CEKT139042,_Small_Air_Terminal_PP_Conf.pdf
PDF 2 MB Posted
- Attached to
- CONSTRUCT SMALL AIR TERMINAL Federal contract opportunity
- Solicitation number
- W91ZRS-17-R-0013
About this file
Pre-Proposal Conference/Site Visit Presentation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs_-_W91ZRS-17-R-0013,_CEKT139042_20_Jun_17.pdf | ||
| W91ZRS-17-R-0013-AMEND_0004.pdf | ||
| W91ZRS-17-R-0013-AMEND_0003.pdf | ||
| RFIs_-_W91ZRS-17-R-0013,_CEKT139042_15_Jun_17.pdf | ||
| W91ZRS-17-R-0013-AMEND_0002.pdf | ||
| W91ZRS-17-R-0013-AMEND_0001.pdf | ||
| CEKT139042,_Small_Air_Terminal_PP_Conf_Sign_In_Sheet.pdf | ||
| RFIs_-_W91ZRS-17-R-0013,_CEKT139042_17_May_17.pdf | ||
| J&A_(Monaco).pdf | ||
| EXHIBIT_A.doc | DOC document | |
| J&A_(Automated_Logic).pdf | ||
| W91ZRS-17-R-0013.pdf | ||
| EXHIBIT_C.doc | DOC document | |
| EXHIBIT_B.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE
BRADLEY ANGB, CT
18 May 2017
INTRODUCTION
Lt Col Thomas Tortorella: Contracting Officer
MSgt Dawn Whelan: Contract Specialist
Lt Col Henry Chmielinski: Base Civil Engineer
2Lt Joshua Eichelberger: Deputy Base Civil Engineer/COR
Base + Option Line Items 455 Days after NTP
Construct Small Air Terminal Magnitude: $5,000,000-
$10,000,000 One Firm-fixed Price
Contract Will Be Awarded
Project is being solicited 100% Small Business Set Aside
The contract will be awarded based on the lowest price technically acceptable offer
Evaluation Factors - Technical, Past Performance and Price
On The Web - https://www.fbo.gov Solicitation Exhibits Questions & Answers Document Amendments Check Regularly & Refresh Web Page Plans & Specifications - must be registered and have password on FBO https://www.fbo.gov/
Export Controlled Materials Company must be certified (via an approved DD
Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS) Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-800-352-3572 or e-mail: jcp-admin@.dla.mil mailto:jcp-admin@.dla.mil
The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account.
May be longer than the normal waiting period due to backlogs.
The Government Intends to Award Without Discussions and There
May Not Be a Chance for Discussions, Corrections or
Revised Proposals
Offerors Are Strongly Cautioned To Carefully Read The Requirements Of
The Solicitation And Comply Accordingly
Section 00110 Of the RFP details the required information and format for the Proposal
2 Volumes are required
VOL 1 - Price/Cost Proposal Pro forma documents
VOL 2 - Two Parts Part 1 - Technical Capability Proposal Part 2 - Past/Present Performance Information
Offeror portion of SF 1442 Section 00010 - Pricing Info - All Line Items
& BID SCHEDULE
Introductory Page - Section 00110 lists required information Section 00600 - Reps & Certs
• Complete Reps & Certs on the web at https://www.sam.gov/portal/public/SAM/
• Complete & return Reps & Certs in Section 00600 Joint Venture requirements (if applicable) https://www.sam.gov/portal/public/SAM/
Part I - Technical Capability Comprised of four (4) subfactors:
Experience & Capability Construction Schedule and
Commissioning Approach/Timeline Quality Control
LEED®
Technical Capability Ratings:
ACCEPTABLE: Proposal meets the minimum requirements.
UNACCEPTABLE: Proposal does NOT clearly meet the minimum requirements.
Subfactor 1 - Experience & Capability Discuss any previous projects similar to this project in terms of scope, size and complexity Vertical Construction
If no experience, offeror must explain how they will overcome the lack of experience
Subfactor 2 - Construction Schedule & Commisioning Approach/Timeline Schedule in a Gantt Chart using 1
September 2017 Notice to Proceed
(NTP)
Subfactor 3 - Quality Control Quality Control Staff with Lines of
Authority to meet contract requirements
Subfactor 4 - (USGBC) LEED® Experience building to (USGBC)
LEED® standards Demonstrate that key construction personnel have experience in
LEED®
If no experience, offeror must explain how they will overcome the lack of experience
Exhibit A - Part 1 - Performance Relevancy Questionnaires – Use Exhibit Format!
Complete not more than three (3) forms for
Relevant Contracts Completed Or Substantially Completed (70%+) In The Last Five (5) Years
Exhibit A - Part 2 - Describe compliance with FAR 52.219-8, Utilization of Small Businesses
Send Questionnaires for the Exhibit A Projects to your references
“Do This Early” - must be rec’d by the Contracting Office by the closing date.
