wa-ep-olym2022-1-3_plans.pdf
PDF 32 MB Posted
- Attached to
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0. 3 TO 0. 5 & MP 0. 8
- Solicitation number
- 69056727B000002
About this file
This file contains engineering plans and specifications for the WA ERFO NPS OLYM 2022-1(3) project, a bank stabilization and erosion control initiative at Olympic National Park. The project is located approximately 26 miles southeast of Forks, Washington, on Road 107, spanning mileposts 0.3 to 0.5 and 0.8, covering 0.12 miles of roadway. The work scope includes bank stabilization using riprap, installation of engineered log jams, and placement of dolosse (large concrete units used for coastal protection and erosion control).
The project is administered by the Federal Highway Administration under the Department of Transportation's Emergency Relief for Outstanding projects (ERFO) program. The estimated contract value ranges from $2,000,000 to $5,000,000, with a tentative solicitation release scheduled for Fall 2026/Winter 2027 and a fixed completion date targeted for Fall 2027. The plans document provides the technical specifications, design details, and construction requirements necessary for bidders to prepare accurate cost estimates and project schedules for this federal infrastructure repair contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| wa-ep-olym2022-1--3_Prelim Letter.pdf | ||
| Project Description_WA ERFO NPS OLYM 2022-1(3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .