QA_05-15-2023.pdf

PDF 94 KB Posted

Attached to
WA FLAP JEFFER 150009(1), Undi Road Bypass Improvements
Solicitation number
69056723B00005
Issued by

About this file

This document contains a federal contract opportunity and related technical questions and answers file. The federal contract opportunity is an Invitation for Bid for the WA FLAP JEFFER 150009(1) Undi Road Bypass Improvements project for the Department of Transportation Federal Highway Administration. The project involves construction to improve an undivided road bypass. The IFB, plans, physical data files, and construction contract are attached. The physical data files provide existing ground surfaces, horizontal and vertical alignments, proposed 3D breaklines, and proposed finish surfaces for sites 1 and 2. The related technical questions and answers file documents three questions received about the project, regarding insurance specifications, treatment of traffic control supervisor as an incidental or pay item, and a request to check the general or technical nature of an unspecified question. Response dates for questions range from April 27, 2023 to May 15, 2023.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA FLAP JEFFER 150009(1)

Undi Road Bypass Improvements

# General Technical Question Answer Date

1 X Please confirm that FP‐14 Page 38 contains the

Insurance Specifications for this project.

Yes, the insurance requirements for this project are under Subsection 107.05.

4/27/2023

2 X

Flaggers are a pay item, but there is no pay item for Traffic Control Supervisor. Usually

Traffic Control Supervisor is a per day item, so is this an incidental item?

See FP‐14 Subsection 109.05(b). 5/15/2023