Text version

UAsbestos Updates

Complex Name or Bldg Number: 1117 Date: May 2017

UDescription of Asbestos: U UQuantity: Sq. Ft./Ln.

Ft.

1. Room 316A- 12 x 12 tan with brown floor tile and mastic Approx. 38000 SF Located throughout occupied areas of bldg. except 2-20% chrysotile latrines and stairwells; samples have come back positive in the mastic and tile layer. Also beige with white 12 x 12-mastic only.

Room 303C- 12 x 12 pink floor tile and mastic, all floors except dayrooms, latrines, and hall entrance.

Room 203B-12 x 12 white with grey-mastic only.

Latrine/kitchen area-12 x 12 green and olive green tile/mastic.

Storage in kitchen- 12 x 12 tan with brown streaks tile/mastic.

* Approx. 120 SF of floor tile/mastic was abated by Innovar on the 1P st P floor hallways in front of the East and West latrine areas.

2. Ceiling (lid) center hallway first floor

3. Blue TSI Pipe Insulation sealant

4. Roof flashing along seams on roof-black sealant tar.

5. Mechanical room 2P nd P floor-TSI elbow. Approx. 25 elbows

UNO ASBESTOS IN:

• Asphalt and gravel roofing-2P nd P floor.

• 4 inch base cove and mastic in room 316A.

• 2 x 4 suspended ceiling tile in 316A.

• Mulberry carpet-room 315C.

• 4 inch grey base cove and mastic in room 315C.

• 4 inch dark brown base cove and mastic in room 164.

• Brown grey with clusters carpet in room 312.

• Plaster ceiling in latrines.

• TSI pipe insulation in room 303 hallway.

• Stair tread and mastic in stairwells.

• Wallboard (room 203A).

• 2P nd P floor mech rm-TSI end putty.

• Fabric covered wallboard (room 164).

• 1P st P floor North, room 138-6 inch brown base cove and mastic.

• Short orange brown carpet and mastic (rm 128).

• 4 inch beige tan base cove and mastic (rm 160).

• Mute brown carpet without mastic (rm 134).

• Crawl space-exposed soil.

• 1 x 1 smooth ceiling tile-SouthEast entryway.

URemarks:

• UASBESTOS ABATEMENT PROJECTU- Innovar completed an asbestos abatement project from 2-2-09 to 8-7-09 at 1117.

Abatement included removal of TSI fittings in all bathrooms on the 1P st P, 2P nd P, and 3P rd P floors (bathrooms are located on the East and West side on each floor-1 female and male latrine on each side of each floor). Also, during the final abatement of TSI fittings on the 1P st P floor, Innovar removed approx. 120 SF of VAT on the 1P st P floor East and West wing in the hallway areas by the latrines. Innovar started with the 3P rd Pfloor and progressed down to the first floor finishing with

TSI fittings and the tile/mastic in the hallways in front of the latrine areas. Pre-AMS visual inspections were completed. Final air monitoring was completed and passed by OHT after each latrine area on each side of the bldg. After each latrine area passed final air monitoring, a final visual clearing inspection was completed by DPW Environmental and Innovar was cleared for containment teardown after each latrine area was completed. Closeout package and photos are located on the inside cover of the bldg. survey.

• November 9, 2001- E2M abated approx. 266 SF of tile and mastic.