This file consists of preliminary construction plans for the Gifford Pinchot ERFO Repairs 2022 project, a Federal Highway Administration project in Lewis County, Washington, located on NF-2801 in Gifford Pinchot National Forest. The project involves roadway reconditioning, drainage improvements, excavation, grading, and aggregate work over a 0.75-mile length with design specifications conforming to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.

The plans include survey control data establishing coordinate system references (Washington South SPCS NAD83 2011) with field work conducted in June 2023 and final adjustment in June 2023. The project features multiple horizontal and vertical curves with design speeds of 20 MPH, anticipated average daily traffic of less than 400 vehicles in 2024 and 2044. Key construction elements include 18-inch and 24-inch pipe culverts with modified protective aprons, riprap ditches, Type 7A and 7B inlet structures, spillway assemblies with down drains, curve widening up to 5.25 feet, turnouts (10 to 14 feet wide), soil erosion control measures (fiber rolls, silt fence, check dams), and permanent and temporary traffic control signage. Standard drainage details specify Class 2 riprap with geotextile separation at culvert outlets. The plans reference Western Federal Lands Highway Division standards for design approval and include comprehensive erosion and sediment control specifications complying with federal land highway office requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

PROJECT MANAGER

N.LANGER

N O

T

FO

R

CO

N

STRU

CTI

O

N

PARK

NATIONAL

CASCADES

NORTH

u n d o S t e g u

P

P A

C I F I C

O C

A E

N tS raitof Juan de Fuca

OC

LU

MBIA

R

IV

ER

A S N

KE

R

VERI

M

COLU B

I A

V R I

E R

Lakes

Banks

Lakes

Moses

Reservoir

Potholes

PARK

NATIONAL

OLYMPIC

N.P.

RAINIER

MOUNT

MON.

NAT'L VOLC.

ST. HELENS

MOUNT

BELLINGHAM

Forks

Aberdeen

Chehalis

Longview

OLYMPIA

TACOMA

SEATTLE

EVERETT

Wenatchee

Lake

Moses

SPOKANE

Pullman

Pasco

RICHLAND

Kennewick Walla Walla

ANGELES

PORT

Townsend

Port Vernon

Mt.

VANCOUVER

WASHINGTON KEY MAP

YAKIMA

BRITISH COLUMBIA

I D

A H

O

OREGON

UNITED STATES

CANADA

PLANS PREPARED BY

PRELI

M

IN

ARY

WA ERFO FS GIFPN603 2022-1(1)

FOR

541.385.4772

WWW.DOWL.COM

1001 SW EMKAY DRIVE, SUITE 120

BEND, OR 97702

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

GIFFORD PINCHOT ERFO REPAIRS 2022

TYPE OF CONSTRUCTION:

permanent traffic control roadway reconditioning, drainage and

Excavation, grading, aggregate and

DESIGN DESIGNATION:

existing e new e (max)

V

ADT (2044)

ADT (2024)

SPECIFICATION:

on Federal Highway Projects, FP-24

Construction of Roads and Bridges

Standard Specifications for

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

LENGTH 0.75 MILES

PLANS FOR PROPOSED PROJECT

PROJECT LOCATION

LEWIS

GIFFORD PINCHOT NATIONAL FOREST

WASHINGTON

COUNTY

APPROVED:

Western Federal Lands Highway Division

Chief of Engineering, DATE

Scale in miles

2 0 2 4 6

FOREST

NATIONAL

PINCHOT

GIFFORD

Cis pus Riv er

NF-23

Cowlitz River

NF-2

NF-2801

NF-76

See Sheet A.3

C is p u s R d

N F

NF-29

NF-28

<400

20 MPH

<400

0% existing

:5

A

M a r c h

A

.1

T it le S h e t c d o w l_ p w

\d \w a e f g if p n p ln g e n .d g n

PROJECT

NUMBER

SHEET

A.1

WA ERFO FS GIFPN603 2022-1(1)

PRELIMINARY - N

OT FOR CONSTRUCTION

BH TP

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

M.P.

M.L.

monument minimum thousand gallon maximum material mile post main line

W

RIP

DI

G W G WV

CP GPS

36 31

36 31

N

E

N 1000EL. 1234.56

TP

TP

SEC.

SEC.

θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

between bearing bridge balance point bench mark back face back btwn brg.

br.

BP

BM

b.f.

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center

NO SCALE

NOTE:

1.

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend

W west drwg(s).

dist.

diaph.

dia.

DHV

D exp. jt.

exc.

EW

EQ or eq.

EOP

emb.

elev.

El. 94.16 e.f.

e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge) jt.

IE

ID

joint invert elevation inside diameter ftg.

flg.

fin.

f.f.

footing flange finish front face

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed (velocity)

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sect.

SC

SADT

S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

KSI

square inch thousand pounds per pvmt.

PT

PST

PSC

PSI

PSF

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve

OHWM

OG

OD

o. to o.

o.c.

ordinary high water mark original ground outside diameter out to out on center

NC

N normal crown north

A A

DI

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

Section Line

Section Corner (Found, Projected)

Control Point (Terrestrial and GPS)

Gas & Water Meter; Gas & Water Valve

Flagpole; Fire Hydrant

Cooking Grate; Garbage Can; Picnic Table

Boulder; Well; Antenna; Grave

Above Ground Tank; Underground Tank

Spot Elevation; Coordinate Grid Tick

Material Source; Bore Hole; Test Pit

Treeline; Individual Trees

Spring or Seep

Section Line 4

Section Corner (Found, Projected) 4

Section Line 16

Section Corner (Found, Projected)16

Property Line

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

BLM Lands Boundary

Indian Reservation Boundary

Existing Roadway (Paved, Gravel)

Railroad

Trail

Fiber Roll

Silt Fence

Sandbag

Intermittent Drainage or Small Creek

Large Creek or River

Lake, Pond or Reservoir; Marshland

North Arrow

Slope Stake Limits Top of Cut

Toe of Fill

Construction Limits

Bottom of Ditch

Fence

Gate with Fence

Cattleguard

Guardrail

Concrete Barrier and Guard Wall

Retaining Wall wall face

Signs (single, double post; portable)

Delineators

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Pipe Culvert with Drop Inlet

Box Culvert

Underdrain

Overhead/Above Ground Utilities

Underground Utilities

Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features

Building

Right-of-Way Line

Permanent Easement

Construction Easement

Riprap

- no symbol -

Section A-A

EXISTING PROPOSED

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,

- no symbol -

ABBREVIATIONS

PLAN SYMBOLS AND

101-1W

FP-24

6/2022

WFLHD DETAIL

:1

J a n u a ry

A

.2

P la n A b b re v ia ti o n s a n d S y m b o ls d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln g e n -2

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

A.2

BEGIN PROJECT

END PROJECT

N

M

A I N

N F -2

N

F

C is p u s R d

Cispus River

NF-2801

Y e ll o w ja c k e t

C re e k

"MAIN 01" 10+00

E=1303386.0519

N=404448.4987

"MAIN 01" 49+75

E=1304996.1525

N=407502.4227

Scale in feet

500 0 500 1000 1500

FOREST

NATIONAL

PINCHOT

GIFFORD

T o R a n d le m ile s

N F

C is p u s R d

N F

NF-23-099

Squatter Creek Pit

Disposal Site

Staging and

:3

P

F e b r u a r y

A

.3

V ic in it y M a p d o w l_ p w

\d \w a e f g if p n p ln g e n .d g n

VICINITY MAP

PROJECT

A.3

9-inch compacted depth

Roadway aggregate, method 2, Existing ground

Place conserved topsoil, 4-inch depth

0 to 9-inch compacted depth

Roadway aggregate, method 2, Roadway reconditioning

Existing profile

LC

Existing ground

- Apply seeding, hydraulic method and mulching, hydraulic method.

