55 $13.25 $3.25 $0.00 $81.30
FIREMAN (ASST. ENGINEER)
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $50.43 $15.55 $13.25 $3.25 $0.00 $82.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $28.09 $10.15 $9.50 $9.21 $0.00 $56.95
12/1/2025 $28.09 $10.15 $9.50 $9.21 $0.00 $56.95
6/1/2026 $29.21 $10.15 $9.50 $9.21 $0.00 $58.07
FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $10.15 $9.50 $9.21 $0.00 $58.07
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE II
3/1/2024 $48.93 $10.33 $11.47 $8.80 $0.00 $79.53
Apprentice: FLOORCOVERER
Effective Date: 3/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.47 $10.33 $0.00 $1.76 $0.00 $36.56
2 55.00 $26.91 $10.33 $0.00 $1.76 $0.00 $39.00
3 60.00 $29.36 $10.33 $0.00 $3.52 $0.00 $43.21
4 65.00 $31.80 $10.33 $0.00 $3.52 $0.00 $45.65
5 70.00 $34.25 $10.33 $11.47 $5.28 $0.00 $61.33
6 75.00 $36.70 $10.33 $11.47 $5.28 $0.00 $63.78
7 80.00 $39.14 $10.33 $11.47 $7.04 $0.00 $67.98
8 85.00 $41.59 $10.33 $11.47 $7.04 $0.00 $70.43
Apprentice Notes
Steps are 750 hrs.
Page 12 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $37.52 $15.55 $13.25 $3.25 $0.00 $69.57
12/1/2025 $38.47 $15.55 $13.25 $3.25 $0.00 $70.52
6/1/2026 $39.33 $15.55 $13.25 $3.25 $0.00 $71.38
GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $40.28 $15.55 $13.25 $3.25 $0.00 $72.33
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
7/1/2025 $48.01 $10.30 $11.95 $12.50 $0.00 $82.76GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
GLAZIERS LOCAL 35
GLAZIERS LOCAL 35 (ZONE 2)
1/1/2026 $49.06 $10.35 $12.00 $12.60 $0.00 $84.01
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 7/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.01 $10.30 $0.00 $0.00 $0.00 $34.31
2 55.00 $26.41 $10.30 $0.00 $6.88 $0.00 $43.59
3 60.00 $28.81 $10.30 $0.00 $7.50 $0.00 $46.61
4 65.00 $31.21 $10.30 $0.00 $8.13 $0.00 $49.64
5 70.00 $33.61 $10.30 $11.95 $8.75 $0.00 $64.61
6 75.00 $36.01 $10.30 $11.95 $9.38 $0.00 $67.64
7 80.00 $38.41 $10.30 $11.95 $10.00 $0.00 $70.66
8 90.00 $43.21 $10.30 $11.95 $11.25 $0.00 $76.71
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.53 $10.30 $0.00 $0.00 $0.00 $34.83
2 55.00 $26.98 $10.30 $0.00 $6.88 $0.00 $44.16
3 60.00 $29.44 $10.30 $0.00 $7.50 $0.00 $47.24
4 65.00 $31.89 $10.30 $0.00 $8.13 $0.00 $50.32
5 70.00 $34.34 $10.30 $11.95 $8.75 $0.00 $65.34
6 75.00 $36.80 $10.30 $11.95 $9.38 $0.00 $68.43
7 80.00 $39.25 $10.30 $11.95 $10.00 $0.00 $71.50
8 90.00 $44.15 $10.30 $11.95 $11.25 $0.00 $77.65
Page 13 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
7/1/2025 $43.48 $12.94 $11.01 $8.72 $2.13 $78.28
7/1/2026 $43.48 $13.24 $11.01 $9.92 $2.13 $79.78
1/1/2027 $43.48 $13.54 $11.01 $11.12 $2.13 $81.28
7/1/2027 $44.98 $13.54 $11.01 $11.12 $2.13 $82.78
HVAC (DUCTWORK)
SHEETMETAL WORKERS LOCAL 63
SHEETMETAL WORKERS LOCAL 63
1/1/2028 $46.48 $13.54 $11.01 $11.12 $2.13 $84.28
For apprentice rates see "Apprentice- SHEET METAL WORKER"
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74HVAC (ELECTRICAL CONTROLS)
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
For apprentice rates see "Apprentice- ELECTRICIAN"
