10-T-0001 Solicit.doc
DOC document 293 KB Posted
- Attached to
- Heater, Boiler, Air compressor Replacement Federal contract opportunity
- Solicitation number
- W91ZRS-10-T-0001
About this file
W91ZRS-10-T-0001 Solicitation for blg 27 boiler replacement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions Answers T-0001.doc | DOC document | |
| Blg 27 drawings.pdf | ||
| Bldg 27 Boiler SOW.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 30 - BLOCK 14 CONTINUATION PAGE
DBA WAGE DETERMINATION
General Decision Number: CT080024 09/04/2009 CT24
State: Connecticut
Construction Type: Building
County: Hartford County in Connecticut.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 05/22/2009
1 06/05/2009
2 06/12/2009
3 06/19/2009
4 07/03/2009
5 07/24/2009
6 08/07/2009
7 09/04/2009
BOIL0237-001 10/01/2008
Rates Fringes
BOILERMAKERS.....................$ 33.79 34%+8.96
BRCT0001-008 10/01/2008
Rates Fringes
TILE SETTER......................$ 30.78 16.98
BRCT0001-013 04/06/2009
Rates Fringes
BRICKLAYER.......................$ 32.10 19.48+a a.PAID HOLIDAY: Employees shall receive 4 hours for Chirstmas
Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay.
BRCT0001-014 04/06/2009
Rates Fringes
CEMENT MASON/CONCRETE
FINISHER (Including Caulking)....$ 32.10 19.48+a a.PAID HOLIDAY: Employees shall receive 4 hours for
Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday.
Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay.
BRCT0001-021 04/06/2009
Rates Fringes
PLASTERER........................$ 32.10 19.48
CARP0024-012 05/04/2009
Rates Fringes
CARPENTER (Including Drywall
Hanging, Acoustical Ceiling
Installation, Soft
Floor/Carpet Laying, Metal
Stud Installation, Form Work and Scaffold Building)...........$ 29.00 17.80
CARP0024-013 05/04/2009
Rates Fringes
MILLWRIGHT.......................$ 29.75 17.80
ELEC0035-007 06/01/2009
Entire County excluding Berlin, Bristol, Hartland, New Britain, Newington, Plainville and Southington Townships
Rates Fringes
ELECTRICIAN, Including Low
Voltage Wiring...................$ 35.40 19.51
ELEC0090-007 06/01/2009
Berlin, Bristol, New Britain, Newington, Plainville, Southington Townships
Rates Fringes
ELECTRICIAN, Including Low
Voltage Wiring...................$ 34.95 19.50
ELEC0488-010 06/01/2009
Hartland Township
Rates Fringes
ELECTRICIAN, Including Low
Voltage Wiring...................$ 34.80 19.80
ELEV0091-001 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 42.34 18.285+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas
Day, plus the Friday after Thanksgiving.
b. VACATION: Employer contributes 8% of basic hourly rate for
5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0478-013 04/05/2009
Rates Fringes
POWER EQUIPMENT OPERATOR:
Asphalt Paver...............$ 32.01 17.75+a
Asphalt Roller..............$ 31.36 17.75+a
Backhoe/Excavator 2 cubic yards and over..............$ 33.73 17.75+a
Backhoe/Excavator under 2 cubic yards; Grader/Blade;
Rubber Tire
Backhoe/Excavator...........$ 32.99 17.75+a
Bobcat/Skid Loader;
Forklift....................$ 30.53 17.75+a
Bulldozer (Rough Grade
Dozer)......................$ 31.70 17.75+a
Bulldozer Fine Grade........$ 32.99 17.75+a
Concrete Pump...............$ 32.01 17.75+a
Crane handling or erecting structural steel or stone...$ 34.05 17.75+a+b
Cranes (100 ton capacity & over).......................$ 33.73 17.75+a+b
Cranes (under 100 ton rated capacity).............$ 32.99 17.75+a+b
Earth Roller................$ 28.49 17.75+a
Front End Loader (3 cubic yards up to 7 cubic yards)..$ 31.70 17.75+a
Front End Loader (7 cubic yards or over)..............$ 34.05 17.75+a
Front End Loader (under 3 cubic yards)................$ 30.53 17.75+a
Maintenance Engineer/Oiler..$ 25.65 17.75+a
Mechanic....................$ 30.96 17.75+a
Vibratory Hammer............$ 28.49 17.75+a
a. PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
b. Crane with boom, including jib, 150 feet - $1.50 extra .
