Brand_Name_JA_Bldg_18.pdf

PDF 387 KB Posted

Attached to
ADD/ALTER BUILDING 18 FOR SFS, BRADLEY AIR NATIONAL GUARD BASE, CT
Solicitation number
W91ZRS-18-R-5001
Issued by

About this file

Brand Name Justification and Approval

View the file

Other files

File Type Posted
W91ZRS-18-R-5001_AMEND_0002.pdf PDF
20180911_Pre-bid_RFI_Log_CTANG_SFS.pdf PDF
AMENDMENT_REPORT_-_005.pdf PDF
20180907_Pre-bid_RFI_Log_CTANG_SFS.pdf PDF
W91ZRS-18-R-5001_PP_Conf_CON_Brief_24_Jul_18.pdf PDF
Pre-Bid_Attendance_20180724.pdf PDF
CE_CEKT149052_Pre-Bid_Presentation.pdf PDF
W91ZRS-18-R-5001_Solicitation.pdf PDF
EXHIBIT_A.doc DOC document
EXHIBIT_C-REV.doc DOC document
EXHIBIT_B.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No: 18-34

Justification and Approval for Other Than Full and Open Competition

FOR OFFICIAL USE ONLY

1. Contracting Activity: USPFO-CT

2. Description of Action: Brand name items for CEKT149042 Add and repair Building 18 SFS.

3. Description of Supplies/Services: See X’d items below.

X Advantor Security System - Air Force/NGB certified security system is the only system used at Bradley ANGB. Estimated Cost: $58,500

X Monaco Mass Notification Panel and Monaco Fire Alarm Addressable Components are installed in all of the 103AW modernized facilities. Monaco components are designed to function properly with the Monaco D21 ECC which is installed in two locations at the Bradley

ANGB. Estimated Cost: $50,400

X Monaco MAAP-X - Estimated Cost: $21,500

X Schlage CO200 electronic locks are the standard for securing buildings at the 103AW. CO-

200CY70 KP RHO 626 BD RH – Cylindrical, CO-200993R70 KP RHO 626 BD RP – Exit, and

CO-200MS70 KP RHO 626 BD RH – Mortise. Estimated Cost: $7200

4. Authority Cited: FAR 6.302-1(a) and (c) Application for brand name descriptions. An acquisition or portion of an acquisition that uses a brand-name description or other purchase description to specify a particular brand-name, product, or feature of a product, peculiar to one manufacturer. As only a portion of the acquisition is for brand-name product(s), this justification and approval is to cover only the portion of the acquisition which is for the brand-name product(s), and the approval level that therefore applies is that of the Contracting Officer for up to $700,000 for each brand-name product. The brand-name product(s) are essential to the

Government’s requirements, thereby precluding consideration of a product manufactured by another company. This justification shall be posted with the solicitation in accordance with FAR

5.102(a)(6).

5. Reason for Authority Cited: These are the only manufacturers that allow for standardization and guaranteed interoperability. To build a structure that did not utilize these items would compromise the ability to secure, protect, and monitor the building without substantial duplication of cost that would most likely not be recovered through competition.

6. Efforts to Obtain Competition: The procurement of these items will be part of a construction acquisition that is being posted as a competitive 100% small business set aside project.

7. Actions to Increase Competition: No actions have been taken at this time to increase competition.

8. Market Research: Specific market research for these items and systems has not been performed.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/05.htm#P30_4481

9. Interested Sources: To date, no other sources have written to express an interest. This justification will be posted with the solicitation.

10. Other Facts: The project is expected to be awarded based on price and technical/past performance. The source selection authority will make the determination of price fair and reasonable prior to award.

11. Technical Certification: I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Base Civil Engineer

12. Requirements Certification: I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.

Contract Specialist

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. Determination of price fair and reason will be based on fair competition for the main construction project.

Contracting Officer

14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Approval

Based on the foregoing justification, I hereby approve the procurement of the items checked above on an other than full and open competition basis pursuant to the authority cited in FAR

6.302-1, subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.

2018-06-12T20:03:41-0400
CHMIELINSKI.HENRY.H.IV.1009833222
2018-06-13T13:25:29-0400
HOSS.ERIC.MATTHEW.1014786020
2018-06-13T14:20:33-0400
TORTORELLA.THOMAS.E.1014600341
2018-06-13T14:20:54-0400
TORTORELLA.THOMAS.E.1014600341
2018-06-13T14:22:18-0400
TORTORELLA.THOMAS.E.1014600341

File details come from the government source that posted it.