7/1/2025 $43.48 $12.94 $11.01 $8.72 $2.13 $78.28
7/1/2026 $43.48 $13.24 $11.01 $9.92 $2.13 $79.78
1/1/2027 $43.48 $13.54 $11.01 $11.12 $2.13 $81.28
7/1/2027 $44.98 $13.54 $11.01 $11.12 $2.13 $82.78
HVAC (TESTING AND BALANCING - AIR)
SHEETMETAL WORKERS LOCAL 63
SHEETMETAL WORKERS LOCAL 63
1/1/2028 $46.48 $13.54 $11.01 $11.12 $2.13 $84.28
For apprentice rates see "Apprentice- SHEET METAL WORKER"
9/1/2025 $55.00 $12.70 $9.71 $8.06 $0.00 $85.47HVAC (TESTING AND BALANCING -WATER)
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 6/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.08 $0.00 $0.00 $0.00 $0.00 $32.08
2 60.00 $35.00 $15.55 $13.25 $3.25 $0.00 $67.05
3 65.00 $37.91 $15.55 $13.25 $3.25 $0.00 $69.96
4 70.00 $40.83 $15.55 $13.25 $3.25 $0.00 $72.88
5 75.00 $43.75 $15.55 $13.25 $3.25 $0.00 $75.80
6 80.00 $46.66 $15.55 $13.25 $3.25 $0.00 $78.71
7 85.00 $49.58 $15.55 $13.25 $3.25 $0.00 $81.63
8 90.00 $52.50 $15.55 $13.25 $3.25 $0.00 $84.55
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 12/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.88 $0.00 $0.00 $0.00 $0.00 $32.88
2 60.00 $35.87 $15.55 $13.25 $3.25 $0.00 $67.92
3 65.00 $38.86 $15.55 $13.25 $3.25 $0.00 $70.91
4 70.00 $41.85 $15.55 $13.25 $3.25 $0.00 $73.90
5 75.00 $44.84 $15.55 $13.25 $3.25 $0.00 $76.89
6 80.00 $47.82 $15.55 $13.25 $3.25 $0.00 $79.87
7 85.00 $50.81 $15.55 $13.25 $3.25 $0.00 $82.86
8 90.00 $53.80 $15.55 $13.25 $3.25 $0.00 $85.85
Apprentice to Journeyworker Ratio: 1:6
Page 14 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
PLUMBERS LOCAL 4
PLUMBERS LOCAL 4
3/1/2026 $57.80 $11.30 $9.71 $8.06 $0.00 $86.87
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
9/1/2025 $55.00 $12.70 $9.71 $8.06 $0.00 $85.47HVAC MECHANIC
PLUMBERS LOCAL 4
PLUMBERS LOCAL 4
3/1/2026 $57.80 $11.30 $9.71 $8.06 $0.00 $86.87
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
6/1/2025 $40.59 $10.15 $9.50 $9.11 $0.00 $69.35
12/1/2025 $41.97 $10.15 $9.50 $9.11 $0.00 $70.73
6/1/2026 $43.41 $10.15 $9.50 $9.11 $0.00 $72.17
12/1/2026 $44.85 $10.15 $9.50 $9.11 $0.00 $73.61
6/1/2027 $46.30 $10.15 $9.50 $9.11 $0.00 $75.06
12/1/2027 $47.75 $10.15 $9.50 $9.11 $0.00 $76.51
6/1/2028 $49.25 $10.15 $9.50 $9.11 $0.00 $78.01
HYDRAULIC DRILLS
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $10.15 $9.50 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $10.15 $9.50 $9.21 $0.00 $69.45
12/1/2025 $41.97 $10.15 $9.50 $9.21 $0.00 $70.83
6/1/2026 $43.41 $10.15 $9.50 $9.21 $0.00 $72.27
HYDRAULIC DRILLS (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $10.15 $9.50 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
9/1/2025 $54.31 $14.75 $9.52 $10.09 $0.00 $88.67INSULATOR (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (WORCESTER)
9/1/2026 $57.38 $14.75 $9.52 $10.09 $0.00 $91.74
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.16 $14.75 $9.27 $5.05 $0.00 $56.23
2 60.00 $32.59 $14.75 $9.32 $6.05 $0.00 $62.71
3 70.00 $38.02 $14.75 $9.37 $7.06 $0.00 $69.20
4 80.00 $43.45 $14.75 $9.42 $8.07 $0.00 $75.69
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $28.69 $14.75 $9.27 $5.05 $0.00 $57.76