[2]

- Clear vegetation over 1' in height.

[1]

FOOTNOTE:

Existing

5'

C o n s tr u c ti o n l im it

Existing roadway width varies 12.1' to 15.3'

2%

Selective clearing [1] arie s

1:2 to

1:4

1:2

2%

[2]

Turf Establishment Limits

Varies

C o n s tr u c ti o n l im it

"MAIN 01"

10+00 to 13+50

16+16.04 to 19+25

2. See Section G for ditch widening and treatment at culvert ends.

1. See Section D for curve widening.

NOTE:

:1 a r c h

C

.1

T y p ic a l

S e c ti o n s d o w l_ p w

\d

\w a e f g if p n p ln ty p

.d g n

TYPICAL SECTIONS

PROJECT

C.1

Roadway reconditioning

9-inch compacted depth

Roadway aggregate, method 2, Existing ground Existing ground

Existing ground

Place conserved topsoil, 4-inch depth

9-inch compacted depth

Roadway aggregate, method 2, Existing ground

Place conserved topsoil, 4-inch depth

- Apply seeding, hydraulic method and mulching, hydraulic method.

[2]

- Clear vegetation over 1' in height.

[1]

FOOTNOTE:

"MAIN 01"

13+50 TO 16+16.04

28+50 TO 29+25

49+25 to 49+75

Varies

5'

5'

C o n s tr u c ti o n l im it

Existing road width varies 11.3' to 15.1'

Varies

C o n s tr u c ti o n l im it

28+50 to 29+25

1:

Turf establishment limits

1:4

28+50 to 29+25

C o n s tr u c ti o n l im it

1:4

C o n s tr u c ti o n l im it

2. See Section G for ditch widening and treatment at culvert ends.

1. See Section D for curve widening.

NOTE:

:1 a r c h

C

.2

T y p ic a l

S e c ti o d o w l_ p w

\d

\w a e f g if p n p ln ty p

.d g n

TYPICAL SECTIONS

PROJECT

C.2

1:

C o n s tr u c ti o n l im it

[2] Turf establishment limits

4%4%

Existing ground

V ar ie s (1 :1 .5 t o 1:

2)

Profile grade

C o n s tr u c ti o n l im it

"MAIN 01"

19+25 to 28+50

30+40 to 49+25 compacted depth method 2, 9-inch Roadway aggregate, 1:4

Varies 1:2 to 1:4

Existing ground

30+40 to 31+35 36+70 to 38+00

.5 ft

1:21:2

Riprap ditch, See Section G for details

Existing ground

C o n s tr u c ti o n l im it

Place conserved topsoil, 4-inch depth

Place conserved topsoil, 4-inch depth

00+00 to 00+75.00

"APPR 01"

C o n s tr u c ti o n l im it

1:41:2

9-inch compacted depth Roadway aggregate, method 2, Place conserved topsoil, 4-inch

19+50 to 21+10

C o n s tr u c ti o n l im it

1:4

1:2

Place conserved topsoil, 4-inch

25+00 to 26+60 42+90 to 44+50

9-inch compacted depth Roadway aggregate, method 2, Place conserved topsoil, 4-inch depth

Traveled way

14'

Turnout

10'

Turnout

10'

- Apply seeding, hydraulic method and mulching, hydraulic method.

[2]

- Clear vegetation over 1' in height.

FOOTNOTE:

[2]Turf establishment limits

.5 ft

V a ri e s

.5 to

.0 a ri e s

.5 to

.0

2. See Section G for ditch widening and treatment at culvert ends.

1. See Section D for curve widening.

NOTE:

:1 a rc h

C

.3

T y p ic a l S e c ti o d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln ty p -0

.d g n

TYPICAL SECTIONS

PROJECT

C.3

Existing ground Roadway reconditioning See Section G for details

Riprap ditch 29+25 to 30+40

Existing ground

Place conserved topsoil, 4-inch depth

C o n s tr u c ti o n l im it

C o n s tr u c ti o n l im it

"MAIN 01"

29+25 to 30+40

Existing 1:2

.5

Existing traveled way

12'

Selective clearing

5'

- Apply seeding, hydraulic method and mulching, hydraulic method.

- Clear vegetation over 1' in height.

[1]

FOOTNOTE:

:3 a rc h

C .4

T y p ic a l S e c ti o d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln ty p -0

.d g n

TYPICAL SECTIONS

PROJECT

C.4

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER

NORTH EAST

ORTHOMETRIC

ELEVATION

LATITUDE LONGITUDE

ELLIPSOID

HEIGHT

COMBINED

FACTOR

DESCRIPTION NOTE:

23101 405851.181 1303052.541 1291.809 46°26'18.353001"N 121°50'17.678033"W 1225.7903 0.999859299 5/8" ir w/fhwa alum cap 1.

23102 405237.150 1303172.231 1295.994 46°26'12.312202"N 121°50'15.820465"W 1229.9855 0.999859174 5/8" ir w/fhwa alum cap

23103 404911.453 1303238.366 1300.053 46°26'09.108461"N 121°50'14.797402"W 1234.0513 0.99985902 MAG nail

23104 404807.858 1303253.409 1306.877 46°26'08.088435"N 121°50'14.557552"W 1240.8782 0.999858706 5/8" ir w/fhwa alum cap

23105 404432.938 1303378.725 1326.556 46°26'04.408719"N 121°50'12.677721"W 1260.5669 0.999858706 5/8" ir w/fhwa alum cap

23106 404519.259 1303575.905 1334.152 46°26'05.293737"N 121°50'09.883571"W 1268.1685 0.999857438 5/8" ir w/fhwa alum cap

23107 404714.571 1303613.590 1328.476 46°26'07.227887"N 121°50'09.392792"W 1262.4908 0.999857685 5/8" ir w/fhwa alum cap

23108 405044.835 1303756.378 1321.586 46°26'10.511654"N 121°50'07.434085"W 1255.6018 0.999857973 5/8" ir w/fhwa alum cap

COORDINATE SYSTEM : Washington South SPCS NAD83 2011

VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : WA83/2011-SIF NSR11 (NAD83/2011) Washington, South Zone, International foot

PROJECT : GP ERFO REPAIRS 2020, PHASE 1 (FR 2801)

DATE OF FIELD WORK :6/2023

DATE OF FINAL ADJUSTMENT : 6/13/2023

PROJECT UNITS : International foot

-M a r-

:0

P

M c d o w l_ p w

\d w a -e f-g if p n -1

-1 s u r_ g e n .d g n .x ls x ]S h e e t

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

PROJECT

D.1

GP ERFO REPAIRS 2020, PHASE 1

(FR 2801)

SHEET

NUMBER

SURVEY CONTROLPRELIMINARY - N

0 1

CP

23105

10+84.02 to 12+64.10

Curve widening - 6.0'

10+40.02 to 10+84.02

Curve widening taper

Slope stake limit maintaining the design ditch profile conform to roadway return radii while

Field-fit ditch alignment as needed to

71.64' LT

+00.00

23.66' LT

+38.17

16.57' LT

+70.78

16.40' RT

+31.94

29.86' RT

+22.82

See Section G for Details

Culvert Outlet With Ditch, Modified Protective Apron At accomodate ditch widening

Field-fit riprap ditch to

Construction Limit

Edge of traveled way

Section G for details

Riprap V-ditch, See

Existing Ground

See Section XSC for details

18-inch pipe culvert

10+57.92

Begin Special Ditch

El. 1320.00

10+00, 107.61 LT

End Special Ditch

El. 1327.14

11+18.86, 13.96' RT

End Special Ditch

El. 1328.21

11+22.99, 18.04' LT

Begin Special Ditch

El. 1325.99

10+25.24, 36.13' RT

BEGIN PROJECT

"MAIN 01" line to be constructed

N

PI 11+90.31

Δ = 76°25'50" (LT)

