Questions Answers T-0001.doc

DOC document 28 KB Posted

Attached to
Heater, Boiler, Air compressor Replacement Federal contract opportunity
Solicitation number
W91ZRS-10-T-0001
Issued by
Department of the Army Connecticut Army National Guard

About this file

Questions Answers resulting from walk-through.

View the file

Other files for this federal contract opportunity

Other files attached to Heater, Boiler, Air compressor Replacement, newest first.
File Type Posted
Blg 27 drawings.pdf PDF
10-T-0001 Solicit.doc DOC document
Bldg 27 Boiler SOW.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91ZRS-10-T-0001 Questions & Answers

Q1: Topic of concentric vent kits for the KN boilers. Should there be one kit/pipe for combustion air & exhaust?

A1: The concentric kits that are in our brochures are not available. So separate intake and exhaust vents for the boilers are required.

Q2: What is the size of the existing system circulator pumps (for replacement)?

A1:

1. Required pipe size for pumps: 2” (two inch)

2. GPM: 120

3. Feet of Head: 30 TDH ft

4. Voltage and Phase: 208, 3-phase

5. Location of new pumps: are to be located within the existing mechanical room in such a location that they are accessible by maintenance personnel. Preferred location would be at a level that would not require a lift or ladder to access (close to floor).