2 60.00 $34.43 $14.75 $9.32 $6.05 $0.00 $64.55
3 70.00 $40.17 $14.75 $9.37 $7.06 $0.00 $71.35
4 80.00 $45.90 $14.75 $9.42 $8.07 $0.00 $78.14
Apprentice to Journeyworker Ratio: 1:4
Page 15 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
IRONWORKER/WELDER
IRONWORKERS LOCAL 7
IRONWORKERS LOCAL 7 (WORCESTER AREA)
9/16/2025 $57.57 $9.05 $12.75 $14.50 $0.00 $93.87
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $39.84 $10.15 $9.50 $9.11 $0.00 $68.60
12/1/2025 $41.22 $10.15 $9.50 $9.11 $0.00 $69.98
6/1/2026 $42.66 $10.15 $9.50 $9.11 $0.00 $71.42
12/1/2026 $44.10 $10.15 $9.50 $9.11 $0.00 $72.86
6/1/2027 $45.55 $10.15 $9.50 $9.11 $0.00 $74.31
12/1/2027 $47.00 $10.15 $9.50 $9.11 $0.00 $75.76
6/1/2028 $48.50 $10.15 $9.50 $9.11 $0.00 $77.26
LABORER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.00 $10.15 $9.50 $9.11 $0.00 $78.76
Apprentice: IRONWORKER/WELDER
Effective Date: 9/16/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $34.54 $9.05 $12.75 $4.50 $0.00 $60.84
2 75.00 $43.18 $9.05 $12.75 $4.50 $0.00 $69.48
3 85.00 $48.93 $9.05 $12.75 $4.50 $0.00 $75.23
Apprentice to Journeyworker Ratio: 1:4
Apprentice: LABORER
Effective Date: 6/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $23.90 $10.15 $9.50 $9.11 $0.00 $52.66
2 70.00 $27.89 $10.15 $9.50 $9.11 $0.00 $56.65
3 80.00 $31.87 $10.15 $9.50 $9.11 $0.00 $60.63
4 90.00 $35.86 $10.15 $9.50 $9.11 $0.00 $64.62
Apprentice: LABORER
Effective Date: 12/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.03 $9.90 $9.25 $9.11 $0.00 $53.29
Page 16 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $39.84 $10.15 $9.50 $9.21 $0.00 $68.70
12/1/2025 $41.22 $10.15 $9.50 $9.21 $0.00 $70.08
6/1/2026 $42.66 $10.15 $9.50 $9.21 $0.00 $71.52
LABORER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.10 $10.15 $9.50 $9.21 $0.00 $72.96
6/1/2025 $39.84 $10.15 $9.50 $9.11 $0.00 $68.60
12/1/2025 $41.22 $10.15 $9.50 $9.11 $0.00 $69.98
6/1/2026 $42.66 $10.15 $9.50 $9.11 $0.00 $71.42
12/1/2026 $44.10 $10.15 $9.50 $9.11 $0.00 $72.86
6/1/2027 $45.55 $10.15 $9.50 $9.11 $0.00 $74.31
12/1/2027 $47.00 $10.15 $9.50 $9.11 $0.00 $75.76
6/1/2028 $48.50 $10.15 $9.50 $9.11 $0.00 $77.26
LABORER: CARPENTER TENDER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.00 $10.15 $9.50 $9.11 $0.00 $78.76
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $39.84 $10.15 $9.50 $9.11 $0.00 $68.60
12/1/2025 $41.22 $10.15 $9.50 $9.11 $0.00 $69.98
LABORER: CEMENT FINISHER TENDER
LABORERS
Apprentice: LABORER
Effective Date: 12/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
2 70.00 $29.20 $9.90 $9.25 $9.11 $0.00 $57.46
3 80.00 $33.38 $9.90 $9.25 $9.11 $0.00 $61.64
4 90.00 $37.55 $9.90 $9.25 $9.11 $0.00 $65.81
Apprentice to Journeyworker Ratio: 1:5
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 6/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $23.90 $10.15 $9.50 $9.21 $0.00 $52.76
2 70.00 $27.89 $10.15 $9.50 $9.21 $0.00 $56.75
3 80.00 $31.87 $10.15 $9.50 $9.21 $0.00 $60.73
4 90.00 $35.86 $10.15 $9.50 $9.21 $0.00 $64.72
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 12/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.03 $9.90 $9.25 $9.21 $0.00 $53.39