If You Do Not Have Relevant Past Performance And Are Using Experience Of Key Personnel, Predecessor Companies Or Subcontractors To Obtain This Ensure You Clearly State This In The Proposal
To Be Considered Subcontractor Must Complete A Consent Form - Exhibit B
• Proposal Due 1400 Hours (2:00 P.M.) on 12 June 2017
• Proposal Must Be Signed By Officer Of Your Company
• No Facsimile Or Electronic Offers
• Send or deliver to: (follow instructions in Section
00100). Hand carried proposals:
Camp Hartell Building P-123 580 North Street Windsor Locks, CT 06196
Reference Questionnaires Are Also Due By This Time And Date
Send Reference Questionnaires Out
EARLY!
Return to Contracting Officer Via E-mail at:
thomas.e.tortorella.mil@mail.mil and dawn.m.whelan.mil@mail.mil mailto:thomas.e.tortorella.mil@mail.mil mailto:dawn.m.whelan.mil@mail.mil
Exhibit A - Performance Relevancy Questionnaire
PART 1 (NTE 3) PART 2 (1)
Exhibit B - Subcontractor/Teaming Partner/Key Personnel Info & Consent Form (if applicable)
Exhibit C - Reference Questionnaire Package
Process Is Detailed In RFP Section 00120
Carefully Review Section 00120 When Preparing Proposal
Comply With Section 00100 And 00110 Requirements
Failure To Furnish A Complete Proposal May Result In Elimination From Consideration
Submit a Complete Proposal In Accordance With Instructions - Use Formats Provided
Prime Contractors are responsible for coordination among the divisions with subcontractors
• Award is contemplated to be made without discussions - Do Not anticipate a chance to make corrections or changes
• Your first proposal will probably be your only proposal!
• Read the solicitation requirements carefully!
• Consider using Section 00120 to “rate” yourself before submitting the proposal
• Is it complete?
When Using A Subcontractor To Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, Or it Will Not Be Considered
Award In This Process Does Not Necessarily Mean The Lowest Price Wins
All amendments will be posted on the FBO web site
Check site regularly for changes & refresh the page
After closing no information will be available until award Awards will be posted to the web Results should be announced in approximately 60-90 days FAR 52.219-14, Limitations on Subcontracting Apply-
Small Business must perform 15% of cost of contract, not including the cost of materials with its own employees
• Questions Must Be Submitted Via E-mail To:
thomas.e.tortorella.mil@mail.mil and dawn.m.whelan.mil@mail.mil. Submit Questions NLT COB 5 June 2017
• Questions Received After 5 June 2017 May Be Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary
• Do Not Call Technical Personnel Or A&E - This Will Delay Getting An Answer!
mailto:thomas.e.tortorella.mil@mail.mil mailto:dawn.m.whelan.mil@mail.mil
• All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site
• https://www.fbo.gov/
• If Necessary Addendums, Issued By
An Amendment, Will Also Be Posted
• Check Web Site Regularly And Don’t
Forget To Refresh Web Page
• https://www.fbo.gov
• https://www.acquisition.gov/
• www.ccr.gov/
• http://orca.bpn.gov/
• http://www.wdol.gov/wdol/scafiles/ davisbacon.ct.html https://www.fbo.gov/ https://www.acquisition.gov/ http://www.ccr.gov/ http://orca.bpn.gov/ http://www.wdol.gov/wdol/scafiles/davisbacon.ct.html
2:00 p.m.
12 June 2017
DON’T FORGET TO HAVE REFERENCES SENT IN
BY THIS TIME & DATE
| �W91ZRS-17-R-0013�Project No. CEKT139042, �Construct Small Air Terminal� |
| Slide Number 2 |
| PERIOD �OF �PERFORMANCE |
| Scope (work) of Contract |
| Scope (work) of Contract |
| SOLICITATION, PLANS�& SPECIFICATIONS |
| SOLICITATION, PLANS�& SPECIFICATIONS |
| SOLICITATION, PLANS�& SPECIFICATIONS |
| IMPORTANT REMINDER� The following is a brief overview of the proposal requirements |
| DISCLAIMER � The following is a brief overview of the proposal requirements |
| SUBMISSION REQUIREMENTS |
| SUBMISSION REQUIREMENTS |
| Volume 1 - Cost/Price Info & Pro Forma Documents |
| Volume 2 Part I - Technical Capability�NO PRICES/COST IN THIS VOLUME |
| Volume 2 Part I - Technical Capability�NO PRICES/COST IN THIS VOLUME |
| Volume 2 Part I - Technical Capability (cont.) |
| Volume 2 Part I - Technical Capability (cont.) |
| Volume 2 Part I - Technical Capability (cont.) |
| Volume 2 Part I - Technical Capability (cont.) |
| Volume 2 Part II - Past/Present Performance Information�NO PRICES/COST IN THIS VOLUME |
| Volume 2� Past/Present Performance (cont.) |
| Proposal Due Dates |
| References |
| Exhibits |
| Proposal Evaluation |
| Important Reminders |
| Important Reminders |
| Important Reminders |
| Important Reminders |
| How Questions Will Be Handled |
| Answers To Questions |
| Helpful Websites |
| PROPOSALS ARE DUE� NOT �LATER THAN |
| Site Visit Time |
File details come from the government source that posted it. Updated .