Project Description_WA ERFO NPS OLYM 2022-1(3).pdf
PDF 260 KB Posted
- Attached to
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0. 3 TO 0. 5 & MP 0. 8
- Solicitation number
- 69056727B000002
About this file
This is a federal contract presolicitation document for the National Park Service (NPS) Eastern Regional Facility Organization (ERFO) outlining a road repair project in Olympic National Park.
The project, designated WA ERFO NPS OLYM 2022-1(3), involves bank stabilization, riprap placement, and construction of an engineered log jam with dolosse along Road 107 in Jefferson County, Washington, approximately 26 miles southeast of Forks. The project scope spans 0.12 miles and carries an estimated price range of $2,000,000 to $5,000,000. The tentative solicitation date is Fall 2026/Winter 2027, with a tentative fixed completion date of Fall 2027. Work will be performed using FP-24 specifications in US customary units and includes two schedule options (Schedule A and Additional Schedule B).
The project requirements include construction survey and staking, contractor quality control and assurance, contractor sampling and testing, and construction scheduling. Earthwork consists of clearing and grubbing (1,400 square yards) and placement of 80 boulders. Slope reinforcement work includes 790 cubic yards of Class 4 riprap and 260 cubic yards of Class 5 riprap. Environmental design work encompasses six root wads and either four engineered log jams with dolosse (Schedule A) or four textured engineered log jams with dolosse (Schedule B). Additional work includes soil erosion and sediment control, turf establishment, mulching, erosion control products, temporary stream diversion, and comprehensive temporary traffic control measures including signage, pavement markings, flagging services, and traffic control supervision.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| wa-ep-olym2022-1--3_Prelim Letter.pdf | ||
| wa-ep-olym2022-1-3_plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA ERFO NPS OLYM 2022-1(3), OLYMPIC
NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Jefferson County, WA
This work consists of: Bank stabilization, riprap, engineered log jam with dolosse.
Project Location: This project is located approximately 26 Miles SE of Forks, WA.
Project Length: 0.12 Miles
Estimated Price Range: Between $2,000,000 and $5,000,000
Tentative Solicitation Date: Fall 2026/ Winter 2027
Tentative Fixed Completion Date: Fall 2027
DESCRIPTION OF WORK in US CUSTOMARY UNITS
USING FP-24 SPECS
O n e S ch ed u le
S ch
N am e
A d d it io n al
N am e
B
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes
One Schedule Sch Name
Additional Sch Sch
Name B
153 Contractor Quality Control and Assurance (yes/no)
Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no)
157 Soil Erosion & Sediment Control (Fiber Roll)
330 LNFT 330 LNFT
DIVISION 200 – Earthwork
201 Clearing & Grubbing 1400 SQYD
1400 SQYD
204 Boulder 80 EACH 80 EACH DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Placed Riprap, Class 4 790 CUYD
790 CUYD
251 Placed Riprap, Class 5 260 CUYD
260 CUYD
622 Rental Equipment (yes/no) Yes
623 General Labor (yes/no) Yes
625 Turf Establishment (indicate seeding or mulching separately)
840 SQYD
840 SQYD
626 Mulching 1600 SQYD
1600 SQYD
626 Plantings (Government-Furnished) LPSM
LPSM
628 Temporary Stream Diversion LPSM
629 Rolled Erosion Control Product 1300 SQYD
1300 SQYD
635 Temporary Traffic Control – Government- Furnished Kiosk)
635 Temporary Traffic Control – Tubular Marker
40 EACH
40 EACH
635 Temporary Traffic Control – Drum 15 EACH
15 EACH
635 Temporary Traffic Control – Warning Light Type B
6 EACH
635 Temporary Traffic Control – Pavement Markings
80 LNFT
80 LNFT
635 Temporary Traffic Control – Pavement Markings Removal
80 LNFT 80 LNFT
635 Temporary Traffic Control – Construction Sign
190 SQFT
190 SQFT
635 Temporary Traffic Control – Flagger 1000 Hour
1000 Hour
635 Temporary Traffic Control – Traffic Control Supervisor
50 Day
50 Day
647 Environmental Design, Root Wad 6 EACH
647 Environmental Design, Bank Stabilization (Engineered Log Jam with Dolosse)
4 EACH
0 EACH
647 Environmental Design, Bank Stabilization (Engineered Log Jam with Dolosse- Textured)
0 EACH 4 EACH