Brand_Name_JA_Bldg_18.pdf
PDF 387 KB Posted
- Solicitation number
- W91ZRS-18-R-5001
About this file
Brand Name Justification and Approval
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91ZRS-18-R-5001_AMEND_0002.pdf | ||
| 20180911_Pre-bid_RFI_Log_CTANG_SFS.pdf | ||
| AMENDMENT_REPORT_-_005.pdf | ||
| 20180907_Pre-bid_RFI_Log_CTANG_SFS.pdf | ||
| W91ZRS-18-R-5001_PP_Conf_CON_Brief_24_Jul_18.pdf | ||
| Pre-Bid_Attendance_20180724.pdf | ||
| CE_CEKT149052_Pre-Bid_Presentation.pdf | ||
| W91ZRS-18-R-5001_Solicitation.pdf | ||
| EXHIBIT_A.doc | DOC document | |
| EXHIBIT_C-REV.doc | DOC document | |
| EXHIBIT_B.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No: 18-34
Justification and Approval for Other Than Full and Open Competition
FOR OFFICIAL USE ONLY
1. Contracting Activity: USPFO-CT
2. Description of Action: Brand name items for CEKT149042 Add and repair Building 18 SFS.
3. Description of Supplies/Services: See X’d items below.
X Advantor Security System - Air Force/NGB certified security system is the only system used at Bradley ANGB. Estimated Cost: $58,500
X Monaco Mass Notification Panel and Monaco Fire Alarm Addressable Components are installed in all of the 103AW modernized facilities. Monaco components are designed to function properly with the Monaco D21 ECC which is installed in two locations at the Bradley
ANGB. Estimated Cost: $50,400
X Monaco MAAP-X - Estimated Cost: $21,500
X Schlage CO200 electronic locks are the standard for securing buildings at the 103AW. CO-
200CY70 KP RHO 626 BD RH – Cylindrical, CO-200993R70 KP RHO 626 BD RP – Exit, and
CO-200MS70 KP RHO 626 BD RH – Mortise. Estimated Cost: $7200
4. Authority Cited: FAR 6.302-1(a) and (c) Application for brand name descriptions. An acquisition or portion of an acquisition that uses a brand-name description or other purchase description to specify a particular brand-name, product, or feature of a product, peculiar to one manufacturer. As only a portion of the acquisition is for brand-name product(s), this justification and approval is to cover only the portion of the acquisition which is for the brand-name product(s), and the approval level that therefore applies is that of the Contracting Officer for up to $700,000 for each brand-name product. The brand-name product(s) are essential to the
Government’s requirements, thereby precluding consideration of a product manufactured by another company. This justification shall be posted with the solicitation in accordance with FAR
5.102(a)(6).
5. Reason for Authority Cited: These are the only manufacturers that allow for standardization and guaranteed interoperability. To build a structure that did not utilize these items would compromise the ability to secure, protect, and monitor the building without substantial duplication of cost that would most likely not be recovered through competition.
6. Efforts to Obtain Competition: The procurement of these items will be part of a construction acquisition that is being posted as a competitive 100% small business set aside project.
7. Actions to Increase Competition: No actions have been taken at this time to increase competition.
8. Market Research: Specific market research for these items and systems has not been performed.
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/05.htm#P30_4481
9. Interested Sources: To date, no other sources have written to express an interest. This justification will be posted with the solicitation.
10. Other Facts: The project is expected to be awarded based on price and technical/past performance. The source selection authority will make the determination of price fair and reasonable prior to award.
11. Technical Certification: I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.
Base Civil Engineer
12. Requirements Certification: I certify that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and belief.
Contract Specialist
13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. Determination of price fair and reason will be based on fair competition for the main construction project.
Contracting Officer
14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Approval
Based on the foregoing justification, I hereby approve the procurement of the items checked above on an other than full and open competition basis pursuant to the authority cited in FAR
6.302-1, subject to availability of funds, and provided that the services and property herein described have otherwise been authorized for acquisition.
| 2018-06-12T20:03:41-0400 | |
| CHMIELINSKI.HENRY.H.IV.1009833222 |
| 2018-06-13T13:25:29-0400 | |
| HOSS.ERIC.MATTHEW.1014786020 |
| 2018-06-13T14:20:33-0400 | |
| TORTORELLA.THOMAS.E.1014600341 |
| 2018-06-13T14:20:54-0400 | |
| TORTORELLA.THOMAS.E.1014600341 |
| 2018-06-13T14:22:18-0400 | |
| TORTORELLA.THOMAS.E.1014600341 |
File details come from the government source that posted it.