R = 135.00' T = 106.29' L = 180.09' e = existing

P C

.0

N83°01'23"E

6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50

1,320 1,320

1,322 1,322

1,324 1,324

1,326 1,326

1,328 1,328

1,330 1,330

1,332 1,332

1,334 1,334

1,336 1,336

1,338 1,338

1,340 1,340

NF-2

2.5%

8.3

5.1% 3.8%

Scale in feet

40 0 40 80 120

E = 1303385.250 N = 404451.726

"MAIN 01" 10+00

LEGEND

Roadway Reconditioning

Roadway Obliteration, method 1

:2 a rc h

D .3

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.3

C P

C P

Construction Limit

12+64.10 to 13+04.10

Curve widening taper

"MAIN 01" line to be constructed

16+16.04 to 16+33.04

Curve widening taper

17+02.76 to 17+37.76

Curve widening taper

16+33.04 to 17+02.76

Curve widening - 2.5'

17+37.76 to 18+72.97

Curve widening - 5.25'

Existing ground

N

N19°11'36"E N25°05'36"E N18°45'10"E N33°19'27"E

PI 13+13.35

Δ = 12°36'03" (RT)

R = 115.00' T = 12.70' L = 25.29' e = existing

PI 14+75.38

Δ = 05°53'59" (RT)

R = 150.00' T = 7.73' L = 15.45' e = existing

PI 16+48.38

Δ = 14°34'17" (RT)

R = 120.00' T = 15.34' L = 30.52' e = existing

PI 11+90.31

Δ = 76°25'50" (LT)

R = 135.00' T = 106.29' L = 180.09' e = existing

PI 15+46.41

Δ = 06°20'26" (LT)

R = 150.00' T = 8.31' L = 16.60' e = existing

PI 18+10.19

Δ = 51°47'48" (LT)

R = 150.00' T = 72.83' L = 135.60' e = existing

P T

.9

P C

.6

P T

.0

P C

.0

P T

.5

N06°3 5'33

"E

P T

.1

P C

.1

P T

.7

P C

.3

P C

.6

6 1

12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50

1,322 1,322

1,324 1,324

1,326 1,326

1,328 1,328

1,330 1,330

1,332 1,332

1,334 1,334

1,336 1,336

1,338 1,338

1,340 1,340

NF-2801

Scale in feet

40 0 40 80 120

:5 a rc h

D .4

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.4

Construction Limit

Slope stake limits Edge of traveled way

Construction Limit

Construct turnout, 10' width 20+00 to 20+60

Turnout taper 19+50 to 20+00

Turnout taper 20+60 to 21+10

"MAIN 01" line to be constructed

18+72.97 to 19+07.97

Curve widening taper

Existing ground

Profile Grade

N

PI 18+10.19

Δ = 51°47'48" (LT)

R = 150.00' T = 72.83' L = 135.60' e = existing

N18°28'21"W

P T

.9

P C

.3

18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50

1,312 1,312

1,314 1,314

1,316 1,316

1,318 1,318

1,320 1,320

1,322 1,322

1,324 1,324

1,326 1,326

SSD = 1124'

K = 90

90' VC

,3

.6

-0.75% 2

.3

.7

.4

.5

HLSD = 2315'

K = 44

82' VC

NF-2801

Scale in feet

40 0 40 80 120

:5 a rc h

D .5

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.5

Edge of traveled way

Slope stake limits

Construction Limit

Construct turnout, 10' width 25+60 to 26+10

See Section G for details

Type 7A inlet, 26+10 to 26+60

Turnout taper

25+00 to 25+50

Turnout taper

"MAIN 01" line to be constructed

See Section G for details

Riprap V-ditch, See Section G for details riprap protective apron, down drain, slip-joint and

Spillway assembly with accomodate ditch widening

Field-fit riprap ditch to

Existing Ground

Profile Grade

End special ditch

El. 1299.85

29+18.44, 14.84' RT

Begin special ditch

El. 1305.18

28+00, 14.57' RT

See Section XSC for details

24-inch pipe culvert

29+18.53

N

N18 °2

8'2 1"

W

N16°48'04"E

PI 25+61.26

Δ = 35°16'25" (RT)

R = 610.00' T = 193.94' L = 375.54' e = 0%

.3

P T

.8

6 2

24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50

1,294 1,294

1,296 1,296

1,298 1,298

1,300 1,300

1,302 1,302

1,304 1,304

1,306 1,306

1,308 1,308

1,310 1,310

1,312 1,312

1,314 1,314

1,316 1,316

1,318 1,318

1,320 1,320

1,322 1,322

.0

.4

HLSD = INF'

K = 115

60' VC

.0 4-1.75%

-1.94%

-1.42%

.0

.3

SSD = 5635'

K = 312

60' VC

NF-2801

4.5%

Scale in feet

40 0 40 80 120

:5 a rc h

D .6

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.6

Edge of traveled way

30+72.84 to 32+16.04

Curve widening - 5.25'

30+42.00 to 30+72.84

Curve widening taper

32+16.04 to 32+47.00

Curve widening taper

35+73.48 to 35+00.48

Curve widening taper

Edge of traveled way

Construction Limit

Slope stake limits accommodate ditch widening

Field-fit riprap ditch to

NF-2801

"MAIN 01" line to be constructed

N F the design ditch profile return radii while maintaining roadway horizontal and needed to conform to

Field-fit ditch alignment as

17.13' RT

+16.04

26.41' LT

+16.04

23.26' LT

+81.14

See Section G for Detials

Culvert Outlet With Ditch, Modified Protective Apron At

Existing GroundProfile Grade

See Section XSC for details

24-inch pipe culvert, 31+39.42

A

P P

R

10.6%

1.0%

3.3%

End Special Ditch

El. 1282.54

32+50, 10.63' RT

Begin Special Ditch

El. 1282.66

31+95.00, 14.88 RT

Begin Special Ditch

El. 1281.22

31+31.00, 36.06 LT

.8

End Special Ditch

El. 1277.42

32+59.84, 30.35 RT

N

N °4

8'

"E

PI 31+50.43

Δ = 54°41'59" (RT)

R = 150.00' T = 77.59' L = 143.20' e = 0%

P T

.0

N71°30'03"E

PI 36+24.34

Δ = 55°35'04" (LT)

R = 235.00' T = 123.86' L = 227.98' e = ___

P C

.4

PC

.8

30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50

1,278 1,278

1,280 1,280

1,282 1,282

1,284 1,284

1,286 1,286

1,288 1,288

1,290 1,290

1,292 1,292

1,294 1,294

1,296 1,296

1,298 1,298

1,300 1,300

.4

.7

.6

.9

HLSD = 78'

K = 9

130' VC

HLSD = INF'

K = 150

200' VC

.8

6-13.30%

+1.09%

+2.42%

65'-0"R

20'-0"R

Scale in feet

40 0 40 80 120

:2 a rc h

D .7

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.7

Edge of traveled way

37+28.46 to 37+78.46

Turnout taper

35+00.48 to 37+28.46

Curve widening - 4.0' without ditch, See Section G for details

Protective apron at culvert outlet

NF-280

"MAIN 01" line to be constructed

36+18.48 to 36+68.46

Turnout taper

36+68.46 to 37+28.46

Turnout - 14'

Section G for details

Riprap V-ditch, See

Existing Ground

Profile Grade

Section XSC for details

24-inch pipe culvert See

39+01.04

N

N15°55 '00"E

PI 40+89.34

Δ = 18°29'34" (RT)

R = 725.00' T = 118.03' L = 234.00' e = 0%

P T

.4

P C

.3

PI 36+24.34

Δ = 55°35'04" (LT)

