Questions Answers T-0001.doc
DOC document 28 KB Posted
- Attached to
- Heater, Boiler, Air compressor Replacement Federal contract opportunity
- Solicitation number
- W91ZRS-10-T-0001
About this file
Questions Answers resulting from walk-through.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Blg 27 drawings.pdf | ||
| 10-T-0001 Solicit.doc | DOC document | |
| Bldg 27 Boiler SOW.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91ZRS-10-T-0001 Questions & Answers
Q1: Topic of concentric vent kits for the KN boilers. Should there be one kit/pipe for combustion air & exhaust?
A1: The concentric kits that are in our brochures are not available. So separate intake and exhaust vents for the boilers are required.
Q2: What is the size of the existing system circulator pumps (for replacement)?
A1:
1. Required pipe size for pumps: 2” (two inch)
2. GPM: 120
3. Feet of Head: 30 TDH ft
4. Voltage and Phase: 208, 3-phase
5. Location of new pumps: are to be located within the existing mechanical room in such a location that they are accessible by maintenance personnel. Preferred location would be at a level that would not require a lift or ladder to access (close to floor).
File details come from the government source that posted it. Updated .