Crane with boom, including jib, 200 feet- $2.50 extra.
Crane with boom, including jib, 250 feet - $5.00 extra.
Crane with boom, including jib, 300 feet - $7.00 extra.
Crane with boom, including jib, 400 feet - $10.00 extra.
IRON0015-006 06/29/2009
Rates Fringes
IRONWORKER, ORNAMENTAL,
REINFORCING AND STRUCTURAL.......$ 32.75 25.08+a
a. PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day.
LABO0056-010 04/05/2009
Rates Fringes
LABORERS
Common or General...........$ 24.25 14.45
Mason Tender-Brick..........$ 24.75 14.45
Mason Tender-
Cement/Concrete.............$ 24.75 14.45
Plaster Tender..............$ 24.50 14.45
PAIN0011-012 06/01/2009
Rates Fringes
GLAZIER..........................$ 31.73 14.55+a
a. PAID HOLIDAYS: Labor Day and Christmas Day.
PAIN0011-020 06/01/2009
Rates Fringes
PAINTER
Brush and Roller............$ 28.17 14.55
Drywall Finishing/Taping
Only........................$ 28.92 14.55
Paperhanger Only............$ 28.67 14.55
Spray Only..................$ 31.17 14.55
PLUM0777-006 06/01/2009
Rates Fringes
PIPEFITTER, Including HVAC
Pipe Installation................$ 36.32 21.26
PLUM0777-007 06/01/2009
Rates Fringes
PLUMBER, Excluding HVAC Pipe
Installation.....................$ 36.32 21.26
ROOF0009-005 06/01/2009
Rates Fringes
ROOFER
Composition.................$ 31.10 14.46
Slate and Tile..............$ 31.60 14.46
* SFCT0676-002 08/01/2009
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers)......................$ 39.30 17.25+a
a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.
SHEE0040-004 07/01/2009
Rates Fringes
SHEETMETAL WORKER, Including
HVAC Duct Installation...........$ 31.57 25.92
SUCT2009-005 04/15/2009
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 24.25 10.76
LABORER: Airtool Operator.......$ 17.04 6.90
LABORER: Fence Erector..........$ 19.65 7.00
LABORER: Landscape..............$ 19.97 2.70
LINE CONSTRUCTION: Groundman....$ 10.00 2.17
LINE CONSTRUCTION: Lineman......$ 22.09 6.18
OPERATOR: Asphalt Spreader......$ 25.05 8.90
TILE FINISHER....................$ 24.55 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section 00010 - Solicitation Contract Form
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Hot Water Boiler Replacement
FFP
Remove leaking hot water boiler and replace with two new hot water boilers in accordance with the attached Statement of Work (SOW).
FOB: Destination
PURCHASE REQUEST NUMBER: F6F9CE9287A001
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Hot Water Heater Replacement
Remove leaking hot water heater and replace with two new on demand hot water heaters in accordance with the attached Statement of Work (SOW).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lump Sum |
Air Compressor Replacement
Remove existing air compressor and replace with new rotary screw-type air compressor in accordance with the attached Statement of Work (SOW).
FOB: Destination
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 60 dys. ADC |
| 1 |
| 103D AW CIVIL ENG F6F9CE |
100 NICHOLSON ROAD BRADLEY ANGB BLDG 2
EAST GRANBY CT 06026
860.292.2397
FOB: Destination
F6F9CE
| 0002 |
| 60 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F6F9CE
| 0003 |
| 60 dys. ADC |
| 1 |
| (SAME AS PREVIOUS LOCATION) |
F6F9CE
Section 00100 - Bidding Schedule/Instructions to Bidders
CLAUSES INCORPORATED BY REFERENCE
| 52.214-34 |
| Submission Of Offers In The English Language |
| APR 1991 |
| 52.214-35 |
| Submission Of Offers In U.S. Currency |
| APR 1991 |
| 52.232-28 |
| Invitation to Propose Performance-Based Payments |
| MAR 2000 |
| 52.236-28 |
| Preparation of Proposals--Construction |
| OCT 1997 |
CLAUSES INCORPORATED BY FULL TEXT
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ (End of provision
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplements (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
Section 00600 - Representations & Certifications
CLAUSES INCORPORATED BY REFERENCE
| 52.209-2 |
| Prohibition on Contracting with Inverted Domestic Corporations--Representation |
| JUL 2009 |
| 52.225-18 |
| Place of Manufacture |
| SEP 2006 |
52.204-3 TAXPAYER IDENTIFICATION (OCT 1998)
(a) Definitions.