R = 235.00' T = 123.86' L = 227.98' e = 0% 3

35+50 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00

1,278 1,278

1,280 1,280

1,282 1,282

1,284 1,284

1,286 1,286

1,288 1,288

1,290 1,290

1,292 1,292

1,294 1,294

1,296 1,296

1,298 1,298

.0

.9

-3.53%

+1.14%

.0

.2

SSD = 266'

K = 29

170' VC

HLSD = 252'

K = 49

230' VC

Scale in feet

40 0 40 80 120

:0 a rc h

D .8

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.8

Edge of traveled way

46+08.00 to 46+38.59

Curve widening taper

46+38.59 to 47+95.48

Curve widening - 5.5'

Construct turnout, 10' width

Slope stake limits

Edge of traveled way

Construction Limit

Slope stake limits without ditch, See Section G for details

Protective apron at culvert outlet

NF-2801

"MAIN 01" line to be constructed

Existing Ground

Profile Grade

Section XSC for details

24-inch pipe culvert see

44+83.54

N

N34°24'34"E

PI 47+25.07

Δ = 59°55'45" (RT)

R = 150.00' T = 86.48' L = 156.89' e = 0%

P T

.3

P C

.5

41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 46+50 47+00

1,284 1,284

1,286 1,286

1,288 1,288

1,290 1,290

1,292 1,292

1,294 1,294

1,296 1,296

1,298 1,298

1,300 1,300

1,302 1,302

+1.14%

Scale in feet

40 0 40 80 120

:1 a rc h

D .9

P la n a n d P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln p p -0

.d g n

PLAN AND PROFILE

PROJECT

D.9

Profile grade

Existing ground

47+50 48+00 48+50 49+00 49+50 50+00 50+50

1,290 1,290

1,292 1,292

1,294 1,294

1,296 1,296

1,298 1,298

1,300 1,300

1,302 1,302

1,304 1,304

1,306 1,306

1,308 1,308

1,310 1,310

1,312 1,312

1,314 1,314

1,316 1,316

HLSD = 251'

K = 49

412' VC

.8

.0

.8

N

Construction Limit

Slope stake limits

Edge of traveled way

47+95.48 to 48+26.00

Curve widening taper

"MAIN 01" line to be constructed NF-2801

END PROJECT

P T

.4

S85°39'42"E

P C

.9

8 4 9 5

E = 1304949.269

N = 407502.841

"MAIN 01" 49+75

Scale in feet

40 0 40 80 120

LEGEND

Roadway Reconditioning

Roadway Obliteration, method 1

:3 a r c h

D

.1

P la n a n d P r o f il e d o w l_ p w

\d \w a e f g if p n p ln p p .d g n

PLAN AND PROFILE

PROJECT

D.10

Edge of traveled way

Slope stake limits

Construction limit

Construction limit

Slope stake limits

Existing ground

Profile grade

END CONSTRUCTIONBEGIN CONSTRUCTION

"APPR 01" 00+00.00 =

N °4

'0 "E

P C

.8

N60°3 8'02

"W

N21°52'30"W

PI 0+12.07

Δ = 38°45'32" (RT)

R = 15.00' T = 5.28' L = 10.15' e = 0%

P C

.8

P T

.9

P O

E

.2

0+00 0+50 1+00 1+50 2+00

1,276 1,276

1,278 1,278

1,280 1,280

1,282 1,282

1,284

1,286 1,286

1,288 1,288

,2

.2

-1.28% 1

.7

.1

.5

.2

SSD = 282'

K = 10

42' VC

HLSD = INF'

K = 43

50' VC

R

R

N F-2

NF-2801-11

"APPR 01" 00+0.00 "APPR 01" 00+75.00

El. 1283.6 E=1303718.7176 N=406329.3864

E=1303684.5987 N=406394.0788

"MAIN 01" 31+02.32

:5 a rc h

E

.1

A p p ro a c h

P la n a n d

P ro fi le d o w l_ p w

\d \w a -e f-g if p n -1

-1 p ln

-0 .d g n

APPROACH PLAN AND PROFILE

PROJECT

E.1

N °0

'2 "E

N °3

5'

"E

N19 °1

1'3 6"

E

Fiber rolls, typ.

Edge of traveled way

Slope stake limits

Slope stake limits

LEGEND:

across ditch, see Section E for details

Install soil erosion control, fiber rolls, N

BEGIN PROJECT

N

Edge of traveled way

Fiber rolls, typ.

Slope stake limits for details

(fiber roll), across ditch, see Section E

Install soil erosion control, check dam check dam, typ.

Soil erosion control, N25°05'36"E

N18°45'10"E

N33°19'27"E

N18 °2

8'

"W

10+00.00

BEGIN RECONSTRUCTION

Scale in feet

40 0 40 80 120

:3 a r c h

F

.1

E r o s io n C o n tr o l P la d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

EROSION CONTROL PLAN

PROJECT

F.1

Proposed edge of pavem ent

Slope stake lim its

Proposed edge of pavement

Slope stake limits

Slope stake limits

N18°28'21"W

Slope stake limits of paving limit

Proposed edge check dam

Soil erosion control, N N

Scale in feet

40 0 40 80 120

:4 a r c h

F

.2

E r o s io n C o n tr o l P d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

EROSION CONTROL PLAN

PROJECT

F.2

Proposed edge of pavement

Soil erosion control, check dam

N71°30'03"E

N15 °5

5'

"E

Proposed edge of pavement

Proposed edge of pavement

Slope stake limits

N

N

N34°24'34"E

2 4 3 4 4 4

Scale in feet

40 0 40 80 120

:5 a r c h

F

.3

E r o s io n C o n tr o l P d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

EROSION CONTROL PLAN

PROJECT

F.3

Slope stake limits

Proposed edge of pavement

N Soil erosion control, silt fence

Scale in feet

40 0 40 80 120

:5 a r c h

F

.4

E r o s io n C o n tr o l P d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

EROSION CONTROL PLAN

PROJECT

F.4 larger than fiber roll

Existing ground (typ.)

ground

Existing soil to match ground level

Backfilled and compacted

Fiber roll

Flow direction

Fiber roll

Slope

Stagger joints (typ.)

along contours

Install fiber rolls on uphill side of fiber roll

Place excavated material wood stakes. See Note 2.

Fiber roll

Slope

1" x 1" wood stake

NO SCALE

NOTE:

2.

1.

fiber roll while staking.

used for permanent installations. Do not crush fiber roll is secure to slope. Live stakes may be from distur bed area s

Direction of runof f

INSTALLATION BEYOND TOE OF SLOPE

PROPERLY STAKED AND ENTRENCHED FIBER ROLL

FIBER ROLL STAKING DETAIL

FIBER ROLL LAPPING DETAIL

INSTALLATION ALONG SLOPES

SLOPE PROTECTION INSTALLATION

ALTERNATE FIBER ROLL JOINT DETAIL

PLAN

FIBER ROLL SPACING STAKES REQUIRED

and install fiber rolls

Step 1: Excavate trench Step 2: Backfill soil against fiber rolls

ELEVATION

Fi ll slo pe

Direction of runoff

T o e o f fi ll s lo p e disturbed areas

Runoff from

D ire c tio n o f ru n o ff

Fl ow

Pay lim its

Pay lim its sp ac in g ch ar t

S ee F ib er R ol l

Flow fiber roll and space stakes at 4-foot maximum.

6-inches from fiber roll end angles towards the adjacent

Overlap fiber rolls 12-inch minimum. Drive stakes at

Drive stakes at each end and at 4-foot spacing until ove rlap

12" m in.

1" x 1" or 1" Ø m in m in t o as shown in plans

3' minimum or

3' minimum

Excavate trench 2" 2" minimum

Slope Spacing Fiber roll length for each roll

Stakes required

1:1

1:2

1:3

1:4 or flatter

(FT) (FT)

FIBER ROLL

157-21W

FP-24, FP-14

7/2016

WFL STANDARD

:1

J a n u a r y

F

.5

F ib e r R o ll

S ta n d a r d

D e ta il d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

F.5

Steel or wood post

Silt fence reinforcement

Geotextile

Backfilled and compacted soil

End Posts Detail

End posts, see

Section B

Geotextile fabric, fabric, Section A

Geotextile

Fasten fabric to posts around each post one full turn.

