This is a federal contract presolicitation document for the National Park Service (NPS) Eastern Regional Facility Organization (ERFO) outlining a road repair project in Olympic National Park.

The project, designated WA ERFO NPS OLYM 2022-1(3), involves bank stabilization, riprap placement, and construction of an engineered log jam with dolosse along Road 107 in Jefferson County, Washington, approximately 26 miles southeast of Forks. The project scope spans 0.12 miles and carries an estimated price range of $2,000,000 to $5,000,000. The tentative solicitation date is Fall 2026/Winter 2027, with a tentative fixed completion date of Fall 2027. Work will be performed using FP-24 specifications in US customary units and includes two schedule options (Schedule A and Additional Schedule B).

The project requirements include construction survey and staking, contractor quality control and assurance, contractor sampling and testing, and construction scheduling. Earthwork consists of clearing and grubbing (1,400 square yards) and placement of 80 boulders. Slope reinforcement work includes 790 cubic yards of Class 4 riprap and 260 cubic yards of Class 5 riprap. Environmental design work encompasses six root wads and either four engineered log jams with dolosse (Schedule A) or four textured engineered log jams with dolosse (Schedule B). Additional work includes soil erosion and sediment control, turf establishment, mulching, erosion control products, temporary stream diversion, and comprehensive temporary traffic control measures including signage, pavement markings, flagging services, and traffic control supervision.

View the file

Other files

File Type Posted
wa-ep-olym2022-1--3_Prelim Letter.pdf PDF
wa-ep-olym2022-1-3_plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WA ERFO NPS OLYM 2022-1(3), OLYMPIC

NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8

Jefferson County, WA

This work consists of: Bank stabilization, riprap, engineered log jam with dolosse.

Project Location: This project is located approximately 26 Miles SE of Forks, WA.

Project Length: 0.12 Miles

Estimated Price Range: Between $2,000,000 and $5,000,000

Tentative Solicitation Date: Fall 2026/ Winter 2027

Tentative Fixed Completion Date: Fall 2027

DESCRIPTION OF WORK in US CUSTOMARY UNITS

USING FP-24 SPECS

O n e S ch ed u le

S ch

N am e

A d d it io n al

N am e

B

DIVISION 150 – Project Requirements

152 Construction Survey & Staking (yes/no) Yes Yes

One Schedule Sch Name

Additional Sch Sch

Name B

153 Contractor Quality Control and Assurance (yes/no)

Yes

154 Contractor Sampling & Testing (yes/no) Yes Yes

155 Schedules for Construction Contracts (construction schedules) (yes/no)

157 Soil Erosion & Sediment Control (Fiber Roll)

330 LNFT 330 LNFT

DIVISION 200 – Earthwork

201 Clearing & Grubbing 1400 SQYD

1400 SQYD

204 Boulder 80 EACH 80 EACH DIVISION 250 – Slope Reinforcement and Retaining Walls

251 Placed Riprap, Class 4 790 CUYD

790 CUYD

251 Placed Riprap, Class 5 260 CUYD

260 CUYD

622 Rental Equipment (yes/no) Yes

623 General Labor (yes/no) Yes

625 Turf Establishment (indicate seeding or mulching separately)

840 SQYD

840 SQYD

626 Mulching 1600 SQYD

1600 SQYD

626 Plantings (Government-Furnished) LPSM

LPSM

628 Temporary Stream Diversion LPSM

629 Rolled Erosion Control Product 1300 SQYD

1300 SQYD

635 Temporary Traffic Control – Government- Furnished Kiosk)

635 Temporary Traffic Control – Tubular Marker

40 EACH

40 EACH

635 Temporary Traffic Control – Drum 15 EACH

15 EACH

635 Temporary Traffic Control – Warning Light Type B

6 EACH

635 Temporary Traffic Control – Pavement Markings

80 LNFT

80 LNFT

635 Temporary Traffic Control – Pavement Markings Removal

80 LNFT 80 LNFT

635 Temporary Traffic Control – Construction Sign

190 SQFT

190 SQFT

635 Temporary Traffic Control – Flagger 1000 Hour

1000 Hour

635 Temporary Traffic Control – Traffic Control Supervisor

50 Day

50 Day

647 Environmental Design, Root Wad 6 EACH

647 Environmental Design, Bank Stabilization (Engineered Log Jam with Dolosse)

4 EACH

0 EACH

647 Environmental Design, Bank Stabilization (Engineered Log Jam with Dolosse- Textured)

0 EACH 4 EACH