Common parent, as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its Federal income tax returns on a consolidated basis, and of which the offeror is a member.
Taxpayer Identification Number (TIN), as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.
(b) All offerors must submit the information required in paragraphs (d) through (f) of this provision to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d), reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M, and implementing regulations issued by the IRS. If the resulting contract is subject to the payment reporting requirements described in Federal Acquisition Regulation (FAR) 4.904, the failure or refusal by the offeror to furnish the information may result in a 31 percent reduction of payments otherwise due under the contract.
(c) The TIN may be used by the Government to collect and report on any delinquent amounts arising out of the offeror's relationship with the Government (31 U.S.C. 7701(c)(3)). If the resulting contract is subject to the payment reporting requirements described in FAR 4.904, the TIN provided hereunder may be matched with IRS records to verify the accuracy of the offeror's TIN.
(d) Taxpayer Identification Number (TIN).
___ TIN:.--------------------------------------------------------
___ TIN has been applied for.
___ TIN is not required because:
___ Offeror is a nonresident alien, foreign corporation, or foreign partnership that does not have income effectively connected with the conduct of a trade or business in the United States and does not have an office or place of business or a fiscal paying agent in the United States;
___ Offeror is an agency or instrumentality of a foreign government;
___ Offeror is an agency or instrumentality of the Federal Government.
(e) Type of organization.
___ Sole proprietorship;
___ Partnership;
___ Corporate entity (not tax-exempt);
___ Corporate entity (tax-exempt);
___ Government entity (Federal, State, or local);
___ Foreign government;
___ International organization per 26 CFR 1.6049-4;
___ Other--------------------------------------------------------
(f) Common parent.
___ Offeror is not owned or controlled by a common parent as defined in paragraph (a) of this provision.
___ Name and TIN of common parent:
Name-------------------------------------------------------------------
TIN--------------------------------------------------------------------
(End of provision)
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (MAY 2004) - ALTERNATE I (APR 2002)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238220.
(2) The small business size standard is $14.0M.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b) Representations. (1) The offeror represents as part of its offer that it ( ) is, ( ) is not a small business concern.
(2) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents, for general statistical purposes, that it ( ) is, ( ) is not a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a women-owned small business concern.
(4) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a veteran-owned small business concern.
(5) (Complete only if the offeror represented itself as a veteran-owned small business concern in paragraph (b)(4) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a service-disabled veteran-owned small business concern.
(6) [Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.] The offeror represents, as part of its offer, that--
(i) It ( ) is, ( ) is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material change in ownership and control, principal office, or HUBZone employee percentage has occurred since it was certified by the Small Business Administration in accordance with 13 CFR part 126; and
(ii) It ( ) is, ( ) is not a joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (b)(6)(i) of this provision is accurate for the HUBZone small business concern or concerns that are participating in the joint venture. (The offeror shall enter the name or names of the HUBZone small business concern or concerns that are participating in the joint venture:____________.) Each HUBZone small business concern participating in the joint venture shall submit a separate signed copy of the HUBZone representation.
(7) (Complete if offeror represented itself as disadvantaged in paragraph (b)(2) of this provision.) The offeror shall check the category in which its ownership falls:
____ Black American.
____ Hispanic American.
____ Native American (American Indians, Eskimos, Aleuts, or Native Hawaiians).
____ Asian-Pacific American (persons with origins from Burma, Thailand, Malaysia, Indonesia, Singapore, Brunei, Japan, China, Taiwan, Laos, Cambodia (Kampuchea), Vietnam, Korea, The Philippines, U.S. Trust Territory of the Pacific Islands (Republic of Palau), Republic of the Marshall Islands, Federated States of Micronesia, the Commonwealth of the Northern Mariana Islands, Guam, Samoa, Macao, Hong Kong, Fiji, Tonga, Kiribati, Tuvalu, or Nauru).
____ Subcontinent Asian (Asian-Indian) American (persons with origins from India, Pakistan, Bangladesh, Sri Lanka, Bhutan, the Maldives Islands, or Nepal).