2 70.00 $29.20 $9.90 $9.25 $9.21 $0.00 $57.56
3 80.00 $33.38 $9.90 $9.25 $9.21 $0.00 $61.74
4 90.00 $37.55 $9.90 $9.25 $9.21 $0.00 $65.91
Page 17 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2026 $42.66 $10.15 $9.50 $9.11 $0.00 $71.42
12/1/2026 $44.10 $10.15 $9.50 $9.11 $0.00 $72.86
6/1/2027 $45.55 $10.15 $9.50 $9.11 $0.00 $74.31
12/1/2027 $47.00 $10.15 $9.50 $9.11 $0.00 $75.76
6/1/2028 $48.50 $10.15 $9.50 $9.11 $0.00 $77.26
LABORERS - ZONE 2
12/1/2028 $50.00 $10.15 $9.50 $9.11 $0.00 $78.76
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $39.93 $10.15 $9.50 $9.65 $0.00 $69.23
12/1/2025 $41.31 $10.15 $9.50 $9.65 $0.00 $70.61
6/1/2026 $42.75 $10.15 $9.50 $9.65 $0.00 $72.05
12/7/2026 $44.19 $10.15 $9.50 $9.65 $0.00 $73.49
6/7/2027 $45.64 $10.15 $9.50 $9.65 $0.00 $74.94
12/6/2027 $47.09 $10.15 $9.50 $9.65 $0.00 $76.39
6/5/2028 $48.59 $10.15 $9.50 $9.65 $0.00 $77.89
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
LABORERS
LABORERS - ZONE 2
12/4/2028 $50.09 $10.15 $9.50 $9.65 $0.00 $79.39
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
LABORER: MASON TENDER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.09 $10.15 $9.50 $9.21 $0.00 $68.95
12/1/2025 $41.47 $10.15 $9.50 $9.21 $0.00 $70.33
6/1/2026 $42.91 $10.15 $9.50 $9.21 $0.00 $71.77
LABORER: MASON TENDER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.35 $10.15 $9.50 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $39.84 $10.15 $9.50 $9.11 $0.00 $68.60
12/1/2025 $41.22 $10.15 $9.50 $9.11 $0.00 $69.98
6/1/2026 $42.66 $10.15 $9.50 $9.11 $0.00 $71.42
12/1/2026 $44.10 $10.15 $9.50 $9.11 $0.00 $72.86
6/1/2027 $45.55 $10.15 $9.50 $9.11 $0.00 $74.31
12/1/2027 $47.00 $10.15 $9.50 $9.11 $0.00 $75.76
6/1/2028 $48.50 $10.15 $9.50 $9.11 $0.00 $77.26
LABORER: MULTI-TRADE TENDER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.00 $10.15 $9.50 $9.11 $0.00 $78.76
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $39.84 $10.15 $9.50 $9.11 $0.00 $68.60
12/1/2025 $41.22 $10.15 $9.50 $9.11 $0.00 $69.98
6/1/2026 $42.66 $10.15 $9.50 $9.11 $0.00 $71.42
12/1/2026 $44.10 $10.15 $9.50 $9.11 $0.00 $72.86
6/1/2027 $45.55 $10.15 $9.50 $9.11 $0.00 $74.31
12/1/2027 $47.00 $10.15 $9.50 $9.11 $0.00 $75.76
6/1/2028 $48.50 $10.15 $9.50 $9.11 $0.00 $77.26
LABORER: TREE REMOVER
LABORERS
LABORERS - ZONE 2
Page 18 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
12/1/2028 $50.00 $10.15 $9.50 $9.11 $0.00 $78.76
This classification applies to the removal of standing trees, and the trimming and removal of branches and limbs when related to public works construction or site clearance incidental to construction . For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.80 $10.15 $9.50 $9.11 $0.00 $74.56
12/1/2027 $47.25 $10.15 $9.50 $9.11 $0.00 $76.01
6/1/2028 $48.75 $10.15 $9.50 $9.11 $0.00 $77.51
LASER BEAM OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.25 $10.15 $9.50 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.09 $10.15 $9.50 $9.21 $0.00 $68.95
12/1/2025 $41.47 $10.15 $9.50 $9.21 $0.00 $70.33
6/1/2026 $42.91 $10.15 $9.50 $9.21 $0.00 $71.77
