wa-ef-gifpn-gifpn603-2017-1-2_plans.pdf

PDF 7 MB Posted

Attached to
WA ERFO FS GIFPN603 2017-1(2), Gifford Pinchot Repairs 2017, Phase 2
Solicitation number
69056722B000026
Issued by

About this file

This document outlines a federal solicitation for construction services. The Solicitation Number is 69056722B000026 for WA ERFO FS GIFPN603 2017-1(2), Gifford Pinchot Repairs 2017, Phase 2. The opportunity type is a solicitation from the Department of Transportation Federal Highway Administration seeking construction services as detailed in the attached solicitation documents for repairs at the Gifford Pinchot National Forest. Responses were due by the date specified in the solicitation documents. The award date will also be included in the solicitation documents. Pricing, terms, and any set-aside designations are defined in the attached solicitation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.c

"O u Q) .s::;

u

.c

"O Q) C:

C\ "iii Q)

Fo

BEL

s"1<J1to, BRITISH COLUMBIA CANAD r'TiT ____ _

WASHINGTON KEY MAP

TYPE OF CONSTRUCTION:

Roadway repair, grading, aggregate base, and reinforced soil slopes.

DESIGN DESIGNATION:

ADT 2017

ADT 2037

V e (max)

<400 <400

25MPH

0.06

SPECIFICATION:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

PLANS PREPARED BY

N

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

VANCOUVER, WASHINGTON

PLANS PREPARED BY

AS'COM

PROJECT MANAGER

C. WARREN

T 14 N

3 N

N .-, a: a:

STATE PROJECT

U. S. DE PARTMENT OF TRANSPORTATION

FEDE RAL HIGHWAY ADMINISTRATION

WA

ERFO FS GIFPN603

2017-1(2)

:;: w a: a:

PLANS FOR PROPOSED PROJECT

WA ERFO FS GIFPN603 2017-1(2)

GIFFORD PINCHOT REPAIRS 2017,

PHASE 2

w w .-, N a: a:

co

GIFFORD PINCHOT NATIONAL FOREST

LEWIS COUNTY, WASHINGTON

WW

NM

a: a:

LITZ

r----�-i

7.5 0

WW

M ,r a: a:

0.07 MILES PROJECT SITE

SCALE IN MILES

WW

a: a:

WW

a: a:

r---�""""�""""►-=-----P�--�Y

I N D E X TO S H E E T S

A.1

A.2

B.l

C.1

C.2

C.3

D.1

D.2

D.3

D.4

D.S

A. GENERAL INFORMATION

TITLE SHEET

PLAN SYMBOLS AND ABBREVIATIONS

B. SUMMARY OF QUANTITIES

SUMMARY OF QUANTITIES

C. FR 63, MP 12.0

TYPICAL SECTION

PLAN AND PROFILE

SURVEY CONTROL

D. MISCELLANEOUS DETAILS

SILT FENCE DETAIL

CHECK DAM STANDARD

STABILIZED CONSTRUCTION EXIT DETAIL

FIBER ROLL DETAIL

STOCKPILE STABILIZATION DETAIL

FR 63

Latitud ngitude

46.603 121.85

APPROVED:

½

BRENT L COE

Chief of Eng1neer1ng

Western Federal Lands Highway Division

0 ½

Digitally signed by BRENT L COE Date: 2022.06.27 14:49:04 -07'00'

DATE _____ _

SHEET

NUMBER

A.1 z M I-

Sheet and Description

Section C

FR 63,

MP 12.0

Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM All ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM All ALL

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND

ASSURANCE LPSM All ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM All ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM All ALL

A0120 15701-0000 SOIL EROSION CONTROL LPSM All ALL

A0140 20101-0000 CLEARING AND GRUBBING ACRE 0.26 0.26

A0160 20401-0000 ROADWAY EXCAVATION CUYD 40 45

A0180 20410-0000 SELECT BORROW CUYD 1,054 1,160

A0200 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE,

CLASS 1, TYPE A (NONWOVEN) SQYD 470 520

A0220 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 1,116 1,225

A0240 26101-0000 REINFORCED SOIL SLOPE SQFT 6,076 6,690

A0260 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 128 145

A0280 62502-0000 TURF ESTABLISHMENT SQYD 750 750

MileStone: 100% Final Date Completed: In Progress Report Date: 06/30/22

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-J un

-2

4:

P

M

Remarks and/or Determination of

Estimated Quantity Pay Item Description Unit

Estimated Quantities c:

\p w -w or k\ d0

_w a-ef

1b a.

xl sm

]S he et

STATE PROJECT

B.1ERFO FS GIFPN603 2017-

1(2)WA

SHEET

NUMBER

6/23/22

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

19101 466194.314 1301107.407 3700.348 46°36'13.648952"N 121°51'00.160163"W 3635.0309 0.999741015 5/8" IR W/FHWA ALUM CAP 1.

19102 466177.370 1300942.023 3696.036 46°36'13.453760"N 121°51'02.524453"W 3630.7126 0.999741221 5/8" IR W/FHWA ALUM CAP

19103 466117.938 1300812.116 3691.850 46°36'12.845184"N 121°51'04.370253"W 3626.5214 0.99974142 5/8" IR W/FHWA ALUM CAP

PROJECT : 63 Road MP12 DATE OF FIELD WORK : August 2019

PROJECT UNITS : US SURVEY FOOT

COORDINATE SYSTEM : Washington South SPCS NAD83 (2011)

EPOCH DATE : 2010.0000

VERTICAL DATUM : Orthometric elevations based on the NAVD88GEOID12b

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

C

M yF ile s\

Pr oj ec ts

_2

2\ W as hi ng to n\ G iff or d_ Pi nc ho t\ pw

R oa d_ co nt ro ls he et .x ls x]

S he et

-M ay

-2

1:

W

FL

H D

S ur ve y

W

FL

H D

S ur ve y

D es ig ne d by

C he ck ed b y:

STATE PROJECT

SHEET

NUMBER

ERFO FS GIFPN603

2017-1(2)WA

SURVEY CONTROL

pg AA
Comments_wa-ef-gifpn-gifpn603-2017-1-2_plans