____ Individual/concern, other than one of the preceding.
(c) Definitions. As used in this provision--
Service-disabled veteran-owned small business concern--
(1) Means a small business concern--
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
"Small business concern," means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and the size standard in paragraph (a) of this provision.
Veteran-owned small business concern means a small business concern--
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
"Women-owned small business concern," means a small business concern --
(1) That is at least 51 percent owned by one or more women or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; or
(2) Whose management and daily business operations are controlled by one or more women.
(d) Notice.
(1) If this solicitation is for supplies and has been set aside, in whole or in part, for small business concerns, then the clause in this solicitation providing notice of the set-aside contains restrictions on the source of the end items to be furnished.
(2) Under 15 U.S.C. 645(d), any person who misrepresents a firm's status as a small, HUBZone small, small disadvantaged, or women-owned small business concern in order to obtain a contract to be awarded under the preference programs established pursuant to section 8(a), 8(d), 9, or 15 of the Small Business Act or any other provision of Federal law that specifically references section 8(d) for a definition of program eligibility, shall--
(i) Be punished by imposition of fine, imprisonment, or both;
(ii) Be subject to administrative remedies, including suspension and debarment; and
(iii) Be ineligible for participation in programs conducted under the authority of the Act.
(End of provision)
52.219-22 SMALL DISADVANTAGED BUSINESS STATUS (OCT 1999)
(a) General. This provision is used to assess an offeror's small disadvantaged business status for the purpose of obtaining a benefit on this solicitation. Status as a small business and status as a small disadvantaged business for general statistical purposes is covered by the provision at FAR 52.219-1, Small Business Program Representation.
(b) Representations.
(1) General. The offeror represents, as part of its offer, that it is a small business under the size standard applicable to this acquisition; and either--
___ (i) It has received certification by the Small Business Administration as a small disadvantaged business concern consistent with 13 CFR 124, Subpart B; and
(A) No material change in disadvantaged ownership and control has occurred since its certification;
(B) Where the concern is owned by one or more disadvantaged individuals, the net worth of each individual upon whom the certification is based does not exceed $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(C) It is identified, on the date of this representation, as a certified small disadvantaged business concern in the database maintained by the Small Business Administration(PRO0Net); or
___ (ii) It has submitted a completed application to the Small Business Administration or a Private Certifier to be certified as a small disadvantaged business concern in accordance with 13 CFR 124, Subpart B, and a decision on that application is pending, and that no material change in disadvantaged ownership and control has occurred since its application was submitted.
(2)___ For Joint Ventures. The offeror represents, as part of its offer, that it is a joint venture that complies with the requirements at 13 CFR 124.1002(f) and that the representation in paragraph (b)(1) of this provision is accurate for the small disadvantaged business concern that is participating in the joint venture. [The offeror shall enter the name of the small disadvantaged business concern that is participating in the joint venture: ____________.]
(c) Penalties and Remedies. Anyone who misrepresents any aspects of the disadvantaged status of a concern for the purposes of securing a contract or subcontract shall:
(1) Be punished by imposition of a fine, imprisonment, or both;
(2) Be subject to administrative remedies, including suspension and debarment; and
(3) Be ineligible for participation in programs conducted under the authority of the Small Business Act.
(End of provision)
52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)
The offeror represents that --
(a) ( ) It has, ( ) has not participated in a previous contract or subcontract subject to the Equal Opportunity clause of this solicitation;
(b) ( ) It has, ( ) has not, filed all required compliance reports; and
(c) Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.
(End of provision)
252.204-7007 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (52.204-8) ALTERNATE A
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238220.
(2) The small business size standard is $14.0M.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes tofurnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included inthis solicitation, paragraph (c) of this provision applies.
(2) If the clause at 52.204-7 is not included in this solicitation, and the offeroris currently registered in CCR, and has completed the ORCA electronically, the offerormay choose to use paragraph (b) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
(__) Paragraph (c) applies.
(__) Paragraph (c) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) Web site at https://orca.bpn.gov/.
After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR/DFARS clause No. Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.
(End of Provision)
Section 00700 - Contract Clauses
SOW
LOCATION. Bradley ANG Base, 100 Nicholson Rd, East Granby, CT 06026-9309. Arrangements for entrance onto the Base must be made by contacting Base Engineering at (860) 292-2484 or (860) 292-2594 between the hours of 7:00 a.m. and 4:30 p.m., Monday through Friday.