Fold geotextile fabric

End Posts Detail

End posts, see

(undisturbed)

Existing ground

Limits of clearing

Staple or tie

Geotextile fabric

Steel or wood post

Tie top of posts together driven tightly together.

Steel or wood posts Staple or tie

NO SCALE

NOTE:

running around the ends.

Curve ends of silt fence upgrade to prevent water from as possible.

Install silt fence to follow the ground contours as closely attached to, and does not slide down, supporting posts.

procedures. All types must ensure silt fence remains manufacturer's recommendations for installation as long as specified dimensions are satisfied. Follow

Alternate preassembled silt fence options will be allowed

4.

3.

2.

1.

POST AND GEOTEXTILE INSTALLATION DETAIL

SILT FENCE INSTALLATION AT TOE OF FILL

END DETAIL

POSTS AT JOINTS

END POSTS DETAIL

PLAN

ELEVATION

PLAN

PLAN

PLANELEVATION

Flow

T o e o f s lo p e

See Note 3

Fi ll sl op e

See Note 3

Varies

Flow Fi ll slo pe

Flow f o r s p a c in g

S e e N o te

Varies

T o e o f s lo p e m in m in m in

4" min.

6" min. trench 6-foot maximum spacing without silt fence reinforcement.

10-foot maximum spacing with silt fence reinforcement.

SILT FENCE

157-1W

10/2016

:4

F e b r u a r y

F

.6

S il t F e n c e S ta n d a r d

D e d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

F.6 are similar for flat-bottom ditches

Check dam installation details

V-ditch design shown.

uphill side of fiber roll trench material on

Place excavated See Note 5

Flow line the ends. See Note 6 to prevent flow around

Curve ends upstream

Gravel bag

Filter rock

Filter rock

Trench 2" min.

Trench 2" min.

Fiber roll 9" Ø min.

NO SCALE

NOTE:

conditions.

Adjust check dam spacing based on site-specific around the ends of the fiber roll.

Provide sufficient length to prevent water from flowing

Drive stakes into undisturbed soil of trench bottom.

stakes. Drive stakes at each end of the fiber roll and at

Install check dams in ditches perpendicular to the flowline.

installation.

Repair all rills or gullies and properly compact prior to requirements of the check dam device.

gravel bags as approved, to meet the functional

Construct check dams from fiber rolls, filter rock, or

7.

6.

5.

4.

3.

2.

1.

FIBER ROLL CHECK DAM

GRAVEL BAG CHECK DAM

FILTER ROCK CHECK DAM

CROSS SECTION

(See Note 7)

CHECK DAM SPACING*

FIBER ROLL

CROSS SECTION

V-DITCH

CROSS SECTION

FLAT-BOTTOM DTICH

STAKING DETAIL

FIBER ROLL

PLAN

CROSS SECTION

(See Note 7)

CHECK DAM SPACING

FILTER ROCK

(See Note 7)

CHECK DAM SPACING**

GRAVEL BAG

than 6%.

dams on ditch grades steeper

** Do not use gravel bag check on ditch grades steeper than 5%.

Do not use fiber roll check dams

* Spacing calculated based on

Flow

F lo w

Se e N ote m in m in m in .6 m in

-inch wood8

-inch x 18

Stake fiber rolls in place with 1

Expose stakes 2-inches minimum above top of fiber roll.

2-foot maximum spacing.

9" Ø minimum fiber roll.

GRADE

DITCH

SPACING (max.)

CHECK DAM

5%

4%

3%

2%

GRADE

DITCH

SPACING (max.)

CHECK DAM

6%

5%

4%

3%

2%

GRADE

DITCH

SPACING (max.)

CHECK DAM

6%

5%

4%

3%

2%

(FT)

(FT)

(FT)

MODERATE GRADES

CHECK DAM

157-15W

7/2016

:5

M a r c h

S td W d o w l_ p w

\d

\w a e f g if p n p ln e c

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

F.7

COVER

MINIMUM

DIAMETER

VALENT

EQUI-

RADIUS

CORNER

MINIMUM

COVER

MINIMUM

COVER

MINIMUM

COVER

MINIMUM

DIAMETER

VALENT

EQUI-

RADIUS

CORNER

MINIMUM

142 x 91

137 x 87

128 x 83

117 x 79

112 x 75

103 x 71

95 x 67

87 x 63

83 x 57

81 x 59

77 x 52

73 x 55

71 x 47

66 x 51

64 x 43

60 x 46

57 x 38

49 x 33

42 x 29

35 x 24

28 x 20

24 x 18

21 x 15

17 x 13

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)

INCHES INCHES

0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8

INCHES INCHES INCHES INCHES

0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8

INCHES INCHES

0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/10

INCHESINCHES INCHES INCHES

NO SCALE

NOTE:

of camber or increase the pipe culvert gradient.

elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet

When directed, camber pipe culverts upward

4.

3.

2.

1.

culvert to the top of the pavement.

maximum fill height from the top of the pipe

For all roadway surface types, measure pipe culvert to the top of the pavement.

measure minimum cover from the top of the roadway subgrade. For rigid pavements, top of the pipe culvert to the bottom of the roadways, measure minimum cover from the

For flexible pavement and aggregate surface corrugation pipe.

Obtain approval before furnishing annular of helical lockseam and welded seam pipe.

corrugations are more restrictive than those

Fill heights for culvert pipe with annular lockseam and welded seam pipe only.

The fill heights in the table are for helical special analysis by the CO.

METAL ROUND PIPE CULVERT

FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

METAL PIPE ARCH CULVERT

FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

Fill heights exceeding 100 feet require

STEEL ALUMINUM

DIAMETER

SIZE

PIPE

SPAN x RISE

SIZE

PIPE ARCH

ALUMINUMSTEEL

DIAMETER

SIZE

PIPE

SPAN x RISE

SIZE

PIPE ARCH

" CORRUGATIONS2

" x 3

2 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE) METAL THICKNESS (INCH/GAGE)

" CORRUGATIONS2

" x 3

2 3" x 1" CORRUGATIONS

" CORRUGATIONS2

" x 3

METAL THICKNESS (INCH/GAGE)

3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS " CORRUGATIONS2

" x 3

2 3" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE)

3.5

103 x 71

95 x 67

87 x 63

81 x 59

73 x 55

66 x 51

64 x 43

60 x 46

57 x 38

49 x 33

42 x 29

35 x 24

28 x 20

24 x 18

21 x 15

17 x 13

3.5

METAL PIPE CULVERT

602-1

8/2024

FLH STANDARD

:1 a r c h

G

.1

M e ta l P ip e C u lv e r d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.1

Slope

Toe plateToe plate

A (min) B (max) H (min) W (max)

SLOPE

Approx.

A (min) B (max) H (min) W (max)

SLOPE

Approx.

diameter

Span or

B

L

AWA

End Section

SpanR is e

Di am et er

Toe plate extension

(min. width A+W)

Toe plate extension

Corner plate

(min. width A+W)

Toe plate extension

Corner plate

Reinforced edge

Expander lug End section steel or aluminum pipe

Smooth galvanized

Bolted or welded

Threaded rod

Rod holder connector

Flat strap Pipe culvert Pipe culvert

End section End section

Strap bolt

Pivot bolt

H H

" bolts8 3spacing for

35" × 24" thru 66" × 51" pipe arch

For 30" thru 60" round pipe and

17" × 13" thru 28" × 20" pipe arch

For 12" thru 24" round pipe and

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.079

0.079

0.064

0.064

0.064

0.064

0.064

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.075

0.075

0.060

0.060

0.060

0.060

0.060

112 × 75

103 × 71

95 × 67

87 × 63

83 × 57

81 × 59

77 × 52

73 × 55

71 × 47

66 × 51

64 × 43

60 × 46

57 × 38

49 × 33

42 × 29

35 × 24

28 × 20

24 × 18

21 × 15

17 × 13

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.109

0.079

0.079

0.064

0.064

0.064

0.064

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.105

0.075

0.075

0.060

0.060

0.060

0.060

INCHES

SPAN × RISE

PIPE SIZE METAL THICKNESS

STEEL ALUMINUM

INCHES GAGE INCHES GAGE

INCHES

DIMENSIONS

L (±2")(INCHES)

DIAM.

VALENT

EQUI-

INCHES

DIAMETER

PIPE SIZE

STEEL

METAL THICKNESS

INCHES GAGE

ALUMINUM

INCHES GAGE

INCHES

DIMENSIONS

L (±2") m in

12" (max.) hole lap after expansion

1" Minimum

13" for 30" dia. and over.

culvert less than 30" dia.

7" for concrete pipe

" bolts8 3spacing for m in

12" (max.) hole edge

Reinforced

Pay Limit

Pipe Culvert

1.

2.

3.

4.

5.

6.

7.

8.

ROUND OR PIPE ARCH CULVERT

PIPE ARCH CULVERTROUND PIPE CULVERT

DESIGN C

CONNECTION TO

METAL PIPE OR

OUTLET END OF

CONCRETE PIPE

SECTION A-APLAN

ELEVATION ELEVATION

riveted or welded connection

For all sizes of round pipe and pipe arch

END SECTIONS FOR ROUND PIPE CULVERT

END SECTIONS FOR PIPE ARCH CULVERT

A

A

DESIGN B

CONNECTION TO CONCRETE

PIPE INLET END

DESIGN A

CONNECTION TO ANNULAR

CORRUGATED METAL PIPE

Pipe coupling band shop bolted to

End section

Pipe culvert reinforcement bolted or riveted under the center panel seam.

Supplement the reinforced edges of end sections for

Variations in design and dimensions are permitted to allow for manufacturer's standards.

Fabricate the diameter of the end section of Design B to match the inside diameter of the concrete pipe culvert.

Design C may be used in lieu of design A for all metal pipe culvert sizes. Coupling bands may be any acceptable type for the pipe culvert specified.

Fabricate multiple piece bodies with lap seams tightly joined attached with bolts or rivets.

Fabricate connector section, corner plate and toe plate extensions from the same metal thickness as the panel body.

Use toe plate extension where shown on the plans.

Warp embankment slopes to match the slope of the flared end sections.

NOTE:

NO SCALE

60" and larger diameter pipe and 66" and larger at 6" centers (max.) or equivalent

" angle4

" × 2

" × 22 equivalent pipe arch provide 2

" bolts8 flared end section with

" rivets or bolts. Fabricate end section center panels 8 by

On end section center panels for 66" and larger from 0.138 inch steel or 0.135 inch aluminum.

for 60" and larger diameter pipe and equivalent pipe arch

" stiffener angles 4

" × 2

" × 22 equivalent pipe arch with 2

:1 a r c h

G

.2

S td d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USEMETAL END SECTIONS

602-4

1/2024

PROJECT

G.2 or Span

Dia.

or Span

Dia.

D

/2

/2or Span

Dia.

or Span

Dia.

Original ground Original ground ground

Original ground

Original ground

Original

GeotextileGeotextile

Geotextile Geotextile Geotextile

Flowline

(INCHES) (FEET) (INCHES) (CUYD) (SQYD)

(INCHES) (FEET) (INCHES) (CUYD) (SQYD)

NO SCALE

NOTE:

3.

2.

1.

for payment.

Do not measure riprap placement excavation

Furnish separation and stabilization geotextile.

less than 10%.

Use for aprons serving culverts with slopes

L

A A

END SECTION

CULVERT WITH STANDARD

PLAN VIEW PLAN VIEW

END SECTION

CULVERT WITHOUT STANDARD

L

B

C D

B

C D

SECTION A-A SECTION B-B

SECTION C-C SECTION D-D SECTION E-E

PLAN VIEW

END SECTION

CULVERT WITH STANDARD

PLAN VIEW

END SECTION

CULVERT WITHOUT STANDARD

PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH

PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH

m in

H m in

H

Variable slope Variable slope

L L

/2

/2

D it c h

D

D it c h

D

E

EE

E b o tt o m w id th b o tt o m w id th

4D

H m in

D /2 m in

D /2 ditch slope

Match existing ditch slope

Match existing m in

H m in

D /2 m in

H

FOR INFORMATION ONLY

PROTECTIVE APRON DIMENSIONS AND QUANTITIES

OUTLET WITH DITCH

FOR INFORMATION ONLY

PROTECTIVE APRON DIMENSIONS AND QUANTITIES

OUTLET WITHOUT DITCH

2' min.

2' min.

or flatter

Sloped 1V:2H

QUANTITY

RIPRAP

ESTIMATED

CLASS

RIPAP

QUANTITY

GEOTEXTILE

ESTIMATED

SECTION

END

WITH

SECTION

END

WITHOUT

D

SIZE

CULVERT

L

LENGTH

APRON

H

DEPTH

APRON

14.5

12.5

38.5

29.8

15.1

10.7

4.4

2.7

1.3

35.6

27.2

13.3

9.3

3.6

2.0

0.9

QUANTITY

RIPRAP

ESTIMATED

CLASS

RIPAP

QUANTITY

GEOTEXTILE

ESTIMATED

SECTION

END

WITH

SECTION

END

WITHOUT

D

SIZE

CULVERT

L

LENGTH

APRON

H

DEPTH

APRON

14.5

12.5

49.8

38.7

18.5

13.2

5.2

3.2

1.7

44.4

34.0

15.6

10.8

3.9

2.2

1.0

CULVERT OUTLETS

PLACED RIPRAP AT

251-1W

8/2016

:3 a r c h

G

.3

S td

W d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.3

FLOW Tape r at

5:1 ratio

N o r m a l d it c h l in e subgrade elevation

Maximum 2D or

S u b g r a d e s h o u ld e r o r e n d s e c ti o n

E n d o f p ip e b e v e l

Flat botto m di tch a t cul vert ends

Normal ditch line

Pipe culvert

Subgrade shoulder

Pavement surface

Berm slope

1:3 max

1:1.5 maximum slope

D ditch line

Normal

Subgrade pipe as staked

Slope at

Original ground cut slopeNormal

FLOW Tape r at

5:1 ratio

Flat botto m di tch a t cul vert ends

Normal ditch lineSubgrade shoulder ditch line

Normal

FLOW

1'

B e rm

D d ip a t c e n te r dimension of all pipe arch culverts.

D equals the diameter of all round pipe or the rise 1.

SPECIAL DITCH TRANSITION AND TREATMENT FOR PIPE CULVERT INLET ON-GRADE

SECTION A-A

A

A

PLAN

NOTE:

NO SCALE

3'

3' (min.)

SPECIAL DITCH TRANSITION AND TREATMENT FOR PIPE CULVERT ENDS IN SAGS

:1 a r c h

G

.4

D it c h

W id e n in g

A n d T r e a tm e n t a t

C u lv e r t

E n d d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

TREATMENT AT CULVERT ENDS

DITCH WIDENING AND

PROJECT

G.4

CL CL CLCL CL CL

Ditch Inlet Ditch Inlet

TYPICAL GUTTER PLACEMENT

ONE INTERMEDIATE SLOPE

ONE STEEP SLOPEBOTH SIDES FLATBOTH SLOPES STEEP

ONE FLAT SLOPE

ONE STEEP SLOPE

SECTION A-A SECTION B-B

DETAIL A

B

B

A A

APPROXIMATE QUANTITIES

Normal di tch l ine

Minimum Depth (H)

Inlet concrete for

Additional inlet concrete

Gutter concrete

(not included above)

Cover concrete

Cover reinforcing steel

Pipe size

Concrete

Ditch and Inlet Ditch and Inlet

Cover

Type 7B- double gutter

Cover

Type 7B- double gutterSee Detail A loose rock (typ.)