LASER BEAM OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.35 $10.15 $9.50 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
8/1/2025 $52.08 $11.49 $15.57 $6.05 $0.00 $85.19
2/1/2026 $53.16 $11.49 $15.57 $6.05 $0.00 $86.27
8/1/2026 $54.92 $11.49 $15.57 $6.05 $0.00 $88.03
MARBLE & TILE FINISHERS
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 - MARBLE & TILE
2/1/2027 $56.04 $11.49 $15.57 $6.05 $0.00 $89.15
8/1/2025 $67.97 $11.49 $15.57 $7.99 $0.00 $103.02MARBLE MASONS,TILELAYERS & TERRAZZO MECH
Apprentice: MARBLE & TILE FINISHERS
Effective Date: 8/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $26.04 $11.49 $15.57 $6.05 $0.00 $59.15
2 60.00 $31.25 $11.49 $15.57 $6.05 $0.00 $64.36
3 70.00 $36.46 $11.49 $15.57 $6.05 $0.00 $69.57
4 80.00 $41.66 $11.49 $15.57 $6.05 $0.00 $74.77
5 90.00 $46.87 $11.49 $15.57 $6.05 $0.00 $79.98
Apprentice: MARBLE & TILE FINISHERS
Effective Date: 2/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $26.58 $11.49 $15.57 $6.05 $0.00 $59.69
2 60.00 $31.90 $11.49 $15.57 $6.05 $0.00 $65.01
3 70.00 $37.21 $11.49 $15.57 $6.05 $0.00 $70.32
4 80.00 $42.53 $11.49 $15.57 $6.05 $0.00 $75.64
5 90.00 $47.84 $11.49 $15.57 $6.05 $0.00 $80.95
Page 19 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
2/1/2026 $69.32 $11.49 $15.57 $7.99 $0.00 $104.37
8/1/2026 $71.52 $11.49 $15.57 $7.99 $0.00 $106.57
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 - MARBLE & TILE
2/1/2027 $72.92 $11.49 $15.57 $7.99 $0.00 $107.97
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
MECH. SWEEPER OPERATOR (ON CONST. SITES)
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
MECHANICS MAINTENANCE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
1/6/2025 $43.42 $10.08 $11.47 $9.75 $0.00 $74.72MILLWRIGHT (Zone 3)
MILLWRIGHTS LOCAL 1121
MILLWRIGHTS LOCAL 1121 - Zone 3 1/5/2026 $45.70 $10.08 $11.47 $9.75 $0.00 $77.00
Apprentice: MARBLE MASONS,TILELAYERS & TERRAZZO MECH
Effective Date: 8/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $33.99 $11.49 $15.57 $7.99 $0.00 $69.04
2 60.00 $40.78 $11.49 $15.57 $7.99 $0.00 $75.83
3 70.00 $47.58 $11.49 $15.57 $7.99 $0.00 $82.63
4 80.00 $54.38 $11.49 $15.57 $7.99 $0.00 $89.43
5 90.00 $61.17 $11.49 $15.57 $7.99 $0.00 $96.22
Apprentice: MARBLE MASONS,TILELAYERS & TERRAZZO MECH
Effective Date: 2/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $34.66 $11.49 $15.57 $7.99 $0.00 $69.71
2 60.00 $41.59 $11.49 $15.57 $7.99 $0.00 $76.64
3 70.00 $48.52 $11.49 $15.57 $7.99 $0.00 $83.57
4 80.00 $55.46 $11.49 $15.57 $7.99 $0.00 $90.51
5 90.00 $62.39 $11.49 $15.57 $7.99 $0.00 $97.44
Apprentice to Journeyworker Ratio: 1:5
Apprentice: MILLWRIGHT (Zone 3)
Effective Date: 1/6/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $23.88 $10.08 $0.00 $5.36 $0.00 $39.32
Page 20 of 36Wage Request Number: 20251031154241Issue Date: 10/31/2025 rin t
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $40.09 $10.15 $9.50 $9.11 $0.00 $68.85
12/1/2025 $41.47 $10.15 $9.50 $9.11 $0.00 $70.23
6/1/2026 $42.91 $10.15 $9.50 $9.11 $0.00 $71.67
12/1/2026 $44.35 $10.15 $9.50 $9.11 $0.00 $73.11
6/1/2027 $45.