PURPOSE. The purpose of this specification is to remove old and procure/ install new heating solution, hot water heater, and building air compressor for Building 27, Munitions. The government requires a heating solution that is durable, reliable, economical, energy efficient that meets all requirements of the Department of Defense (DOD), Air Force (AF) and National Guard Bureau (NGB).
BACKGROUND. Building 27 is heated by a single Burnham condensing boiler that was installed in 1993. Due to an improper sealing of the boiler, several sections began to leak and eventually cracked. This condition has caused to boiler to be permanently shut down and resulting in complete replacement. The government needs a new heating solution to replace this single boiler. A preferred replacement would be two smaller, modular-type boilers that would provide redundancy and much better efficiency for the building.
There also exist a gas-fired, 200 gallon hot water heater within this same mechanical room. This heater is much larger than required for the building and requires replacement with a much more energy efficient demand hot water solution.
Finally, there is an 80 gallon, reciprocal-type air compressor that is bulky and leaking oil. The government requires a replacement air compressor that is energy efficient and quieter than the existing.
SCOPE. The work covered in this contract consists of furnishing all labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the removal / replacement of boiler, hot water heater, and air compressor in buildings 27 at Bradley ANG Base. The work provided by the contractor shall be compliant with manufactures specifications on installation, and includes the work described in paragraph 5. Where applicable, requirements of the contract documents apply to alteration work in the same manner as to new construction.
SUMMARY OF WORK. Work shall consist of, but not be limited to:
a. A pre-construction meeting must take place with the Facility Manager, Fire Chief, Base Safety, Contracting Official, Security, Commutations, and Base Civil Engineer.
b. Provide required paper work, warranty and standard operating procedures.
c. Submit list of all chemicals that will be used on this project. Provide Material Safety Data Sheets (MSDS) where appropriate.
d. If welding or torch cutting or soldering is needed for removal or installation of boilers, a burn permit is required each day before work is to be done. The permit must be obtained from the base fire department.
e. Boilers will be KN Series Gas Boilers manufactured by Hydrotherm with options or equivalent, evaluated based on energy savings, reliability, ease of maintenance.
f. Building 27 room 5. Contractor shall remove 1 Burnham model v-910 State number CT 071339, from building and dispose of properly. The contractor shall return all boiler sections that are operational to civil engineering Facility Manager. A credit and letter of disposal shall be provided to the Contracting Officer for any metals, i.e. copper, that are removed from Government Property IAW 103 AWI 32-105.
g. Install 1 New HydroTherm KN-10 Gas Boiler per manufacturer’s specifications. Options installed with boiler, 10K outdoor air sensor, BACnet IP/MSTP ProtoCessor (1) per boiler. All piping will be designed and installed to support manufacturer’s specifications.
h. All Electrical, Mechanical, exhaust venting, gas lines & regulators, material and labor will be included in installation of all Boilers and meet Manufacturing and National Electric code requirements (NFPA 70). All boilers shall be ASME compliant and stamped.
i. Provide data outputs and ensure new boiler is controlled by the currently installed Automated Logics Digital Control System.
j. Contractor shall provide a one year warranty on parts, equipment and labor.
k. Contractor shall Insulate all new exposed piping, label and install directional flow arrows on insulation cover.
l. Contractor shall seal building exterior walls and roof penetrations, if applicable, to maintain the buildings envelope integrity.
DELIVERABLES.
a. Contractor shall Provide AutoCAD and /or PDF versions of as built drawings upon completion of work to the Base Civil Engineer.
b. Contractor shall provide specific servicing instructions (Manual) on any and all equipment installed. Contractor shall provide a written Preventive Maintenance (PM) program to maintain equipment per manufacture’s specifications.
c. Contractor shall install an exterior shut down alarm with a flashing amber light for each boiler in case of unscheduled shut-downs of boilers.
d. Contractor shall provide 8 hours of training for State and Federal HVAC craftsman personnel that works for Bradley ANG Base. This training can be accomplished by a factory training class at the manufacturer’s location or on site at Bradley ANG Base, whichever is deemed to be most convenient for ANG staff and whichever leads to the most productive training possible.
e. Contractor shall coordinate with Manufacture to be at startup and shut-down of all boilers installed. Respective manufacturer’s rep shall be present at and assist in the start-up of each boiler. Representative shall also inspect installation and check for manufacturer’s installation instruction compliance. This service shall be included in the Contractor’s price.
f. Contractor shall meet Connecticut State Operating Certificates for all gas boilers installed. Contractor is liable if boilers do not receive Connecticut State Operating Certificates.
g. All Burnham Boilers must be removed and new boilers installed and operational within 60 days from purchase order award date.