Normal ditch grade pipes to be sealed by welding

Open areas at end of shear connector each end of each pipe

Weld

V a r ia b le

H v a r ie s

Ty pe

B

Ty pe

A slope, 1:2 max.

varies with ditch

Slope on apron

2'-0"

12" 15" 18"

3'-1"

24" 30"

4'-2"

36"

1.7311.5351.3391.1431.0450.947

0.413 cuyd

63 lb.

minimum depth, CUYD

3" Keyway 4

3'-5"

5'-4"

4' -0

5' -4

4' -0

5'-4"4'-0"

8"3'-0"8" both sides

2'-0"

3" 3"

5"

"2

"2

"4 12'-3 "2

12'-6 "2 13'-7

(2 at 3'-0")

"8

" x 2

" x 22

L 2

(2 at 3'-0" required)

"8

L 2" x 2" x " x 4" stud2

" holes to be drilled8

" at8 3in L 2" x 2" x

Type 7B: 1.185 cuyd

Type 7A: 0.724 cuyd

0.362 cuyd for each additional foot of depth (H)

"2

10.68 lbs./ft may be substituted.

2" dia. solid steel bar at pipe at 6.41 lbs./ft (ASTM A53).

" OD double-extra strong steel 2

" OD iron pipe2

" centers4 on 1

3-#5 x 5'-0" spaced m in

1'-2"3'-0"1'-2"

8.

7.

6.

5.

4.

3.

2.

1.

Warp ditch to tie smoothly into inlet gutter.

between two grades.

Type 7B has a double gutter when inlet is in a sag

Type 7A has a single gutter when inlet is on a grade.

acceptable if approved.

Alternate methods of anchoring angle iron will be

AASHTO M 111.

Galvanize grate after fabrication in accordance with

NOTE:

NO SCALE

Maximum depth (H) is 12'-8".

centers and vertical bars on 12-inch centers.

centers each way. In walls, place horizontal bars on 6-inch clear from face of concrete. In floors, place bars on 6-inch

".4

Ensure outside dimensions of grate are 3'-4" x 2'-11 inch -2

All reinforcing bars are #5 placed a minimum 1

:4

F e b r u a r y

G

.5

I n le t ty p e

A a n d

B d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

FOR 12" TO 36" CULVERT

TYPE 7A AND 7B

INLET

604-8

1/2024

PROJECT

G.5

1'

5.

4.

3.

2.

1.

WITH BURIED DOWN DRAIN

SPILLWAY ASSEMBLY

WITH SURFACE DOWN DRAIN

SPILLWAY ASSEMBLY

PROTECTIVE APRON

ELEVATION

ELEVATION

PLAN

Section 602

Coupling band

Variable

Dow n dr ain

Se ct ion

Pipe anchor assembly

Dow n dr ain

Se ct ion

Variable

Section 602 pipe

Approved alternate designs may be used.

apron.

Place class 2 riprap conforming to Section 251 for protective before tightening.

Make all coupling band connections water tight by placing from helically corrugated pipe with factory annular or reformed Fabricate spillway assembly from annular corrugated pipe, or

Protective apron

Protective apron

NO SCALE

NOTE:

Sp illw ay a ss m bl y

- S ec tio n

Va ria bl e sli p-jo in t pipe

Va ria bl e sli p-jo in t

Sp illw ay a ss em bl y

Section 606

Max cover 24" Min cover 12"

27" for 30" down drains 21" for 24" down drains 15" for 18" down drains 8" for 12" down drains

27" for 30" down drains 21" for 24" down drains 15" for 18" down drains 8" for 12" down drains

5' in

3'

1'

4'

1'

4'

1' ends. Use 0.064-inch galvanized steel or 0.060-inch aluminum.

See Standard W606-14 for Pipe Anchor Assembly Detail.

min

1'

4' min in m in plumb on 10'± centers inch bead of approved caulking under each half of the band 16

5'

3'

DOWN DRAIN AND SLIP-JOINT

SPILLWAY ASSEMBLY WITH

606-11W

FP-24. FP-14

9/2009

:2 a rc h

G

.6

S td

W

-1 d o w l_ p w

\d

\w a

-e f-g if p n

-1

-1 h y d p ln h y -0

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.6

PRELIMINARY - NOT FOR CONSTRUCTION

Va ria ble sl op e

4.

3.

2.

1.

Iron pipe stakes specified in contract

Plate material to be ASTM A36. Galvanize after fabrication.

20% or greater.

Approved alternative pipe anchor assemblies may be used.

Galvanize all pipe stakes and hardware after fabrication.

Culvert crown

NO SCALE

7" Coupling band

12" or 24" Coupling band

" Slots4

" x 32

" Steel plate thickness4

" Iron pipe2

8' x 1 to the centerline of the pipe

Measure length of coupling band parallel

ANCHOR ASSEMBLY

STEEL PLATE

METAL PIPE ASSEMBLY

pipe or equalCoupling band

Steel plate only when cable is specified

NOTE:

" x 1" Slots4

" cable clamp8

Collar of 2"

"16

" cable when8

Place slope anchor assemblies on 20' max. centers on slopes

3"

1"

1" R

6"

"8

1"8

"2

4"2

12"

"2

2 "2 stakes, 2.72 lbs/ft (min.)

PIPE ANCHOR ASSEMBLY

606-14W

9/2009

:2 a r c h

G

.7

S td

W d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.7

2H:1V until daylight

Continue backslope at

Geotextile

Edge of traveled way

Riprap Ditch, Class 2

Culvert end section

Geotextile

Riprap, Class 2

2'-0"

2H:1 V2H:1V

V-DITCH

2'-0"

V a r ie s

A

A

MODIFIED RIPRAP APRON AT CULVERT OUTLET WITH DITCH

" 6

Va rie s

PLAN

SECTION A-A

:5 a r c h

G

.8

R ip r a p d it c h d e d o w l_ p w

\d

\w a e f g if p n h y d p ln h y

.d g n

RIPRAP DITCH DETAILS

PROJECT

G.8

WORK

ROAD

AHEAD

WORK

ROAD

AHEAD

ROAD WORK

END

ROAD

CLOSED

ROAD

CLOSED

WORK

ROAD

AHEAD

ROAD

CLOSED

ROAD

CLOSED

ROAD WORK

END 1

G20-2

G20-2

W20-1

W20-1

W20-1

R11-2

R11-2

R11-2

R11-2

N F

C is p u s R d

N F

C is p u s R d

Y e ll o w ja c k e t

C r e e k

Cispus River

N F -2

M

A

IN

NF-2801

ROAD

CLOSED

ROAD

CLOSED

R11-2

R11-2

N F

2. Location of signs will be approved by CO.

Legend: Black, non-reflectorized

Background: Orange, reflectorized

1. Construction sign colors

NOTES:

N

Scale in feet

500 0 500 1000 1500

T o R a n d le m ile s

:5

F e b r u a r y

H

.1

T e m p o ra ry

T ra ff ic

C o n tr o l

S ig n g d o w l_ p w

\d

\w a e f g if p n p ln tt c

.d g n

SIGNING

TRAFFIC CONTROL

TEMPORARY

PROJECT

H.1

ROAD WORK

END

WORK

ROAD

AHEAD

ROAD NAME

WORK

ROAD

AHEAD

ROAD WORK

END

WORK

ROAD

xxxxx

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

WORK

ROAD

AHEAD

xx

MPH

ROAD NAME

ROAD WORK

END

WORK

ROAD

xxxxxxx

ROAD WORK

END

xx

MPH

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

ROAD TYPE

DISTANCE BETWEEN

A B C

NOTE:

M in o r R o a d

M a jo r R o a d

B as de ter mi ne d b y t he C

O

Wor k z on e A re a o f I nfl ue nc

(S ee S ign S pa cin g T ab le)

ADVANCE W

ARNI

NG

AREA

(S ee S ign S pa cin g T ab le)

ADVANCE W

ARNI

NG

AREA

A

B

C

A

A

A

A

Pr oje ct Lim its

See Note 8 W16-8P W20-1 over

W20-1

G20-2

See Note 9 W20-1

See Note 9 W20-1

(optional) W13-1P

See Note 10 G20-1

G20-2

See Note 8 W16-8P W20-1 over

G20-2

G20-2

See Note 9 W20-1

See Note 9 W20-1

(optional) W13-1P

See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).

name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual

Cover post-mounted signs when not applicable.

