waa-jeffer150009-1_Earthwork.pdf

PDF 1 MB Posted

Attached to
WA FLAP JEFFER 150009(1), Undi Road Bypass Improvements
Solicitation number
69056723B00005
Issued by

About this file

This document provides physical data files and details for Invitation for Bid (IFB) number 69056723B00005 from the Department of Transportation Federal Highway Administration. The IFB is for the WA FLAP JEFFER 150009(1) Undi Road Bypass Improvements project. The physical data files located in the attached ZIP folder include existing ground surfaces, horizontal and vertical alignments for Sites 1 and 2, proposed 3D breaklines, and proposed finish surfaces. The files were used to calculate earthwork quantities of 5965 cubic yards of cut and 312 cubic yards of fill for Site 2 using the end area volume method and create cut/fill volumes function since the site cross sections overlap due to curvature. Bidders should review all attached documents and physical data files to understand project requirements and develop bids for the WA FLAP JEFFER 150009(1) earthwork project prior to the IFB response date.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

WA FLAP JEFFER 150009(1)

UNDI ROAD BYPASS IMPROVEMENTS

EARTHWORK

Site 1, UB1

UB1

Site 2 Earthwork Quantitiy Backup

Site 2 cross sections overlap because of the curve. Therefore, the end area volume method is inaccurate.

The method for obtaining cut and fill volumes was by using the "create cut fill volumes" function. This created volumes for cut and fill by comparing the existing surface to the proposed terrain model, generated by the corridor.

161055 cu ft / 27 = 5965 cu yd

8423 cu ft / 27 = 312 cu yd