7. DEFINITIONS.
a.
“IAW” shall mean “In-accordance with”;
b.
“CO” shall mean “Contracting Officer”;
c.
“COR” shall mean “Contracting Officer’s Representative”.
CODES & STANDARDS. All work performed under this contract shall be in accordance with federal, state and local laws, codes, ordinances, rules, regulations, orders and other legal requirements of public authorities that bear on performance of work; and, widely accepted industry standards, including but not limited to:
Abbr. * Organization*
AASHTO
American Association of State Highway and Transportation Officials
ACI
American Concrete Institute
AGA
American Gas Association
AIA
American Institute of Architects
AIEE
American Institute of Electrical Engineers
AISC
American Institute of Steel Construction
AISI
American Iron and Steel Institute
ANSI
American National Standards Institute
ASCE
American Society of Civil Engineers
ASHRAE
American Society of Heating, Refrigeration, and Air Conditioning Engineers
ASME
American Society of Mechanical Engineers
ASTM
American Society for Testing and Material
AWI
American Woodwork Institute
AWPA
American Wood Preservers Association
AWS
American Welding Society
BIA
Brick Institute of America
BOCA
Building Official Code Administrators (Building Code)
CRSI
Concrete Reinforcing Steel Institute
CS
Commercial Standards
FAA
Federal Aviation Administration
FM
Factory Mutual System
FS
Federal Specification
NBS
National Bureau of Standards
NEC
National Electric Code
NEMA
National Electrical Manufacturers Association
NFPA
National Fire Protection Association
OSHA
Occupational Safety & Health Administration
PCA
Portland Cement Association
PCI
Precast Concrete Institute
RMA
Rubber Manufacturers Association
SDI
Steel Deck Institute
SJI
Steel Joist Institute
UBC
Uniform Building Code Standards
UL
Underwriters Laboratories
Reference to other organizations may be included in some sections of the specifications. Many of the above referenced activities can be contacted via the Internet at www.nssn.org.
a.
Various standards and specifications are incorporated in the technical sections of these specifications by reference. In all such instances, the reference shall mean the latest edition, including amendment or revision in effect as of the date of this specification, unless a specific issue is identified otherwise. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply with contract specifications. In the event that referenced specifications or standards contain general requirements in conflict with the general or supplementary conditions, the scope of work of individual sections of these specifications shall govern.
b.
The contractor or his designated representative shall have, at all times during the construction period, a copy of the contract. The contractor shall present said contract, when asked to do so.
9 UTILITIES.
a. Contractors shall when removing and installing boilers use lock out tag out with all local utilities.
b. Contractor shall be responsible for injury to water pipes, gas pipes, oil pipes, electrical wires, conduits, drains, sewers, buildings and other structures that may be set within prosecution of the work, owned by individuals, firms, corporations or by the municipality. Contractor shall be liable for damages to public or private property resulting therefrom.
10. MATERIALS. The materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, which ever is more stringent. Certificates of compliance and Technical Data Sheets are required for all materials supplied. A list of all chemicals to be used shall be provided prior to the start of work. The list shall state the commercial name, manufactures’ name, chemical name, and quantity to be used or stored on government property (See Attachment 1, 2).
11. SITE INSPECTION. The Contractor is required to acknowledge, at time of Bid Opening that said contractor has inspected, and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s), which was existed at the time of the site visit. All site visits shall be coordinated and scheduled through the 103 Airlift Wing (AW) Contracting Offices during the Request for Quote (RFQ)/Bid period
12. BASE ACCESS. The contractor shall provide a list of names and their job or trade, to the Contracting Officers Representative (COR), at the Pre-Construction meeting. Additionally, each person must sign-in and pick-up a security badge, at the Administrative Desk, Building 17, at the beginning of the work day and any time they leave and come back on base. Each person must wear the badge in a prominent location. The badge must be returned anytime departing the base. Access to the Base is limited to travel from the Main Gate to the Civil Engineering Office, Bldg. 17, and the job site. All other areas are off limits. Violations of these security requirements will revoke any or all passes. The Government reserves the right to deny access to any person, with no consequence to the contract.