Do not store traffic control devices along the roadway when not in use.

Maintain two-way traffic during all non-work hours except as approved.

Ensure all sign supports exposed to traffic are crashworthy.

construction area.

needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.

signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.

and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be

Erect all project advance warning signs before starting construction work.

State standards may be used as an alternative if approved.

verify that an encroachment permit has been obtained.

If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.

at each end of the project. Show the distance on the G20-1 sign to the

Ro ad N ame

SIGN SPACING TABLE

For work zones that are 2 miles or more in length, install G20-1 signs

Sign Spacing Table.

When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.

Expressway / Freeway

NO SCALE

SIGNS IN FEET

Rural greater than 50 mph

Urban and Rural 35 mph to 50 mph

Urban and Rural 30 mph and less

ADVANCE SIGNING

TEMPORARY TRAFFIC CONTROL

635-1

2/2024

:5

F e b ru a ry

H

.2

T e m p o ra ry T ra ff ic

C o n tr o l A d v a n c e d s ig n in g S ta n d a rd

D e d o w l_ p w

\d

\w a

-e f-g if p n

-1

-1 p ln tt c -0

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

H.2

NO SCALE

See post detail (typ.)

Breakaway holes

See table for hole size parallel to sign face.

Field drill holes through post

Bottom of sign panel

Post�

Local tangent

< 10

" diameter4 1Attach sign panels with a minimum of two a minimum lateral distance of 1 ft behind the face of lateral offset of 2 ft may be used. In areas with curbs, 6" x 6" or larger.

Use 7 ft minimum spacing between posts for sign posts and 6 ft minimum mounting height for secondary sign.

use 7 ft minimum mounting height for main sign

NOTE:

90°

93°

WOOD POST SELECTION TABLE

X X

0.75X

H

H

X

0.2X0.6X 0.2X

Y

H

D

H

D

H

D

Long side of post

D

7.

6.

5.

4.

3.

2.

1.

In areas where lateral distance is limited, a minimum

D = Post embedment depth for average soil conditions.

Select post lengths to fit field conditions.

H1 and H2 = Overall post length.

bolts per post.

In pedestrian locations, or in areas with obstructed views, the curb may be used.

SINGLE POST SIGN TWO POST SIGN

SIGN INSTALLATION ANGLE

POST DETAIL

E d g e o f s h o u ld e r

E d g e o f tr a v e le d w a y

State standards may be used as an alternative if approved.

S e e N o te m in

S e e N o te m in

See Note 4

6' - 12'

On tangent alignment

200'

"X"

WIDTH AREA

OF POSTS

NUMBER POST SIZE D HOLE SIZE

(SQFT)

Other Shapes ≤ 48" Diamond ≤ 36"

Other Shapes ≤ 12' Diamond ≤ 48"

(INCH) (INCH) (INCH)

Diamond ≤ 48"

65 - 95

65 - 95

50 - 65

50 - 65

20 - 50

10 - 20

10 - 20

> 30'

> 17'

12' - 16'

> 13'

6 x 6

4 x 6

4 x 6

6 x 6

4 x 6

4 x 4

6 x 6

4 x 6

4 x 4

1.5

1.5

1.5

1.5

WOOD POSTS

SIGN INSTALLATION

TEMPORARY TRAFFIC CONTROL

635-14

:5

F e b ru a ry

H

.3

T e m p o ra ry T ra ff ic

C o n tr o l S ig n I n s ta ll a ti o n W o o d P o s ts

S ta n d a rd

D e d o w l_ p w

\d

\w a

-e f-g if p n

-1

-1 p ln tt c -0

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

H.3

NO SCALE

posted speed, not the advisory speed.

Approach speed based on the regulatory *

5.

4.

3.

2.

1.

in the buffer space.

Do not allow equipment, materials, or vehicles to be parked or stored

WORK AHEAD (W20-1) and END ROAD WORK (G20-2) signs.

If closure is completely within the project limits, eliminate the ROAD display the name of the Contractor on the pilot car.

sign at a conspicuous location on the rear of vehicle. Prominently

For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) conditions as approved.

Final location and spacing of devices may be changed to fit field to those depicted for the opposite direction of travel.

Signs are shown for one direction of travel only. Place signs similar

(optional)

Flagger location

ADVANCE WARNING AREA (See Sign Spacing Table)

TERMINATION AREAVARIABLEBUFFER SPACEABC

WORK

ROAD

AHEAD

See Note 4

W20-1

BE

PREPARED

TO STOP

W20-7

(optional)

W16-2Pxxx

FEET

Flagger location

A

ROAD WORK

END

See Note 4

G20-2

W3-4

Traffic flow

Traffic flow

NOTE:LENGTH AND SPACING TABLE

SIGN SPACING TABLE

LENGTH

BUFFER SPACE

SPEED*

APPROACH

BUFFER SPACE

Spacing Table)

(See Length and

Spacing Table)

(See Length and WORK SPACE

ROAD TYPE

DISTANCE BETWEEN

A B C

Expressway / Freeway

SIGNS IN FEET

Rural greater than 50 mph

Urban and Rural 35 mph to 50 mph

Urban and Rural 30 mph and less

FEETMPH

(WITH FLAGGERS)

ROAD CLOSURE LAYOUT

TEMPORARY TRAFFIC CONTROL

635-5

:0

F e b r u a r y

H

.4

T e m p o ra ry

T a ff ic C o n tr o l R o a d

C lo s u re L a y o u d o w l_ p w

\d

\w a e f g if p n p ln tt c

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

H.4

Install sign system R1-1

HILL

BLOCKS

VIEW

Install sign system W7-6

HILL

BLOCKS

VIEW

Install sign system W7-6

STOP

HILL

BLOCKS

VIEW

HILL

BLOCKS

VIEW

Install sign system W7-6

Install sign system W7-6

N

BEGIN PROJECT

N

Scale in feet

400 0 400 800 1200

T o R a n d le m ile s

10+00.00

:4 a r c h

I .1

P e r m a n e n t

T r a f f ic

C o n tr o l

S ig n g d o w l_ p w

\d \w a e f g if p n p ln p tc

.d g n

PLAN

TRAFFIC CONTROL

PERMANENT

PROJECT

I.1

Bottom of sign single post installations of post. Omit notch for

Saw cut notch full width post�

See table for hole size post, parallel to sign face.

Field drill holes through

Backfill material

Same post size

Same post size

Same post size

Backfill material

Backfill material

Backfill material

" lock nut16

" oversized washer16

" outside dia.)4 1(1 " bolt16

" bolt thru the post8

NO SCALE

NOTE:

multiple sign installations.

- Dimensions of a rectangle enclosing all the signs for to back signs

- Overall dimensions of the sign for a single sign, or back For the purpose of post selection X and Y are as follows:

longest post.

Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.

D is the minimum post embedment depth for average soil to fit field conditions.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .