wa-ef-gifpn-gifpn603-2017-1-2_Earthwork.pdf
PDF 165 KB Posted
- Solicitation number
- 69056722B000026
About this file
This document contains a basic volume report for earthwork on a federal highway project in Washington state. The report provides station-by-station cross-sectional data and calculates cut and fill volumes for a road section between stations 21+50 and 25+00 on State Route 63 near Gifford Pinchot National Forest in Lewis County. The total cut volume is 1,094 cubic yards and total fill volume is also 1,094 cubic yards.
The related federal contract opportunity is solicitation number 69056722B000026 for Gifford Pinchot Repairs 2017, Phase 2 issued by the Federal Highway Administration within the Department of Transportation. The solicitation seeks bids for construction services to repair sections of road within Gifford Pinchot National Forest as documented in the attached documents. No further details are provided on response dates, pricing terms, or other requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
PROJECT
WA ERFO FS GIFPN603 2017-1(2)
GIFFORD PINCHOT REPAIRS 2017,
PHASE 2
FDR 63 MP 12.0
EARTHWORK
21+50.00 – 25+00.00
GIFFORD PINCHOT NATIONAL FOREST
LEWIS COUNTY,
WASHINGTON
carrie.warren Sticky Note Accepted set by carrie.warren carrie.warren Sticky Note Completed set by carrie.warren
Basic Volume Report Report Created: 11/12/2019
Time: 12:54pm
Cross Section Set Name: RD63 MP12 Alignment Name: RD63 MP12
Input Grid Factor: 1.000000 Note: All units in this report are in feet, square feet and cubic yards unless specified otherwise.
21+50.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 21+60.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 21+80.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 22+00.00 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 22+20.00 1.00 0.03 0.01 0.01 1.00 15.36 5.69 5.69 -5.68 22+40.00 1.00 8.88 3.30 3.30 1.00 85.57 37.38 37.38 -39.76 22+60.00 1.00 4.27 4.87 4.87 1.00 123.04 77.26 77.26 -112.15 22+80.00 1.00 0.00 1.58 1.58 1.00 0.00 45.57 45.57 -156.14 23+00.00 1.00 14.30 5.30 5.30 1.00 186.25 68.98 68.98 -219.83 23+20.00 1.00 0.02 5.30 5.30 1.00 253.02 162.69 162.69 -377.21 23+40.00 1.00 0.00 0.01 0.01 1.00 0.00 93.71 93.71 -470.92 23+60.00 1.00 0.57 0.21 0.21 1.00 181.94 67.38 67.38 -538.09 23+80.00 1.00 5.45 2.23 2.23 1.00 164.91 128.46 128.46 -664.32 24+00.00 1.00 0.89 2.35 2.35 1.00 157.54 119.42 119.42 -781.40 24+20.00 1.00 6.70 2.81 2.81 1.00 156.91 116.46 116.46 -895.05 24+40.00 1.00 2.41 3.38 3.38 1.00 94.42 93.08 93.08 -984.75 24+60.00 1.00 0.00 0.89 0.89 1.00 47.04 52.39 52.39 -1036.25 24+80.00 1.00 10.29 3.81 3.81 1.00 11.54 21.70 21.70 -1054.14 25+00.00 1.00 0.00 3.81 3.81 1.00 0.00 4.27 4.27 -1054.60
Grand Total: 39.86 39.86 1094.46 1094.46
Baseline Station
- - - - - - - - - - - - - - - - Station Quantities - - - - - - - - - - - - - - - - Mass
Ordinate
- - - - - - - - - - Cut - - - - - - - - - - - - - - - - - - - - Fill - - - - - - - - - -
Factor Area Volume Adjusted Factor Area Volume Adjusted
Page 1 of 1Basic Volume Report
11/12/2019file:///C:/Users/brenda.mcintosh/AppData/Local/Temp/InRoadsReport.htm
File details come from the government source that posted it. Updated .