13. SAFETY. The Contractor shall conduct his operation in accordance with all Federal, State and Local regulations and/or standards pertinent to "Safe Practices". Base Safety personnel shall inspect the job sit to insure safety standards are met. Base Safety, through the COR, shall issue warnings or stop work not in compliance. All contract workers must wear proper Safety personal protection equipment per OSHA requirements. Example; ear plugs, safety goggles, welding helmet, improper Lockout Tagout.
a. These construction documents, and the joint and several phases of construction hereby contemplated are to be governed, at all times, by applicable provisions of the federal laws, including, but not limited to, the latest amendments of the following:
1. Williams-Steiger Occupational Safety & Health Act of 1970, Public Law 91-596.
2. Part 1510 -- Occupational Safety and Health Standards, Chapter XIII of Title 29, Code of Federal Regulations.
3. Part 1518 -- Safety and Health Regulations for Construction, Chapter XIII of Title 29, Code of Federal Regulations, as amended to date.
b. Contractor shall not allow his employees, subcontractors, material, men or any other persons over whom he has control to enter or remain upon or allow any plant or materials to be brought or to remain upon any part of the Airport, which in the opinion of the COR would be a hazardous location. Equipment not actually in operation shall be kept clear of aircraft operating areas.
c. The Contractor will not be permitted to enter upon any area of the active landing strips unless accompanied by a representative of the Contracting Officer designated by the National Guard Bureau to escort the Contractor’s men and equipment to the point or points of operations within the limits of such areas, and he shall not traverse back and forth between points within such areas unless accompanied by said representatives.
d. The Contractor shall furnish, erect, and maintain all barricades, warning signs, “rope-offs”, detours, markings and other protection for hazards. When used during periods of darkness, the protection provided shall be suitably illuminated. The Contractor shall have a man on call 24 hours per day, with means of communication, for emergency maintenance of the hazard lighting, markings and barricades. Open-flame type lights shall not be permitted within the air operations areas of the Airport. Contractor shall place said protection prior to commencing work until their dismantling is directed by the Contracting Officer or his designated representative.
e. Radio Transmitter Restrictions: To preclude accidental actuation of sensitive electronic equipment, under no circumstances shall transmitters be used without prior approval. Cell phones greater than 4 watts, and any cell phone within the munitions compound, shall not be powered on.
f. Loading: No part of any work involved in this contract shall be loaded during construction with a load greater than it is calculated to carry with safety. Should any accidents or damage occur through any violation of this requirement, the Contractor shall be held responsible under his contract and bond.
14. FIRE PREVENTION AND PROTECTION. The Contractor shall comply with all fire protection measures prescribed in AFOSH 127-5, a copy of which is on file in the office of the Contracting Officer. A written fire permit shall be obtained from the Base Fire Department each day for use of open flame devices, such as blowtorches, portable furnaces, tar kettles or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on his part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract.
15. EMERGENCIES. Should tornado, hurricane, gale or heavy wind warnings be issued, take every practicable precaution to minimize danger to persons, to the work and to the adjacent property. Any damage caused by a failure to take every practicable precaution, shall be rectified or replaced to the complete satisfaction of the Contracting Officer and at no expense to the Owner. Injury to personnel, or damage to adjacent property because of the work shall be the complete responsibility of the Contractor, and he accepts exclusive liability for the same. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding and other temporary work.
*16. CLEAN-UP. Clean-up and remove debris generated by this contract to an approved off-base location. Debris shall be trucked off site in an enclosed truck to prevent accidental loss of debris. Two (2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken. Contractor shall keep work area clean at the end of each working day and clean-up entire locations at the completion of contract.
*17. GOVERNMENT RESOURCES. No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the contractor’s actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities. Contractor shall provide all material handling equipment, properly sized to move all equipment to accomplish the work.
a. Use of the site. Confine operations at the site to the areas permitted under the Contract. Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform to site rules and regulations affecting the work while engaged in project construction.
1. Keep existing driveways and entrances serving the premises clear and available to the Owner and his employees at all times. Do not use these areas for parking or storage of materials.
2. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas indicated. If additional storage is necessary, obtain and pay for such storage off-site.
3. Lock automotive type vehicles, such as passenger cars and trucks, and other mechanized and motorized construction equipment when parked and unattended, so as to prevent unauthorized use. Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place.
b. Use of the Existing Buildings. Maintain the existing buildings in a safe and weather tight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupants during the construction period.
1. Keep public areas, such as hallways, vestibules and toilet rooms free from accumulation of waste material, rubbish or construction debris.
2. Smoking or open fires will not be permitted within the building enclosure or on the premises.
3. If contractor discovers existing damage, written notice with photographs must be given before any work is started in the area.
4. Storage is the Contractor’s responsibility. The Government shall not provide any facility, or space within a facility, for storage of materials and equipment.
18. GOVERNMENT OCCUPANCY. Full Occupancy: The government will occupy the site and the existing buildings during the entire period of construction. Cooperate fully with the occupant during construction operations to minimize conflicts and to facilitate government usage. Perform the work so as not to interfere with the government’s operations.
19. WORK SCHEDULE. Due to the National Defense, Mission-Essential nature of our aircraft operations, the Contractor shall coordinate all work schedules with the Contracting Officer or his representative. Contractor will provide a work schedule to be approved by the Contracting Officer
a. Delays. Unavoidable minor delays during construction caused by essential defense activities (alerts, security checks, fire suppression practices, terrorist alerts, etc.) may occur due to mission requirements. These occur at the rate of about four (4) hours per month during the work day.
b. Construct work in stages to accommodate the Government’s use of the premises during the construction period.
c. Coordinate the construction schedule and operations with all other Contractors and Subcontractors performing work on the project.
d. No work, except cement finishing, shall be done other than during normal 8-hour, 5-day workweek without 48 hours advance notice to the Contracting Officer.
e. Overtime work for cement finishing must be anticipated by Contractor and shall be included in his contract price.
20. COOPERATION WITH OTHER WORK. The work of this contract includes coordination of the entire work of the project, including preparation of general coordination of drawings, diagrams and schedules, and control of site utilization, from beginning of construction activity through close-out and warranty periods.
a. Occupied Buildings. The Contractor will be working in and around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer. Leave fixed equipment in place and protect against damage or temporarily disconnect, relocate, protect, and reinstall at completion of work. The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.
HAZARDOUS MATERIALS/WASTE
All hazardous or toxic material used, removed or handled and wastes generated by the Contractor shall be managed in accordance with federal, state and local laws and regulations.
All hazardous materials to be brought on Bradley ANGB by the Contractor shall be subject to pre-approval by the installation environmental office. Paint containing lead or chromium will not be allowed on Bradley ANG Base. The approval process application requirements are at the discretion of the installation environmental office utilizing the AF form 3952 process. The installation reserves the right to prohibit the use of hazardous materials it deems to be especially hazardous to human health or the environment. The installation also reserves the right to prohibit the use of hazardous materials due to the type and/or quantity of hazardous wastes potentially generated from the materials. In the event a hazardous material is not approved for use on installation, the installation may provide the Contractor a list of suitable substitutes; however, the Contractor shall retain responsibility for finding an acceptable substitute. Bradley ANGB promotes waste minimization and pollution prevention practices and the Contractor shall take appropriate actions to comply with this policy.
A minimum of ten (10) working days prior to commencement of work on Bradley ANGB, the Contractor shall submit to the Contracting Officer a listing of hazardous materials that shall be brought on Bradley ANGB during the performance of the contract. The listing shall include estimated usage and estimated quantities for each hazardous material. The Contractor shall identify any “extremely hazardous substances” to be used during the execution of the contract and indicate if the amount of the chemical exceeds the threshold planning quantity. The Contractor shall also supply a Manufacturer’s Material Safety Data Sheet (MSDS) for each hazardous material. The Contractor shall give a brief description of how the hazardous material shall be used and disposed. The Contractor shall, at all times, maintain an up-to-date hazardous material inventory with copies of MSDSs for all materials used on the job site.
The Contractor shall not store hazardous materials on the installation except at the discretion of the installation environmental office. The installation environmental office may require all hazardous materials be removed from the installation at the end of the work day and stored off installation.
All hazardous materials used by the Contractor on base shall be…