wa-ef-gifpn-gifpn603-2017-1-2_plans.pdf
PDF 7 MB Posted
- Solicitation number
- 69056722B000026
About this file
This document outlines a federal solicitation for construction services. The Solicitation Number is 69056722B000026 for WA ERFO FS GIFPN603 2017-1(2), Gifford Pinchot Repairs 2017, Phase 2. The opportunity type is a solicitation from the Department of Transportation Federal Highway Administration seeking construction services as detailed in the attached solicitation documents for repairs at the Gifford Pinchot National Forest. Responses were due by the date specified in the solicitation documents. The award date will also be included in the solicitation documents. Pricing, terms, and any set-aside designations are defined in the attached solicitation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.c
"O u Q) .s::;
u
.c
"O Q) C:
C\ "iii Q)
Fo
BEL
s"1<J1to, BRITISH COLUMBIA CANAD r'TiT ____ _
WASHINGTON KEY MAP
TYPE OF CONSTRUCTION:
Roadway repair, grading, aggregate base, and reinforced soil slopes.
DESIGN DESIGNATION:
ADT 2017
ADT 2037
V e (max)
<400 <400
25MPH
0.06
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
PLANS PREPARED BY
N
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
PLANS PREPARED BY
AS'COM
PROJECT MANAGER
C. WARREN
T 14 N
3 N
N .-, a: a:
STATE PROJECT
U. S. DE PARTMENT OF TRANSPORTATION
FEDE RAL HIGHWAY ADMINISTRATION
WA
ERFO FS GIFPN603
2017-1(2)
:;: w a: a:
PLANS FOR PROPOSED PROJECT
WA ERFO FS GIFPN603 2017-1(2)
GIFFORD PINCHOT REPAIRS 2017,
PHASE 2
w w .-, N a: a:
co
GIFFORD PINCHOT NATIONAL FOREST
LEWIS COUNTY, WASHINGTON
WW
NM
a: a:
LITZ
r----�-i
7.5 0
WW
M ,r a: a:
0.07 MILES PROJECT SITE
SCALE IN MILES
WW
a: a:
WW
a: a:
r---�""""�""""►-=-----P�--�Y
I N D E X TO S H E E T S
A.1
A.2
B.l
C.1
C.2
C.3
D.1
D.2
D.3
D.4
D.S
A. GENERAL INFORMATION
TITLE SHEET
PLAN SYMBOLS AND ABBREVIATIONS
B. SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
C. FR 63, MP 12.0
TYPICAL SECTION
PLAN AND PROFILE
SURVEY CONTROL
D. MISCELLANEOUS DETAILS
SILT FENCE DETAIL
CHECK DAM STANDARD
STABILIZED CONSTRUCTION EXIT DETAIL
FIBER ROLL DETAIL
STOCKPILE STABILIZATION DETAIL
FR 63
Latitud ngitude
46.603 121.85
APPROVED:
½
BRENT L COE
Chief of Eng1neer1ng
Western Federal Lands Highway Division
0 ½
Digitally signed by BRENT L COE Date: 2022.06.27 14:49:04 -07'00'
DATE _____ _
SHEET
NUMBER
A.1 z M I-
Sheet and Description
Section C
FR 63,
MP 12.0
Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM All ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM All ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM All ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM All ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM All ALL
A0120 15701-0000 SOIL EROSION CONTROL LPSM All ALL
A0140 20101-0000 CLEARING AND GRUBBING ACRE 0.26 0.26
A0160 20401-0000 ROADWAY EXCAVATION CUYD 40 45
A0180 20410-0000 SELECT BORROW CUYD 1,054 1,160
A0200 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE,
CLASS 1, TYPE A (NONWOVEN) SQYD 470 520
A0220 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 1,116 1,225
A0240 26101-0000 REINFORCED SOIL SLOPE SQFT 6,076 6,690
A0260 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 128 145
A0280 62502-0000 TURF ESTABLISHMENT SQYD 750 750
MileStone: 100% Final Date Completed: In Progress Report Date: 06/30/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-J un
-2
4:
P
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0
_w a-ef
1b a.
xl sm
]S he et
STATE PROJECT
B.1ERFO FS GIFPN603 2017-
1(2)WA
SHEET
NUMBER
6/23/22
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
19101 466194.314 1301107.407 3700.348 46°36'13.648952"N 121°51'00.160163"W 3635.0309 0.999741015 5/8" IR W/FHWA ALUM CAP 1.
19102 466177.370 1300942.023 3696.036 46°36'13.453760"N 121°51'02.524453"W 3630.7126 0.999741221 5/8" IR W/FHWA ALUM CAP
19103 466117.938 1300812.116 3691.850 46°36'12.845184"N 121°51'04.370253"W 3626.5214 0.99974142 5/8" IR W/FHWA ALUM CAP
PROJECT : 63 Road MP12 DATE OF FIELD WORK : August 2019
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Washington South SPCS NAD83 (2011)
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
2\ W as hi ng to n\ G iff or d_ Pi nc ho t\ pw
R oa d_ co nt ro ls he et .x ls x]
S he et
-M ay
-2
1:
W
FL
H D
S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
SHEET
NUMBER
ERFO FS GIFPN603
2017-1(2)WA
SURVEY CONTROL
| pg AA |
| Comments_wa-ef-gifpn-gifpn603-2017-1-2_plans |
| 05_wa-ef1712211ba |
| Comments_wa-ef-gifpn-gifpn603-2017-1-2_plans |
File details come from the government source that posted it. Updated .